CHAPTER XIII.

THE BREAKWATER.

Breakwaters, Ancient and Modern—Origin and History of that at

Cherbourg—Stones Sunk in Wooden Cones—Partial Failure of the

Plan—Millions of Tons dropped to the Bottom—The Breakwater

Temporarily Abandoned—Completed by Napoleon III.—A Port Bristling

with Guns—Rennie’s Plymouth Breakwater—Ingenious Mode of

Depositing the Stones—Lessons of the Sea—The Waves the Best

Workmen—Completion of the Work—Grand Double Breakwater at

Portland—The English Cherbourg—A Magnificent Piece of

Engineering—Utilisation of Otherwise Worthless Stone—900 Convicts

at Work—The Great Fortifications—The Verne—Gibraltar at Home—A

Gigantic Fosse—Portland almost Impregnable—Breakwaters Elsewhere.

A breakwater, we are told on the highest authority, is an obstruction of

wood, stone, or other material, as a boom or raft of wood, sunken vessels,

&c., placed before the entrance of a port or harbour, or any projection

from the land into the sea, as a mole, pier, or jetty, so situated as to

break the force of the waves and prevent damage to shipping lying at

anchor within them. Thus the piers of the ancient Piræus and of Rhodes;

the moles of Venice, Naples, Genoa, and Castellamare; the piers of

Ramsgate, Margate, Folkestone, Howth, and the famous wooden dike thrown

across the port of Rochelle. The term, of late years, has been almost

exclusively applied to insulated dikes of stone. Of this description of

dike for creating an artificial harbour on a grand scale, Cherbourg,

Plymouth, and Portland present leading examples. The former, already

mentioned in this work, claims our attention.

The French, happily our good friends to-day, were not always so, and there

was a period when the splendid natural harbours, bays, and roadsteads of

this country were a source of annoyance to them. While nature had been

more than kind to us, their coast presented a series of sandy shores,

intermingled with iron-bound coasts, bristling with rocks. De Vauban, the

great engineer, was employed by Louis, the _Grand Monarque_, to inspect

the Channel shores of France, and his natural sagacity and great knowledge

caused him at once to select Cherbourg as one of the best points for

forming an artificial harbour, protected by suitable fortifications. Other

engineers recommended the same port, and one, M. de la Bretonnière,

proposed that a number of old ships should be loaded with stones and sunk,

while a large quantity of stone should be also thrown around them to form

a grand breakwater, which should rise fifty feet from the bottom. This

idea was abandoned, as it appears, partly from the fact that France had

not old vessels enough to spare for the purpose, and that it would cost

too much to purchase them from foreign nations.

In 1781 an eminent French engineer proposed that, instead of one

continuous breakwater, a number of large masses or congregations of

stones, separated from each other on the surfaces but touching at the

bases, should be built on the sea bottom, believing that they would break

the force of the waves almost equally well. As a part of his plan he

suggested that they should be sunk in large conical _caissons_ of wood,

150 feet in diameter at the base and sixty feet broad at the top. These

wooden cones were practically to bind and keep the stones together. They

were to be floated to the site with a number of empty casks attached as

floats, then detached, filled with stones, and sunk. An experiment at

Havre having been considered satisfactory, the Government accepted the

idea, and ordered that operations should be immediately commenced at

Cherbourg. A permanent council was appointed, as were officers and

engineers. In 1783 barracks and a navy-yard were built, and at Becquet, a

short distance from Cherbourg, an artificial harbour, capable of holding

eighty small vessels for the transport of the stone, was literally dug

out.

On June 6th, 1784, the first cone was floated to its destination, and a

month later a second was similarly conveyed, in the presence of 10,000

spectators. Before the latter could be filled with stones a storm, which

lasted five days, half demolished it. In the course of the summer and

autumn not less than 65,000 tons of stone were deposited in and around the

cones. In 1785 several more cones were completed and sunk; at the end of

the year the quantity of stone deposited amounted to a quarter of a

million tons, and at the end of 1787 a million tons. At the end of 1790,

when the works had been seven years in progress and the Government was

getting very tired of the whole matter, between five and six million tons

of stone had been dropped into the sea. M. de Cessart, the engineer, found

that, in order to sink five cones per annum, he had to employ 250

carpenters, 30 blacksmiths, 200 stone-hewers, and 200 masons.

One could hardly expect much permanency from a wooden covering sunk into

the sea, and it is not surprising that, one by one, they burst, few

lasting more than a year. The outbreak of the Revolution put an end, for

some time, to the operations at Cherbourg.

When the construction of the Cherbourg breakwater was resumed, the wooden

cone system was abandoned, and the stone was simply sunk from vessels of

peculiar construction. The breakwater was completed under Napoleon III.,

at a cost exceeding two and a half million pounds sterling. The actual

breakwater itself was finished in 1853,(61) but since that time most

important fortifications have been constructed on the upper works. This is

the greatest breakwater in the world, its length being nearly two and a

half miles; it is 300 feet wide at the base and 31 at the top. The

water-space shut in and protected is about 2,000 acres, much of this great

area being, however, too shallow for very large vessels.

Taken in connection with the fortifications, this breakwater has a value

greater than any other in the world. At the apex of the angle formed by

the junction of the two branches of the breakwater there is a grand fort,

and it bristles generally with batteries and forts, as indeed does

Cherbourg generally. Dr. W. H. Russell wrote of it, in our leading journal

in 1860 that, “Wherever you look you fancy that on the spot you occupy are

specially pointed dozens of the dull black eyes from their rigid lids of

stone.” With its twenty-four regular forts and redoubts, not including

those on the mole, floating harbours, building slips, navy-yards,

arsenals, and barracks, Cherbourg is a most formidable place.

[Illustration: CHERBOURG, FROM THE SEA.]

In England Rennie’s great Plymouth breakwater is the most remarkable

specimen, among many others. Its dimensions are not as great as that of

Cherbourg, but it was, nevertheless, a vast undertaking. It consists of an

immense number of blocks of stone thrown into the Sound, and forms a

barrier nearly a mile in length above the surface of the water. This grand

work was commenced in 1812, and by the end of the second year about 800

yards of the breakwater began to appear at low water, and the swell was so

much broken that ships of all sizes began to take shelter behind it; while

the fishermen within its shelter could not judge accurately of the weather

outside the Sound, so great was the change. Several limestone quarries

near the Catwater were purchased of the Duke of Bedford for £10,000, and

some fifteen vessels were constantly employed in removing the blocks,

which ranged in weight from one to ten tons. These vessels were of

ingenious construction; they had two railways laid along them parallel to

each other, with openings in the stern to admit the cars or trucks laden

with stones. These were wheeled from the quarry to the quay, and so on to

the vessels, till the lines of rails were filled with trucks. The vessels

then proceeded to the works, each bearing its load of stone-laden trucks.

On reaching the breakwater each truck was wheeled to the opening, and the

stones tipped into the sea. During the first five years the amount of

stone deposited gradually rose from 16,000 to 300,000 tons per annum. The

large masses were first lowered, and then smaller stones, quarry rubbish,

&c., to fill up the interstices. The structure was completed in 1841, with

the use of 3,670,444 tons of stone(62) and at a cost of something like a

million and a half of money. A distinguished French engineer, M. Dupin,

who visited the works during their progress, describes in glowing terms

the admirable arrangements, the order and regularity visible in all the

proceedings. “Those enormous masses of stone,” he remarks, “which the

quarrymen strike with heavy strokes of their hammers; and those aerial

roads of flying bridges, which serve for the removal of the superstratum

of earth; those lines of cranes, all at work at the same moment; the

trucks, all in motion; the arrival, the loading, and the departure of the

vessels, all this forms one of the most imposing sights that can strike a

friend to the great works of art. At fixed hours the sound of a bell is

heard, in order to announce the blasting of the quarry. The operations

instantly cease on all sides; all becomes silence and solitude. This

universal silence renders still more imposing the noise of the explosion,

the splitting of the rocks, their ponderous fall, and the prolonged sound

of the echoes.”

“The waves,” said Rennie, “were the best workmen” in the construction of a

breakwater of rough stones, and on the whole his belief was confirmed, for

the storms by which his great work was assailed rather helped than

hindered it, by showing the most desirable slope on the sea-side, while

comparatively little damage was done. The slope of the stone barrier was,

however, by their force changed very greatly. An inclination of three to

one was altered to about five to one, and Rennie had recommended that the

authorities should take a lesson from nature and finish the breakwater

according to her teachings. “It would appear,” says Mr. Smiles,(63) “that

Mr. Whidbey, the resident engineer, contrived to finish most of the

exterior face at a slope of only three to one, as before; and that it

stood without any material interruption until several years after Mr.

Rennie’s death. By that time nearly the whole of the intended rubble,

amounting to 2,381,321 tons, had been deposited, and the main arm, with

200 yards of the west arm, making 1,241 yards in length, had been raised

to the required level. The work had arrived at that stage when it had to

experience the full force of another terrific storm, which took place on

the 23rd of November, 1824. It blew at first from the south-south-east and

then veered round to the south-west, and the effect of this concurrence of

winds was to heap together the waters of the Channel between Bolt Head and

Lizard Point, and drive them, with terrific force, into the narrow inlet

of Plymouth Sound. This storm was not only greatly more violent, but of

much longer duration than that of 1817. When the breakwater could be

examined it was found that out of the 1,241 yards of the upper part, which

had been completed with a slope of three to one, 796 yards had been

altered as in the previous storm, and the immense blocks of stone which

formed the seaface of the work had, by the force of the waves, been rolled

over to the landward sides thus reducing the sea-slope, as before, to

about five to one. The accuracy of Mr. Rennie’s view as to the proper

slope—which was indicated by the action of the sea itself—was thus a

second time confirmed;” and a board of eminent engineers reporting in

accordance, the work was so finished. When the action of the sea had

formed its own slope and had wedged together and settled the great mass of

materials which form the breakwater, and when no further movement was

apparent, but the whole appeared consolidated together, then the slope

towards the sea was cased with regular courses of masonry, dove-tailed and

cramped together, the diving-bell being brought into requisition for

placing the lower courses. A lighthouse has been erected on its western

extremity, and the work may be regarded as a magnificent success, worthy

of a great maritime nation.

A third leading illustration of a magnificent breakwater is afforded at

Portland, and it is deserving of particular mention inasmuch as all

authorities agree that it was constructed with little or no waste of the

public money. “In the mind of the inquiring tax-payer,” said our leading

journal,(64) “breakwaters are always associated with millions of money

thrown broadcast into the sea, in out-of-the-way bays and inlets, which

even without these obstacles to make them more dangerous, the most

distressed mariner would be particularly careful to avoid;” and the writer

goes on to mention several which either ought not to have been attempted,

or where extravagant expenditure has been incurred. “In such a woeful list

of hideous failure and costly mismanagement, it is a comfort to perceive

that the long lane begins to turn at last, and that from our now having

one good standard to go by, we may hope for better things for the future.

Portland breakwater is a really grand and magnificent work, and one of

which the nation may well be proud if it is inclined to let bygones be

bygones, and forget the many successive failures before it was able to

attain so much.” Portland breakwater is the right construction in the

right place, and before its erection the Roads afforded doubtful shelter

to vessels in distress. One advantage it enjoys, that of possessing a

splendid anchorage of stiff blue clay, and being free from rock or shoal

from the island of Portland itself up to the very esplanade of Weymouth.

There, too, was the stone on the very spot; steep and rugged heights for

fortifications, a noble harbour for shipping, and rail communication with

all parts. But all these advantages might have been ignored but for the

formidable nature of the works constructed at Cherbourg. The port itself

is about five hours’ steaming from the French Cronstadt it was designed,

_sub rosâ_, to keep an eye upon. So, in 1844, the commissioners

recommended that it should be made a grand fortified naval station. In

1847 an Act was passed authorising the construction of a breakwater, and

in 1849 the foundation-stone was laid by the Prince Consort.

[Illustration: PORTLAND.]

Nature has provided, in the mighty bank known as the Chesil Beach,

practically a great shingle embankment, protection to Portland Harbour on

the west and south-west, and the object of the breakwater was to secure,

by engineering art, a similar protection to the bay on the south-east

side. The Chesil Bank, though now and for long perfectly impregnable to

the tremendous rollers of the south-westerly gales, was not always so, and

as late as the reign of Henry VIII, great breaches had been temporarily

effected by the power of the sea. Still it affords a splendid protection,

as does now the mighty double breakwater designed by Rendel, and brought

to completion by Coode. The breakwater leaves the shore at the

north-eastern extremity of the island, and runs out due east to a distance

of 600 yards. “This inner limb alone,” wrote an authority in

engineering,(65) “is a splendid achievement of human labour and skill. It

has been top-finished by a grand superstructure of hewn granite, and ends

in a circular head, which has been completed as a fort and mounts eight

guns. The foundations of this massive bastion have been most carefully

planned, with especial reference to the safe passage of the largest

vessels through the 400 feet gap which the fort flanks on one side. The

masonry is continued in a perpendicular line to a point 25 feet below the

lowest water-line of spring-tides. A ship of the line, as is well-known,

draws at the utmost 24 feet. An extra foot of perpendicular masonry,

therefore, having been allowed, the lower masses of the fort begin to

slant outwards, and continue to do so till they reach the firm clay

bottom. This lower portion consists of a well-consolidated mass of unhewn

stone. The outer, and by far the longer limb, of the breakwater begins to

bend away to a point very near due north shortly after leaving the gap,

the further side of which is also flanked by a circular head.... The whole

of this vast outer limb, with the exception of the circular head at its

inner extremity and a fort at the other end, consists of nothing more than

a stupendous bank of rough unhewn stones of all shapes and sizes, tumbled

out of the wagons on the timber staging above. Divers, constantly

employed, have effectually prevented the chance of any holes being left in

the rising mass, and have been able to indicate the precise spot over

which a given number of loads were required to be ‘tipped.’ The security

of the bank is further guaranteed by its enormous width at the base; and

although the waves have already rounded many a giant block below the

water-line and made it look as if its present place had been its abode

ever since the Creation, yet this polishing and grinding is the extent of

the effect which they will be able to produce upon a work probably

destined to hold its own as long as Portland itself.”

The rapidity with which the breakwater was constructed reflected great

credit on Mr. Coode. The actual routine of the construction followed, when

the line for the structure had been sounded and carefully marked out, was

to commence piling for the railway that was to carry the long trains of

wagons filled with the stone; and when a short piece of this was

completed, to go on “tipping in” the rubble and rough stone till they made

their appearance above water at last; then the piling was carried forward

a few yards more, and the process repeated, and so on by successive stages

to the completion of the work. All appears very simple on paper until we

learn that it had to be accomplished through eleven fathoms of rough

tumbling waves. One night’s rough weather often swept away the timber-work

that cost many thousands of pounds, and many months of labour to construct

and fix in its position in the sea. The piling that had to resist the

action of a deep and heavy sea, and to carry also, at a height of 90 feet,

a railway for the heaviest traffic, required to be something more than a

common framework of timber. Every log used had to be first of all

saturated to its very centre with creosote, and this was done in a most

ingenious manner. A great boiler, 100 feet long and 7 feet in diameter,

was filled with the largest and finest logs procurable; the mouth being

closed with a solid air-tight cover, the air was pumped out, not only from

the tube, but from the very pores of the wood itself. When the vacuum was

as complete as possible, the creosote was admitted from tanks at the

bottom and forced into the timber by hydraulic power of about 300 lbs. to

the square inch. In this the logs remained for two or three days, by which

time the creosote was forced into the fibre of the wood. Several of the

logs thus prepared were bolted and bound together, till one huge spar 90

feet long, and eight or nine tons in weight, was formed. Then an iron

“Mitchell” screw—as used in the lighthouses built on sands, already

described—was affixed at the lower end, and the whole sunk till it rested

on the bottom, when it was worked round by a capstan till it was firmly

screwed into the clay. Thus secured, they were tolerably safe, though

single heavy waves would uproot piles and moorings together, to obviate

which two or three piles were generally set at the same time, and well

bound together by powerful cross timbers.

The stone quarried for the breakwater from the very top of Portland Island

was largely excavated and brought to the spot by convict labour. The stone

itself used was unfit for architectural purposes, but quite suitable for

the breakwater. The convict prison, also on the top of the island, was

virtually the barracks for 900 labourers, who were more profitably

employed than in walking a treadmill or picking oakum. The quarries were

some 400 or 500 feet above the level of the breakwater, and the stone was

conveyed to it by three inclines of broad double gauge rails. The trains

of trucks or wagons were worked up and down with a wire rope over a drum,

the weight of the loaded descending wagons winding the empty ones up again

to the quarries. A powerful locomotive pushed the loaded trains to the end

of the work, where the stone was tipped into the sea, as much as 3,000

tons a day having been sunk at Portland. The total amount so committed to

the deep was about 5,360,000 tons, and the area protected by the

breakwater would accommodate sixty of the very largest men-of-war, and

almost any number of smaller vessels.

“During the progress of the works,” wrote Mr. Moule, “the engineer has

from time to time instituted some highly interesting investigations into

the structure of the Chesil Bank.... During a single night’s gale, between

three and four _millions of tons_ weight of pebbles have been found to be

swept away into the gulfs of the Atlantic, being gradually thrown back

again in the three or four following days. The size of the pebbles had

long been observed to vary greatly at the two opposite ends of the beach.

At the western, or Abbotsbury end, they are exceedingly small, more

resembling gravel than shingle. At the Portland end it is not uncommon to

meet with them several inches in diameter, and several pounds in weight.

This phenomenon has been explained by the very probable assumption that

the pebbles are driven eastward by the wind-waves, and not moved by the

slow and (for purposes like this) powerless tidal current. The larger

pebbles, presenting a broad surface to the waves, are easily rolled

forward, while the smaller ones are passed by, offering a less surface,

and becoming more easily imbedded in the sand.” It is said that a

practised smuggler on that coast could tell his whereabouts on the bank in

the darkest night or thickest fog, by feeling the size of the pebbles on

which he stood. And smugglers and “wreckers” were once very numerous among

the Portlanders. In these better days their courage and great personal

strength has saved many a life and ship endangered off the bank.

An old and popular song says that—

“Britannia needs no bulwarks,

No towers along the steep,”

but recent legislators have evidently not been so thoroughly satisfied of

the fact, or they would not have authorised the construction of the great

fortifications at Portland, which make it almost the Gibraltar of the

Channel. The splendid breakwater there did not need protection. All the

battering it is ever likely to get could not injure it seriously, and

whatever ruins Macaulay’s New Zealander may stand upon, they are not

likely to be those of a great breakwater, each year of the existence of

which renders it generally more compact. But it was for good reasons that

the extensive works of Portland were undertaken. “We,” said the _Times_,

“of all people in the world, who so toiled and suffered, lavishing blood

and treasure under the walls of Sebastopol, should be the last to

underrate the importance of a good fortification as a check to an invading

army.” The reader will hardly require any defence of such policy, for

naval arsenals contain the very germ of our power, as the iron safe of the

prudent man contains his valuables.

The Bill of Portland greatly resembles the situation of Gibraltar. There

are the same bold, steep, rocky headlands; the breakwater stands in place

of the Mole, and Chesil Bank connects it with the mainland, as the neutral

ground does our great Mediterranean citadel with Spanish soil. “Its

height, its isolation, and the harbour it commands, all pointed it out as

a place for an impregnable—we had almost said an inaccessible—fortress. To

the late Prince Consort is due the credit of having seen its vast

importance in this respect, as it was also owing to his enlightened

judgment that the breakwater was begun at last, and he himself laid the

foundation-stone. Portland is rising, as we have said, into a first-class

fortress, of which the Verne is the great key or citadel.” So spoke the

_Times_, in 1863; and now Portland is the best fortified port and naval

station in the kingdom.

The Verne is a height which, like La Roche at Cherbourg, dominates over

all around it for miles, especially on the side which overlooks the

breakwater and the sea. On the north side it is protected by nearly

perpendicular cliffs; elsewhere it is fully protected by art. One of its

greatest defences is the dry ditch which completely encircles the whole

work, except on the north side just mentioned, where it is both

unnecessary and impossible. This ditch is one of the greatest ever

undertaken in ancient or modern days. Its depth is 80 feet, and its width

100, and in some places 200 feet; its length is nearly a mile, and its

floor is 368 feet up the hill-side. Nearly two million tons of stone had

to be blasted to form it; and it would never have been excavated on the

colossal scale indicated, but that all the said stone was utilised in

building the breakwater. With this tremendous artificial ravine to cross,

with fortifications and bastions fully prepared with heavy Armstrong

ordnance towering above, what enemy is ever likely to attack the citadel

of the Verne? Our leading journal spoke of it as more compact than

Cherbourg, Cronstadt, or Sebastopol, while it is more than three times

their elevation above the sea.

Jutting out from the main fortress are two bastionettes, one of which has

eight faces, mounting guns on each so as to sweep with a murderous fire

two-thirds of the whole length of the fosse or ditch. The other is nearly

as formidable, and both are pierced with loop-holes in all directions for

the fire of riflemen. The great barracks in the enclosure of the Verne

can, at a pinch, accommodate 10,000 men, the peace garrison being about a

third of that number. The arrangements for water supply are perfect, great

reserve tanks having been cut from the solid rock, and covered with

shot-proof roofs. These are kept full, and, protected from air and light;

the water is always sweet. Portland bristles with batteries; but the Verne

commands everything in range of cannon, inside or outside the breakwater,

including all parts of the island, and can cross fire with other important

forts. It is probably the strongest fortified harbour in the world.

[Illustration: HOLYHEAD BREAKWATER.]

Other and important breakwaters, like that of Holyhead, which cost a

couple of million sterling, and which is generally cited as an example of

much money thrown into the sea; Alderney, which has swallowed up close on

three-fourths of the above sum; and Dover, which has a fine _vertical_

sea-wall, might be mentioned. Enough has been said to show the general

importance of the subject to a maritime people, and that, on the whole,

England has been fully alive to the fact. Indeed, counting large and small

breakwaters and sea-walls, more has been expended in this country for

these works than in any two or three foreign countries possessing

sea-boards.