CHAPTER IX

PART ONE.--ALUMINUM WELDING

(=117=) So far as the actual fusion of aluminum is concerned, it is

probably more easily learned than any other metal, but on account of

the rapid conductivity of heat and the loss of most of its strength

when heated, aluminum has caused much concern among oxy-acetylene

welders.

(=118=) There are two methods used in welding aluminum, the flux

method and the puddle method. The puddle system gets its name from

the use of a puddle stick or spoon-like rod which is used to stir the

metal together, and is very satisfactorily used on all cast aluminum.

The flux method is applied to both cast and sheet aluminum and it is

so-called because a flux is used to break up the oxide along the line

of weld. The discussion to follow applies only to cast aluminum. It

is in this metal that most interest is centered, as the welding of

sheet aluminum, such as is found in automobile bodies and some cooking

utensils, is not encountered in the ordinary run of work.

[Illustration:

(_Courtesy of the Torchweld Equipment Co._)

FIG. 76.--Showing Aluminum Crank Cases Before and After Welding.]

(=119=) When working with the flux method about the same sized tip is

used as when working on cast iron. This is applied to the line of weld

and held there until the oxide on the surface commences to wrinkle

and small globules of a mercury-like appearance form on the surface.

When heat is introduced in aluminum it is transmitted throughout the

piece in the same manner as occurs in copper and brass, therefore it

will require much more time to heat the work than the same sized piece

of cast iron or steel. As soon as the weld assumes the condition

mentioned, fast work is necessary or the metal will collapse, for it

loses most of its strength when heated to this condition. The end

of the filler-rod bearing the flux is brought down on the metal and

immediately the surfaces will clear up and run together, like so much

mercury. The torch is instantly jerked away and applied farther along

the weld. The theory of this reaction is that the heavy aluminum

oxide is the only thing which prevents the metal flowing together

when heated, and as soon as the flux is introduced this oxide will be

destroyed along the line of weld and a fusion of the metal effected.

This actually takes place, providing enough heat has been introduced

to permit this reaction to penetrate the depth of the weld. The

flux contains the chemicals necessary to cause this reaction if the

metal is in the right condition. There are many welders who do not

use sufficient heat and blame the faulty results upon the flux. On

the other hand, there are many fluxes which are absolutely useless

in performing a function of this kind. The chemicals necessary in

compounding a good flux for this class of work are expensive and

therefore this flux cannot be procured at a low price. When the weld

is finished and cooled the surface should be scrubbed with soap and

water to remove all traces of the flux, otherwise a corrosion may occur

a month or so afterwards, and while it may not affect the weld in any

degree, the owner of the piece may not be pleased at the sight. It is

therefore advisable to remove all traces of flux used on aluminum work.

(=120=) The puddle system differs from that of the flux, insomuch

that when the metal has been brought to the same heat, where the flux

has been applied it will be found that the metal is really in a pasty

condition. It can be stirred together and the break entirely eliminated

by the use of a puddle stick, either of a pointed or a flat spoon-shape

design, as shown in Fig. 77. During this puddling stage, the torch

is usually held in the left hand with the flame some distance away

from the work, only introducing enough heat to keep the puddle pasty.

The puddle stick is handled by the right hand and when extra metal

is needed the puddle stick is laid aside and the aluminum filler-rod

is picked up and worked into the weld. When sufficient metal has

been added the puddle stick again comes into play and can be used in

stirring the metal together and finishing it off in the desired manner.

Reinforcing the weld will apply to aluminum the same as every other

metal, and a very neat job can be made after a little practice with the

puddle stick. At times some of the aluminum may adhere to the stick,

which is made from a quarter-inch piece of steel filler-rod, but this

can be removed by scraping it upon the fire bricks which should be in

the vicinity of the weld.

[Illustration: FIG. 77.--“Puddle-sticks” for Welding Aluminum.]

(=121=) There are two kinds of filler-rods used in aluminum welding.

Both are aluminum, but one is cast and the other is a drawn rod. This

same difference will also be noticed in bronze filler-rods, and there

has been much discussion as to which is the desirable one to use.

Neither of them is supposed to be 100 per cent pure aluminum, as such a

filler-rod does not give the desired results under the action of the

flame. A matter of from 90 to 95 per cent aluminum, with 5 per cent to

10 per cent of copper present as an alloy, is found to make a stronger

and more successful weld. It is recommended, if possible, to use the

drawn rods whenever available; for a weld at best is only a casting,

and if this casting can be made from virgin metal, rather than recast

from metal which has been cast many times and the contents not known,

it is thought that the results will be far more satisfactory. A weld

made with such a filler-rod, care being taken to work out the oxides,

will compare very favorably with the strength of the original metal and

in many instances a reinforcement will make it much stronger.

(=122=) To combine the two methods of welding aluminum is not

recommended. If the flux were stirred up inside the weld with a puddle

stick an unsatisfactory weld would result, so they are to be kept

entirely separate. It is not necessary to “V” out aluminum for the

same reason as other metals are “V-ed” out. When it is in workable

condition it can be puddled and stirred about as desired. It is well,

however, to “V” out slightly for the sake of marking the line of weld.

When aluminum is heated up, the expansion which occurs may close up

the crack, which was previously quite visible, in such a manner that

it cannot be located without much loss of time. Ordinary chalk or

soapstone, if available, may be used to mark any preheated work, but

the use of a chisel along the line of weld is the most reliable method.

PART TWO.--ALUMINUM WELDING

(=123=) It will be noticed, when welding aluminum, that bright surfaces

will oxidize immediately when exposed to the air. This action occurs

perhaps faster on aluminum than on any other metal. With this oxide

or scale present the metal will not run together nor fuse, no matter

how much heat is applied. The metal may be molten on each side of an

oxidized crack and at times will cause the line of fracture to even

float, but if the oxide is not destroyed the metal will not fuse.

As has been noted previously, two methods are used to destroy this

oxide, namely, the flux method and the puddle system. On account of

this exceedingly rapid oxidation, it will be found to the operator’s

advantage to complete his aluminum welds as quickly as possible in

order that he will have less of this oxide to combat. It will be found

in using the puddle system that greater haste can be made by using the

torch in the left hand, leaving the right free to do the puddling and

to add whatever metal is necessary. In this method most of the success

depends upon the operator’s skill in handling his puddle stick and

puddling in additional metal. Generally the right hand can do this more

rapidly than the left.

(=124=) It is well to learn how to make a successful weld from one

side of the metal only, and while this will apply to all metals, it is

especially advantageous in working aluminum. Where a small layer of

metal has been added to one side of an aluminum job, such as a crank

case, and it does not penetrate the entire thickness of the metal, when

the other side is turned, and the flame applied to it, a difference in

temperature and the loss of strength in this metal when heated will

cause the first side welded to crack unless the operator is extremely

cautious. Therefore it is always well to learn how to penetrate the

entire thickness of the metal from one side and make a satisfactory

weld in this manner.

(=125=) As previously stated, aluminum when melted loses most of its

strength, and if not supported by some means or other the metal will

collapse. On account of this it is advisable to back up aluminum work,

when possible, whether the job is to be done cold or in preheated

condition. The most successful manner of backing up is shown in Fig.

78, wherein _A_ represents a thin sheet of copper which has been fitted

to the work, and daubs of asbestos cement shown at _B_ will aid to some

extent in holding the plate in position, but this alone should not be

depended upon. A prop or fire brick, upon the top of which has been

placed a cushion of cement, will serve as a good backing, but where

this cannot be accomplished filler-rods may be bent in the manner shown

in Fig. 78. These filler-rods are not of the springy type, but are of

soft wire and the loop as shown is not for a spring effect, but merely

to take care of the contraction and expansion of the wire. Copper is

given a preference over most of the other sheet metals, because it

can be peened with a hammer to any shape desired, and many odd shaped

additions can be formed by its use.

[Illustration: FIG. 78.--One Method Used to “Back Up” Aluminum Work,

when Welding. _A_ Represents a Sheet of Copper; _B_, Asbestos Cement.]

(=126=) The use of clamps, when working on aluminum, is not recommended

on account of the great conductivity of heat and the weakening of the

metal as it approaches the melting-point. Pressure of any kind is not

desired and the operators who attempt to use clamps will regret it

sooner or later.

(=127=) In aluminum work contraction and expansion take place the

same as in other metals, only to a much greater extent, and greater

allowances must be made. However, the same rules can be applied when

determining whether work should be preheated or not, for if the

ends are free to move, the work can usually be accomplished without

preheating, whereas if confined, it will be necessary. When preheating

is necessary the whole piece must be treated in the same way,

regardless of the size. If only part of the work were preheated and the

balance left exposed, it would be almost impossible to avoid warpage

and shrinkage strains, which would render the work useless. Always

preheat the entire piece if any portion requires it.

(=128=) Great care must be exercised when setting up aluminum work

for preheating. Its weight should be distributed equally on whatever

support is used, so that there will be no danger of any one part

sagging, thereby throwing the whole piece out of alignment. A good way

of accomplishing this is to lay fire bricks on their flat side, in such

a manner that the weight of the work will be fairly well distributed.

Then put a daub of clay or asbestos cement on each brick and press

the aluminum piece down on this cushion. This will overcome the use

of shims and other methods used for jacking up the work, which are

unreliable.

(=129=) If charcoal is to be used as a preheating fuel, an oven of fire

brick should be built up with draft holes in the bottom layer of brick,

as described in the chapter on Preheating. A layer or two of charcoal

is then ignited. The oven is then covered with asbestos paper or a

piece of sheet metal. Asbestos paper is preferable as the metal becomes

very hot and is apt to burn the operator. After the fire has received

a good start, additional charcoal is added until sufficient heat is

obtained. This can be determined by sprinkling a little sawdust on the

surface of the aluminum, and if it chars readily, the work is ready to

weld. Other methods have been outlined previously, any or all of which

may be used in learning this heat. In executing the weld as little of

the work is exposed to the air as possible, in order to hold a uniform

heat and not permit any part to become chilled. At the completion of

the weld the oven is covered over, the openings in the bottom row of

bricks are stopped up, and the piece allowed to cool with the dying

fire. The charcoal process is the slow but sure method of handling

preheated aluminum work, and is always recommended.

(=130=) When preheating aluminum with torches burning kerosene or gas

a different kind of oven is built, as previously described in the

lecture on Preheating. No openings are left in the lower row of bricks

and the oven is built very much closer to the work being preheated. As

the object is to confine as much heat as possible and have a uniform

temperature throughout, it is not desirable to have such ovens loosely

constructed. If the bricks are irregular, a double wall can be built

with a layer of asbestos between them. Such a procedure is always

recommended if time and bricks permit. A hole is left in one end of

the oven for the preheating torch flame to enter. On aluminum work the

flame is never played directly upon the metal. A baffling plate of

metal or fire brick is used to distribute the flame around the sides of

the piece and very satisfactory results may be obtained by preheating

in this manner.

PART THREE.--ALUMINUM WELDING

(=131=) Many times aluminum crank cases which have large holes punched

in them and parts missing are brought to a welder for repairs. A

question arises as to whether it is best to back up these holes and

fill in the missing parts with a filler-rod as the welding progresses,

or whether these parts should be cast separately or cut out of another

crank case. It will generally depend upon the size of the hole, as to

the desirable procedure in a case of this kind. It must be remembered

that if the casting and welding are to be done at one and the same time

each additional layer of metal must be fused to the last layer and that

in reality a great deal of welding is necessary. In addition this added

metal must be fused to the crank case. On small holes, perhaps two or

three inches in diameter, this method is recommended, but if the hole

is much larger, it is best to cast a piece and then weld it in, for in

this instance there is only one line of weld to look after.

(=132=) On aluminum work it is proper to weld from the closed end of a

crack toward the open, whether the piece has or has not been preheated.

This is true also of all other metals, for if the weld were to be

started at the open end and worked backwards there would certainly be

internal strains set up, which would be undesirable. If it is not clear

which end is the open one, the operator should stop a moment and figure

it out.

(=133=) Were a suspension arm of the U type on an aluminum crank case

to break about three or four inches from the body of the case, it could

be welded in place without dismantling the motor, if handled properly.

Free access must be had to the line of break, so that the operator

can manipulate his flame at whatever angle he thinks best. Due to the

contraction and expansion, which may throw the piece being welded out

of alignment slightly, it is best to blank the bolt hole at the end

of this suspension arm and face it off, before the piece is welded in

position. Later a new hole can be drilled which will line up accurately

with the frame, and the welder will not then have to worry or attempt

to return it exactly to its former position. In order to keep the case

itself as cool as possible, wet asbestos should be packed around it,

near the broken arm, so that too much heat will not be absorbed by it.

The broken end is then tacked in position at two or three places and

the weld started. On such a problem the puddle system will be found

best, for both horizontal and vertical welding are to be done, as

well as some overhead. As flux causes the metal to flow, it is rather

difficult for the beginner to apply it to vertical and overhead work.

The puddle stick should work through the metal its full thickness and

eliminate every possible trace of the break, digging out the old metal

where dirt is found, and adding new metal for reinforcing. When one

side has been welded and reinforced it should not be allowed to cool

while the other side is being worked. The torch should be played upon

it every now and then, in order that the whole line of weld will be at

approximately the same temperature; otherwise, the weld may break in

cooling. The ease with which aluminum is puddled together, which many

welders have likened to the children’s method of making mud pies, seems

so simple to the beginner that he cannot see where the strength comes

from when cooled. On account of this, he invariably works his aluminum

too long. After welding a few test bars of this metal and breaking them

in the line of weld, many old welders will gain confidence upon seeing

the results of their own efforts.

Oxy-acetylene welding manual · 第 9 / 12 章