The construction of the Central Pacific Railroad of California was

begun at Sacramento on the 8th of January, 1863. The day the work

started was rainy and calculated to damp the most cheerful of spirits.

There was, however, a brass band, banners, flags, speeches, and a

crowd standing on bundles of hay near the levee to keep its feet dry.

Two wagon-loads of earth were driven up before the platform on which

were gathered the dignitaries present, and Stanford, then governor

of California, seized a shovel and deposited the first earth for the

embankment. The enthusiastic Charles Crocker promptly called for nine

cheers. The sun smiled brightly, and everybody, for the moment at

least, felt happy that after so many years of dreaming, they now saw

with their own eyes the actual commencement of a Pacific railroad.[94]

It was fortunate that Mr. Crocker was enthusiastic, for the

difficulties which the Central Pacific had to overcome were serious.

The chief difficulties were as follows:

_Gradients._ Some reference has been made in the previous chapter to

the elevations which the Central Pacific had to surmount. The highest

point which the company had to reach was Summit Station, 105 miles from

Sacramento, at an altitude of 7,042 feet. Since Sacramento lay only 56

feet above sea level, to reach this point required an ascent of 6,986

feet in a distance of 105 miles, more or less, according as the route

chosen was longer or shorter. The company’s engineer said in 1864 that

if it had been possible to maintain a continuous ascending grade, the

maximum grade, from the foothills to the summit of the Sierras could

have been reduced to 80 feet per mile.

In the attempt to approach this ideal condition the Central Pacific

surveyed and resurveyed continuously until its rails were actually on

the ground. Barometrical reconnaissances were made in 1862 and 1863 on

lines via Downieville and Yuba Gap, and via Oroville and Beckwourth’s

Pass, in addition to the surveys via Georgetown, Dutch Flat, and

Henness Pass, to which earlier reference has been made (page 20).[95]

Location surveys reached Alta in 1863, the state line in 1866, and

Ogden in 1868.[96] After Mr. Judah’s death almost an entire relocation

of the line from the 31st to the 48th section was made in 1864 in

order to avoid tunneling, and to reduce cost,[97] and still later

it was found desirable to shift the whole route between Dutch Flat

and Emigrant Gap from the Bear River side of the ridge, up which the

Central Pacific was proceeding, to the American River side. This change

avoided some 20 miles of 116-foot grade, together with a great deal of

curvature.[98]

The final result of these various surveys was a line with maximum

grades of 116 feet to the mile. This does not compare unfavorably

with most of the transcontinental routes subsequently built. It is

interesting to observe, however, that the Central Pacific summit is

some 2,000 feet higher than the altitude of Beckwourth’s Pass, and

that the maximum grade of the Western Pacific Railway, built years

afterwards through that pass, is only 52.8 feet to the mile, or one per

cent. Neither Judah nor his immediate successors, therefore, discovered

the best route across the Central Sierras.

[Illustration]

_Temperature._ A second physical difficulty incident to mountain

construction was found in the mountain climate. The summer climate of

the Sierras is delightful, at least at altitudes of about 6,000 to

7,000 feet. At lower elevations the temperature is often uncomfortably

warm. But the winter climate is quite different. As early as August the

nights begin to get cold, the first snows come in November, while in

January the trails become impassable, and the high levels are unvisited

by man until the following year. The official record shows that the

greater part of the mountain construction on the Central Pacific

occurred between July, 1866, and July, 1868.

Mr. Stanford has testified that both the winter of 1866-67 and that of

1867-68 were unusually severe, and his engineers have dwelt in great

detail upon the consequent impediments to their work. Not only did the

frozen earth resist pick and shovel, but there were snow banks from

30 to 100 feet deep. It was necessary to remove this snow to permit

excavation, and to keep clear the space to be occupied by embankments

in order to prevent settling. When the summit was approached tunnels

had to be driven through the snow to the rock face. As the whole

working force could not be employed in the tunnels, the surplus labor,

with all its supplies, was hauled beyond the summit and put to work,

at great expense, in the cañons of the Truckee River. The first snow

sheds were built in the summer of 1867, and in the following years it

was decided to cover all the cuts and points where the road crossed

the paths of the great avalanches beyond the summit. The total length

of sheds and galleries built by the fall of 1869 was 37 miles, and the

cost was $2,000,000.[99]

In addition to the difficulties caused by snow, it must be remembered

that the frozen earth, though uncovered, was difficult to work.

Not only was it necessary to blast out material which could have

been cheaply moved at a more favorable time, but, when piled into

embankments, the ground settled in the spring as the frost was leaving,

and required constant attention.[100]

All the various obstacles raised by climate would have been minimized

if construction had proceeded more slowly. Indeed, Mr. Hood and Mr.

Strobridge, engineers in charge of construction, agreed that if the

Central Pacific had been built at less speed, and as such railways are

usually constructed, the expense would have been from 70 to 75 per

cent less than the actual cost. The saving would not have been due

altogether to the abandonment of winter construction, but this would

have been an important factor. The Central Pacific, however, preferred

speed to economy, in the hope of outstripping the Union Pacific in the

race for the business of Nevada, and for the subsidies and land grants

offered by Congress.

_Supplies._ A further obstacle in the way of successful construction

of the Central Pacific lay in the difficulty of getting supplies. Wood

and stone could be procured in the mountains, but iron, coal, and

manufactured articles of all sorts, including rails, locomotives, and

cars, were brought from Sacramento or from the East. Prices in general

were high, in part because of the war. The first ten locomotives

purchased by the Central Pacific Railway cost upwards of $191,000; the

second ten upwards of $215,000. Iron rails cost $91.70 per ton at the

mills. The price of powder increased from $2.25 to $6 during the period

of construction. The cost of food was exorbitant. Hay was worth $100 a

ton out upon the line, and oats about 14 or 15 cents a pound. Stanford

says he sold one potato for $2.50.[101]

In the cases cited, high cost of transportation often played an

important part in determining the final prices, and in general,

indeed, the expense of moving supplies was comparable with the initial

cost. Among many possible illustrations one may mention the fact that

shipments of rails via the Isthmus of Panama as late as 1868 cost, for

transportation alone, $51.97 per ton, making the total cost of the rail

delivered at Sacramento, $143.67, not including charges for transfer

from ships at San Francisco, nor for transportation up the Sacramento

River. Nor was this freight rate high when compared with the cost of

wagon hauls in the mountains, when material had to be transported away

from the finished track. Mr. Huntington tells of meeting some teams

with ties in the Wahsatch Mountains. He continues:

They had seven ties on that wagon. I asked where they were hauled

from, and they said from a certain canon. They said it took three days

to get a load up to the top of the Wahsatch Mountains and to get back

to their work. I asked them what they had a day for their teams, and

they said $10. This would make the cost of each tie more than $6. I

passed back that way in the night in January, and I saw a large fire

burning near the Wahsatch summit, and I stopped to look at it. They

had, I think, some twenty to twenty-five ties burning. They said it

was so fearfully cold they could not stand it without having a fire to

warm themselves.

Fortunately for the company, the cost of labor on the Central Pacific

and transcontinental lines does not seem to have been excessive. The

total number of men employed ranged from 1,200 in 1864, to 14,000 or

14,500 in 1867, when construction was at its height. White men, of whom

there were some 2,500 or 3,000 in 1867, received $35 a month and board

as common laborers, and from $3 to $5 a day as skilled mechanics. Most

of the track laborers, however, were Chinamen, who were paid $35 a

month, and boarded themselves.[102] These Chinamen proved reliable and

willing workers, and, because of his experience with them, it was with

distinct reluctance that Mr. Stanford in later years allied himself

with the friends of Chinese exclusion.[103]

Letting of Construction Contracts

Such obstacles as these made the task upon which the

Huntington-Stanford group had entered a formidable one indeed. Just how

the difficulties should be met, Mr. Huntington himself did not know.

Arrangements were first made with small contractors for the building of

stretches of road from Sacramento towards Newcastle. Charles Crocker

resigned his directorship in 1862 and took the first contract for 18

miles. Then Cyrus Collins and Brothers got a contract which they did

not complete, and other contracts were let to Turton, Knox and Ryan, C.

D. Bates, and S. D. Smith. Mr. Crocker says the people raised a hue and

cry saying that he was a favored contractor, so that the directors told

him that he could not have more than two miles of the road between the

18th and 30th sections.[104] He adds that the independent contractors

got to bidding against each other for laborers, and thus put up the

price. Huntington was told that the smaller contractors quarreled with

each other, and tried to “scoop” labor from each other;[105] while

Mr. Stanford says that the small contractors did not finish their

sections in consecutive order, that they did not hurry, and could not

be sufficiently controlled.[106]

At any rate, after the completion of section 29, no more contracts

were let to anyone except Charles Crocker and Company. According

to the associates, it was not so much a question of price as one

of organization and control. This may be true, or it may be that

the associates finally decided that it would be easier to make a

satisfactory profit out of government subsidies by doing the building

themselves, than by beating down subcontractors to the lowest possible

contract price. It should be noticed that the change in policy referred

to did not take place until 1864, when the federal Act of 1862 had been

passed and that of 1864 was imminent, and that the Central Pacific did

not select any single contractor, but gave all its work to Charles

Crocker, one of the original associates.

Contracts with Crocker

The first contract with Charles Crocker, covering sections 1 to 18,

provided for a lump sum payment of $400,000, of which $250,000 was to

be in cash, $100,000 in bonds of the company, and $50,000 in capital

stock. This was also the type of contract made with other contractors

up to section 30, although the amounts paid varied. At least one bill

for extras was allowed Mr. Crocker. Sections 30 and 31 were built by

Crocker, and after these were completed he was permitted to continue

without a written contract.

In June, 1865, Mr. Hopkins made a report to the president and directors

of the Central Pacific upon the general subject of contracts. In this

report Hopkins dwelt upon the necessity of rapid construction for the

purpose of capturing the passenger traffic between Sacramento and

Virginia City; and also in order to comply with the acts of Congress

and the state legislature, which required rapid construction of the

road. Persons of large capital, he said, seemed unwilling to bind

themselves to construct the road as rapidly as necessary. Charles

Crocker and Company, on the other hand, had pushed and were pushing

the work with extraordinary vigor and success, and had in all cases

complied with the orders and directions of the officers of the company.

He recommended, therefore, that arrangements be continued with that

firm, at rates specified in an accompanying resolution.[107] The

directors thereupon adopted this report, and resolved as follows:

_Resolved and ordered_ that Charles Crocker and Company be allowed

and paid for all work done and material furnished, or which may

hereafter be done and furnished, until the further order of the Board

of Directors, in the construction of the railroad of the Company, from

section 43 eastward, subject to and in accordance with the terms,

conditions and stipulations set forth in the contract with said

Charles Crocker and Company, dated September 19, 1863, except so far

as the same are modified or changed by this order, at the following

rates and prices, and in accordance with the following classification,

to-wit:

[Here are inserted the rates for clearing and grubbing, and excavation

in various kinds of rock, etc.]

The payments to be made monthly, according to the monthly estimates,

five-eighths thereof in gold coin, and the remaining three-eighths

in the capital stock of the Company, at the rate of two dollars of

capital stock for each one dollar of said three-eighths of said

estimate, with the privilege of paying said three-eighths in gold coin

in lieu of said stock, at the election of said Company, to be made at

the time of such payment.

[Illustration: Summit Valley. Altitude 6,960 feet. Emigrant Mountain

and Railroad Pass in the distance]

Payments in Cash and Stock

The essence of this arrangement was that Mr. Crocker was to go ahead

indefinitely and that he was to be paid not a given sum per mile,

but at a given rate of so much per unit for each class of work which

he might find it necessary to do. Payments were to be made in cash,

and also up to a certain per cent in stock, taken at a valuation of

50 cents on the dollar. Under date of April 16, 1866, Mr. Crocker

requested that stock be given him at a valuation of 30 cents on the

dollar, instead of 50 cents, and this was agreed to.[108]

The change from a 50-cent to a 30-cent valuation was made ostensibly

because Crocker and Company could not realize more than 30 cents on the

stock which they were receiving. As a matter of fact, Crocker could

not sell Central Pacific stock at any price, so that the alteration

of the contract merely increased his chance for a speculative gain,

to be realized after construction should have been completed. Mr.

Stanford has said that the directors did not care very much what the

prices were, so long as the work was done. Under the contract, the

Central Pacific Railroad itself, through Mr. Huntington, purchased

locomotives and cars for Crocker and Company, and charged for them at

cost.[109] Bonds were also sent from San Francisco to Huntington, but

it was Huntington’s impression that they were sold for the company,

not for the contractors. In any case, Huntington rendered an account

every month of what he had done, and Hopkins settled with the company

or with the contractors, as the case might be.[110] Describing the

situation at a later date, Crocker said, “It was decided that I should

go on immediately and see what I could do. I did go on until we got

tied up in suits and I had to stop. I could not get any money. They had

all the money I had, and all I could borrow. That was the time that I

would have been very glad to take a clean shirt, lose all I had, and

quit.”

The total payments made to Charles Crocker or to Charles Crocker

and Company, under the various arrangements just described, were as

follows:[111]

TOTAL AMOUNT PAID CHARLES CROCKER AND COMPANY ON HIS CONTRACT AND FOR

EXTRA WORK

Cash, or its equivalent, including material furnished

him $8,853,117.93

Bonds, taken at par 100,000.00

Stock, taken at 50 cents on the dollar 2,696,200.00

Stock, taken at 30 cents on the dollar 11,947,530.00

Stock, taken at par value 57,980.22

——————————————

Total $23,654,828.15

══════════════

If we take the cash payments at par and the bonds at 75, this would

make the tidy sum of $69,210 per mile on 129 miles. When we bear in

mind that Crocker accepted the contract for the first 18 miles out of

Sacramento at a price including a cash payment of only $13,800 per

mile, and that the arrangements with the small contractors who followed

him were distinctly less favorable, it is possible to say with some

confidence that the profits on the Crocker contracts were considerable.

Whatever they were, Mr. Crocker shared them with his associates by

depositing at a later date $14,000,000 in Central Pacific stock in the

treasury of the Contract and Finance Company, (discussed in the next

section) for the benefit of the stockholders of that organization.

Inasmuch as Stanford was one of the principal stockholders in the

Contract and Finance Company, his later categorical denial before the

United States Pacific Railway Commission that he had participated in

the profits of the Crocker contracts makes interesting reading.[112]

“Contract and Finance Company”

When the Central Pacific approached the state line of California in

the latter part of 1867, the associates told Mr. Crocker that they did

not think it best for him to go any further. They said they wanted

more capital—they wanted to engage heavy men in the enterprise.[113]

Crocker had not been successful in persuading capitalists to go in

with him, while it was believed that investors were deterred from

taking stock in the Central Pacific by reason of the liability which

would be thereby incurred under California law. Either Huntington or

Stanford—both claim the credit—conceived the idea that there would be

an advantage in organizing a corporation to undertake the construction

work. The subject was mentioned on the occasion of one of Huntington’s

visits to California, although the company was formed while Huntington

was in the East.[114] The name finally decided upon for the new

corporation was that of “Contract and Finance Company.” Articles of

association were filed in October, 1867. W. E. Brown, Theodore J.

Milliken, and B. R. Crocker attended to the details. Milliken was a

merchant in Sacramento, and the other two were connected with the

Central Pacific.

According to its articles of incorporation, the Contract and Finance

Company was formed for the purpose of engaging in and carrying on

the business of constructing, purchasing, leasing, selling, holding,

maintaining, operating, and repairing railroads, wagon and transit

roads, steamboats, vessels, telegraph lines, and rolling stock of

railroads; the purchasing, holding, hypothecating, and selling of bonds

and stocks issued by railroad and other companies or corporations;

the purchasing and using of iron and other materials for railroad and

telegraph lines; the borrowing and loaning of money; the conducting of

an express and stage business, and any and all other kinds of business

connected with or pertaining to railroads and telegraph lines; the

transportation of persons and property, on land and water; and the

purchasing, holding, leasing, and selling of real estate of all kinds.

The capital stock was set at $5,000,000.

Failure to Attract Outside Capital

It is the unanimous testimony of the associates that the real and

only reason for forming the Contract and Finance Company was that

outside capital might be induced to come in. Huntington says that when

the company was organized, he went with new energy to capitalists in

the East to induce them to take a share in the risks and profits of

construction. Yet from the point of view of attracting outside capital,

the Contract and Finance Company was a complete failure. William

and Commodore Garrison, of New York, A. A. Selover, Moses Taylor,

and William E. Dodge, among others, considered the matter, but all

concluded that the risk was too great. In California, Stanford applied

to D. O. Mills, W. C. Ralston, Haggin and Tevis, Michael Reese—in

short, to everybody whom he thought he might possibly induce to take

an interest—but in vain.[115] The result of the failure to secure

outside subscriptions to the Contract and Finance Company was that the

associates had to take up the stock of that company themselves. Crocker

was made president at an early date, and apparently took the bulk of

the stock in the first instance. Then, when it was evident that no

outside investors would come in, he put the stock back, and Stanford,

Hopkins, Huntington, and E. B. Crocker took equal shares with him—each

subscribing for 10,000 shares out of the 50,000 outstanding.[116] Later

a little stock was disposed of to outsiders, but when the Contract and

Finance Company got into the courts the associates bought this back.

Throughout the whole life of the Contract and Finance Company the

stockholders were the same men who held the bulk of the stock of the

Central Pacific Railroad. Contracts between the finance company and the

railroad company were therefore made by the associates in one capacity,

with themselves in another capacity, a situation unfortunately not

unique in the history of American railroad building. An unusual

feature of the arrangement, however, which was common to arrangements

with other construction companies formed by the associates, was that

the funds of the Contract and Finance Company, over and above the

sums received from the Central Pacific, were derived from loans to

the company by its stockholders and not from payments on the stock

subscribed. There is no evidence that Hopkins, Stanford, Huntington,

or either of the Crockers paid a cent in cash on their subscriptions.

Instead, they gave their notes. To provide the Contract and Finance

Company with funds, they deposited money, sometimes more and sometimes

less, paying interest on their notes, and receiving credit for interest

on their balances, each partner as a rule putting in all the funds

which he could spare, and having an individual account kept of his

transactions. The Contract and Finance Company was, therefore, always

heavily in debt, although the debt was owed to its own stockholders.

The advantages of this arrangement would seem to be two: first, that

it concealed effectively the profits which the company was making; and

second, that it did not limit any stockholder to a proportionate share

in the burdens and gains of the undertaking. If any of the associates

desired to participate more heavily than his friends, or less heavily,

he could do so. Such a privilege was probably not important before

1869, but it became so later.

Contracts with Construction Company

A word may now be said about the contracts which the Contract and

Finance Company secured. Under date of December 3, 1867, Mr. Stanford,

as president of the Central Pacific, reported to his directors that he

had made a contract for the construction and equipment of the railway

and telegraph line of the company lying east of the eastern boundary

of the line of California, and presented a draft of the contract,

which the directors approved.[117] Leland Stanford, E. B. Crocker,

Mark Hopkins, and E. H. Miller, Jr., were present and voted. Mr.

Miller explains that he did not understand at the time who the owners

of the Contract and Finance Company were, and that nothing was said

about it at the meeting. The contract provided that the Contract and

Finance Company should build the road of the Central Pacific from the

state line, eastward, 552 miles. It was to grade the road, build the

bridges, lay the track, build and complete a telegraph line, furnish

telegraph offices and instruments, furnish rails, ties, buildings,

roundhouses, turntables, and a specified number of engines and cars

and running material per mile. On its part, the Central Pacific agreed

to pay $86,000 per mile, half in cash and half in Central Pacific

stock, and in practice the Central Pacific provided the equipment

and the iron, charging them to the Contract and Finance Company at

cost. This statement relative to the terms of the contract with the

construction company is made on the strength of the recollections of

parties interested,[118] for the actual contract is one of the missing

documents characteristic of Central Pacific history. Stanford describes

the contract as an exhaustive one. That is to say, the Central Pacific

turned over all it had and the Contract and Finance Company built the

road and got the profits, if there were any.

The apparent advantages of an arrangement with a construction company

as compared with those of construction by the Central Pacific itself,

were those connected with specialization of the work. A company which

does nothing but construction and which does that all the time, may be

expected to have a force more highly trained in this particular grade

of work, and a more abundant supply of tools and material than an

organization which builds railroads only occasionally. The unfortunate

necessity of hiring men for each new job and discharging them at the

completion of the job is avoided. In the case of the Central Pacific

this advantage was somewhat illusory, it is true, for the reason that

the Contract and Finance Company on its first contract, whatever might

have been the fact later, could scarcely have had an advantage over the

railroad; and as for tools, the Contract and Finance Company had no

machine tools at all at the beginning, and had to rely on the railroad

not only for cars and engines to transport its men, but for equipment

for large construction of any sort. The real reason for using a

construction company in this case was a financial and not an operating

one.

Profits of Construction

Much has been said about the profits of the Contract and Finance

Company. Here, again, books are missing, having been packed into boxes

by the industrious Mark Hopkins in 1873, and never again produced.[119]

A man named John Miller, one-time secretary of the Contract and

Finance Company, and defaulter to the alleged extent of $900,000 at

a subsequent period, was in possession of transcripts from these

books, if we may believe his statement; but even these transcripts

disappeared, if indeed they ever existed.[120] We do not know,

therefore, how much construction cost the Contract and Finance Company,

and we cannot calculate with any accuracy the profit obtained.

It does appear that the work done by the Contract and Finance Company

cost the Central Pacific, in all $23,736,000 in cash and the same

amount in capital stock.[121] If we add to this $100,000 in cash

and $2,900,000 in bonds paid to the Union Pacific for the stretch

of land from Promontory Point to a point five miles west of Ogden,

and $1,072,874.79 for snowsheds and other extra work performed in

1870, we have a total of $51,544,874.79, of which $24,908,874.79 was

in cash. Taken in connection with the Crocker contracts, this makes

an aggregate of $33,761,992.72 in cash, $3,000,000 in bonds, and

$38,437,710.22 in stock. It was the judgment of the United States

Pacific Railway Commission that the total cost of building the 690

miles from Sacramento to Promontory Point, and of purchasing from

the Union Pacific 47½ miles of road from Promontory Point to the end

of the Central Pacific line, 5 miles west of Ogden, did not exceed

$36,000,000, and this included 9 miles built by small contractors, the

payment for which is not included in the figures just given.[122]

[Illustration: Summit tunnel (altitude 7,042 feet) before

completion—Sierra Nevada Mountains]

In a word, if the conclusions of the United States Pacific Railway

Commission are to be relied upon, and they were made by engineers

relatively soon after the completion of the road, the builders of

the Central Pacific were able to accomplish their contracts with the

cash and the proceeds of the company’s bonds that were turned over to

them, and to retain their Central Pacific stock as a clear profit. If

we compare this stock surplus with the probable cash investment in

the road, taking the shares at any reasonable valuation, say at $15

or $20 per share, the profit does not seem excessive. If we compare

it with the contributions of the associates, however, and this is the

more reasonable because the associates received the full benefit of

the difference between cost and receipts, it represents, on the most

conservative calculation, 500 or 600 per cent for an investment which

probably did not exceed $1,000,000, over a period of six years. To

this should be added the proceeds of the land grant and of the local

subsidies.

The federal government seems in these matters to have assumed the

major portion of the risk, and the associates seem to have derived

the profits. Nor is this point of view vitiated by the fact that the

federal government was ultimately repaid its loan in full, for the

reason that the repayment was not at the expense of the associates, but

was made possible by a credit arising out of the earnings of the road,

and represented merely a shifting of the burden of the debt due the

federal authorities to the communities along the line.

Besides the completion of the main line of the Central Pacific, the

Contract and Finance Company built a portion of the California and

Oregon Railroad, part of the Western Pacific, and the entire San

Joaquin Valley branch of the Central Pacific from Lathrop to Goshen.

The arrangements between the Contract and Finance Company and Central

Pacific for this work varied, but substantial additional profits were

secured. In 1874, the Contract and Finance Company was dissolved.

There is some dispute as to whether its assets were divided into

four or five parts, but both Stanford and Crocker have testified that

their dividend consisted of approximately $13,000,000 in Central

Pacific stock, at par.[123] At the same time the stockholders of

the construction company assumed its debts, amounting to perhaps

$1,600,000.[124]