CANADIAN PETROLEUM.

When I visited Canada in 1877-78, the refining of petroleum was

principally conducted in the city of London, Ontario. At the present

time Petrolia, Ontario, is the chief seat of the industry, and it was

accordingly to this city that we made our way. Here we were treated

with the greatest kindness and hospitality by Mr. John D. Noble,

vice-president of the Petrolia Crude Oil and Tanking Co., and his

brother, Mr. R. D'Oyley Noble, and were enabled in the short time at

our disposal to visit typical portions of the producing territory and

some of the principal refineries.

The development of the Canadian petroleum industry may be said to date

from 1857, when a well dug for water was found to yield a considerable

quantity of petroleum; but long previously, indeed from the time of

the earliest settlements in the county of Lamberton, in the western

part of the province of Ontario, petroleum was known to exist in

Canada. In 1862 productive flowing wells were drilled at Oil Springs,

but these wells, which were comparatively shallow, quickly became

exhausted, and the territory was deserted on the discovery in 1865 of

oil at Petrolia, seven miles to the northward, and about 16 miles

southwest of the outlet of Lake Huron. Recently the Oil Springs wells

have been drilled deeper, and are now producing 10,000 to 12,000

barrels (of 42 American gallons) per month. Petroleum has also been

found at Bothwell, 35 miles from Oil Springs, but this district has

ceased to yield. Quite recently a new territory has been discovered at

Euphemia, 17 miles from Bothwell, where, at the time of our visit,

there were four wells producing collectively 70 barrels per day. This

territory is by some regarded as part of the Bothwell field.

The present producing oil belt extends from Petrolia in a

northwesterly direction, to the township of Sarnia, and in a

southeasterly direction to Oil Springs, but in the latter direction

there is a break of about four and a quarter miles, commencing at a

point about two miles from Petrolia. At Oil Springs there appears to

be a pool about two miles square. The extension of the belt then

continues in the same direction, with another break of about nine

miles, to the new oil field of Euphemia, the average width of the oil

belt being about two miles. In all, about 15,000 wells are believed to

have been drilled in the Canadian oil fields, and of these about 2,500

are now producing, the average yield being about three quarters of a

barrel per well per day. The aggregate production is probably about

700,000 barrels per annum, the greater part of which is obtained in

the Petrolia district, and the stocks were at the time of our visit

stated to amount to from 400,000 to 450,000 barrels.

In the Canadian oil fields the drilling contractor usually employs his

own derrick, engine, boiler, and tools, furnishes wood and water,

cases the well, and fixes the pump; the well owner providing the

casing and pump, and subsequently erecting the permanent derrick.

The wells in the Oil Springs field were formerly from 200 ft. to 300

ft. in depth, but the oil stratum then worked became waterlogged, and

the wells are now sunk to a depth of about 375 ft., and are cased to a

depth of about 275 ft. to shut off the water. The contract price for

drilling a 4-5/8 in. hole to a depth of about 375 ft. under the

conditions mentioned is 150 dols. (£30), and the time occupied in

drilling is usually about a week when the work is continued night and

day. The wells in the Petrolia field have a depth of 480 ft., the

contract price, including the cost of 100 ft. of wooden conductor,

being 175 dols. (£35), and the time occupied in drilling being from

six to twelve days. Pole tools are used in drilling, the poles being

of white ash, 37 ft. in length. The derrick is about 48 ft. in height.

An auger some 4 ft. in length, and about a foot in diameter, is used

to bore through the earth to the bed rock, the auger being rotated by

horse power.

The drilling tools commonly consist of a bit, 2½ ft. in length by

4-5/8 in. in diameter, weighing about 60 lb.; a sinker bar, into which

the bit is screwed, 30 ft. in length by 3 in. in diameter, weighing

about 1,040 lb.; and the jars, inserted between the sinker bar and the

poles about 6 ft. in length, and weighing 150 lb. The tools are

suspended by a chain, which passes three times round the end of the

walking beam and thence to the windlass, with ratchet wheel fixed on

the walking beam, by means of which the tools are gradually lowered as

the drilling proceeds. The cable is thus only employed in raising the

tools from the well and lowering them into it.

The sand pump or bailer is frequently as much as 37 ft. in length, and

is about 4 in. in diameter. The casing (4-5/8 in diameter) costs about

45 cents (1s. 10½d.) per foot, and the 1¼ in. pump, with piping, costs

from 65 dols. (£13) to 85 dols. (£17), according to the length of

pipe required. An ordinary square frame derrick costs, with mud sill,

from 22 dols. (£4 8s.) to 27 dols. (£5 8s.), and the walking beam

about 8 dols. (£1 12s.) In many cases, however, a three-pole derrick,

which can be erected at an expense of about 10 dols. (£2), is

employed. A 100 barrel wooden tank costs, erected, 50 dols. (£10).

Scientific American Supplement, No. 611, September 17, 1887 · 第 41 / 52 题