~Table 15--Average Cost for Labor for Sand Handling.~

(_A_) ~Per Million Gallons Pumped To Filter.~

=============+=======+=======+=======+=======+=======+========+========

Month. | Scrap-| Eject-| Wash- |Smooth-|Raking.| Re- | Total.

| ing. | ing. | ing. | ing. | |sanding.|

-------------+-------+-------+-------+-------+-------+--------+--------

1909.

-------------+-------+-------+-------+-------+-------+--------+--------

July | $0.10 | $0.21 | $0.03 | $0.02 | ... | $0.21 | $0.57

August | 0.07 | 0.16 | 0.03 | 0.01 | ... | 0.04 | 0.31

September | 0.05 | 0.13 | 0.02 | 0.01 | $0.01 | 0.27 | 0.49

October | 0.06 | 0.15 | 0.03 | 0.01 | 0.02 | 0.12 | 0.39

November | 0.02 | 0.06 | ... | ... | 0.02 | ... | 0.70

December | 0.02 | 0.04 | 0.01 | ... | 0.01 | 0.01 | 0.09

-------------+-------+-------+-------+-------+-------+--------+--------

1910.

-------------+-------+-------+-------+-------+-------+--------+--------

January | 0.04 | 0.07 | ... | 0.01 | 0.02 | ... | 0.14

February | 0.04 | 0.10 | ... | 0.01 | ... | 0.02 | 0.17

March | 0.04 | 0.06 | ... | 0.01 | 0.01 | 0.05 | 0.17

April | 0.10 | 0.15 | 0.04 | 0.01 | 0.02 | 0.06 | 0.38

May | 0.02 | 0.03 | 0.01 | ... | 0.01 | 0.11 | 0.18

June | 0.02 | 0.04 | ... | ... | 0.02 | 0.01 | 0.09

-------------+-------+-------+-------+-------+-------+--------+--------

Average | 0.05 | 0.10 | 0.01 | 0.01 | 0.01 | 0.08 | 0.26

-------------+-------+-------+-------+-------+-------+--------+--------

Fiscal years:| | | | | | |

-------------+-------+-------+-------+-------+-------+--------+--------

1905-06 | 0.06 | 0.29 | 0.02 | 0.06 | ... | 0.04 | 0.47

1906-07 | 0.07 | 0.20 | 0.05 | 0.02 | ... | 0.24 | 0.58

1907-08 | 0.09 | 0.14 | 0.03 | 0.01 | 0.02 | 0.13 | 0.42

1908-09 | 0.07 | 0.15 | 0.03 | 0.01 | 0.01 | 0.14 | 0.41

-------------+-------+-------+-------+-------+-------+--------+--------

~Table 15~--(_Continued._)

(_B_) ~Per Cubic Yard of Sand.~

=============+=======+=======+=======+=======+=======+=======+=========

Month. | Scrap-| Eject-| Wash- |Smooth-|Raking.| Re- | Total.

| ing. | ing. | ing. | ing. | |sanding.|

-------------+-------+-------+-------+-------+-------+--------+--------

1909.

-------------+-------+-------+-------+-------+-------+--------+--------

July | $0.08 | $0.15 | $0.03 | $0.01 | ... | $0.10 | $0.37

August | 0.07 | 0.15 | 0.03 | 0.01 | ... | 0.11 | 0.37

September | 0.07 | 0.17 | 0.03 | 0.01 | ... | 0.17 | 0.45

October | 0.06 | 0.15 | 0.03 | 0.01 | ... | 0.09 | 0.34

November | 0.10 | 0.23 | 0.02 | 0.02 | ... | ... | 0.37

December | 0.12 | 0.25 | 0.04 | 0.02 | ... | 0.08 | 0.51

-------------+-------+-------+-------+-------+-------+--------+--------

1910.

-------------+-------+-------+-------+-------+-------+--------+--------

January | 0.10 | 0.19 | ... | 0.02 | ... | ... | 0.31

February | 0.07 | 0.15 | ... | 0.01 | ... | 0.09 | 0.32

March | 0.06 | 0.11 | ... | 0.02 | ... | 0.08 | 0.27

April | 0.07 | 0.09 | 0.03 | 0.01 | ... | 0.05 | 0.25

May | 0.06 | 0.09 | 0.03 | 0.01 | ... | 0.06 | 0.25

June | 0.06 | 0.12 | ... | 0.01 | ... | 0.10 | 0.29

-------------+-------+-------+-------+-------+-------+--------+--------

Average | 0.07 | 0.14 | 0.02 | 0.01 | ... | 0.10 | 0.34

-------------+-------+-------+-------+-------+-------+--------+--------

Fiscal years:

-------------+-------+-------+-------+-------+-------+--------+--------

1905-06 | 0.07 | 0.35 | 0.04 | 0.07 | ... | 0.14 | 0.67

1906-07 | 0.06 | 0.19 | 0.03 | 0.02 | ... | 0.17 | 0.47

1907-08 | 0.09 | 0.15 | 0.03 | 0.01 | ... | 0.14 | 0.42

1908-09 | 0.06 | 0.14 | 0.03 | 0.01 | ... | 0.13 | 0.37

=============+=======+=======+=======+=======+=======+=======+=========

For convenience in referring to the different systems, the combined

rapid and slow sand filter will be designated as Filter Plant No. 1,

the combined Maignen scrubber and slow sand filter as Filter Plant

No. 2, and the combined coagulating basin and slow sand basin as

Filter Plant No. 3.

The length of run of Filter Plant No. 1 was relatively long at

first. The rapid rate of filtration, however, tended to carry the

clay, which was suspended in the applied water, to a considerable

depth in the filtering material, so that the runs gradually

decreased in length until they were reduced to about three days.

Unfortunately, it was necessary to use unfiltered water for washing,

which, together with the great penetration from the applied water,

finally made it necessary to remove all the filtering materials, and

wash them.

Although this preliminary filter was operated at a high rate, its

efficiency was quite satisfactory. In fact, at times when the

applied water was comparatively good, very little work was left for

the slow sand filter. At times of high turbidity, however, some of

the exceedingly fine mud in the applied water passed through this

filter, as well as the slow sand filter connected with it, and it

proved to be absolutely impossible to produce a clear effluent at

all times with this combination.

Filter Plant No. 2 proved more economical and convenient in

operation, but somewhat less efficient than Filter Plant No. 1.

Neither filter could be depended on to give a clear effluent when

the applied water was turbid.

In the operation of Filter Plant No. 3, sulphate of alumina was used

when the applied water contained too much turbidity to be treated

satisfactorily by slow sand filters.

When the water was comparatively clear, either one of the three

systems, or slow sand filtration alone, was entirely satisfactory.

At times of high turbidity, however, Filter Plant No. 3 was the only

one which could be depended on to produce a clear effluent.

A fair comparison between the results of the three systems when

treating turbid water in January, 1908, is given in Table 16.

Table 16 shows very clearly that neither Filter Plant No. 1 nor No.

2 would prove at all satisfactory when treating turbid water, while

No. 3 could be depended on under all conditions. The results of

operation are shown in detail in Tables 17, 18, and 19. It will be

noticed in Table 17, that on March 10th, 1908, Filter Plant No. 1

was put out of service and a Puech system of preliminary filters was

substituted for it.

The Puech preliminary filters consisted of five units containing

gravel of varying sizes through which the water was filtered

successively before it was finally applied to the final slow sand

filter. A general idea of this system may be obtained by referring

to Figure 8.

~Table 16--Turbidity Results with Experimental Filters,

During Period of High Turbidity, January, 1908.~

Columns:

A - Effluent preliminary filter.

B - Effluent sand filter.

C - Effluent preliminary filter.

D - Effluent sand filter.

E - Effluent coagulant basin.

F - Effluent sand filter.

============+======+=============+=============+==============

| Raw |Filter No. 1.|Filter No. 2.|Filter No. 3.

Date. |water.|------+------+------+------+------+-------

| | A | B | C | D | E | F

------------+------+------+------+------+------+------+-------

January 12th| 40 | 10 | 1 | 12 | 1 | 2 | 0

January 13th| 110 | 45 | 2 | 51 | 2 | 2 | 0

January 14th| 210 | 95 | 3 | 113 | 4 | 2 | 0

January 15th| 325 | 190 | 12 | 222 | 15 | 3 | 0

January 16th| 360 | 210 | 37 | 247 | 42 | 5 | 0

January 17th| 242 | 122 | 24 | 147 | 26 | 6 | 0

January 18th| 137 | ... | ... | 73 | 7 | 6 | 0

January 19th| 117 | 40 | 12 |clean-| ... | 5 | 0

| | | | ing | | |

January 20th| 72 | 31 | 6 | sand | ... |clean-| 0

| | | |filter| | ing |

January 21st| 55 | 20 | 4 | 25 | 4 | sand | ...

January 22d | 49 | 17 | 3 | 21 | 4 |filter| ...

January 23d | 40 | 12 | 3 | 15 | 3 | 3 | 0

January 24th| 40 | 11 | 3 | 13 | 3 | 3 | 0

============+======+======+======+======+======+======+=======

It is unfortunate that this system was not in operation in January,

1908, when the water was cold and turbid. The results, however,

indicate that it would be no more successful than either Filter

Plant No. 1 or No. 2.

_Experimental Rate Studies._--In September, 1908, an experimental

plant consisting of six small filters was put in operation. The

object of these experiments was to study the relative efficiencies

and cost for the operation of slow sand filters when operated at

different rates.

The units of the plant consisted of cylindrical galvanized-iron

tanks 4 ft. in diameter and 9 ft. high. The filter sand in these

tanks was taken from the supply for the main filters. It was

supported on gravel layers and supplied with under-drains of

suitable sizes for the proposed rate of flow in each case.

The units of the experimental plant were designated as Nos. 1, 2, 3,

4, 5, and 6, and it was the original intention to operate them at

rates of 1,000,000, 3,000,000, 6,000,000, 10,000,000, 30,000,000,

and 100,000,000 gal. per acre daily, respectively.

This schedule of rates was carried out in a general way with all the

filters, with the exception of Nos. 5 and 6. For these, the rates

were found to be higher than could be maintained for any great

length of time, owing to the deeper penetration of the mud in the

filter sand, which caused high initial losses of head, short runs,

and deep scrapings. A rate of about 30,000,000 gal. was maintained

in the case of Filter No. 5 from the time it was started on

September 9th, 1908, until November 8th, 1909, when it was reduced

to about 17,000,000 gal., which rate was maintained thereafter until

the filter was shut down in February, 1910.

[Illustration: ~Figure 7--Plan of Filter-House and Equipment.~]

In the case of Filter No. 6, it was found impossible to maintain a

rate of 100,000,000 gal. for more than a very few days at a time. It

was started at about this rate, however, at the beginning of each

run, and kept as high as possible for the remainder of the time

during the first seven runs. At the end of the seventh run, on

October 17th, 1908, the filter was given a very deep scraping and

re-sanded.

[Illustration: ~Figure 8--Diagrammatic Sketch Showing Arrangements for

Testing "Puech" System of Water Filtration at Washington D. C.,

U. S. A.~]

The layer of clean sand restored the original capacity, and the

filter was operated as before, but with gradually decreasing rates

until December, 1908, when the rate was reduced to about 40,000,000

gal. Even this lower rate was too high to be maintained without

removing and replacing a large part of the sand. The rates,

therefore, gradually decreased to about 23,000,000 gal. on March

13th, 1909, when the filter was again re-sanded. After this

re-sanding the rate was reduced to about 20,000,000 gal., and the

filter was operated at approximately that rate until it was again

re-sanded on November 13th, 1909, when the rate was again reduced to

about 14,000,000 gal., which was maintained until the filter was put

out of service on February 28th, 1910.

This experimental plant was in service from September, 1908, to the

latter part of February, 1910, or for about 1-1/2 years, and the

leading results are summarized in Table 20.

~Table 17--Record of Experimental Filter Plant No. 1.~

Columns:

A - Rate, millions of gallons per acre daily.

B - Loss of head.

C - Rate, millions of gallons per acre daily.

D - Loss of head.

E - Applied water.

F - Effluent preliminary filter.

G - Effluent final filter.

H - Applied water.

I - Effluent preliminary filter.

J - Effluent final filter.

Transactions of the American Society of Civil Engineers, vol. LXXII, June, 1911 Water Purification Plant, Washington, D. C. Results of Operation. · 第 3 / 11 段