THE HOBOKEN DRAINAGE PROBLEM.

Our thriving neighbor, Hoboken, just across the Hudson River, has a

large and vitally important problem to solve. Of the 720 acres within

the city limits, 270 acres lie at a considerable height above the river

and constitute what are known as the knoll or uplands of Hoboken.

Between this low ridge and Palisade Ridge lie 450 acres of marsh lands

or meadows, 140 acres of which have already been built upon. The marsh

is about half a mile wide, and something like a mile and a half long,

extending southward into Jersey City. The surface is a network of matted

vegetation and roots perhaps five feet deep, and under that lies a mass

of blue clay or river silt 100 feet or more in depth. The original

tidal flow over these marsh lands has been obstructed by viaducts for

railroads and streets, leaving only two natural outlets, a sluice way at

Fifteenth street on the north, and on the south a basin constructed by

the D. L. & W. R. R., 100 feet wide, and 2,300 feet long. The average

level of the marsh land is three feet above mean low water and a foot

and a half below mean high water. In the part built upon the streets are

but two feet above mean high water.

During long easterly and northerly storms, especially at times of high

spring tides, the level of the water in the Hudson is often such as to

cover the meadows even at low tide; and on several occasions the water

at high tide has been 4½ feet above the level of the meadows, and a foot

or more above the established grade of the streets.

The problem is to drain these marsh lands so as to make them properly

habitable and to protect them from invasion by high tides and storm

waters.

The first drainage map of the district was made about fifteen years ago;

since then over $100,000 have been expended on tidal sewers and other

devices, and several acts have been passed by the New Jersey Legislature

in furtherance of the work. An extended review of the plans proposed

and the experiments made thus far is given in a report presented to the

Board of Health and Vital Statistics, last May, by Engineers Spielmann

and Brush. Ten years ago Mr. Arthur Spielmann, on being directed by the

City Council to prepare plans and estimates for a contemplated sewer in

Ferry street to the western boundary of the city, reported adversely

to the project, believing that such a sewer would fail to answer the

purpose of its construction.

There were but two ways, he thought, of securing the end desired: First,

by raising the grade sufficient to give a good drainage; second, by

making reservoirs and forcing the drainage matter out into the river by

steam pumps. The first method he found impracticable on account of the

cost of filling in so large an area and of raising the large number of

houses already on the low ground. The second plan was recommended as

being much cheaper and entirely practicable. Substantially the same

position is taken in the report of last May, wherein it is alleged that

the superior economy of a pumping system has been sufficiently attested

by several eminent hydraulic engineers who have since investigated the

problems involved. On a small scale the efficacy of the pumping system

has been practically tested, first, in Meadow street, between Ferry and

First streets, and more recently in the southern part of the city, where

a number of property owners have kept twenty-five acres free from water

(except during storms) by means of a private pump.

The comparative economy of the pumping system is shown by estimates

in detail of the cost of constructing and operating such a system in

contrast with, the cost of raising the grade and introducing tidal

sewers. Under both systems the cost of the ordinary sewers will be

about the same. A proper system of tidal sewers, it is claimed, will

necessitate the raising of the grade of the streets on the low lands

to a height at least ten feet above mean high water. The extra cost of

raising the streets is estimated at $3,000,000. The cost of the pumping

system, with machinery and power sufficient to remove all storm water

and sewage, is put at $150,000, while the running expenses, including

interest on the first outlay, are put at $30,000 a year. The interest on

the preliminary expenditure of the first plan considered is $180,000 a

year, or six times as much as the pumping system would involve.

According to the estimates made by Engineer Kirkwood, in his report

of 1874, a total pumping capacity of 134,500,000 gallons a day will

ultimately have to be provided to meet the requirements during the

heaviest storms, besides some six or seven million gallons a day of

sewage proper, exclusive of storm waters. Not more than half that amount

of pumping will be required at first, the increase to be made gradually

as the marsh land is built upon.

* * * * *