ALONG THE TRACKS

The section crews are the men who lay new railroad tracks and keep the

old ones repaired. Railroaders call them gandy dancers, and the boss of

the crew is the king snipe.

In the old days, all the section work was done with hand tools. Men

lifted the heavy rails with tongs. They chipped out the notches in the

wooden ties for the rails to rest in. They hammered down the spikes that

held the rails. The crew rode to work on a handcar, pumping a lever up

and down to make the wheels turn.

Now there are motor cars instead of handcars, and wonderful machines

help with the work. A rail-laying crane lifts the rails and swings them

into place on the ties. An adzer with whirling knife-blades cuts the

notches. The spikes still have to be started into their holes by hand,

but then a mechanical hammer that runs by compressed air finishes the

pounding job.

[Illustration]

Perhaps you’ve noticed that there seem to be a lot of cinders along

railroad tracks. But they didn’t come from the engines. They were put

there on purpose. Railroads also use chipped stone or gravel or even

squashed-up oyster shells under the tracks and ties.

All of these things are called ballast, and they make a good firm bed

for the rails. When it rains or snows, the loose pebbly ballast lets the

water run off quickly, so that the ties will dry out and keep from

rotting.

Grass and weeds don’t grow very well in ballast, but when they do a

motor car with a chemical spray comes along and kills them off. When

lots of rubbish has collected, a cleaning machine goes to work. The

machine is called the Big Liz. It moves down the track, scooping up

ballast and sifting out all the dust and junk. Then it squirts the

cleaned ballast out again, leaving a clean roadbed behind.

[Illustration]

Section crews often have portable telephones or walkie-talkies that save

a lot of time. If they need materials, they call up the office and put

in the order right away. And if the job takes longer than they expected,

they phone a warning to the nearest station where trains can wait until

it’s safe to go ahead.

How does the section crew know when it is necessary to put in a new

rail? In the old days, they got orders from an inspector who walked or

rode slowly along in an inspection car, looking for cracks or breaks.

That’s still the way it is done in many places. But some railroads have

a machine-detective that finds cracks so small a man couldn’t even see

them.

The machine rides in a detector car, and it works by electricity with

tubes something like radio tubes. The men who run it simply look at wavy

lines drawn on paper by pens that are part of the machine. Whenever the

car passes over a cracked rail, the pens make a different kind of line.

And right away the section crew is asked to put a new rail in. Summer

and winter, the detector cars creep along, making sure that tracks are

safe.

In winter, of course, the tracks must be kept clear. If there’s just an

ordinary snowfall, a powerful locomotive can run through it with no

trouble. But when drifts get deep and heavy, the snow plow must go to

work.

[Illustration]

The man who first invented railroad snow plows got the idea from

watching a windmill. He saw how the windmill blades tossed snow around

as it fell. Why couldn’t blades at the front of an engine cut into

drifts and toss the snow off to one side? Of course they could.

Railroads began using powerful rotary plows. The whirling blades chewed

the drifts away. Even in lower country, there’s often plenty of work for

the snow eaters to do.

[Illustration: TIE ADZER]

Trains at Work · 第 39 / 60 题