CHAPTER II

HISTORY OF THE BUILDING

The architectural history of the minster is somewhat vague and

uncertain, and has been the subject of several disputes. It will be as

well, perhaps, before entering into details, to give a table of

approximate dates, both of the different parts of the minster as it now

stands and of the buildings which preceded it. These dates are mostly

sanctioned by the authority of Professor Willis.

Edwin's Wooden Chapel 627 A.D.

Edwin's Minster begun (circ.) 628

" " finished by Oswald (circ.) 635

" " repaired by Wilfrid (circ.) 699

" " burnt down (?) 741

Albert rebuilds Minster (?) 767-780

Minster wholly or partially burnt 1069

Nave, Transepts, and perhaps Choir,

built by Thomas (circ.) 1080

Choir and Crypt rebuilt by Roger 1154-1181

Present South Transept built 1230-1241 (circ.)

" North Transept " 1241-1260

" Nave built 1291-1324

" Chapter-House built 1320 (?)

" West Front of Nave built 1338

Vault of Nave built (circ.) 1354

Presbytery (or eastern part of Choir) built 1361-1370 (circ.)

Choir (west of High Altar) built 1380-1400 (circ.)

Central Tower built 1400-1423 (circ.)

South-West Bell Tower built 1433-1447

North-West Bell Tower built 1470-1474

Choir injured by fire 1829

Choir repaired (circ.) 1832

Nave injured by fire 1840

Nave repaired 1841

South Transept restored 1875

It will be seen that it is doubtful whether the fire of 741 and the

rebuilding of 767-780 mentioned by historians refer to the minster at

all. The fact that a wooden chapel was erected for the baptism of Edwin

in 627 seems to show that no Christian church had remained at York from

Roman days, as at Canterbury; this chapel, therefore, is the first

Christian building in York of which we have any definite record. The

church of stone with which it was immediately replaced was finished by

Oswald, after the death of Edwin in battle; whose head was carried

thither and placed in the Chapel of St. Gregory. It has been supposed

that there are remains of this original stone church in the crypt.

In sixty years Edwin's church had fallen into great disrepair. It was

restored by Archbishop Wilfrid about 669. The following account of the

dilapidated condition of the building as he found it is taken from a

versified life of Wilfrid, ascribed to Frithegode, a monk of the tenth

century:--

Ecclesiae vero fundamina cassa vetustae,

Culmina dissuto violabant trabe palambes,

Humida contrito stillabant assere tecta;

Livida nudato suggrundia pariete passa

Imbricibus nullis, pluriae quacunque vagantur,

Pendula discissis fluitant laquearia tignis,

Fornice marcebant cataractae dilapidato.

Wilfrid glazed the windows, repaired the holes, painted and decorated,

and, strange to say, whitewashed the building.

We now come to the first disputed point in the history of the minster.

In the chronicle of Richard Hovenden it is stated that _Monasterium in

Eboraca Civitate Succensum est nono Kalendas Maii Feria prima_--that is

to say, that a church was burnt down in the city of York on Sunday the

23rd of April 741 A.D. It has been contended that the word _monasterium_

need not of necessity mean the minster, that the word _civitas_ may

perhaps mean the diocese, the ecclesiastical state, and not the city of

York, and that, therefore, the church mentioned may be not the minster,

but some other large church in the city or diocese of York. Professor

Willis is of opinion that this is probably the case.

In the poem of Alcuin or Flaccus Albinus, there is a passage speaking of

a church built by Albert (767-780), in the following terms:--

Ast nova Basilicae mirae structura diebus

Praesulis hujus erat jam caepta, peracta, sacrata,

Haec nimis alta domus solidis suffulta columnis

Suppositae quae slant curvatis arcubus, intus

Emicat egregiis laquearibus atque fenestris

Pulchraque porticibus fulget circumdata multis,

Plurima diversis retinens solaria tectis,

Quae triginta tenet variis ornatibus aras.

It is plain that this church, wherever it was, and the poem does not

mention its locality, was a very important one. It was very lofty, and

had many porches, or apses (_porticus_ may mean either), and thirty

altars.

Just before this passage in the poem there is an account of altars set

up by the archbishop, probably in the cathedral. Professor Willis thinks

that if the church referred to immediately after were the cathedral, an

account of altars set up in it would not be given before an account of

the building of the church itself. But, as Professor Freeman points out,

it is most improbable that two writers, the chronicler and Flaccus

Albinus, should allude to a church other than the minster without giving

its name. It is, of course, just possible that Albert set up his altars

before rebuilding the cathedral, in which case Professor Willis'

contention would lose its force. It is curious that no other chronicler

mentions either the fire or the rebuilding of the church, but this

omission would be almost equally strange whether the building in

question were the minster or some important church in the diocese.

On the whole, therefore, it is perhaps most probable that the church

referred to by Flaccus Albinus was the minster. If that is so, this

church remained until it was ruined by the Danes in 1069. Then it was

certainly either wholly or partially burnt down. Thomas, the first

Norman archbishop, appointed in 1070, found the minster, the city, and

the diocese, all waste and desolate. At first he was satisfied with

roofing in what remained of the cathedral and otherwise restoring it as

best he could. Afterwards, before 1080, he began to rebuild it. It is

uncertain whether he rebuilt the whole church, or merely the nave and

transepts.

Stubbs on this point seems to give two different accounts.

"Thomas," he states, "restored the canons of the church after he had

rebuilt it as well as he could." Afterwards he says, "He built the

church as it now is from its foundations."

Probably, this first passage refers to the immediate repairs which

Thomas found necessary in 1070, and the second to his ultimate

rebuilding of the church.

William of Malmesbury says that he began the church from its foundations

and finished it. In the face of this positive testimony it is probable

that Thomas built not only the nave but the choir. That he did so has

been doubted, because the choir of his day was undoubtedly a very small

one, and was afterwards demolished by Roger. It must, however, be

remembered that Lanfranc rebuilt Anselm's Norman choir at Canterbury in

the same way. It is very likely that Thomas was forced by necessity to

plan his work on as modest a scale as possible, and that the pride of

Roger would not allow the choir of his minster to remain one of the

smallest in the cathedrals of England.

The minster, as Thomas left it, was utterly unlike the present church.

The nave was probably shorter than the present one, and was certainly

twenty feet narrower. This was discovered after the fire of 1840, when

remains of the side aisle walls of Thomas's nave were discovered. There

are no data for the number of piers in this nave or for the position of

the west front.

The tower certainly stood on the site of the present tower, as Roman

ashlaring has been discovered on the north-west side of the north-west

tower pier, above the vault of the side aisle, and also portions of a

shaft with a base, which probably belonged to the Norman clerestory. It

will be seen that the present piers supporting the central tower contain

cores of Norman work recased in Perpendicular times.

The transepts of Thomas's church appear to have been without aisles. The

remains in the crypt show that there were two eastern apses to these

transepts close to the central tower, and Professor Willis deduces from

the position of these apses that they left no room for eastern aisles.

There is no instance in existence of a transept having western without

eastern aisles. One may therefore conclude that aisles were entirely

wanting. Professor Willis thinks it possible that an additional pair of

apses may have existed on the east side of these transepts, to the north

and south respectively of these already discovered. This was certainly

the case in St. Mary's Abbey.

As has been mentioned, considerable doubts still exist as to the size

and character of the choir of Thomas's church.

On the one hand we have positive testimony that Thomas rebuilt the whole

church; on the other, the walls of the crypt, as they existed up to the

time of Roger's choir, are a part of the Saxon church. Their masonry is

Saxon, and they mark the lines of a chancel far too narrow to have been

that of Thomas, even if we suppose that his choir was necessarily small,

from the want of funds at his command, and the wasted condition of the

diocese.

This would seem to support the theory that Thomas left the Saxon choir

as it was, and contented himself with rebuilding the ruined nave and

transepts. In that case, of course, the Saxon choir remained until the

time of Roger.

The alternate theory is that Thomas rebuilt an enlarged, but still a

small, choir, leaving the Saxon crypt as it remains to this day; and

that even this choir proved too small for the magnificent ideas of

Roger, who utterly demolished it to make room for his own great

building, leaving no trace of it above ground. This is the more probable

supposition, and it is supported by the fact that the inner wall of the

crypt is composed of fragments of masonry, buildings, etc., of early

Norman date, which might well be parts of Thomas's choir, if it was

destroyed, as we suppose. Some of the stones are covered with white

plaster, showing they are parts of the interior of a building, and they

are of the same red sandstone as the remains of the transept apse, which

was undoubtedly built by Thomas.

As has been said, the choir of the minster remained unusually small for

so important a church. The eleventh and twelfth centuries were periods

of great activity in church building, and many of the Norman architects

planned their works on a vast scale. With the examples of Durham,

Winchester, and St. Albans before them, it was natural that the

archbishops of the Metropolitan Church of York should be dissatisfied

with the size of their own choir. It fell to the lot of Roger, the rival

of Thomas à Becket, to rebuild it. The date of his nave is approximately

1154-1181. The remains of his work in the crypt show that it was in the

latest style of Norman architecture and considerably influenced by

Flambard's work at Durham, with channeled and fluted pillars. The detail

appears to have been richer and later in character even than Flambard's.

The outer wall of the crypt shows the dimensions of this choir. It was

square at the end, and had flanking towers--two bays from the

east--which served as transepts inside. The eastern transepts of the

present choir still keep the position and tradition of these towers. The

aisle probably ran round the east end as at Romsey and Byland. The two

bays east of the tower were wider than the others. Roger, it should be

said, had been Archdeacon of Canterbury, and he was therefore well

acquainted with the "glorious Choir of Conrad" built by Anselm. There is

much in the planning of his work to show that he was influenced by the

example of Conrad's choir.

[Illustration: The Minster (from an Old Print).]

At the end of the twelfth century the minster was utterly unlike the

present building. Except in the crypt, and in certain parts of the nave

and tower not visible to the casual observer, there are no vestiges of

the work of the earlier builders. There is now no Norman work to be seen

in the minster itself, and in 1200, nave, choir, transepts, and towers

were all Norman. Of these the transepts appear to have been the poorest

part. They were probably short, and had no aisles. The nave also was of

rude Early Norman character. The Early English architects having

determined, probably, to rebuild the nave and transepts, made a

beginning with the transepts about 1230. Roger's choir, only finished

about fifty years before, no doubt seemed to them grand enough. The

transepts were built on a totally different scale to the rest of the

church as it then stood. They were both longer and broader, and they had

aisles on each side of them. No doubt the object of this was to get a

standard for the ultimate rebuilding of the nave. The greater width of

these transepts made it difficult to join their aisles with those of the

nave and choir, and were the cause of a curious and daring expedient,

which will be described in the architectural account of the building.

The south transept was the first to be rebuilt. It is the work of Walter

de Gray, archbishop from 1216 to 1265, who was buried under an arch of

his own building, in a tomb which still remains the most beautiful,

perhaps, in the minster. The north transept seems to have been begun as

soon as the south was finished; it is said to have been the work of John

Romeyn, or the Roman, an Italian, and the treasurer of York. Walter de

Gray probably also had a large part in the building of them. These

transepts are the earliest part of the existing minster. John Romeyn

also built an Early English central tower in place of Thomas's Early

Norman tower. It remained for John Romeyn the younger, son of the

treasurer, and archbishop from 1286 to 1296, to begin the rebuilding of

the nave. It was planned on a far larger scale than the old nave, and

was wider even than the Early English transepts. The old nave had been

83 feet wide, the transepts were 95, and the new nave 103. The

difference in width between the transepts and the new nave is in the

aisles. The plan of the transepts had no influence on the plan of the

nave. The large triforium, small clerestory, and moderate-sized main

arches give way to a large clerestory, large main arches, and

practically non-existent triforium. These are unusual proportions in

English Churches of that period. At Ely, Westminster, Beverley, and many

other places, the proportions of Norman or Early English work influenced

those of the later Decorated and Perpendicular.

The records of the building of the nave are somewhat scanty. Stubbs

tells us that the foundation stone was laid on April 6, 1291, and that

it was begun on the south side towards the east. It has been supposed

that the chief object of making the new nave so much wider and loftier

than its predecessor, was that it might be built round the old work

without interfering with its utility.

But a petition, dated 1298, states that the old nave had long since

fallen (_diu est corruita_). If this were so there was no object in

refraining from disturbing the old work. It is uncertain whether the

nave had been purposely destroyed, or had fallen of its own weight. It

may be, though we have no record of the fact, that Thomas's Norman tower

fell down, as did so many Norman central towers, destroying with it some

part of the nave, and so made the rebuilding of that part of the church

necessary.

The nave is fully developed geometrical Decorated work. It is loftier

than the transepts, and its roof is low pitched. The main part of the

rebuilding seems to have been done between 1298 and 1320. The indenture

for glazing the great west window is still extant, and is dated 1338.

The nave must have been roofed before this.

The vault was probably intended to be stone, but the great width of the

building seems to have made the builders afraid, and they erected a

vault of wood, but shaped and ribbed to look like stone. The outer walls

of the clerestory, and the pinnacles of the south side of the nave show

vestiges of flying buttresses. It is uncertain whether these were merely

intended when a stone vault was projected, or whether they were actually

erected, and afterwards, being unnecessary for the support of a wooden

vault, were allowed to fall into disrepair. There are no flying

buttresses on the north side, and the pinnacles are much smaller.

The west front was undoubtedly the latest part of the work to be

finished, except the vault. The lowest stages, though geometrical in

style, are later in character than the nave itself. The great west

window, and the upper stages are of florid curvilinear Gothic. The west

front is said to have been finished, and the great west window glazed by

Archbishop Melton, who gave 500 or 600 marks to the fabric in 1338. The

church was vaulted in 1354; Archbishop Thoresby is said to have given

the wood. Before the beginning of the nave, the relics of St. William

had been carried into the choir, and installed there with great pomp.

The offerings of the faithful at his shrine helped to defray the expense

of the building. Further funds were gained by means of indulgences

granted by successive archbishops. The houses of Vavasour and Percy gave

wood and stone, and statues of their representatives were placed over

the main porch of the west front.

The date of the chapter-house, and the passage connecting it with the

north transept is disputed. Browne thinks it was begun about 1280, and

finished about 1340. He partly bases his contention on the fact that the

Acts of the Chapter from 1223 to 1300 are given _in Capitulo Eborum_.

After 1300 _in Capitulo Ecclesiae_, or _in loco Capitulari ipsius

Ecclesiae_. After 1342 _in domo Capitulari_. From this he argues that up

to 1342 the chapter-house was not in existence, or unfinished, but that

it was in use from that date. The geometrical character of the tracery,

and the Purbeck marble shafts used in the chapter-house might seem to

support that view. Professor Willis, however, considers there is little

significance in the difference in the phrases used. _In capitulo_ simply

means "in chapter," and _in loco capitulari_ and _in domo capitulari_

are vague phrases which may either mean a chapter-house, or a place used

for the sittings of the chapter. At any rate, he thinks the

chapter-house was not begun until after 1320, and the passage leading to

it is still later. If this is the case, however, there is no reason why

the chapter-house should not have been finished in 1342, and that would

account for the change of phrase in the Acts. Though, at first sight,

the building appears to be Early Decorated in style, on a closer

examination it will be seen that the slender mouldings, the character of

the carvings, and the details, especially on the outside, all point to a

later date. It is curious, however, that if the building was not begun

until after 1320, the tracery was not curvilinear, as in the great west

windows, and the middle windows of the towers built about the same time.

Perhaps, however, the geometrical forms were found to give the greater

support, necessary owing to the absence of a central pillar. On the

whole, the evidence of details, particularly of the foliage in the

beautiful arcading inside the chapter-house, seem to point to its not

having been begun until 1320 or later.

[Illustration: The West Front (1810).]

In 1362 John of Thoresby became archbishop. The times were unpropitious

for building. Yorkshire was suffering much from the black death, there

was great poverty among the peasantry, and the diocese was in great need

of discipline and reform. Thoresby gave himself up for nine years to

this work, and in 1361 he thought the time had come for the rebuilding

of the choir. We have already seen how at York, one great work led to

another. The transepts were rebuilt that they might be in harmony with

the grandeur of Roger's choir, the nave that it might not be eclipsed by

the transepts; and now it was contended that the choir must not be

inferior to the rest of the church. Therefore, on the 20th of July 1361,

it was resolved by the archbishop and chapter that "It was right that

every church whatsoever should agree in the fitting decoration of each

particular part, and that the choir in particular, where the holy

sacrifice of the mass took place, should be especially rich in

ornament." Thereupon they decided to rebuild the choir. The foundation

stone was laid on the 30th July 1361, and the work was begun at the

extreme east end. There was a very good reason for this procedure. The

design of the new choir, both as to size and the planning of the bays,

was modelled on that of the nave. It was Thoresby's object to build the

largest and most magnificent choir in England. It was therefore both

wider, loftier, and longer than that of Roger's, and beginning at the

east end it was possible to complete almost the whole of the portion

east of the altar as it now stands--that is to say, the presbytery,

without interfering with Roger's choir. While, therefore, the presbytery

was being built, the service of the church was still carried on in

Roger's choir, and only the aisles behind Roger's east end were

destroyed. Even when the four bays of the presbytery were completed, say

about 1370, it was possible to continue the aisles of the new choir

proper without interfering with Roger's work, except to pull down the

towers flanking it, so much wider was the new building than the old.

Even Roger's transepts did not extend beyond the aisle walls of the new

choir, and their place was taken by the present eastern transepts, which

are each merely a bay of the aisle, raised to the same height as the

vault of the choir itself, and open to the choir from top to bottom.

There has been a dispute whether or no this presbytery was completed in

Thoresby's lifetime. According to Stubbs, Thoresby provided tombs for

six of his predecessors, and placed them in the choir in front of the

lady chapel--that is to say, in the presbytery.

He also says that _Idem Archiepiscopus ... Capellam ... Virginis Mariae

Mirabili arte Sculpturae atque notabili pictura peregit_.

The building must certainly have been roofed before it was decorated,

and if Stubbs is accurate, and there is no reason to suppose that he is

not, the work was completed by Thoresby. Thoresby died in 1373, and if

he finished the presbytery, there was a gap of seven or eight years

between its completion and the beginning of the choir. There is internal

evidence to support this presumption. The presbytery, though

Perpendicular in its main features, shows many traces of the transition

from the curvilinear Decorated to the Perpendicular style, especially in

the tracery of the great east window and the clerestory windows. In the

choir proper these traces have vanished, and the work, though apparently

of the same character as that in the presbytery, is altogether

Perpendicular. A lapse of ten years in the continuity of the work would

account for this change, and becomes still more probable when we

consider that the circumstances of the time were not favourable for

great expenditure on building. The presbytery had been completed

unusually quickly. Indeed, we know that £627 were spent upon it in one

year, and this was an unusual amount. The average expenditure, for

instance, on the choir of Ely was £318. It was natural, therefore, that

there should be a halt to collect further funds. The work of the choir

itself proceeded much more slowly. There was a complaint in 1390 on the

archbishop's visitation--_quod fabrica ecclesiae negligenter

tardatur_--and it was not roofed in until 1400.

The contract for the glazing of the great east window is December 10,

1405--that is to say, thirty years and more from the date of its

construction. But there is nothing unusual in this. It was customary

before filling windows with stained glass to cover them with linen cloth

which admitted a sufficient amount of light, or to glaze them with plain

glass; and it was only natural that a long time should elapse before

stained glass could be supplied to the largest window in the world.

Burying was begun at the east end soon after 1400, and Scrope was buried

there in 1405. Bowet's monument also was erected there in 1415, while he

was still alive.

A new high altar was projected in 1418, and the new crypt was fitted

with iron work and paved in the same year. The building of the choir had

caused a subsidence in the crypt, so the work of Roger and others was

broken into fragments and patched together, older capitals being placed

on Roger's pillars, in the condition in which we now see it. Nothing is

known of the history of the vaults of the choir and eastern transepts.

Like those of the nave and transepts, they are of wood, though of the

same shape and design as a stone vault.

The great central tower was erected between 1400 and 1423. Hitherto

there had been the Early English tower of the elder John Romeyn,

supported by Norman piers which, perhaps, had received a partial casing

of Early English stonework. These piers were afterwards recased, not

simultaneously, but as the arches between them were erected, in the

following manner:--

Taking the south-western pier for an example: when the present nave was

begun, the western face of the pier was cased with masonry, so that

three parts still remained Norman; when the Decorated arch[1] in the

transept was erected south of it, it received a further Decorated casing

on its south side; when the central tower was built, its northern and

eastern faces were cased with Perpendicular masonry: so, in the case of

the north and south-eastern piers, their eastern faces were completely

cased when the choir was built, their western only when the tower was in

course of erection. To this day it may be seen that there is no bond

between the different periods of masonry, and that the courses are at

different levels.

[1] For the explanation of the erection of this Decorated arch,

see the architectural account of the transepts.

The piers were probably completely recased by 1409.

[Illustration: THE EAST END. From Britton.]

Nothing is known of the elder Romeyn's tower, or the manner in which the

present one replaced it. A great part of the new work has been

attributed to Walter Skirlawe, Bishop of Durham. It will be seen it is

of the same character as the lower part of the central tower at Durham.

It has never been finished, as the corners and the condition of the

masonry at the top still show, but it is impossible to say whether it

was intended to receive another storey, and if so, of what character

that other storey was to be. At one time, as may be seen in old

engravings, it had a turret in one corner, 24 feet high; this was

probably destroyed in the last century.

The south-west bell tower was built probably between 1433 and 1447, the

north-west between 1470 and 1474. They are thus both Perpendicular in

style.

At the end of the fifteenth century, therefore, the minster as we now

see it was fully built. Since that date it has suffered no changes of

importance, and the record is only one of occasional damage from fires

or fanaticism, and of necessary restorations.

The minster suffered to a certain extent at the restoration, and in a

less degree at the hands of the Puritans. In 1734 the nave was repaved.

Several tombs were found when the old pavement was removed, and relics

taken from them and deposited with the other treasures of the minster.

On the 2nd February 1829, Jonathan Martin, a brother of the apocalyptic

painter, John Martin, and a religious maniac, hid himself during evening

service behind the tomb of Archbishop Greenfield in the north transept,

and when the church was shut up for the night set fire to the choir. The

flames were not extinguished until the stalls, the organ, and the vault

had been entirely destroyed. The actual stonework and carving of the

choir were considerably injured, and the glass of the great east window

itself only just avoided destruction. Martin escaped through a window of

the transept, but was quickly captured, and discovered to be insane. The

restoration, carried on by Smirke, was begun in 1832, and on the whole

was fairly done. At any rate, the authorities of the minster may console

themselves with the knowledge that it was absolutely necessary. The

stalls were a reproduction, as exact as possible, of the old woodwork,

but the design of the throne and pulpit are original, and not

successful. The cost of the restoration was £65,000, most of which was

contributed by subscription. Timber, to the value of £5000, was given by

the State, and Sir Edward Vavasour, following the example of his

ancestor of the fourteenth century, supplied the stone.

Another fire broke out on the 30th May 1840. It began in the south-west

tower, and is said to have been caused by some workmen who were

repairing the clock. The whole tower, excepting its shell, including the

bells, was destroyed, and the fire was not extinguished until the wooden

vault of the nave had been burnt. The restoration on this occasion cost

£23,000, and was finished in a year, under the superintendence of Sydney

Smirke, son of the former restorer.

In 1871 the south transept was discovered to be in a dilapidated, and,

indeed, a dangerous condition, and the advice of Street was asked on the

question of restoring it. In his report he stated that the design of the

clerestory, constructed as it was of two thin walls, was not strong

enough for the weight it had to support, even though the vault was of

wood. The whole wall of the transept had given way, and the clerestory,

in particular, was in a very bad condition. It became necessary,

therefore, to rebuild the side walls of the clerestory and the flying

buttresses under the steep roofs of the aisles, to remove the heavy

slates from the roof, and to renew the pinnacles.

On investigation, it was discovered that the inside portion of the walls

had been made up of stone chippings without cement. It is curious that

builders in the thirteenth century, whose system of ornament was most

profuse and thorough, often scamped the more important details of

structure. At Peterborough, no less than at York, instances have been

discovered of what would, in these days, be called jerry-building.

The walls were rebuilt with solid masonry, held together by Portland

cement, and strengthened by wrought-iron bars; the Purbeck marble shafts

were in places renewed; the groining of the vault was stripped of the

whitewash which concealed its material; the lath and plaster work of the

vault between the groins was removed, and replaced by oak boarding; the

bosses were gilded, and picked out with vermilion paint.

The cost in all of this restoration was about £20,000. In the course of

it it was discovered that there were many remains of tombs and coffins

under the pavement, but they have not yet been thoroughly explored.

The reredos, made of terra-cotta and wood, was designed by Street, the

figures by Tinworth.

Modern stained glass windows have from time to time been placed in the

minster. In the last century a certain Pickett patched and rearranged

much of the older glass.

Bell's Cathedrals: The Cathedral Church of York A Description of Its Fabric and A Brief History of the Archi-Episcopal See · 第 2 / 6 章