We have now to describe briefly another great undertaking, begun by

George Stephenson, and taken up and completed by his son, in the course

of which the latter carried out some of his greatest works--we mean the

Chester and Holyhead Railway, completing the railway connection with

Dublin, as the Newcastle and Berwick line completed the connection with

Edinburg. It will thus be seen how closely Telford was followed by the

Stephensons in perfecting the highways of their respective epochs; the

former by means of turnpike roads, and the latter by means of railways.

George Stephenson surveyed a line from Chester to Holyhead in 1838,

and at the same time reported on the line through North Wales to Port

Dynallen, as proposed by the Irish Railway Commissioners. His advice

was strongly in favor of adopting the line to Holyhead, as less costly

and presenting better gradients. A public meeting was held at Chester

in January, 1839, in support of the latter measure, at which he was

present to give explanations. Mr. Uniacke, the mayor, in opening the

proceedings, observed that it clearly appeared that the rival line

through Shrewsbury was quite impracticable. Mr. Stephenson, he added,

was present in the room, ready to answer any questions which might be

put to him on the subject; and "it would be better that he should be

asked questions than required to make a speech; for, though a very good

engineer, he was a bad speaker."

One of the questions then put to Mr. Stephenson related to the mode

by which he proposed to haul the passenger-carriages over the Menai

Suspension Bridge by horse-power; and he was asked whether he knew the

pressure the bridge was capable of sustaining. His answer was that

"he had not yet made any calculations, but he proposed getting data

which would enable him to arrive at an accurate calculation of the

actual strain upon the bridge during the late gale. He had, however,

no hesitation in saying that it was more than twenty times as much

as the strain of a train of carriages and a locomotive engine. The

only reason why he proposed to convey the carriages over by horses was

in order that he might, by distributing the weight, not increase the

wavy motion. All the train would be on at once, but distributed. This

he thought better than passing them linked together, by a locomotive

engine." It will thus be observed that the practicability of throwing a

rigid railroad bridge across the Straits had not yet been completed.

The Dublin Chamber of Commerce passed resolutions in favor of

Stephenson's line after hearing his explanations of its essential

features. The project, after undergoing much discussion, was at length

embodied in an act passed in 1844, and the work was brought to a

successful completion by his son, with several important modifications,

including the grand original feature of the tubular bridges across the

Menai Straits and the estuary of the Conway. Excepting these great

works, the construction of this line presented no unusual features,

though the remarkable terrace cut for the accommodation of the railway

under the steep slope of Penmaen Mawr is worthy of a passing notice.

About midway between Conway and Bangor, Penmaen Mawr forms a bold and

almost precipitous headland, at the base of which, in rough weather,

the ocean dashes with great fury. There was not space enough between

the mountain and the strand for the passage of the railway; hence in

some places the rock had to be blasted to form a terrace, and in others

sea walls had to be built up to the proper level, on which to form an

embankment of sufficient width to enable the road to be laid. A tunnel

of 10-1/2 chains in length was cut through the headland itself; and

on its east and west sides the line was formed by a terrace cut out

of the cliff, and by embankments protected by sea walls, the terrace

being three times interrupted by embankments in its course of about a

mile and a quarter. The road lies so close under the steep mountain

face that it was even found necessary at certain places to protect it

against possible accidents from falling stones, by means of a covered

way. The terrace on the east side of the headland was, however, in some

measure, protected against the roll of the sea by the mass of stone run

out from the tunnel, which formed a deep shingle-bank in front of the

wall.

[Illustration: PENMAEN MAWR. [By Percival Skelton, after his original

Drawing.]]

The part of the work which lies to the westward of the headland

penetrated by the tunnel was exposed to the full force of the sea,

and the formation of the road at that point was attended with great

difficulty. While the sea wall was still in progress, its strength was

severely tried by a strong northwesterly gale which blew in October,

1846, accompanied with a spring tide of 17 feet. On the following

morning it was found that a large portion of the rubble was irreparably

injured, and 200 yards of the wall were then replaced by an open

viaduct, with the piers placed edgeways to the sea, the openings

between them being spanned by ten cast-iron girders 42 feet long. This

accident farther induced the engineer to alter the contour of the sea

wall, so that it should present a diminished resistance to the force

of the waves.

But the sea repeated its assaults, and made farther havoc with the

work, entailing heavy expenses and a complete reorganization of the

contract. Increased solidity was then given to the masonry, and the

face of the wall underwent farther change. At some points outworks were

constructed, and piles were driven into the beach about 15 feet from

the base of the wall for the purpose of protecting its foundations and

breaking the force of the waves. The work was at length finished after

about three years' anxious labor; but Mr. Stephenson confessed that if

a long tunnel had been made in the first instance through the solid

rock of Penmaen Mawr, a saving of from £25,000 to £30,000 would have

been effected. He also said he had arrived at the conclusion that in

railway works engineers should endeavor as far as possible to avoid the

necessity of contending with the sea;[89] but if he were ever again

compelled to go within its reach, he would adopt, instead of retaining

walls, an open viaduct, placing all the piers edgeways to the force

of the sea, and allowing the waves to break upon a natural slope of

beach. He was ready enough to admit the errors he had committed in the

original design of this work; but he said he had always gained more

information from studying the causes of failures and endeavoring to

surmount them, than he had done from easily-won successes. While many

of the latter had been forgotten, the former were indelibly fixed in

his memory.

But by far the greatest difficulty which Robert Stephenson had to

encounter in executing this railway was in carrying it across the

Straits of Menai and the estuary of the Conway, where, like his

predecessor Telford, when forming his high road through North Wales,

he was under the necessity of resorting to new and altogether untried

methods of bridge construction. At Menai, the waters of the Irish Sea

are perpetually vibrating along the precipitous shores of the Strait,

rising and falling from 20 to 25 feet at each successive tide, the

width and depth of the channel being such as to render it available

for navigation by the largest ships. The problem was to throw a bridge

across this wide chasm--a bridge of unusual span and dimensions--of

such strength as to be capable of bearing the heaviest loads at high

speeds, and of such a uniform height throughout as not in any way to

interfere with the navigation of the Strait. From an early period Mr.

Stephenson had fixed upon the spot where the Britannia Rock occurs,

nearly in the middle of the channel, as the most eligible point for

crossing, the water width from shore to shore at high water being there

about 1100 feet.

[Illustration: MAP OF MENAI STRAIT; BRITANNIA BRIDGE]

The engineer's first idea was to construct the bridge of two cast-iron

arches of 350 feet span each. There was no novelty in this idea; for,

as early as the year 1801, Mr. Rennie prepared a design of a cast-iron

bridge across the Strait at the Swilly Rocks, the great centre arch of

which was to be 450 feet span; and at a later period, in 1810, Telford

submitted a design of a similar bridge at Inys-y-Moch, with a single

cast-iron arch of 500 feet. But the same objections which led to the

rejection of Rennie's and Telford's designs proved fatal to Robert

Stephenson's, and his iron-arched railway bridge was rejected by the

Admiralty. The navigation of the Strait was under no circumstances to

be interfered with; and even the erection of scaffolding from below,

to support the bridge during construction, was not to be permitted.

The idea of a suspension bridge was dismissed as inapplicable, a

degree of rigidity and strength greater than could be secured by any

bridge erected on the principle of suspension being considered an

indispensable condition of the proposed structure.

Mr. Stephenson next considered the expediency of erecting a bridge by

means of suspended centering, after the ingenious method proposed by

Telford in 1810,[90] by which the arching was to be carried out by

placing equal and corresponding voussoirs on opposite sides of the pier

at the same time, tying them together by horizontal tie-bolts. The

arching, thus extended outward from each pier and held in equilibrium,

would have been connected at the crown with the extremity of the arch

advanced in like manner from the adjoining pier. It was, however, found

that this method of construction was not applicable at the crossing

of the Conway, and it was eventually abandoned. Various other plans

were suggested; but the whole question remained unsettled even down to

the time when the company went before Parliament in 1844 for power to

construct the proposed bridges. No existing kind of structure seemed

to be capable of bearing the severe extension to which rigid bridges

of the necessary spans would be subjected, and some new expedient of

engineering therefore became necessary.

Mr. Stephenson was then led to reconsider a design which he had made

in 1841 for a road bridge over the River Lea at Ware, with a span of

50 feet, the conditions only admitting of a platform 18 or 20 inches

thick. For this purpose a wrought-iron platform was devised, consisting

of a series of simple cells, formed of boiler-plates riveted together

with angle-iron. The bridge was not, however, carried out after this

design, but was made of separate wrought-iron girders composed of

riveted plates.[91] Recurring to his first idea of this bridge, the

engineer thought that a stiff platform might be constructed, with

sides of strongly-trussed frame-work of wrought iron, braced together

at top and bottom with plates of like material riveted together with

angle-iron, after a method adopted by Mr. Rendel in stiffening the

suspension bridge at Montrose with wooden trellis-work a few years

before; and that such platform might be suspended by strong chains

on either side to give it increased security. "It was now," says Mr.

Stephenson, "that I came to regard the tubular platform as a beam, and

that the chains should be looked upon as auxiliaries." It appeared to

him, nevertheless, that without a system of diagonal struts inside,

which of course would have prevented the passage of trains _through_

it, this kind of structure was ill suited for maintaining its form, and

would be very liable to become lozenge-shaped. Besides, the rectangular

figure was deemed objectionable, from the large surface which it

presented to the wind.

It then occurred to him that circular or elliptical tubes might better

answer the intended purpose; and in March, 1845, he gave instructions

to two of his assistants to prepare drawings of such a structure, the

tubes being made with a double thickness of plate at top and bottom.

The results of the calculations made as to the strength of such a tube

were considered so satisfactory, that Mr. Stephenson says he determined

to fall back upon a bridge of this description on the rejection of his

design of the two cast-iron arches by the Parliamentary Committee.

Indeed, it became evident that a tubular wrought-iron beam was the only

structure which combined the necessary strength and stability for a

railway, with the conditions deemed essential for the protection of the

navigation:

"I stood," says Mr. Stephenson, "on the verge of a responsibility

from which, I confess, I had nearly shrunk. The construction of a

tubular beam of such gigantic dimensions, on a platform elevated

and supported by chains at such a height, did at first present

itself as a difficulty of a very formidable nature. Reflection,

however, satisfied me that the principles upon which the idea was

founded were nothing more than an extension of those daily in

use in the profession of the engineer. The method, moreover, of

calculating the strength of the structure which I had adopted was

of the simplest and most elementary character; and whatever might

be the form of the tube, the principle on which the calculations

were founded was equally applicable, and could not fail to lead

to equally accurate results."[92]

Mr. Stephenson accordingly announced to the directors of the railway

that he was prepared to carry out a bridge of this general description,

and they adopted his views, though not without considerable misgivings.

While the engineer's mind was still occupied with the subject, an

accident occurred to the _Prince of Wales_ iron steam-ship, at

Blackwall, which singularly corroborated his views as to the strength

of wrought-iron beams of large dimensions. When this vessel was being

launched, the cleat on the bow gave way in consequence of the bolts

breaking, and let the vessel down so that the bilge came in contact

with the wharf, and she remained suspended between the water and the

wharf for a length of about 110 feet, but without any injury to the

plates of the ship, satisfactorily proving the great strength of this

form of construction. Thus Mr. Stephenson became gradually confirmed

in his opinion that the most feasible method of bridging the strait at

Menai and the river at Conway was by means of a hollow tube of wrought

iron. As the time was approaching for giving evidence before Parliament

on the subject, it was necessary for him to settle some definite plan

for submission to the committee.

"My late revered father," says he, "having always taken a deep

interest in the various proposals which had been considered for

carrying a railway across the Menai Straits, requested me to

explain fully to him the views which led me to suggest the use

of a tube, and also the nature of the calculations I had made in

reference to it. It was during this personal conference that Mr.

William Fairbairn accidentally called upon me, to whom I also

explained the principles of the structure I had proposed. He at

once acquiesced in their truth, and expressed confidence in the

feasibility of my project, giving me at the same time some facts

relative to the remarkable strength of iron steam-ships, and

invited me to his works at Millwall to examine the construction of

an iron steam-ship which was then in progress."[93]

The date of this consultation was early in April, 1845, and Mr.

Fairbairn states that, on that occasion,

"Mr. Stephenson asked whether such a design was practicable, and

whether I could accomplish it; and it was ultimately arranged that

the subject should be investigated experimentally, to determine

not only the value of Mr. Stephenson's original conception (of a

circular or egg-shaped wrought-iron tube, supported by chains),

but that of any other tubular form of bridge which might present

itself in the prosecution of my researches. The matter was placed

unreservedly in my hands; the entire conduct of the investigation

was intrusted to me; and, as an experimenter, I was to be left free

to exercise my own discretion in the investigation of whatever

forms or conditions of the structure might appear to me best

calculated to secure a safe passage across the Straits."[94]

Mr. Fairbairn then proceeded to construct a number of experimental

models, for the purpose of testing the strength of tubes of different

forms. The short period which elapsed, however, before the bill was

in committee, did not admit of much progress being made with those

experiments; but from the evidence in chief given by Mr. Stephenson

on the subject on the 5th of May following, it appears that the idea

which prevailed in his mind was that of a bridge with openings of

450 feet (afterward increased to 460 feet), with a roadway formed of

a hollow wrought-iron beam about 25 feet in diameter, presenting a

rigid platform suspended by chains. At the same time, he expressed the

confident opinion that a tube of wrought iron would possess sufficient

strength and rigidity to support a railway train running inside of it

without the help of the chains.

While the bill was still in progress, Mr. Fairbairn proceeded with

his experiments. He first tested tubes of a cylindrical form, in

consequence of the favorable opinion entertained by Mr. Stephenson

of tubes in that shape, extending them subsequently to those of an

elliptical form.[95] He found tubes thus shaped more or less defective,

and proceeded to test those of a rectangular kind. After the bill had

received the royal assent, on the 30th of June, 1845, the directors

of the company, with great liberality, voted a sum for the purpose of

enabling the experiments to be prosecuted, and upward of £6000 were

thus expended to make the assurance of their engineer doubly sure.

Mr. Fairbairn's tests were of the most elaborate and eventually

conclusive character, bringing to light many new and important facts

of great practical value. The due proportions and thicknesses of the

top, bottom, and sides of the tubes were arrived at after a vast number

of separate trials, one of the results of the experiments being the

adoption of Mr. Fairbairn's invention of rectangular hollow cells in

the top of the beam for the purpose of giving it the requisite degree

of strength. About the end of August it was thought desirable to obtain

the assistance of a mathematician, who should prepare a formula by

which the strength of a full-sized tube might be calculated from the

results of the experiments made with tubes of smaller dimensions.

Professor Hodgkinson was accordingly called in, and he proceeded to

verify and confirm the experiments which Mr. Fairbairn had made, and

afterward reduced them to the required formulæ, though Mr. Fairbairn

states that they did not appear in time to be of any practical service

in proportioning the parts of the largest tubes.[96]

Mr. Stephenson's time was so much engrossed with his extensive

engineering business that he was in a great measure precluded from

devoting himself to the consideration of the practical details, which

he felt were safe in the hands of Mr. Fairbairn--"a gentleman," as he

stated to the Committee of the Commons, "whose experience was greater

than that of any other man in England." The results of the experiments

were communicated to him from time to time, and were regarded by him

as exceedingly satisfactory. It would appear, however, that while Mr.

Fairbairn urged the sufficient rigidity and strength of the tubes

without the aid of chains, Mr. Stephenson had not quite made up his

mind upon the point. Mr. Hodgkinson, also, was strongly inclined to

retain them.[97] Mr. Fairbairn held that it was quite practicable

to make the tubes "sufficiently strong to sustain not only their own

weight, but, in addition to that load, 2000 tons equally distributed

over the surface of the platform--a load ten times greater than they

will ever be called upon to support."

It was thoroughly characteristic of Mr. Stephenson, and of the

caution with which he proceeded in every step of this great

undertaking--probing every inch of the ground before he set his foot

down upon it--that he should, early in 1846, have appointed his able

assistant, Mr. Edwin Clark, to scrutinize carefully the results of

every experiment, whether made by Mr. Fairbairn or Mr. Hodgkinson,

and subject them to a separate and independent analysis before

finally deciding upon the form or dimensions of the structure, or

upon any mode of procedure connected with it. That great progress

had been made by the two chief experimenters before the end of 1846

appears from the papers on the subject read by Messrs. Fairbairn and

Hodgkinson before the British Association at Southampton in September

of that year. In the course of the following month Mr. Stephenson had

become satisfied that the use of auxiliary chains was unnecessary,

and that the tubular bridge might be made of such strength as to be

entirely self-supporting.[98] While these important discussions

were in progress, measures were taken to proceed with the masonry

of the bridges simultaneously at Conway and the Menai Strait. The

foundation-stone of the Britannia Bridge was laid by Mr. Frank Forster,

the resident engineer, on the 10th of April, 1846; and on the 12th

of May following that of the Conway Bridge was laid by Mr. A. M.

Ross, resident engineer at that part of the works. Suitable platforms

and workshops were also erected for proceeding with the punching,

fitting, and riveting of the tubes; and when these operations were in

full progress, the neighborhood of the Conway and Britannia Bridges

presented scenes of extraordinary bustle and industry. On the 11th of

July, 1847, Mr. Clark informed Mr. Stephenson that "the masonry gets on

rapidly. The abutments on the Anglesea side resemble the foundations

of a great city rather than of a single structure, and nothing appears

to stand still here." About 1500 men were employed on the Britannia

Bridge alone, and they mostly lived upon the ground in wooden cottages

erected for the occasion. The iron plates were brought in ship-loads

from Liverpool, Anglesea marble from Penmon, and red sandstone from

Runcorn, in Cheshire, as wind and tide, and shipping and convenience,

might determine. There was an unremitting clank of hammers, grinding

of machinery, and blasting of rock going on from morning to night. In

fitting the Britannia tubes together not less than 2,000,000 of bolts

were riveted, weighing some 900 tons.

The Britannia Bridge consists of two independent continuous tubular

beams, each 1511 feet in length, and each weighing 4680 tons,

independent of the cast-iron frames inserted at their bearings on

the masonry of the towers. These immense beams are supported at five

places, namely, on the abutments and on three towers, the central of

which is known as the Great Britannia Tower, 230 feet high, built on a

rock in the middle of the Strait. The side towers are 18 feet less in

height than the central one, and the abutments 35 feet lower than the

side towers. The design of the masonry is such as to accord with the

form of the tubes, being somewhat of an Egyptian character, massive and

gigantic rather than beautiful, but bearing the unmistakable impress of

power.

The bridge has four spans--two of 460 feet over the water, and two of

230 feet over the land. The weight of the longer spans, at the points

where the tubes repose on the masonry, is not less than 1587 tons.

On the centre tower the tubes lie solid; but on the land towers and

abutments they lie on roller-beds, so as to allow of expansion and

contraction. The road within each tube is 15 feet wide, and the height

varies from 23 feet at the ends to 30 feet at the centre. To give an

idea of the vast size of the tubes by comparison with other structures,

it may be mentioned that each length constituting the main spans is

twice as long as London Monument is high; and if it could be set on end

in St. Paul's Church-yard, it would reach nearly 100 feet above the

cross.

[Illustration: CONSTRUCTION OF THE MAIN BRITANNIA TUBE ON THE STAGING.]

The Conway Bridge is, in most respects, similar to the Britannia,

consisting of two tubes of 400 feet span, placed side by side, each

weighing 1180 tons. The principle adopted in the construction of the

tubes, and the mode of floating and raising them, was nearly the same

as at the Britannia Bridge, though the general arrangement of the

plates is in many respects different.

It was determined to construct the shorter outer tubes of the Britannia

Bridge on scaffoldings in the positions in which they were permanently

to remain, and to erect the larger tubes upon wooden platforms at

high-water-mark on the Caernarvon shore, from whence they were to be

floated in pontoons--in like manner as Rennie had floated into their

places the centerings of his Waterloo and other bridges--and then

raised into their proper places by means of hydraulic power, after a

method originally suggested by Mr. Edwin Clark. The tubes of the Conway

Bridge also were to be constructed on shore, and floated to their

places on pontoons, as in the case of the main centre tubes of the

Britannia Bridge.

[Illustration: CONWAY BRIDGE. [By Percival Skelton.]]

The floating of these tubes on pontoons, from the places where they

had been constructed to the recesses in the masonry of the towers, up

which they were to be hoisted to the places they were permanently to

occupy, was an anxious and exciting operation. The first proceeding of

this nature was at Conway, where Mr. Stephenson directed it in person,

assisted by Captain Claxton, Mr. Brunel, and other engineering friends.

On the 6th of March, 1848, the pontoons bearing the first great tube

of the up-line were floated round quietly and majestically into their

place between the towers in about twenty minutes. Unfortunately, one

of the sets of pontoons had become slightly slued by the stream, by

which the Conway end of the tube was prevented from being brought home,

and five anxious days to all concerned intervened before it could be

set in its place. In the mean time, the presses and raising machinery

had been fitted in the towers above, and the lifting process was begun

on the 8th of April, when the immense mass was raised 8 feet, at the

rate of about 2 inches a minute. On the 16th the tube had been raised

and finally lowered into its permanent bed; the rails were laid within

it; and on the 18th Mr. Stephenson passed through with the first

locomotive. The second tube was proceeded with on the removal of the

first from the platform, and was completed and floated in seven months.

The rapidity with which this second tube was constructed was in no

small degree owing to the Jacquard punching-machine, contrived for

the purpose of punching the holes for the rivets by Mr. Roberts, of

Manchester. The tube was finally fixed in its permanent bed on the 2d

of January, 1849.

The floating and fixing of the great Britannia tubes was a still more

formidable enterprise, though the experience gained at Conway rendered

it easy compared with what it otherwise would have been. Mr. Stephenson

superintended the operation of floating the first in person, giving

the arranged signals from the top of the tube on which he was mounted,

the active part of the business being performed by a numerous corps of

sailors, under the immediate direction of Captain Claxton. Thousands of

spectators lined the shores of the Strait on the evening of the 19th of

June, 1849. On the land attachments being cut, the pontoons began to

float off; but one of the capstans having given way from the too great

strain put upon it, the tube was brought home again for the night.

By next morning the defective capstan was restored, and all was in

readiness for another trial. At half past seven in the evening the tube

was afloat, and the pontoons swung out into the current like a monster

pendulum, held steady by the shore guide-lines, but increasing in speed

to almost a fearful extent as they neared their destined place between

the piers.

"The success of this operation," says Mr. Clark, "depended mainly

on properly striking the 'butt' beneath the Anglesey tower, on

which, as upon a centre, the tube was to be veered round into its

position across the opening. This position was determined by a

12-inch line, which was to be paid out to a fixed mark from the

Llanfair capstan. The coils of the rope unfortunately overrode

each other upon this capstan, so that it could not be paid out. In

resisting the motion of the tube, the capstan was bodily dragged

out of the platform by the action of the palls, and the tube was

in imminent danger of being carried away by the stream, or the

pontoons crushed upon the rocks. The men at the capstan were all

knocked down, and some of them thrown into the water, though they

made every exertion to arrest the motion of the capstan-bars. In

this dilemma, Mr. Charles Rolfe, who had charge of the capstan,

with great presence of mind called the visitors on shore to his

assistance; and handing out the spare coil of the 12-inch line

into the field at the back of the capstan, it was carried with

great rapidity up the field, and a crowd of people, men, women,

and children, holding on to this huge cable, arrested the progress

of the tube, which was at length brought safely against the butt

and veered round. The Britannia end was then drawn into the recess

of the masonry by a chain passing through the tower to a crab on

the far side. The violence of the tide abated, though the wind

increased, and the Anglesey end was drawn into its place beneath

the corbeling in the masonry; and as the tide went down, the

pontoons deposited their valuable cargo on the welcome shelf at

each end. The successful issue was greeted by cannon from the

shore and the hearty cheers of many thousands of spectators, whose

sympathy and anxiety were but too clearly indicated by the unbroken

silence with which the whole operation had been accompanied."[99]

By midnight all the pontoons had been got clear of the tube, which now

hung suspended over the waters of the Strait by its two ends, which

rested upon the edges cut in the rock for the purpose at the base of

the Britannia and Anglesey towers respectively, up which the tube had

now to be lifted by hydraulic power to its permanent place near the

summit. The accuracy with which the gigantic beam had been constructed

may be inferred from the fact that, after passing into its place, a

clear space remained between the iron plating and the rock outside of

it of only about three quarters of an inch!

Mr. Stephenson's anxiety was, of course, very great up to the time

of effecting this perilous operation. When he had got the first tube

floated at Conway and saw all safe, he said to Captain Moorsom, "Now I

shall go to bed." But the Britannia Bridge was a still more difficult

enterprise, and cost him many a sleepless night. Afterward describing

his feelings to his friend Mr. Gooch, he said, "It was a most anxious

and harassing time with me. Often at night I would lie tossing about,

seeking sleep in vain. The tubes filled my head. I went to bed with

them and got up with them. In the gray of the morning, when I looked

across the Square,[100] it seemed an immense distance across to the

houses on the opposite side. It was nearly the same length as the span

of my tubular bridge!" When the first tube had been floated, a friend

observed to him, "This great work has made you ten years older." "I

have not slept sound," he replied, "for three weeks." Sir F. Head,

however, relates that, when he revisited the spot on the following

morning, he observed, sitting on a platform overlooking the suspended

tube, a gentleman, reclining entirely by himself, smoking a cigar, and

gazing, as if indolently, at the aerial gallery beneath him. It was

the engineer himself, contemplating his newborn child. He had strolled

down from the neighboring village, after his first sound and refreshing

sleep for weeks, to behold in sunshine and solitude that which, during

a weary period of gestation, had been either mysteriously moving in

his brain, or, like a vision--sometimes of good omen and sometimes of

evil--had, by night as well as by day, been flitting across his mind.

The next process was the lifting of the tube into its place, which

was performed very deliberately and cautiously. It was raised by

powerful hydraulic presses, only a few feet at a time, and carefully

under-built, before being raised to a farther height. When it had

been got up by successive stages of this kind to about 24 feet, an

extraordinary accident occurred, during Mr. Stephenson's absence

in London, which he afterward described to the author in as nearly

as possible the following words: "In a work of such novelty and

magnitude, you may readily imagine how anxious I was that every

possible contingency should be provided for. Where one chain or rope

was required, I provided two. I was not satisfied with 'enough:' I

must have absolute security, so far as that was possible. I knew the

consequences of failure would be most disastrous to the company,

and that the wisest economy was to provide for all contingencies,

at whatever cost. When the first tube at the Britannia had been

successfully floated between the piers, ready for being raised, my

young engineers were very much elated; and when the hoisting apparatus

had been fixed, they wrote to me, saying, 'We are now all ready for

raising her: we could do it in a day, or in two at the most.' But my

reply was, No; you must only raise the tube inch by inch, and you must

build up under it as you rise. Every inch must be made good. Nothing

must be left to chance or good luck. And fortunate it was that I

insisted upon this cautious course being pursued; for, one day, while

the hydraulic presses were at work, the bottom of one of them burst

clean away! The cross-head and the chains, weighing more than 50 tons,

descended with a fearful crash upon the press, and the tube itself fell

down upon the packing beneath. Though the fall of the tube was not more

than nine inches, it crunched solid castings, weighing tons, as if they

had been nuts. The tube itself was slightly strained and deflected,

though it still remained sufficiently serviceable. But it was a

tremendous test to which it was put, for a weight of upward of 5000

tons falling even a few inches must be admitted to be a very serious

matter. That it stood so well was extraordinary. Clark immediately

wrote me an account of the circumstance, in which he said, 'Thank God

you have been so obstinate; for if this accident had occurred without

a bed for the end of the tube to fall on, the whole would now have

been lying across the bottom of the Straits.' Five thousand pounds

extra expense was caused by this accident, slight though it might

seem. But careful provision was made against future failure; a new and

improved cylinder was provided; and the work was very soon advancing

satisfactorily toward completion."[101]

When the queen first visited the Britannia Bridge, on her return from

the North in 1852, Robert Stephenson accompanied her majesty and Prince

Albert over the works, explaining the principles on which the bridge

had been built, and the difficulties which had attended its erection.

He conducted the royal party to near the margin of the sea, and, after

describing to them the incident of the fall of the tube, and the reason

of its preservation, he pointed with pardonable pride to a pile of

stones which the workmen had there raised to commemorate the event.

While nearly all the other marks of the work during its progress had

been obliterated, that cairn had been left standing in commemoration of

the caution and foresight of their chief.

[Illustration: MENAI BRIDGE. [By Percival Skelton, after his original

Drawing.]]

The floating and raising of the remaining tubes need not be described

in detail. The second was floated on the 3d of December, and set in

its permanent place on the 7th of January, 1850. The others[102] were

floated and raised in due course; on the 5th of March Mr. Stephenson

put the last rivet in the tube, and passed through the completed

bridge, accompanied by about a thousand persons, drawn by three

locomotives. The bridge was found almost entirely rigid, scarcely

showing the slightest deflection. When, in the course of the day, a

train of 200 tons of coal was allowed to rest with all its weight,

for two hours, in the centre of the eastern land tube, the deflection

was only four tenths of an inch, or less than that produced upon the

structure by half an hour's sunshine;[103] while the whole bridge might

with safety, and without injury to itself, be deflected to the extent

of 13 inches. The bridge was opened for public traffic on the 18th of

March. The cost of the whole work was £234,450.

The Britannia Bridge is one of the most remarkable monuments of the

enterprise and skill of the present century. Robert Stephenson was the

master spirit of the undertaking. To him belongs the merit of first

seizing the ideal conception of the structure best adapted to meet the

necessities of the case, and of selecting the best men to work out

his idea, himself watching, controlling, and testing every result by

independent check and counter-check. And, finally, he organized and

directed, through his assistants, the vast band of skilled workmen

and laborers who were for so many years occupied in carrying his

magnificent original conception to a successful practical issue.

But it was not accomplished without the greatest anxiety and mental

pressure. Mr. Clark has well observed that few persons who merely

witness the results of the engineer's labors can form any conception

of the real difficulties overcome, and the intense anxiety involved

in their elaboration. "If the stranger," he says, "who contemplates

the finished reality, requires so much thought to appreciate its

principles and comprehend its detail, what weary hours must he have

undergone who first conceived its bold proportions--who, combating,

almost alone, every prejudice that assailed him, and with untiring

labor discussing every objection, listening to every opinion, and

embodying every inquiry, at length matured, step by step, this noble

monument?" On the occasion of raising the last tube into its place, Mr.

Stephenson declared, in reply to the felicitations of a large company

who had witnessed the proceedings with intense interest, that not all

the triumph which attended this great work, and the solution of the

difficult problem of carrying a rigid roadway across an arm of the sea

at such a height as to allow the largest vessels to pass with all their

sails set beneath it, could repay him for the anxieties he had gone

through, the friendships he had compromised, and the unworthy motives

which had been attributed to him; and that, were another work of the

same magnitude offered to him with like consequences, he would not for

worlds undertake it!

The Britannia Bridge was indeed the result of a vast combination of

skill and industry. But for the perfection of our tools, and the

ability of our mechanics to use them to the greatest advantage--but

for the matured powers of the steam-engine--but for the improvements

in the iron manufacture, which enabled blooms to be puddled of sizes

before deemed impracticable, and plates and bars of immense size to

be rolled and forged--but for these, the Britannia Bridge would have

been designed in vain. Thus it was not the product of the genius of the

railway engineer alone, but of the collective mechanical genius of the

English nation.

[Illustration: CONWAY BRIDGE--FLOATING THE FIRST TUBE.]

FOOTNOTES:

[89] The simple fact that in a heavy storm the force of impact of

the waves is from one and a half to two tons per square foot, must

necessarily dictate the greatest possible caution in approaching so

formidable an element. Mr. R. Stevenson (Edinburg) registered a force

of three tons per square foot at Skerryvore during a gale in the

Atlantic, when the waves were supposed to run twenty feet high.

[90] See "Lives of the Engineers," vol. ii., p. 445. It appears that

Mr. Fairbairn suggested this idea in his letter to Mr. Stephenson,

dated the 3d of June, 1845, accompanied by a drawing. See his "Account

of the Construction of the Britannia and Conway Tubular Bridges," etc.

London, 1849.

[91] Robert Stephenson's narrative of the early history of the design,

in Edwin Clark's "Britannia and Conway Tubular Bridges," vol. i., p.

25, London, 1850.

[92] Robert Stephenson's narrative in Clark's "Britannia and Conway

Tubular Bridges," vol. i., p. 27.

[93] Robert Stephenson's narrative in Clark's "Britannia and Conway

Tubular Bridges," vol. i., p. 27.

[94] "Account of the Construction of the Britannia and Conway Tubular

Bridges." By W. Fairbairn, C.E., London, 1849.

[95] Mr. Stephenson continued to hold that the elliptical tube was

the right idea, and that sufficient justice had not been done to it.

A year or two before his death, Mr. Stephenson remarked to the author

that, had the same arrangement for stiffening been adopted to which the

oblong rectangular tubes owe a great part of their strength, a very

different result would have been obtained.

[96] "Mr. Fairbairn's Account," p. 22.

[97] The following passage occurs in Robert Stephenson's report to

the directors of the Chester and Holyhead Railway, dated the 9th of

February, 1846: "You will observe in Mr. Fairbairn's remarks that

he contemplates the feasibility of stripping the tube entirely of

all the chains that may be required in the erection of the bridge;

whereas, on the other hand, Mr. Hodgkinson thinks the chains will be an

essential, or, at all events, a useful auxiliary, to give the tube the

requisite strength and rigidity. This, however, will be determined by

the proposed additional experiments, and does not interfere with the

construction of the masonry, which is designed so as to admit of the

tube, with or without chains. The application of chains as an auxiliary

has occupied much of my attention, and I am satisfied that the ordinary

mode of applying them to suspension bridges is wholly inadmissible in

the present instance; if, therefore, it be hereafter found necessary or

desirable to employ them in conjunction with the tube, another mode of

employing them must be devised, as it is absolutely essential to attach

them in such a manner as to preclude the possibility of the smallest

oscillation."

[98] In a letter of Mr. Fairbairn to Mr. Stephenson, dated July 18th,

1846, he says: "To get rid of the chains will be a desideratum; and I

have made the tube of such strength, and intend putting it together

upon such a principle, as will insure its carrying a dead weight,

equally distributed over its hollow surface, of 4000 tons. With a

bridge of such powers, what have we to fear? and why, in the name of

truth and in the face of conclusive facts, should we hesitate to adopt

measures calculated not only to establish the principle as a triumph of

art, but, what is of infinitely more importance to the shareholders,

the saving of a large sum of money, nearly equal to half the cost

of the bridge? I have been ably assisted by Mr. Clark in all these

contrivances; but in a matter of such importance we must have your

sanction and support."--"Mr. Fairbairn's Account," p. 93.

[99] "The Britannia and Conway Tubular Bridges." By Edwin Clark. Vol.

ii., p. 683-4.

[100] No. 34 Gloucester Square, Hyde Park, where he lived.

[101] The hydraulic presses were of an extraordinary character. The

cylinders of those first constructed were of wrought iron (cast iron

being found altogether useless), not less than 8 inches thick. They

were tested by being subjected to an internal pressure of 3 or 3-1/2

tons to the circular inch. The pressure was such that it squeezed

the fibres of the iron together; so that, after a few tests of this

character, the piston, which at first fitted it quite closely, was

found considerably too small. "A new piston," says Mr. Clark, "was then

made to suit the enlarged cylinder; and a farther enlargement occurring

again and again with subsequent use, the new pistons became as

formidable an obstacle as the cylinders. The wrought-iron cylinder was

on the point of being abandoned, when Mr. Amos (the iron manufacturer),

having carefully gauged the cylinder inside and out, found to

his surprise that, although the internal diameter had increased

considerably, the external diameter had retained precisely its original

dimensions. He consequently persevered in the construction of new

pistons, and ultimately found that the cylinder enlarged no longer,

and to this day it continues in constant use. Layer after layer having

attained additional permanent set, sufficient material was at length

brought into play, with sufficient tenacity to withstand the pressure;

and thus an obstacle, apparently insurmountable, and which threatened

at one time to render much valuable machinery useless, was entirely

overcome. The workman may be excused for calling the stretched cylinder

stronger than the new one, though it is only stronger as regards the

amount of its yielding to a given force."--Clark, vol. i., p. 306. The

hydraulic presses used in raising the tubes of the Britannia Bridge, it

may be remembered, were afterward used in starting the _Great Eastern_

from her berth on the shore at Milwall, where she had been built.

[102] While the preparations were in progress for floating the third

tube, Mr. Stephenson received a pressing invitation to a public railway

celebration at Darlington, in honor of his old friend, Edward Pease.

His reply, dated the 15th of May, 1850, was as follows: "I am prevented

having the pleasure of a visit to Darlington on the 22d, owing to that

or the following day having been fixed upon for floating the next tube

at the Menai Straits; and as this movement depends on the tide, it is,

of course, impossible for me to alter the arrangements. I sincerely

regret this circumstance, for every early association connected with

my profession would have tended to render my visit a gratifying one.

It would, moreover, have given me an opportunity of saying publicly

how much the wonderful progress of railways was dependent upon the

successful issue of the first great experiment, and how much that issue

was influenced by your great discernment, and your confidence in my

late revered father. In my remembrance you stand among the foremost of

his patrons and early advisers; and I know that throughout his life

he regarded you as one of his very best friends. One of the things in

which he took especial delight was in frequently and very graphically

describing his first visit to Darlington, on foot, to confer with you

on the subject of the Stockton and Darlington Railway."

[103] The effect of sunshine in deflecting the bridge is very curious.

When the first main tube was tested, ballast-wagons loaded with iron

were drawn into the centre and left standing there. The first 20 tons

increased the deflection an eighth of an inch, and with 50 tons the

deflection was 9 inches. After standing all night, the deflection in

the morning was found to be only 8-3/8 inches. How was this to be

accounted for? Mr. Clark says: "This was attributed at the time to

an error made in the reading; but this, and many other anomalies in

the deflection, were afterward fully accounted for by local changes

of temperature. _A gleam of sunshine_ on the top of the tube raised

it on one occasion nearly an inch in half an hour with 200 tons at

the centre, the top plates being expanded by increase of temperature,

while the lower plates remained constant from radiation to the water

immediately beneath them. In a similar manner, the tube was drawn

sidewise to the extent of an inch from _the sun shining on one side_,

and returned immediately as clouds passed over the sun, being, in fact,

a most delicate thermometer in constant motion, both vertically and

laterally."

[Illustration: VIEW IN TAPTON GARDENS. [By Percival Skelton.]]

The Life of George Stephenson and of his Son Robert Stephenson Comprising Also a History of the Invention and Introduction of the Railway Locomotive · 第 18 / 20 章