BY CHARLES W. RAYMOND, M. AM. SOC. C. E.[A]

Some time before the appointment of the Board of Engineers which

supervised the designing and construction of the New York Tunnel

Extension of the Pennsylvania Railroad, the late A. J. Cassatt, then

President of the Company, said to the writer that for many years he had

been unable to reconcile himself to the idea that a railroad system like

the Pennsylvania should be prevented from entering the most important

and populous city in the country by a river less than one mile wide. The

result of this thought was the tunnel extension project now nearly

completed; but it is only in recent years that new conditions have

rendered such a solution of the problem practicable as well as

desirable.

Previously a tunnel designed for steam railroad traffic, to enter New

York City near Christopher Street, was partly constructed, but the work

was abandoned for financial reasons. Then plans for a great suspension

bridge, to enable all the railroads reaching the west shore of the North

River to enter the city at the foot of 23d Street, were carefully

worked out by the North River Bridge Company. The Pennsylvania Railroad

Company gave this project its support by agreeing to pay its _pro rata_

share for the use of the bridge; but the other railroads declined to

participate, and the execution of this plan was not undertaken.

New operating conditions, resulting from the application of electric

traction to the movement of heavy railroad trains, which had been used

initially in tunnels by the Baltimore and Ohio Railroad and was

subsequently studied and adopted by railroads in Europe, made it

possible to avoid the difficulty of ventilation connected with steam

traction in tunnels, and permitted the use of grades practically

prohibitive with the steam locomotive. The practicability of the tunnel

extension project finally adopted was thus assured.

The acquisition of the control of the Long Island Railroad by the

Pennsylvania Railroad Company, which occurred in 1900, introduced new

and important elements into the transportation problem, from a freight

as well as a passenger standpoint. Previously, the plans considered had

for their only object the establishment of a convenient terminus in New

York, to avoid the delays and difficulties involved in the necessity of

transporting passengers and freight across the North River. When the

Long Island Railroad became practically a part of the Pennsylvania

System, it was possible and desirable to extend the project so as to

provide, not only for a great prospective local traffic from all parts

of Long Island, but also for through passenger and freight traffic to

the New England States, and to and from all points on the Pennsylvania

System, thus avoiding the long ferriage from Jersey City around the

harbor to the Harlem River.

This paper has for its subject the New York Tunnel Extension project,

and is intended merely as an introduction to the detailed accounts of

the construction of the various divisions of the line to be given in

succeeding papers prepared by the engineers who actively carried out the

work. The project, however, forms the most important part of the

comprehensive scheme adopted by the Pennsylvania Railroad Company for

conducting its traffic into and through New York City, and a brief

description of this general plan is therefore necessary in order that

the relations of the tunnel line to the other parts of the

transportation project may be clearly understood.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 The New York Tunnel Extension of the Pennsylvania Railroad. Paper No. 1150 · 第 6 / 15 题