Hudson River Tubes of the Hudson & Manhattan R. R. Co.]

A tunneling shield consists essentially of a tube or cylinder slightly

larger in diameter than the tunnel it is intended to build, which slides

over the exterior of the finished lining like the tubes of a telescope.

The front end of this cylindrical shield is provided with a diaphragm or

bulkhead in which are apertures which may be opened or closed at will.

Behind this diaphragm are placed a number of hydraulic jacks, so

arranged that by thrusting against the last erected iron ring the entire

shield is pushed forward. The hind end of the shield is simply a

continuation of the cylinder which forms the front end, and this hind

end, or tail, always overlaps the last few feet of the built-up

iron-shell tunnel.

When the openings in the bulkhead are closed, the tunnel is protected

from the inrush of water or soft ground, and the openings may be so

regulated that control is maintained over the material passed through.

After a ring of iron lining has been erected within the tail of the

shield, excavation is carried out ahead. When sufficient excavation has

been taken out, the jacks are again extended, thus pushing the shield

ahead, and another ring of iron is erected as before.

[Illustration: ONE OF THE SIXTY-SEVEN-TON TUNNEL SHIELDS]

For the erection of these heavy plates, a hydraulic swinging arm, called

the “Erector,” is mounted, either on the shield itself or on an

independent erector platform, according to conditions. This erector

approaches closely the faculties of the human arm. It is hydraulically

operated and can be moved in any desired direction. This method of

construction can be followed in almost every kind of ground that can be

met with, and it is especially valuable in dealing with soft, wet

grounds. In passing through materials saturated with water, the shield

is assisted by using compressed air in the working chamber.

[Illustration: CUTTING SHIELD HEAD]

The employment of compressed air under such conditions is really a

rather simple thing in itself, and means merely that the pressure of air

in the chamber where men are working is maintained at a point sufficient

to offset the pressure of the hydrostatic head of water and thereby

prevent its inflow. A crude comparison may be made by saying that if the

ceiling of a room was weak and threatening to fall--if we filled the

room with sufficient pressure of air, it would support the ceiling and

prevent it falling in. In tunnel work, air is supplied under compression

from the mechanical construction plant located on the surface, and the

pressure of air maintained in the working chamber is determined by the

depth of the work below tide level, as the hydrostatic head increases

with the depth.

Control of air pressure is never entrusted to any but the most reliable,

competent and experienced man, as it is of the utmost importance that

air pressure be maintained properly. The first impulse of an

inexperienced man, should he notice an inrush of water, would be to

increase the air pressure, which might be a very dangerous thing to do.

An experienced man, however, would very likely first lower his pressure

in such an emergency, and then put up with the nuisance and difficulty

of having a good deal of water in his working chamber. By doing this, he

would permit the greater external pressure to squeeze the soil into the

leaking pockets and thereby choke the leak.

[Illustration: APRON IN FRONT OF SHIELD, FIVE MINUTES BEFORE SHOVING]

To improperly or inopportunely raise the air pressure would be quite

likely to result in the air blowing a hole through the roof of the

tunnel heading, allowing all air pressure to escape, and permitting an

uncontrollable volume of water to rush in and flood the work.

The outer shell of the tunnel shield is composed of two- or three-ply

boiler plates, and the interior is braced with a system of steel

girders. The shields used weighed approximately sixty-seven tons each.

Sixteen or eighteen were used. To move the shield forward, each shield

was equipped with sixteen hydraulic jacks, arranged around the shield

circumferentially. These jacks were controlled by a series of valves,

which were so designed that any one jack or any set of jacks desired

could be operated. This was necessary as the direction of the shield

was, as it were, guided by the pressure of the jacks. When it was

desired to alter the direction of the shield, either upwards or

downwards, or to the right or left, the jacks on the opposite side to

which the shield was to point, were operated. The hydraulic pressure

operating these jacks was 5,000 pounds per square inch, and the total

energy, when all jacks were employed at the same time, was equivalent to

2,500 tons, which was equal to eleven tons per square foot of heading.

[Illustration: CUTTING EDGE OF SHIELD IN NORTH TUNNEL]

Air pressure used to prevent the inflow of water and soft dirt varied

from nothing up to forty-two pounds, although a fair average throughout

was thirty-two pounds. It varied, of course, according to the condition

encountered.

The working chamber is the space between the tunnel heading where work

is in progress and the air-lock. The air-lock is a device used for the

purpose of enabling workmen and materials to pass from the portion of

the tunnel where the atmospheric pressure is normal into the portion

where the air pressure is greater than normal; that is, the working

chamber. The air-lock is a cylinder, usually about six feet in diameter

and twenty feet in length, with a heavily constructed iron door at each

end. This lock is placed horizontally in the tunnel at such a level as

the conditions of the work necessitate, but usually near the bottom, and

around this cylinder, and completely filling the cross-section of the

tunnel, a concrete bulkhead is built and is known as the lock bulkhead.

The two doors open in the same direction; the one at the normal pressure

end opening into the cylinder, and the one at the heading end opening

away from the cylinder. One door is always closed, and both doors are

closed during the operation of entering or leaving the air-pressure

section.

Going into the air pressure, the door at the heading end is held closed

by the pressure of air against it while one is entering the lock, after

which the outer door is also closed. A valve is then opened which

permits the air to flow from the working chamber into the lock, until

the lock becomes filled with air of the same pressure as exists in the

heading. As soon as the pressure is thus equalized, the door at the

heading end can be opened and the workmen pass into the heading. Going

out, the operations are simply reversed. After the heading door is

closed, with the workmen in the air-lock, a valve is opened which

permits the air in the lock to exhaust into the normal air, until the

pressure within the lock reduces to the same as that outside, when the

outer door can be opened and persons inside the lock pass out. Both

operations must be gradual, as a sudden change from normal to high

pressure, or _vice versa_, would be very dangerous to anyone.

[Illustration: SHIELD CUTTING EDGE BREAKING THROUGH WALL AT SIXTH AVENUE

AND TWELFTH STREET, LOOKING SOUTH, OCTOBER 23, 1907]

In tunneling under the river, nearly every conceivable combination of

rocks and soils were met, but for the most part the material was silt.

In such material, with a pressure of 5,000 pounds per square inch on the

shield jacks, the shield was pushed through the ground as though one

pushed a stick into a heap of snow, pushing aside the silt, and thus

obviating the necessity of removing any excavated material. Sand or

gravel, or any material which would not flow or become displaced by the

shield, of course, had to be excavated ahead of the shield, and removed

from the heading prior to pushing it forward. In the silt the most

satisfactory and economic progress was attained, and a record was made

of seventy-two feet of finished tunnel, completely lined with iron, in

one day of twenty-four hours.

The most difficult combination that had to be dealt with under the river

was when the bottom consisted of rock and the top of silt and wet sand.

In such cases, and there were many of them, the upper section of soft

ground was first excavated and the exposed face securely supported with

timbers ahead of the shield, and the rock underlying then drilled and

blasted. This was very tedious and expensive work. Exceedingly small

charges of dynamite had to be used and the procedure conducted with the

utmost caution.

In the course of their progress, the shields were subjected to the most

intense strains and hard usage, as may well be imagined. One of the

shields is illustrated. It was used to construct the south tunnel of the

up-town pair of tubes, and passed from under the Hudson River, through

Morton, Greenwich and Christopher Streets, into Sixth Avenue, and north

to Twelfth Street, a total distance of 4,525 feet, of which 2,075 feet

was through rock overlaid with wet sand. During the progress of this

shield, 26,000 sticks of dynamite were exploded in front of the cutting

edge, causing great damage to the structure of the shield, so that when

it arrived at its destination at Sixth Avenue and Twelfth Street, it was

in such a condition of distortion that it was with difficulty that the

tunnel lining could be erected behind it.

[Illustration: NORTH TUNNEL, SHOWING COMMENCEMENT OF NEW WORK]

In pushing a shield forward with the battery of powerful hydraulic

jacks, each advance is of two feet, and must be followed immediately by

installation of the permanent lining in the rear. In the early days,

brick work was used for lining, and in recent years it has also been

used to some extent, but even with the use of quick-setting Portland

cement, neither brick work nor concrete has proved successful for

subaqueous work, as the cement cannot reach the required strength within

the time it is feasible to leave the shield standing before advancing it

again.

[Illustration: HOLE BROKEN THROUGH THE SOUTH TUBE OF THE NEW YORK AND

JERSEY TUNNEL LOOKING WEST]

During the early work on the north tube of the uptown tunnels, a point

was reached where the rock was sixteen feet above the bottom of the

tunnel, and the overlying silt was in a semi-fluid state. Five barges of

clay had been dumped in the river over this point to make a roof for the

tunnel, but the fluid clay could not be controlled, and crept through

the doors of the shield. After trying all known methods to get through,

it was decided to bake this wet clay by means of intense heat. Two large

barges of kerosene were sent into the tunnel, and an air pipe connected

to them. Fine blow-pipes were also attached, and the fire from the

blow-pipes was impinged on the exposed clay until it became caked

sufficiently dry and hard to overcome slipping. It required eight hours

of this baking to dry the clay hard, and, during this period, water had

to be played continuously on the shield to avoid damage due to the high

temperature. It is believed that this was the first time that soft

material met with in tunneling under a river has been solidified by

means of fire. Seven days after passing this troublesome point, the rock

suddenly disappeared and the work proceeded without further trouble.

[Illustration: NEW YORK AND NEW JERSEY TUNNEL SHOWING SIGNAL AND CAR]

Another unusual situation occurred in the south tunnel of the uptown

tubes. When the shield had advanced 115 feet from the Jersey side, the

night superintendent in charge of the tunnel work, in his anxiety to

push the work, disobeyed instructions, and the tunnel got away from him

and was flooded, and his men had a narrow escape with their lives. In

order to regain the tunnel, several schemes were considered, including

that of sending a dredge through to dredge out the bed of the river just

in advance of the shield, a sufficient depth to enable a diver to go

down and timber up the exterior opening of the doorway, where the silt

and mud had come through and filled the tunnel. This plan had to be

abandoned, as the river above was almost entirely occupied by shipping

that could not be interrupted.

[Illustration: AN X-RAY VIEW OF A BUSY HALF-MILE UNDER THE GROUND ON THE

JERSEY SIDE OF THE HUDSON RIVER]

[Illustration: CROSS-SECTION ON SIXTH AVENUE AT THIRTY-THIRD STREET, NEW

YORK

1. FOOT PASSAGE

2. MANHATTAN ELEVATED RAILROAD

3. STREET SURFACE AND METROPOLITAN STREET RAILWAY

4. NEW RAPID TRANSIT SUBWAY

5. HUDSON AND MANHATTAN RAILROAD STATION

6. PENNSYLVANIA RAILROAD TUNNEL]

Finally the difficult situation was met by obtaining two large and heavy

mainsails, which made a double canvas cover measuring about sixty by

forty feet. This canvas cover was then spread on a flat barge, small

sections of pig iron being attached around the edges of it. Ropes were

carried to fixed points to hold it in exact position. The barge was then

withdrawn, and the canvas cover dropped to the bed of the river, and,

most fortunately, it settled over the point where the leak had occurred,

and a large number of bags of dirt were then deposited on it. An opening

was then made in the bulkhead of the tunnel below, and for eight days

material, under hydrostatic pressure, forced its way into the tunnel,

where it was loaded on cars, and finally the canvas was drawn into the

hole, stopping it up. Additional material was then deposited into the

river to fill the cavity, and finally the tunnel was recovered, pumped

out and work resumed. This event is of somewhat historical interest, in

that the two mainsails which were used were procured from the owner of

the famous American cup defender, the well-remembered “Reliance.”

Probably the most unique and interesting pieces of construction are the

three junctions on the Jersey side of the river, where the uptown

tunnels from New York diverge, north to Hoboken and south to Jersey City

and New York downtown. For safe and expeditious operation of trains,

where the schedule is only one and one-half minutes, it was imperative

that grade crossings should be avoided. By grade crossings is meant the

tracks of one service crossing the tracks of another service at the same

grade. At the point in question, this was a knotty problem to solve,

owing to the unusual operating conditions which had to be met, there

being six separate and distinct operating classes of trains to be

handled around this triangle.

To meet this situation, three massive reinforced concrete caissons were

built on the surface. They are practically large two-story houses, each

being over one hundred feet in length, about fifty feet in height, and

about forty-five feet in width at their widest point. The bottom edges

were sharp, and, with the use of air pressure and great weights, the

three structures were sunk in the ground to the same grade as the

intercepting tunnels, and the tunnels were then driven into them.

Particular attention should be given to the Jersey City to Hoboken tube,

in the lower part of the caisson in the foreground, in the accompanying

illustration, which curls around the Hoboken to Jersey City tube, and

rises to the elevation of, and connects into, the New York to Hoboken

tube, at the caisson in the background, at the left of the illustration.

Very few of the people who travel through the tube are probably aware of

such manipulation. At the same time, the arrangement absolutely avoids

any grade crossing whatever, and without such an arrangement of tracks

the road could not be operated with trains run so closely together as

under the prevailing system.

In constructing the river tunnels the work was carried on simultaneously

from opposite sides of the river, the tunnels meeting under the river,

and it is interesting, if not remarkable, when one considers the

difficulties under which the engineering work had to be carried on, to

note that the tunnels met with practically absolute accuracy.

* * * * *

What Causes Floating Islands?

A floating island consists generally of a mass of earth held together by

interlacing roots.

They occur on the Mississippi and other rivers, being portions of the

banks detached by the force of the current and carried down the stream,

often bearing trees. Sometimes such islands are large enough to serve as

pasture grounds.

Artificial floating islands have been formed by placing lake mud on

rafts of wicker-work covered with reeds. They were formerly used in the

waters around Mexico, and may be seen in Persia, India, and on the

borders of Tibet. On these the natives raise melons, cucumbers and other

vegetables which need much water.