CHAPTER XI

SOME PRACTICAL HITCHES

Whether the load is made up with kyacks, alforjas, or separate packs

slung to the crosstree saddle as described in the preceding chapter it

must be secured in place. For this purpose various hitches are employed

by packers, each hitch well adapted to the particular conditions which

evolved it.

Our description will be confined to the following six hitches, which

furnish ample variety to suit the exigencies of ordinary circumstances:

(1) The crosstree or squaw hitch, which is the father of all hitches

because from it the diamond, the double diamond and all pack-train

hitches in present-day use were evolved.

(2) A diamond hitch, adapted to the crosstree pack saddle. This is a

form of single diamond.

(3) The United States army diamond particularly adapted for use with

the aparejo. The true double diamond is a hitch rarely called for save

in army work or freighting pack trains, and will therefore be omitted.

There are several so-called double diamonds that might be described,

but these near-double diamonds possess little or no advantage over

the single diamond, and we shall pass them over as they are scarcely

resorted to in ordinary pack work.

(4) The one-man or lifting hitch.

(5) The stirrup hitch, to be used when the packer has rope but no cinch.

(6) The saddle hitch, employed in slinging loads upon an ordinary

riding saddle.

(7) The hitch for packing a sick or injured man.

THE CROSSTREE HITCH

This hitch was introduced into the Northwest by the early fur traders

and adopted by the Indians. Among Indians, women are the laborers, and

the crosstree hitch being the hitch almost exclusively employed by the

squaws was presently dubbed by white men the "squaw hitch." It is a

hitch very generally used by prospectors, and for this reason is known

in some localities as the "prospector's hitch." In other sections of

the West, where sheep herders commonly use it, it is locally called the

"sheep herder's hitch." It is a hitch easily thrown by one man, holds

well, and is therefore a favorite.

[Illustration: SQUAW OR CROSSTREE HITCH

(FIG. 1.) Rope engaged on cinch hook and bight of rope running from

rear forward under standing rope.]

[Illustration: (FIG. 2.) Loop of bight enlarged, reversed and passed

around bottom and lower corners of off side pack.]

[Illustration: (FIG. 3.) Hitch formed and ready to tighten. 1. Standing

rope. 2. Running rope. 3. Rear rope--off side. 4. Front rope--off side.

5. Front rope--near side. 6. Rear rope--near side. 7. Marker.]

With lash rope attached to cinch, take a position on the near side of

the animal facing the pack. Throw the cinch over the top and center of

pack in such manner as to be easily reached under the horse's belly.

Pick up cinch and engage the rope from in out upon the hook. Draw up

slack, taking care that the cinch rests properly upon the horse's

belly. Grasp the running and standing rope in left hand above the hook,

to hold slack, and with the right hand double the running rope and

thrust the doubled portion under the standing rope from rear forward

in a bight, at top of pack. Enlarge the loop of the bight by drawing

through enough slack rope to make the loop of sufficient size to be

passed over and around the off side kyack or pack. Step to off side,

turn loop over, and engage it around the ends and bottom of kyack, from

front to rear. Return to near side, and pass the loose end of running

rope around the forward end, bottom and finally rear end of kyack.

Draw the rope end, from above down, over and under the standing rear

and running ropes, at the top and center of the load, and the hitch is

ready to tighten.

To tighten the hitch, grasp the running rope a little above the cinch

hook, and pull with all your strength, taking up every inch of slack

possible. Retain this slack by holding the standing and running rope

together with left hand, while with the right hand you reach to top of

load and pull up slack where running rope passes under standing rope.

Go to off side and draw in all slack, following the rope around off

side pack. Retaining slack, return to near side, and still following

rope and taking up slack around front to rear of near side pack, grasp

end of rope, already engaged as directed over and under standing rear

and running rope, pull hard, bracing a foot against pack, and tie. Two

men, one on each side of the horse, can, of course, throw the hitch and

tighten the load much more quickly than one. Tightening the load is

just as important a feature of packing as evenly balancing the packs.

The result of an improperly tightened load will pretty certainly be a

sore-backed horse.

THE CROSSTREE DIAMOND HITCH

[Illustration: (FIG. 1.) A turn is here taken around standing rope with

loop of bight of running rope thrust under standing rope from rear to

front, as in Fig. 1, illustrating Squaw Hitch.]

Take position on the near side of horse, as when forming the crosstree

hitch, and throw cinch over horse, engaging it on hook and adjusting

it in exactly similar manner. Take in slack and retain it by grasping

the standing and running ropes in left hand. Double running rope and

thrust doubled portion under standing rope in a bight, from rear

forward at top and center of load. Take up all slack. Enlarge loop

of bight by drawing through enough running rope to form a diamond of

sufficient size to hold top of load. Now bring center of loop over and

under standing rope, from rear forward, thus giving rope at each side

of loop a complete turn around standing rope. Throw the disengaged

portion of running rope to off side of horse, and passing to the off

side, bringing the rope down along rear, bottom, and up front of kyack,

thrust loose rope end up through loop at top of pack. Take in slack and

return to near side of horse. Engage running rope around front, bottom

and rear end of near side kyack or pack, and thrust rope end over and

under standing rope opposite center of loop. Take up slack and load in

ready to tighten.

[Illustration: CROSSTREE DIAMOND HITCH

(FIG. 2.) Hitch formed ready to tighten.]

Tighten load by grasping running rope above hook and drawing as tight

as possible. Hold slack with left hand, gripping running and standing

rope, and take up slack at loop with right hand. Pass to off side and

take up slack and tighten rear to front around kyack. Pass to near

side, tightening front to rear; finally, bracing a foot against the

load pull on loose end, and retaining all slack make final tie.

The above described "diamond" hitch is not the true diamond employed by

government pack trains where the aparejo is used, but it is a diamond

evolved from the crosstree hitch, and is particularly well adapted to

the crosstree or sawbuck pack saddle, is easily formed, and holds the

load securely, which is the ultimate object of all hitches.

THE UNITED STATES ARMY DIAMOND HITCH

The single diamond hitch employed by army packers is the ideal hitch

for securing a load upon an aparejo. This is a two-man hitch, though an

expert can throw it alone.

One packer takes his position on the off side of the animal, while the

other with the coiled lash rope, cinch attached, remains on the near

side.

The near packer, retaining the cinch, throws the coiled rope over the

horse's haunch, to rear. The off packer picks up end of rope, and

receiving the hook end of cinch, passed to him under horse's belly by

near packer, holds it together with end of rope in his left hand, and

stands erect.

[Illustration: UNITED STATES ARMY DIAMOND HITCH

Figures represent successive stages in formation. Near side towards

right in each case. Line PP in Fig. 1 represents horse's back. AA (Fig.

3) standing part of rope, and A´ (Fig. 2) the running rope.

FIG. 1.]

[Illustration: FIG. 2.]

[Illustration: FIG. 3.]

[Illustration: FIG. 4.]

[Illustration: FIG. 5.]

[Illustration: FIG. 6.]

The near packer, taking a position at the horse's neck, grasps the rope

about six feet from cinch, and with an upward and backward motion,

drops it between the two packs, one slung on either side of the

aparejo.

Still grasping the rope in his right hand just forward of the packs at

the top, he pulls forward between the packs sufficient running rope to

permit him to bring his hand down to his side. Retaining the rope in

his right hand he now reaches up with his left hand, and with back of

hand up and thumb under grasps running rope and draws sufficient rope

forward to permit the left hand grasping the rope to come down to his

side, arm's length.

With the right elbow crooked the right hand, still holding the rope,

is brought up about on a level with the chin, and the left hand, also

retaining its hold on the rope, thumb down, is raised to hollow of the

right arm, with loop of rope between the hands lying outside the right

arm. Now by a single swinging motion with both hands the rope in the

right hand, called the "standing rope," is thrown over the center of

pack to the off packer who stands ready to receive it; and the rope

held in the left hand, called the "running rope," over the horse's

neck, forward of the pack.

The off packer, still standing with cinch hook and end of rope in left

hand, with his right hand grasps the standing rope as it comes over

as high up as he can conveniently reach, draws it down, and holding

the cinch hook in proper position below the aparejo draws down the

standing rope and engages it upon the hook from in out.

The near packer now draws forward between the packs about six feet

more rope, which he throws to the rear of the near side pack. This

rope is now called the "rear" rope. He next grasps the running rope at

the horse's neck, and with the off packer's assistance releases that

portion of the running rope lying between the packs forward of the

standing rope, and brings it to the center of pack on near side, next

to and just back of the standing rope.

He now slips his right hand down the rope to a point half way between

pack and aparejo boot, and with the left hand reaches from forward

between standing rope and aparejo and grasps the rope just above the

right hand. Both hands are now slipped down the rope, and with the same

motion drawn apart, one on each side of standing rope (under which the

rope being manipulated passes) to the cinches. With the hands about

ten inches apart, the section of rope between them, which is held in a

horizontal position, is jammed down between the two cinches under the

aparejo.

The off packer, holding the running rope with his right hand above the

hook, places the left hand holding end of rope on top of running rope

between his right hand and the hook, and with thumb under running rope

grasps both ropes and slips his hands up on running rope, bringing it

to center of load.

He now draws the end of the rope, held by left hand, forward until a

foot or so falls upon the near side of the horse's neck. The hitch is

now formed, ready to tighten.

To tighten, the near packer with his left palm passing the side and

center of the pack grasps the running rope at the rear of the standing

rope, at the same time bringing the running rope between the thumb and

index finger of the left hand, which he is using as a brace. In this

position he is prepared to hold slack as it is given him by the off

packer.

The off packer grasps the running rope close down to the hook, and,

bracing himself with a knee against the aparejo boot, pulls with all

his might, taking two or more pulls, if necessary, and giving slack to

near packer, until no more slack can be taken on standing rope. He now

steps smartly to rear and throws the top rope forward of the pack. The

top rope is the rope leading up from the rear corner of the aparejo

boot on near side to the side and center of off side pack. After it

is thrown forward it is called the "front" rope. He now prepares to

receive slack from near packer by grasping the rear rope where it lies

between the packs.

The near packer, who has been receiving the slack given him by the off

packer, carries his right hand, with which he holds the slack at rear

of standing rope, to lower side of pack toward the aparejo, and reaches

under standing rope, with left hand grasps rope above right hand,

drawing it forward under standing rope, and employing both hands jams

it upward in a bight between standing rope and pack. Care should be

taken during this operation to retain all slack.

The near packer now engages around front boot of aparejo the free

portion of the running rope below the bight just formed. Holding slack

with left hand, he grasps the rope to rear of cinch in right hand;

receiving slack from left hand he brings rope to rear of aparejo boot,

and with both hands carries rope smartly to upper corner of side pack,

always retaining slack. The off packer receives slack, pulling it in

quickly hand over hand, the near packer retaining his hold until the

off packer has the rope taut. The near packer now takes a position

at the forward end of load, facing the rear, and grasps end of rope

prepared to take slack from off packer.

The off packer, after receiving slack from near packer as described

takes a turn of the rope around each hand, holding every inch of

slack, steps to the rear, keeping in line with the horse's body,

and then facing forward throws his full weight back upon the rope.

Retaining the slack with his left hand, with his right hand he brings

the free portion of running rope under and around the aparejo boot,

from rear to front, passes forward of rope, and facing the rear and

grasping rope, right hand above the left, brings it smartly to upper

corner of pack.

The near packer, holding end of rope, immediately draws in slack until

he has about six feet of free rope, which he throws over center of load

to off side, and then drawing in all remaining slack takes a turn of

rope around each hand and throws his weight upon it, and the off packer

releases his hold.

Holding the slack with the left hand, the near packer releases his

right hand and with it engages the free or running portion of rope

under and around the aparejo boot to rear of load, while the off packer

steps to rear of load, takes end of rope, and while he draws in all

slack, neatly coils rope, holding coil in right hand at lower side

of pack, and, with palm of left hand braced against center of load,

receives slack from near packer.

Grasping in his left hand the taut rope above the coils, and lifting

it sufficiently above the load to admit the coiled rope under it, he

swings the coils with his right hand from rear to front to top of load

and brings the standing rope held in his left hand down on top of the

coils to hold them. He now takes a loop of the rope, forces it between

standing rope and pack, in a bight, and takes a turn of the loop around

standing and running rope to secure it, first joining the loop well up,

and the hitch is tightened.

THE ONE-MAN OR LIFTING HITCH

This is a pretty good hitch sometimes where kyacks are not used and an

irregular pack is swung upon the crosstree. While it holds the pack

very securely to the animal's back, its tendency is to lift the corners

that might cause friction upon the horse's sides.

Standing on the near side of the horse, throw cinch over the horse's

back, pick up cinch and engage rope upon cinch hook, from in out, as in

previous hitches. Take up slack, bring running rope up side of pack,

double and thrust loop or bight under standing rope from rear forward

at top of pack, to hold slack. Throw all loose rope to off side, and

pass around to off side yourself.

[Illustration: (FIG. 1.)

A--Cinch D--Running rope

C--Standing rope E--Front rope

B--Cinch hook F--Marker]

[Illustration: LIFTING HITCH

(FIG. 2.) Grasp loop A in left hand and with right jam rope C C along

and under rope B (where latter passes beneath corner of pack) to D, as

shown in Fig. 3.]

[Illustration: (FIG. 3.) Off side of hitch completed.]

[Illustration: LIFTING HITCH

(FIG. 4.) Hitch formed ready to tighten.]

Draw loose end of running rope forward and from under standing rope

at top of pack. The effect of operations thus far is this: The running

rope passes up the near side, from hook and to top of load and passes

under standing rope, which will serve effectually in final tightening

of cinch to hold slack.

Pass end of running rope over and under the forward end of off pack and

backward under standing rope and pack. Now bring the rope forward over

side of pack, double, and thrust the doubled portion over and under

forward rope in a bight. With left hand grasp double of rope at bight

just to rear of forward rope where it passes over and under forward

rope, and with right hand slip running rope down and just to rear of

standing rope. Take up slack. By pulling hard upon loose end of running

rope the ends of pack will be lifted slightly.

Throw loose end over horse to near side, and across middle of load.

Pass to near side and manipulate rope as on off side. Tighten load.

Secure the hitch by bringing loose end of rope over and under forward

running and standing ropes, and tie.

STIRRUP HITCH

This hitch is useful where the packer has lash rope but no cinch, and

may be employed on sawbuck saddle, aparejo, or where the load is hung

upon an ordinary riding saddle. It is a two-man hitch, though one man

may manipulate it.

[Illustration: (FIG. 1.) Rope is thrown across load with equal portion

falling on each side. Loop A is formed on top of load, and the ends BB

are passed through it to form large loops C and D.]

[Illustration: STIRRUP HITCH

(FIG. 2.) Loops C and D are passed under horse's belly and seized by

packers on opposite sides. Each packer then draws end of rope which he

is holding through loop which has been passed to him. Off packer forms

bowline knot, E, and near packer passes his end of rope through this.

Hitch is now ready to tighten.]

Pass the rope over the load, with an equal division of rope on either

side. Form a loop at center and top of load. Each packer will now place

a foot upon the rope, where it falls from loop to ground, and pass his

end of rope through loop from above down and draw through slack rope.

This forms a loop on either side in which the foot rests. Each packer

will now bring forward and under the horse's belly the loop in which

his foot rests, passing the loop to the other packer at the same time

disengaging his foot, and will pass the loose end of rope which he

holds through the loop which he receives. The ropes on top of pack

will now be spread to properly cover and secure the pack, and all slack

taken.

The off side packer now forms a bowline knot in the loose end of his

rope, the near side packer passes his loose end through the bowline

loop. To tighten the load the off side packer gives slack, while the

near side packer braces and draws in on loose end of rope, tying at

bowline loop to secure load.

THE SADDLE HITCH

[Illustration: SADDLE HITCH

With rope arranged as shown throw deer across saddle, enlarge loops

A and B around haunches and neck. Bring ends C and D together, form

bowline knot on end D, pass end C through it and tighten.]

This is a particularly useful hitch when it becomes necessary to sling

a deer to a riding saddle for transportation to camp.

Throw the lash rope across the saddle seat, an equal division of rope

falling to either side. Double the rope where it crosses the cinch ring

and thrust it through the cinch ring in a loop, drawing through enough

loose rope to form a good-sized loop. This should be done on both

sides. Lay the deer across saddle, with head hanging on one side and

haunches on the other side, slip loop on one side over the deer's head,

and the loop on the other side over its haunches. Take in all slack.

Form a bowline loop on end of off side rope, and lay it on top of load.

This loop should be so adjusted as to reach the middle of the top of

load. Passing to near side, thread loose end of near side rope through

the bowline loop. Tighten load by pulling on loose end, and tie.

HOW TO PACK A SICK OR INJURED MAN

Sometimes it occurs that a member of a party is so injured or becomes

so ill as to be helpless, and the problem of transporting him upon

horseback presents itself. This may be done in the following manner

upon a crosstree or sawbuck saddle:

Cut two straight sticks three feet long and about three inches in

diameter. Fit one on either side of saddle snug against the forks. Lash

securely to forks forward and rear, with ends of sticks protruding an

equal distance forward of and back of forward and rear forks. It may be

well to cut shallow notches in the sticks where they rest against the

forks. This will preclude lateral motion.

Cut two sticks two feet long and three inches in diameter. Place one

in front and one in rear at right angles to and across top of sticks

already in position. These cross-pieces are to be lashed to position

one about two inches from forward ends, the other two inches from

rear ends of lengthwise sticks. Before lashing them into position cut

notches to receive lash ropes at points of intersection, that any

tendency to slip or work loose may be overcome.

Now cut two poles six feet long and three inches in diameter. Spread a

pack cloth upon the ground, and presuming the pack cloth is six feet

wide, place a pole on each outer end of it. Roll poles, with pack

cloth, to center until there is a width of twenty inches between the

outer edges of poles. In this position lace cloth to each pole, or if

horseshoe or other nails are handy, nail it to poles. Should the cloth

be wider than length of poles, fold in a margin on each end, before

rolling. Place litter on cross-pieces, the flat of canvas on top.

Notch, and secure poles of stretcher at front and rear to cross-pieces.

Lash down litter by means of the stirrup hitch.

Packing and Portaging · 第 11 / 15 章