CHAPTER XIV.

ROBERT STEPHENSON CONSTRUCTS THE LONDON AND BIRMINGHAM RAILWAY.

Of the numerous extensive projects which followed close upon the

completion of the Liverpool and Manchester line and the locomotive

triumph at Rainhill, that of a railway between London and Birmingham

was the most important. The scheme originated at the latter place

in 1830. Two committees were formed, and two plans were proposed.

One was of a line to London by way of Oxford, and the other by way

of Coventry. The object of the promoters of both schemes being to

secure the advantages of railway communication with the metropolis,

they wisely determined to combine their strength to secure it. They

resolved to call George Stephenson to their aid, and requested him

to advise them as to the two schemes which were before them. After a

careful examination of the country, Stephenson reported in favor of

the Coventry route. The Lancashire gentlemen, who were the principal

subscribers to the project, having confidence in his judgment,

supported his decision, and the line recommended by him was adopted

accordingly.

At the meeting of gentlemen held at Birmingham to determine upon the

appointment of the engineer for the railway, there was a strong party

in favor of associating with Stephenson a gentleman with whom he had

been brought into serious collision in the course of the Liverpool

and Manchester undertaking. When the offer was made to him that

he should be joint engineer with the other, he requested leave to

retire and consider the proposal with his son. The two walked into

St. Philip's church-yard, which adjoined the place of meeting, and

debated the proposal. The father was in favor of accepting it. His

struggle heretofore had been so hard that he could not bear the idea

of missing so promising an opportunity of professional advancement.

But the son, foreseeing the jealousies and heartburnings which the

joint engineership would most probably create, recommended his

father to decline the connection. George adopted the suggestion, and,

returning to the committee, announced to them his decision, on which

the promoters decided to appoint him the engineer of the undertaking in

conjunction with his son.

This line, like the Liverpool and Manchester, was very strongly

opposed, especially by the land-owners. Numerous pamphlets were

published, calling on the public to "beware of the bubbles," and

holding up the promoters of railways to ridicule. They were compared

to St. John Long and similar quacks, and pronounced fitter for Bedlam

than to be left at large. The canal proprietors, land-owners, and

road trustees made common cause against them. The failure of railways

was confidently predicted--indeed, it was elaborately attempted to be

proved that they had failed; and it was industriously spread abroad

that the locomotive engines, having been found useless and highly

dangerous on the Liverpool and Manchester line, were immediately to

be abandoned in favor of horses--a rumor which the directors of the

company thought it necessary publicly to contradict.

Public meetings were held in all the counties through which the line

would pass between London and Birmingham, at which the project was

denounced, and strong resolutions against it were passed. The attempt

was made to conciliate the landlords by explanations, but all such

efforts proved futile, the owners of nearly seven eighths of the land

being returned as dissentients. "I remember," said Robert Stephenson,

describing the opposition, "that we called one day on Sir Astley

Cooper, the eminent surgeon, in the hope of overcoming his aversion

to the railway. He was one of our most inveterate and influential

opponents. His country house at Berkhampstead was situated near the

intended line, which passed through part of his property. We found

a courtly, fine-looking old gentleman, of very stately manners, who

received us kindly, and heard all we had to say in favor of the

project. But he was quite inflexible in his opposition to it. No

deviation or improvement that we could suggest had any effect in

conciliating him. He was opposed to railways generally, and to this in

particular. 'Your scheme,' said he, 'is preposterous in the extreme. It

is of so extravagant a character as to be positively absurd. Then look

at the recklessness of your proceedings! You are proposing to cut up

our estates in all directions for the purpose of making an unnecessary

road. Do you think for one moment of the destruction of property

involved by it? Why, gentlemen, if this sort of thing be permitted to

go on, you will in a very few years _destroy the noblesse_!' We left

the honorable baronet without having produced the slightest effect upon

him, excepting perhaps, it might be, increased exasperation against

our scheme. I could not help observing to my companions as we left the

house, 'Well, it is really provoking to find one who has been made a

"Sir" for cutting that wen out of George the Fourth's neck, charging us

with contemplating the destruction of the _noblesse_ because we propose

to confer upon him the benefits of a railroad.'"

Such being the opposition of the owners of land, it was with the

greatest difficulty that an accurate survey of the line could be made.

At one point the vigilance of the land-owners and their servants was

such that the surveyors were effectually prevented taking the levels

by the light of day, and it was only at length accomplished at night

by means of dark lanterns. There was one clergyman, who made such

alarming demonstrations of his opposition, that the extraordinary

expedient was resorted to of surveying his property during the time he

was engaged in the pulpit. This was managed by having a strong force of

surveyors in readiness to commence their operations, who entered the

clergyman's grounds on one side the moment they saw him fairly off them

on the other. By a well-organized and systematic arrangement, each man

concluded his allotted task just as the reverend gentleman concluded

his sermon; so that, before he left the church, the deed was done, and

the sinners had all decamped. Similar opposition was offered at many

other points, but ineffectually. The laborious application of Robert

Stephenson was such that, in examining the country to ascertain the

best line, he walked the whole distance between London and Birmingham

upward of twenty times.

When the bill went before the committee of the Commons in 1832, a

formidable array of evidence was produced. All the railway experience

of the day was brought to bear in support of the measure, and all

that interested opposition could do was set in motion against it. The

necessity for an improved mode of communication between London and

Birmingham was clearly demonstrated, and the engineering evidence was

regarded as quite satisfactory. Not a single fact was proved against

the utility of the measure, and the bill passed the committee, and

afterward the third reading in the Commons, by large majorities.

It was then sent to the Lords, and went into committee, when a similar

mass of testimony was again gone through. But scarcely had the

proceedings been opened when it became clear that the fate of the bill

had been determined before a word of the evidence had been heard. At

that time the committees were open to all peers; and the promoters of

the measure found, to their dismay, many of the lords who were avowed

opponents of the measure as land-owners, sitting as judges to decide

its fate. Their principal object seemed to be to bring the proceedings

to a termination as quickly as possible. An attempt at negotiation was

made in the course of the proceedings in committee, but failed, and

the bill was thrown out on the motion of Earl Brownlow, one of Lady

Bridgewater's trustees; but, though carried by a large majority, the

vote was far from unanimous.

As the result had been foreseen, measures were taken to neutralize the

effect of this decision as regarded future operations. Not less than

£32,000 had been expended in preliminary and Parliamentary expenses

up to this stage; but the promoters determined not to look back, and

forthwith made arrangements for prosecuting the bill in a future

session. A meeting of the friends of the measure was held in London,

attended by members of both houses of Parliament and by leading bankers

and merchants, when a series of resolutions was passed, declaring

their conviction of the necessity for the railway, and deprecating the

opposition by which it had been encountered. Lord Wharncliffe, who had

acted as the chairman of the Lords' Committee, attributed the failure

of the bill entirely to the land-owners; and Mr. Glyn subsequently

declared that they had tried to smother it by the high price which

they demanded for their property. It was determined to reintroduce

the bill in the following session (1833), and measures were taken to

prosecute it vigorously. Strange to say, the bill on this occasion

passed both houses silently and almost without opposition. The mystery

was afterward solved by the appearance of a circular issued by the

directors of the company, in which it was stated that they had opened

negotiations with the most influential of their opponents; that

"these measures had been successful to a greater extent than they had

ventured to anticipate; and the most active and formidable had been

conciliated." An instructive commentary on the mode by which these

noble lords and influential landed proprietors had been "conciliated"

was found in the simple fact that the estimate for land was nearly

trebled, and that the owners were paid about £750,000 for what had been

originally estimated at £250,000. The total expenses of carrying the

bill through Parliament amounted to the enormous sum of £72,868.

The land-owners having been thus "conciliated," the promoters of the

measure were at length permitted to proceed with the formation of their

great highway. Robert Stephenson was, with his father's sanction,

appointed engineer-in-chief of the line, at a salary of £1500 a

year. He was now a married man, having become united to Miss Frances

Sanderson in 1829, since which his home had been at Newcastle, near to

the works there; but, on receiving his new appointment, he removed with

his wife to London, to a house on Haverstock Hill, where he resided

during the execution of the Birmingham Railway.

Steps were at once taken to proceed with the working survey, to

prepare the working drawings, and arrange for the prosecution of the

undertaking. Eighty miles of the line were shortly under construction;

the works were let (within the estimates) to contractors, who were

necessarily, for the most part, new to such work. The business of

railway construction was not then well understood. There were no

leviathans among contractors as now, able to undertake the formation

of a line of railway hundreds of miles in length; they were, for the

most part, men of small capital and slender experience. Their tools and

machinery were imperfect; they did not understand the economy of time

and piece labor; the workmen, as well as their masters, had still to

learn their trade; and every movement of an engineer was attended with

outlays, which were the inevitable result of a new system of things,

but which each succeeding day's experience tended to diminish.

[Illustration: (Map of London and Birmingham Railway)]

The difficulties encountered in the construction of this railway were

thus very great, the most formidable of them originating in the

character of the works themselves. Extensive tunnels had to be driven

through unknown strata, and miles of underground excavation had to be

carried out in order to form a level road from valley to valley under

the intervening ridges. This kind of work was the newest of all to

the contractors of that day. Robert Stephenson's experience in the

collieries of the North rendered him well fitted to grapple with such

difficulties; yet even he, with all his practical knowledge, could

scarcely have foreseen the serious obstacles which he was called

upon to encounter in executing the formidable cuttings, embankments,

and tunnels of the London and Birmingham Railway. It would be an

uninteresting, as it would be a fruitless task, to attempt to describe

these works in detail; but a general outline of their extraordinary

character and extent may not be out of place.

The length of railway to be constructed between London and Birmingham

was 112-1/2 miles. The line crossed a series of low-lying districts,

separated from each other by considerable ridges of hills, and it

was the object of the engineer to cross the valleys at as high an

elevation, and the hills at as low a one as possible. The high ground

was therefore cut down, and the "stuff" led into embankments, in some

places of great height and extent, so as to form a road upon as level a

plane as was considered practicable for the working of the locomotive

engine. In some places the high grounds were passed in open cuttings,

while in others it was necessary to bore through them in tunnels with

deep cuttings at either end.

The most formidable excavations on the line are those at Tring, Denbigh

Hall, and Blisworth. The Tring cutting is an immense chasm across

the great chalk ridge of Ivinghoe. It is two miles and a half long,

and for a quarter of a mile is fifty-seven feet deep. A million and a

half cubic yards of chalk and earth were taken out of this cutting by

means of horse-runs, and deposited in spoil-banks, besides the immense

quantity run into the embankment north of the cutting, forming a solid

mound nearly six miles long and about thirty feet high. Passing over

the Denbigh Hall cutting, and the Wolverton embankment of a mile and a

half in length across the valley of the Ouse, we come to the excavation

at Blisworth, a brief description of which will give the reader an idea

of one of the most formidable kinds of railway work.

[Illustration: BLISWORTH CUTTING. [By Percival Skelton.]]

The Blisworth Cutting is a mile and a half long, in some places

sixty-five feet deep, passing through earth, stiff clay, and hard

rock. Not less than a million cubic yards of these materials were dug,

quarried, and blasted out of it. One third of the cutting was stone,

and beneath the stone lay a thick bed of clay, under which were found

beds of loose shale so full of water that almost constant pumping was

necessary at many points to enable the works to proceed. For a year

and a half the contractor went on fruitlessly contending with these

difficulties, and at length he was compelled to abandon the adventure.

The engineer then took the works in hand for the company, and they

were vigorously proceeded with. Steam-engines were set to work to pump

out the water; two locomotives were put on, one at either end of the

cutting, to drag away the excavated rock and clay; and eight hundred

men and boys were employed along the work, in digging, wheeling, and

blasting, besides a large number of horses. Some idea of the extent of

the blasting operations may be formed from the fact that twenty-five

barrels of gunpowder were exploded weekly, the total quantity used

in forming this one excavation being about three thousand barrels.

Considerable difficulty was experienced in supporting the bed of rock

cut through, which overlaid the clay and shale along either side of

the cutting. It was found necessary to hold it up by strong retaining

walls, to prevent the clay bed from bulging out, and these walls were

farther supported by a strong invert--that is, an arch placed in an

inverted position under the road--thus binding together the walls on

both sides. Behind the retaining walls, a drift or horizontal drain was

run to enable the water to escape, and occasional openings were left

in the walls themselves for the same purpose. The work was at length

brought to a successful completion, but the extraordinary difficulties

encountered in executing the undertaking had the effect of greatly

increasing the cost of this portion of the railway.

The Tunnels on the line are eight in number, their total length being

7336 yards. The first high ground encountered was Primrose Hill, where

the stiff London clay was passed through for a distance of about 1164

yards. The clay was close, compact, and dry, more difficult to work

than stone itself. It was entirely free from water; but the absorbing

properties of the clay were such that when exposed to the air it

swelled out rapidly. Hence an unusual thickness of brick lining was

found necessary; and the engineer afterward informed the author that

for some time he entertained an apprehension lest the pressure should

force in the brick-work altogether, as afterward happened in the case

of the short Preston Brook tunnel upon the Grand Junction Railway,

constructed by his father. The pressure behind the brick-work was

so great that it made the face of the bricks to fly off in minute

chips, which covered his clothes while he was inspecting the work. The

materials used in the building were, however, of excellent quality, and

the work was happily brought to a completion without accident.

At Watford the chalk ridge was penetrated by a tunnel about 1800 yards

long, and at Northchurch, Lindslade, and Stowe Hill there were other

tunnels of minor extent. But the chief difficulty of the undertaking

was the execution of that under the Kilsby ridge. Though not the

largest, this is in many respects one of the most interesting works of

the kind. It is about two thousand four hundred yards long, and runs at

an average depth of about a hundred and sixty feet below the surface.

The ridge under which it extends is of considerable extent, the famous

battle of Naseby having been fought upon one of the spurs of the same

high ground, about seven miles to the eastward.

[Illustration: LINE OF THE SHAFTS OVER KILSBY TUNNEL. [By Percival

Skelton.]]

Previous to the letting of the contract, the character of the

underground soil was fairly tested by trial shafts, which indicated

that it consisted of shale of the lower oolite, and the works were

let accordingly. But they had scarcely been commenced when it was

discovered that, at an interval between the two trial-shafts, which had

been sunk about two hundred yards from the south end of the tunnel,

there existed an extensive quicksand under a bed of clay forty feet

thick, which the borings had escaped in the most singular manner. At

the bottom of one of these shafts, the excavation and building of the

tunnel were proceeding, when the roof at one part suddenly gave way,

a deluge of water burst in, and the party of workmen with the utmost

difficulty escaped with their lives. They were only saved by means of

a raft, on which they were towed by one of the engineers swimming with

the rope in his mouth to the lower end of the shaft, out of which they

were safely lifted to the daylight.

The works were of course at that point immediately stopped. The

contractor who had undertaken the construction of the tunnel was

so overwhelmed by the calamity that, though he was relieved by the

company from his engagement, he took to his bed and shortly after died.

Pumping-engines were erected for the purpose of draining off the water,

but for a long time it prevailed, and sometimes even rose in the shaft.

The question arose whether, in the face of so formidable a difficulty,

the works should be proceeded with or abandoned. Robert Stephenson sent

over to Alton Grange for his father, and the two took serious counsel

together. George was in favor of pumping out the water from the top by

powerful engines erected over each shaft, until the water was fairly

mastered. Robert concurred in that view, and, although other engineers

who were consulted pronounced strongly against the practicability of

the scheme and advised the abandonment of the enterprise, the directors

authorized him to proceed, and powerful steam-engines were ordered to

be constructed and delivered without loss of time.

In the mean time Robert suggested to his father the expediency of

running a drift along the heading from the south end of the tunnel,

with the view of draining off the water in that way. George said he

thought it would scarcely answer, but that it was worth a trial, at all

events until the pumping-engines were got ready. Robert accordingly

gave orders for the drift to be proceeded with. The excavators were

immediately set to work, and they had nearly reached the quicksand,

when one day, while the engineer, his assistants, and the workmen were

clustered about the open entrance of the drift-way, they heard a sudden

roar as of distant thunder. It was hoped that the water had burst

in--for all the workmen were out of the drift--and that the sand-bed

would now drain itself off in a natural way. Instead of which, very

little water made its appearance, and on examining the inner end of the

drift, it was found that the loud noise had been caused by the sudden

discharge into it of an immense mass of sand, which had completely

choked up the passage, and thus prevented the water from draining off.

The engineer now found that nothing remained but to sink numerous

additional shafts over the line of the tunnel at the points at which

it crossed the quicksand, and endeavor to master the water by sheer

force of engines and pumps. The engines, which were shortly erected,

possessed an aggregate power of 160 horses; and they went on pumping

for eight months, emptying out an almost incredible quantity of water.

It was found that the water, with which the bed of sand extending

over many miles was charged, was in a great degree held back by the

particles of the sand itself, and that it could only percolate through

at a certain average rate. It appeared in its flow to take a slanting

direction to the suction of the pumps, the angle of inclination

depending upon the coarseness or fineness of the sand, and regulating

the time of the flow. Hence the distribution of the pumping power

at short intervals along the line of the tunnel had a much greater

effect than the concentration of that power at any one place. It soon

appeared that the water had found its master. Protected by the pumps,

which cleared a space for engineering operations--carried on, as it

were, amid two almost perpendicular walls of water and sand on either

side--the workmen proceeded with the building of the tunnel at numerous

points. Every exertion was used to wall in the dangerous parts as

quickly as possible, the excavators and bricklayers laboring night

and day until the work was finished. Even while under the protection

of the immense pumping power above described, it often happened that

the bricks were scarcely covered with cement ready for the setting ere

they were washed quite clean by the streams of water which poured from

overhead. The men were accordingly under the necessity of holding over

their work large whisks of straw and other appliances to protect the

bricks and cement at the moment of setting.

The quantity of water pumped out of the sand-bed during eight months of

this incessant pumping averaged two thousand gallons per minute, raised

from an average depth of 120 feet. It is difficult to form an adequate

idea of the bulk of water thus raised, but it may be stated that if

allowed to flow for three hours only, it would fill a lake one acre

square to the depth of one foot, and if allowed to flow for an entire

day it would fill the lake to over eight feet in depth, or sufficient

to float a vessel of a hundred tons' burden. The water pumped out of

the tunnel while the work was in progress would be nearly equivalent to

the contents of the Thames at high water between London and Woolwich.

It is a curious circumstance, that notwithstanding the quantity of

water thus removed, the level of the surface in the tunnel was only

lowered about two and a half to three inches per week, showing the vast

area of the quicksand, which probably extended along the entire ridge

of land under which the railway passed.

The cost of the line was greatly increased by the difficulties thus

encountered at Kilsby. The original estimate for the tunnel was only

£99,000; but by the time it was finished it had cost about £100 per

lineal yard forward, or a total of nearly £300,000. The expenditure

on the other parts of the line also greatly exceeded the amount first

set down by the engineer, and, before the railway was complete, it

had been more than doubled. The land cost three times more than the

estimate, and the claims for compensation were enormous. Although the

contracts were let within the estimates, very few of the contractors

were able to finish them without the assistance of the company, and

many became bankrupt. Speaking of the difficulties encountered during

the construction of the line, Robert Stephenson subsequently observed

to us: "After the works were let, wages rose, the prices of materials

of all kinds rose, and the contractors, many of whom were men of

comparatively small capital, were thrown on their beam-ends. Their

calculations as to expenses and profits were completely upset. Let

me just go over the list. There was Jackson, who took the Primrose

Hill contract--he failed. Then there was the next length--Nowells;

then Copeland and Harding; north of them Townsend, who had the Tring

cutting; next Norris, who had Stoke Hammond; then Soars; then Hughes: I

think all of these broke down, or at least were helped through by the

directors. Then there was that terrible contract of the Kilsby Tunnel,

which broke the Nowells, and killed one of them. The contractors to the

north of Kilsby were more fortunate, though some of them pulled through

only with the greatest difficulty. Of the eighteen contracts in which

the line was originally let, only seven were completed by the original

contractors. Eleven firms were ruined by their contracts, which were

relet to others at advanced prices, or were carried on and finished by

the company. The principal cause of increase in the expense, however,

was the enlargement of the stations. It appeared that we had greatly

under-estimated the traffic, and it accordingly became necessary to

spend more and more money for its accommodation, until I think I am

within the mark when I say that the expenditure on this account alone

exceeded by eight or ten fold the amount of the Parliamentary estimate."

The magnitude of the works, which were unprecedented in England, was

one of the most remarkable features in the undertaking. The following

striking comparison has been made between this railway and one of

the greatest works of ancient times. The great Pyramid of Egypt

was, according to Diodorus Siculus, constructed by three hundred

thousand--according to Herodotus, by one hundred thousand--men. It

required for its execution twenty years, and the labor expended upon

it has been estimated as equivalent to lifting 15,733,000,000 of

cubic feet of stone one foot high; whereas, if the labor expended

in constructing the London and Birmingham Railway be in like manner

reduced to one common denomination, the result is 25,000,000,000 of

cubic feet _more_ than was lifted for the Great Pyramid; and yet the

English work was performed by about 20,000 men in less than five

years. And while the Egyptian work was executed by a powerful monarch

concentrating upon it the labor and capital of a great nation, the

English railway was constructed, in the face of every conceivable

obstruction and difficulty, by a company of private individuals out of

their own resources, without the aid of government or the contribution

of one farthing of public money.

The laborers who executed these formidable works were in many respects

a remarkable class. The "railway navvies,"[77] as they were called,

were men drawn by the attraction of good wages from all parts of the

kingdom; and they were ready for any sort of hard work. Many of the

laborers employed on the Liverpool line were Irish; others were from

the Northumberland and Durham railways, where they had been accustomed

to similar work; and some of the best came from the fen districts of

Lincoln and Cambridge, where they had been trained to execute works of

excavation and embankment. These old practitioners formed a nucleus of

skilled manipulation and aptitude which rendered them of indispensable

utility in the immense undertakings of the period. Their expertness in

all sorts of earth-work, in embanking, boring, and well-sinking--their

practical knowledge of the nature of soils and rocks, the tenacity of

clays, and the porosity of certain stratifications--were very great;

and, rough-looking as they were, many of them were as important in

their own department as the contractor or the engineer.

During the railway-making period the navvy wandered about from one

public work to another, apparently belonging to no country and having

no home. He usually wore a white felt hat with the brim turned up, a

velveteen or jean square-tailed coat, a scarlet plush waistcoat with

little black spots, and a bright-colored kerchief round his Herculean

neck, when, as often happened, it was not left entirely bare. His

corduroy breeches were retained in position by a leathern strap round

the waist, and were tied and buttoned at the knee, displaying beneath

a solid calf and foot incased in strong high-laced boots. Joining

together in a "butty gang," some ten or twelve of these men would take

a contract to cut out and remove so much "dirt"--as they denominated

earth-cutting--fixing their price according to the character of the

"stuff," and the distance to which it had to be wheeled and tipped. The

contract taken, every man put himself to his mettle; if any was found

skulking, or not putting forth his full working power, he was ejected

from the gang. Their powers of endurance were extraordinary. In times

of emergency they would work for twelve and even sixteen hours, with

only short intervals for meals. The quantity of flesh-meat which they

consumed was something enormous; but it was to their bones and muscles

what coke is to the locomotive--the means of keeping up the steam. They

displayed great pluck, and seemed to disregard peril. Indeed, the most

dangerous sort of labor--such as working horse-barrow runs, in which

accidents are of constant occurrence--has always been most in request

among them, the danger seeming to be one of its chief recommendations.

[Illustration: KILSBY TUNNEL. [North End.]]

Working together, eating, drinking, and sleeping together, and daily

exposed to the same influences, these railway laborers soon presented

a distinct and well-defined character, strongly marking them from the

population of the districts in which they labored. Reckless alike of

their lives as of their earnings, the navvies worked hard and lived

hard. For their lodging, a hut of turf would content them; and, in

their hours of leisure, the meanest public house would serve for their

parlor. Unburdened, as they usually were, by domestic ties, unsoftened

by family affection, and without much moral or religious training,

the navvies came to be distinguished by a sort of savage manners,

which contrasted strangely with those of the surrounding population.

Yet, ignorant and violent though they might be, they were usually

good-hearted fellows in the main--frank and open-handed with their

comrades, and ready to share their last penny with those in distress.

Their pay-nights were often a saturnalia of riot and disorder, dreaded

by the inhabitants of the villages along the line of works. The

irruption of such men into the quiet hamlet of Kilsby must, indeed,

have produced a very startling effect on the recluse inhabitants of the

place. Robert Stephenson used to tell a story of the clergyman of the

parish waiting upon the foreman of one of the gangs to expostulate with

him as to the shocking impropriety of his men working during Sunday.

But the head navvy merely hitched up his trowsers and said, "Why,

Soondays hain't cropt out here yet!" In short, the navvies were little

better than heathens, and the village of Kilsby was not restored to its

wonted quiet until the tunnel-works were finished, and the engines and

scaffolding removed, leaving only the immense masses of _débris_ around

the line of shafts which extend along the top of the tunnel.

FOOTNOTE:

[77] The word "navvie," or "navigator," is supposed to have originated

in the fact of many of these laborers having been originally employed

in making the navigations, or canals, the construction of which

immediately preceded the railway era.

The Life of George Stephenson and of his Son Robert Stephenson Comprising Also a History of the Invention and Introduction of the Railway Locomotive · 第 14 / 20 章