[Illustration: FIG. 3.--Ponte Salario.]
4. _Roman Bridges_.--The first bridge known to have been constructed at
Rome over the Tiber was the timber Pons Sublicius, the bridge defended by
Horatius. The Pons Milvius, now Ponte Molle, was reconstructed in stone by
M. Aemilius Scaurus in 109 B.C., and some portions of the old bridge are
believed to exist in the present structure. The arches vary from 51 to 79
ft. span. The Pons Fabricius (mod. Ponte dei Quattro Capi), of about 62
B.C., is practically intact; and the Pons Cestius, built probably in 46
B.C., retains much of the original masonry. The Pons Aelius, built by
Hadrian A.D. 134 and repaired by Pope Nicholas II. and Clement IX., is now
the bridge of St Angelo. It had eight arches, the greatest span being 62
ft.[1] Dio Cassius mentions a bridge, possibly 3000 to 4000 ft. in length,
built by Trajan over the Danube in A.D. 104. Some piers are said still to
exist. A bas-relief on the Trajan column shows this bridge with masonry
piers and timber arches, but the representation is probably conventional
(fig. 1). Trajan also constructed the bridge of Alcantara in Spain (fig.
2), of a total length of 670 ft., at 210 ft. above the stream. This had six
arches and was built of stone blocks without cement. The bridge of Narses,
built in the 6th century (fig. 3), carried the Via Salaria over the Anio.
It was destroyed in 1867, during the approach of Garibaldi to Rome. It had
a fortification such as became usual in later bridges for defence or for
the enforcement of tolls. The great lines of aqueducts built by Roman
engineers, and dating from 300 B.C. onwards, where they are carried above
ground, are arched bridge structures of remarkable magnitude (see
AQUEDUCTS, § _Roman_). They are generally of brick and concrete.
[Illustration: FIG. 4.--First Span of Schaffhausen Bridge.]
5. _Medieval and other Early Bridges_.--Bridges with stone piers and timber
superstructures were no doubt constructed from Roman times onward, but they
have perished. Fig. 4 shows a timber bridge erected by the brothers
Grubenmann at Schaffhausen about the middle of the 18th century. It had
spans of 172 and 193 ft., and may be taken as a representative type of
bridges of this kind. The Wittingen bridge by the same engineers had a span
of 390 ft., probably the longest timber [v.04 p.0535] span ever
constructed. Of stone bridges in Great Britain, the earliest were the
cyclopean bridges still existing on Dartmoor, consisting of stone piers
bridged by stone slabs. The bridge over the East Dart near Tavistock had
three piers, with slabs 15 ft. by 6 ft. (Smiles, _Lives of the Engineers,_
ii. 43). It is reputed to have lasted for 2000 years.
[Illustration: FIG. 5.--Crowland Bridge.]
The curious bridge at Crowland near Peterborough (fig. 5) which now spans
roadways, the streams which formerly flowed under it having been diverted,
is one of the earliest known stone bridges in England. It is referred to in
a charter of the year 943. It was probably built by the abbots. The first
bridges over the Thames at London were no doubt of timber. William of
Malmesbury mentions the existence of a bridge in 994. J. Stow (_Survey of
the Cities of London and Westminster_) describes the building of the first
stone bridge commonly called Old London Bridge: "About the year 1176, the
stone bridge was begun to be founded by Peter of Colechurch, near unto the
bridge of timber, but more towards the west." It carried timber houses
(fig. 6) which were frequently burned down, yet the main structure existed
till the beginning of the 19th century. The span of the arches ranged from
10 to 33 ft., and the total waterway was only 337 ft. The waterway of the
present London Bridge is 690 ft., and the removal of the obstruction caused
by the old bridge caused a lowering of the low-water level by 5 ft., and a
considerable deepening of the river-bed. (See Smiles, _Lives of the
Engineers_, "Rennie.")
[Illustration: FIG. 6.--Old London Bridge, A.D. 1600. From a Drawing in the
Pepysian Library Magdalene College, Cambridge.
From J. R Green's _A Short History of the English People_, by permission of
Macmillan & Co., Ltd.]
The architects of the Renaissance showed great boldness in their designs. A
granite arch built in 1377 over the Adda at Trezzo had a span at low water
of 251 ft. This noble bridge was destroyed for military reasons by
Carmagnola in 1416. The Rialto bridge at Venice, with a span of 91 ft., was
built in 1588 by Antonio da Ponte. Fig. 7 shows the beautiful Ponte dellà
Trinità erected at Florence in 1566 from the design of B. Ammanati.
6. _Modern Bridges._--(a) _Timber._--In England timber bridges of
considerable span, either braced trusses or laminated arches (_i.e._ arches
of planks bolted together), were built for some of the earlier railways,
particularly the Great Western and the Manchester, Sheffield &
Lincolnshire. They have mostly been replaced, decay having taken place at
the joints. Timber bridges of large span were constructed in America
between the end of the 18th and the middle of the 19th century. The
Amoskeag bridge over the Merrimac at Manchester, N.H., U.S.A., built in
1792, had 6 spans of 92 ft. The Bellows Falls bridge over the Connecticut
(built 1785-1792) had 2 spans of 184 ft. The singular Colossus bridge,
built in 1812 over the Schuylkill, a kind of flat arched truss, had a span
of 340 ft. Some of these timber bridges are said to have lasted ninety
years with ordinary repairs, but they were road bridges not heavily loaded.
From 1840, trusses, chiefly of timber but with wrought-iron tension-rods
and cast-iron shoes, were adopted in America. The Howe truss of 1830 and
the Pratt truss of 1844 are examples. The Howe truss had timber chords and
a lattice of timber struts, with vertical iron ties. In the Pratt truss the
struts were vertical and the ties inclined. Down to 1850 such bridges were
generally limited to 150 ft. span. The timber was white pine. As railway
loads increased and greater spans were demanded, the Howe truss was
stiffened by timber arches on each side of each girder. Such a composite
structure is, however, fundamentally defective, the distribution of loading
to the two independent systems being indeterminate. Remarkably high timber
piers were built. The Genesee viaduct, 800 ft. in length, built in
1851-1852 in 10 spans, had timber trestle piers 190 ft. in height. (See
Mosse, "American Timber Bridges," _Proc. Inst. C.E._ xxii. p. 305, and for
more modern examples, cxlii. p. 409; and clv. p. 382; Cooper, "American
Railroad Bridges," _Trans. Am. Soc. C.E._ vol. xxi pp. 1-28.) These timber
framed structures served as models for the earlier metal trusses which
began to be used soon after 1850, and which, except in a few localities
where iron is costly, have quite superseded them.
[Illustration: FIG. 7.--Ponte della Trinità, Florence.]
7. (b) _Masonry._--The present London Bridge, begun in 1824 and completed
in 1831, is as fine an example of a masonry arch structure as can be found
(figs. 8 and 9). The design was made by John Rennie the elder, and the
acting engineer was his son, Sir John Rennie. The semi-elliptical shape of
the arches the variation of span, the slight curvature of the roadway, and
the simple yet bold architectural details, combine to make it a singularly
beautiful bridge. The centre arch has a span of 152 ft., and rises 29 ft. 6
in above Trinity high-water mark; the arches on each side of the centre
have a span of 140 ft. and the abutment arches 130 ft. The total length of
the bridge is 1005 ft., its width from outside to outside 56 ft., and
height above low [v.04 p.0536] water 60 ft. The two centre piers are 24 ft.
thick, the exterior stones are granite, the interior, half Bramley Fall and
half from Painshaw, Derbyshire. The voussoirs of the centre arch (all of
granite) are 4 ft. 9 in. deep at the crown, and increase to not less than 9
ft. at the springing. The general depth at which the foundations are laid
is about 29 ft. 6 in. below low water. The total cost was £1,458,311, but
the contractor's tender for the bridge alone was £425,081.
[Illustration: FIG. 8.--London New Bridge.]
Since 1867 it had been recognized that London Bridge was inadequate to
carry the traffic passing over it, and a scheme for widening it was adopted
in 1900. This was carried out in 1902-1904, the footways being carried on
granite corbels, on which are mounted cornices and open parapets. The width
between parapets is now 65 ft., giving a roadway of 35 ft. and two footways
of 15 ft. each. The architect was Andrew Murray and the engineer, G. E. W.
Cruttwell. (Cole, _Proc. Inst. C.E._ clxi. p. 290.)
The largest masonry arch is the Adolphe bridge in Luxemburg, erected in
1900-1903. This has a span of 278 ft., 138 ft. rise above the river, and
102 ft. from foundation to crown. The thickness of the arch is 4 ft. 8 in.
at the crown and 7 ft. 2 in. where it joins the spandrel masonry. The
roadway is 52 ft. 6 in. wide. The bridge is not continuous in width, there
are arch rings on each face, each 16.4 ft. wide with a space between of
19.7 ft. This space is filled with a flooring of reinforced concrete,
resting on the two arches, and carrying the central roadway. By the method
adopted the total masonry has been reduced one-third. One centering was
used for the two arch rings, supported on dwarf walls which formed a
slipway, along which it was moved after the first was built.
[Illustration: FIG. 9.--Half Elevation and Half Section of Arch of London
Bridge.]
Till near the end of the 19th century bridges of masonry or brickwork were
so constructed that they had to be treated as rigid blockwork structures.
The stability of such structures depends on the position of the line of
pressure relatively to the intrados and extrados of the arch ring.
Generally, so far as could be ascertained, the line of pressure lies within
the middle half of the depth of the voussoirs. In finding the abutment
reactions some principle such as the principle of least action must be
used, and some assumptions of doubtful validity made. But if hinges are
introduced at crown and springings, the calculation of the stresses in the
arch ring becomes simple, as the line of pressures must pass through the
hinges. Such hinges have been used not only for metal arches, but in a
modified form for masonry and concrete arches. Three cases therefore arise:
(a) The arch is rigid at crown and springings; (b) the arch is two-hinged
(hinges at springings); (c) the arch is three-hinged (hinges at crown and
springings). For an elementary account of the theory of arches, hinged or
not, reference may be made to a paper by H. M. Martin (_Proc. Inst. C. E._
vol. xciii. p. 462); and for that of the elastic arch, to a paper by
A.E.Young (_Proc. Inst. C.E._ vol. cxxxi. p. 323).
In Germany and America two- and three-hinged arches of masonry and concrete
have been built, up to 150 ft. span, with much economy, and the
calculations being simple, an engineer can venture to work closely to the
dimensions required by theory. For hinges, Leibbrand, of Stuttgart, uses
sheets of lead about 1 in. thick extending over the middle third of the
depth of the voussoir joints, the rest of the joints being left open. As
the lead is plastic this construction is virtually an articulation. If the
pressure on the lead is uniformly varying, the centre of pressure must be
within the middle third of the width of the lead; that is, it cannot
deviate from the centre of the voussoir joint by more than one-eighteenth
of its depth. In any case the position of the line of pressures is confined
at the lead articulations within very narrow limits, and ambiguity as to
the stresses is greatly diminished. The restricted area on which the
pressure acts at the lead joints involves greater intensity of stress than
has been usual in arched bridges. In the Württemberg hinged arches a limit
of stress of 110 tons per sq. ft. was allowed, while in the unhinged arches
at Cologne and Coblentz the limit was 50 to 60 tons per sq. ft. (_Annales
des Fonts et Chaussées_, 1891). At Rechtenstein a bridge of two concrete
arches has been constructed, span 75½ ft., with lead articulations: width
of arch 11 ft.; depth of arch at crown and springing 2.1 and 2.96 ft.
respectively. The stresses were calculated to be 15, 17 and 12 tons per sq.
ft. at crown, joint of rupture, and springing respectively. At Cincinnati a
concrete arch of 70 ft. span has been built, with a rise of 10 ft. The
concrete is reinforced by eleven 9-in. steel-rolled joists, spaced 3 ft.
apart and supported by a cross-channel joist at each springing. The arch is
15 in. thick at the crown and 4 ft. at the abutments. The concrete
consisted of 1 cement, 2 sand and 3 to 4 broken stone. An important series
of experiments on the strength of masonry, brick and concrete structures
will be found in the _Zeitschr. des österreichen Ing. und Arch. Vereines_
(1895).
The thermal coefficient of expansion of steel and concrete is nearly the
same, otherwise changes of temperature would cause shearing stress at the
junction of the two materials. If the two materials are disposed
symmetrically, the amount of load carried by each would be in direct
proportion to the coefficient of elasticity and inversely as the moment of
inertia of the cross section. But it is usual in many cases to provide a
sufficient section of steel to carry all the tension. For concrete the
coefficient of elasticity E varies with the amount of stress and diminishes
as the ratio of sand and stone to cement increases. Its value is generally
taken at 1,500,000 to 3,000,000 lb per sq. in. For steel E = 28,000,000 to
30,000,000, or on the average about twelve times its value for concrete.
The maximum compressive working stress on the concrete may be 500 lb per
sq. in., the tensile working stress 50 lb per sq. in., and the working
shearing stress 75 lb per sq. in. The tensile stress on the steel may be
16,000 lb per sq. in. The amount of steel in the structure may vary from
0.75 to 1.5%. The concrete not only affords much of the strength to resist
compression, but effectively protects the steel from corrosion.
8. (c) _Suspension Bridges._--A suspension bridge consists of two or more
chains, constructed of links connected by pins, or of twisted wire strands,
or of wires laid parallel. The chains pass over lofty piers on which they
usually rest on saddles carried by rollers, and are led down on either side
to anchorages in rock chambers. A level platform is hung from the chains by
suspension rods. In the suspension bridge iron or steel can be used in its
strongest form, namely hard-drawn wire. Iron suspension bridges began to be
used at the end of the 18th century for road bridges with spans
unattainable at that time in any other system. In 1819 T. Telford began the
construction of the Menai bridge (fig. 10), the span being 570 ft. and the
dip 43 ft. This bridge suffered some injury in a storm, but it is still in
good condition and one of the most graceful of bridges. Other bridges built
soon after were the Fribourg bridge of 870 ft. span, the Hammersmith bridge
of 422 ft. span, and the Pest bridge of 666 ft. span. The merit of the
simple suspension bridge is its cheapness, and its defect is its
flexibility. This last becomes less [v.04 p.0537] serious as the dead
weight of the structure becomes large in proportion to the live or
temporary load. It is, therefore, a type specially suited for great spans.
Some suspension bridges have broken down in consequence of the oscillations
produced by bodies of men marching in step. In 1850 a suspension bridge at
Angers gave way when 487 soldiers were marching over it, and 226 were
killed.
[Illustration: FIG. 10.--Menai Suspension Bridge.]
To obtain greater stiffness various plans have been adopted. In the Ordish
system a certain number of intermediate points in the span are supported by
oblique chains, on which girders rest. The Ordish bridge built at Prague in
1868 had oblique chains supporting the stiffening girders at intermediate
points of the span. A curved chain supported the oblique chains and kept
them straight. In 1860 a bridge was erected over the Danube canal at
Vienna, of 264 ft. span which had two parallel chains one above the other
and 4 ft. apart on each side of the bridge. The chains of each pair were
connected by bracing so that they formed a stiff inverted arch resisting
deformation under unequal loading. The bridge carried a railway, but it
proved weak owing to errors of calculation, and it was taken down in 1884.
The principle was sound and has been proposed at various times. About 1850
it was perceived that a bridge stiff enough to carry railway trains could
be constructed by combining supporting chains with stiffening girders
suspended from them. W. J. M. Rankine proved (_Applied Mechanics_, p. 370)
that the necessary strength of a stiffening girder would be only
one-seventh part of that of an independent girder of the same span as the
bridge, suited to carry the same moving load (not including the dead weight
of the girder which is supported by the chain). (See "Suspension Bridge
with Stiffened Roadway," by Sir G. Airy, and the discussion, _Proc. Inst,
C.E._, 1867, xxvi. p. 258; also "Suspension Bridges with Stiffening
Girders," by Max am Ende, _Proc. Inst. C.E._ cxxxvii. p. 306.)
[Illustration: FIG. 11.--Niagara Suspension Bridge.]
The most remarkable bridge constructed on this system was the Niagara
bridge built by J. A. Roebling in 1852-1855 (fig. 11). The span was 821
ft., much the largest of any railway bridge at that time, and the height
above the river 245 ft. There were four suspension cables, each 10 in. in
diameter; each was composed of seven strands, containing 520 parallel
wires, or 3640 wires in each cable. Each cable was carried on a separate
saddle on rollers on each pier. The stiffening girder, constructed chiefly
of timber, was a box-shaped braced girder 18 ft. deep and 25 ft. wide,
carrying the railway on top and a roadway within. After various repairs and
strengthenings, including the replacement of the timber girder by an iron
one in 1880, this bridge in 1896-1897 was taken down and a steel arch built
in its place. It was not strong enough to deal with the increasing weight
of railway traffic. In 1836 I. K. Brunei constructed the towers and
abutments for a suspension bridge of 702 ft. span at Clifton over the Avon,
but the project was not then carried further; in 1860, however, the link
chains of the Hungerford suspension bridge which was being taken down were
available at small cost, and these were used to complete the bridge. There
are three chains on each side, of one and two links alternately, and these
support wrought iron stiffening girders. There are wrought iron saddles and
steel rollers on the piers. At 196 ft. on either side from the towers the
chains are carried over similar saddles without rollers, and thence at 45°
with the horizontal down to the anchorages. Each chain has an anchor plate
5 ft. by 6 ft. The links are 24 ft. long at the centre of the bridge, and
longer as they are more inclined, so that their horizontal projection is 24
ft. The chains are so arranged that there is a suspending rod at each 8
ft., attached at the joint of one of the three chains. For erection a
suspended platform was constructed on eight wire ropes, on which the chains
were laid out and connected. Another wire rope with a travelling carriage
took out the links. The sectional area of the chains is 481 sq. in. at the
piers and 440 sq. in. at the centre. The two stiffening girders are plate
girders 3 ft. deep with flanges of 11 sq. in. area. In addition, the hand
railing on each side forms a girder 4 ft. 9 in. deep, with flanges 4½ sq.
in. area.
[Illustration: FIG. 12.--Williamsburg Suspension Bridge.]
Of later bridges of great span, perhaps the bridges over the East river at
New York are the most remarkable. The Brooklyn bridge, begun in 1872, has a
centre span of 1595½ and side spans of 930 ft. The Brooklyn approach being
971 ft., and the New York approach 1562½ ft., the total length of the
bridge is 5989 ft. There are four cables which carry a promenade, a roadway
and an electric railway. The stiffening girders of the main span are 40 ft.
deep and 67 ft. apart. The saddles for the chains are 329 ft. above high
water. The cables are 15¾ in. in diameter. Each cable has 19 strands of 278
parallel steel wires, 7 B.W.G. Each wire is taken separately across the
river and its length adjusted. Roebling preferred parallel wires as 10 %
stronger than twisted wires. Each strand when made up and clamped was
lowered to its position. The Williamsburg bridge (fig. 12), begun in 1897
and opened for traffic in 1903, has a span of 1600 ft., a versed sine of
176 ft., and a width of 118 ft. It has two decks, and carries two elevated
railway tracks, four electric tramcar lines, two carriageways, two footways
and two [v.04 p.0538] bicycle paths. There are four cables, one on each
side of the two main trusses or stiffening girders. These girders are
supported by the cables over the centre span but not in the side spans.
Intermediate piers support the trusses in the side spans. The cables are
18¾ in. in diameter; each weighs about 1116 tons, and has a nominal
breaking strength of 22,320 tons, the actual breaking strength being
probably greater. The saddles are 332 ft. above the water. The four cables
support a dead load of 7140 tons and a live load of 4017 tons. Each cable
is composed of 37 strands of 208 wires, or 7696 parallel steel wires, No. 8
B.W.G., or about 3/16 in. in diameter. The wire was required to have a
tensile strength of 89 tons per sq. in., and 2½% elongation in 5 ft. and 5%
in 8 in. Cast steel clamps hold the cable together, and to these the
suspending rods are attached. The cables are wrapped in cotton duck soaked
in oxidized oil and varnish, and are sheathed in sheet iron. A later
bridge, the Manhattan, is designed to carry four railway tracks and four
tramway lines, with a wide roadway and footpaths, supported by cables 21¼
in. in diameter, each composed of 9472 galvanized steel wires 3/16 in. in
diameter.
[Illustration: FIG. 13.--Tower Bridge, London.]
The Tower Bridge, London (fig. 13), is a suspension bridge with a secondary
bascule bridge in the centre span to permit the passage of ships. Two main
towers in the river and two towers on the shore abutments carry the
suspension chains. The opening bridge between the river towers consists of
two leaves or bascules, pivoted near the faces of the piers and rotating in
a vertical plane. When raised, the width of 200 ft. between the main river
piers is unobstructed up to the high-level foot-bridge, which is 141 ft.
above Trinity H.W. The clear width of the two shore spans is 270 ft. The
total length of the bridge is 940 ft., and that of the approaches 1260 ft.
on the north and 780 ft. on the south. The width of the bridge between
parapets is 60 ft., except across the centre span, where it is 49 ft. The
main towers consist of a skeleton of steel, enclosed in a facing of granite
and Portland stone, backed with brickwork. There are two high-level
footways for use when the bascules are raised, the main girders of which
are of the cantilever and suspended girder type. The cantilevers are fixed
to the shore side of the towers. The middle girders are 120 ft. in length
and attached to the cantilevers by links. The main suspension chains are
carried across the centre span in the form of horizontal ties resting on
the high-level footway girders. These ties are jointed to the hanging
chains by pins 20 in. in diameter with a ring in halves surrounding it 5
in. thick. One half ring is rigidly attached to the tie and one to the
hanging chain, so that the wear due to any movement is distributed over the
length of the pin. A rocker bearing under these pins transmits the load at
the joint to the steel columns of the towers. The abutment towers are
similar to the river towers. On the abutment towers the chains are
connected by horizontal links, carried on rockers, to anchor ties. The
suspension chains are constructed in the form of braced girders, so that
they are stiff against unsymmetrical loading. Each chain over a shore span
consists of two segments, the longer attached to the tie at the top of the
river tower, the shorter to the link at the top of the abutment tower, and
the two jointed together at the lowest point. Transverse girders are hung
from the chains at distances of 18 ft. There are fifteen main transverse
girders to each shore span, with nine longitudinal girders between each
pair. The trough flooring, 3/8 in. thick and 6 in. deep, is riveted to the
longitudinals. The anchor ties are connected to girders embedded in large
concrete blocks in the foundations of the approach viaducts.
The two bascules are each constructed with four main girders. Over the
river these are lattice girders, with transverse girders 12 ft. apart, and
longitudinal and subsidiary transverse girders dividing the floor into
rectangles 3 ft. by 3½ ft. covered with buckled plates. The roadway is of
pine blocks dowelled. The bascules rotate through an angle of 82°, and
their rear ends in the bascule chambers of the piers carry 365 tons of
counterweight, the total weight of each being 1070 tons. They rotate on
steel shafts 21 in. in diameter and 48 ft. long, and the bascules can be
lifted or lowered in one minute, but usually the time taken is one and a
half minutes. They are worked by hydraulic machinery.
9. (d) _Iron and Steel Girder Bridges._--The main supporting members are
two or more horizontal beams, girders or trusses. The girders carry a floor
or platform either on top (_deck_ bridges) or near the bottom (_through_
bridges). The platform is variously constructed. For railway bridges it
commonly consists of cross girders, attached to or resting on the main
girders, and longitudinal rail girders or stringers carried by the cross
girders and directly supporting the sleepers and rails. For spans over 75
ft., expansion due to change of temperature is provided for by carrying one
end of each chain girder on rollers placed between the bearing-plate on the
girder and the bed-plate on the pier or abutment.
Fig. 14 shows the roller bed of a girder of the Kuilenburg bridge of 490
ft. span. It will be seen that the girder directly rests on a cylindrical
pin or rocker so placed as to distribute the load uniformly to all the
rollers. The pressure on the rollers is limited to about p = 600 d in lb
per in. length of roller, where d is the diameter of the roller in inches.
[Illustration: FIG. 14.--Roller Bed of a Girder.]
In the girders of bridges the horizontal girder is almost exclusively
subjected to vertical loading forces. Investigation of the internal
stresses, which balance the external forces, shows that most of the
material should be arranged in a top flange, boom or chord, subjected to
compression, and a bottom flange or chord, subjected to tension. (See
STRENGTH OF MATERIALS.) Connecting the flanges is a vertical web which may
be a solid plate or a system of bracing bars. In any case, though the exact
form of cross section of girders varies very much, it is virtually an I
section (fig. 15). The function of the flanges is to resist a horizontal
tension and compression distributed practically uniformly on their cross
sections. The web resists forces equivalent [v.04 p.0539] to a shear on
vertical and horizontal planes. The inclined tensions and compressions in
the bars of a braced web are equivalent to this shear. The horizontal
stresses in the flanges are greatest at the centre of a span. The stresses
in the web are greatest at the ends of the span. In the most numerous cases
the flanges or chords are parallel. But girders may have curved chords and
then the stresses in the web are diminished.
[Illustration: FIG. 15.--Flanged Girder.]
At first girders had solid or plate webs, but for spans over 100 ft. the
web always now consists of bracing bars. In some girder bridges the members
are connected entirely by riveting, in others the principal members are
connected by pin joints. The pin system of connexion used in the Chepstow,
Saltash, Newark Dyke and other early English bridges is now rarely used in
Europe. But it is so commonly used in America as to be regarded as a
distinctive American feature. With pin connexions some weight is saved in
the girders, and erection is a little easier. In early pin bridges
insufficient bearing area was allowed between the pins and parts connected,
and they worked loose. In some cases riveted covers had to be substituted
for the pins. The proportions are now better understood. Nevertheless the
tendency is to use riveted connexions in preference to pins, and in any
case to use pins for tension members only.
On the first English railways cast iron girder bridges for spans of 20 to
66 ft. were used, and in some cases these were trussed with wrought iron.
When in 1845 the plans for carrying the Chester and Holyhead railway over
the Menai Straits were considered, the conditions imposed by the admiralty
in the interests of navigation involved the adoption of a new type of
bridge. There was an idea of using suspension chains combined with a
girder, and in fact the tower piers were built so as to accommodate chains.
But the theory of such a combined structure could not be formulated at that
time, and it was proved, partly by experiment, that a simple tubular girder
of wrought iron was strong enough to carry the railway. The Britannia
bridge (fig. 16) has two spans of 460 and two of 230 ft. at 104 ft. above
high water. It consists of a pair of tubular girders with solid or plate
sides stiffened by angle irons, one line of rails passing through each
tube. Each girder is 1511 ft. long and weighs 4680 tons. In cross section
(fig. 17), it is 15 ft. wide and varies in depth from 23 ft. at the ends to
30 ft. at the centre. Partly to counteract any tendency to buckling under
compression and partly for convenience in assembling a great mass of
plates, the top and bottom were made cellular, the cells being just large
enough to permit passage for painting. The total area of the cellular top
flange of the large-span girders is 648 sq. in., and of the bottom 585 sq.
in. As no scaffolding could be used for the centre spans, the girders were
built on shore, floated out and raised by hydraulic presses. The credit for
the success of the Conway and Britannia bridges must be divided between the
engineers. Robert Stephenson and William Fairbairn, and Eaton Hodgkinson,
who assisted in the experimental tests and in formulating the imperfect
theory then available. The Conway bridge was first completed, and the first
train passed through the Britannia bridge in 1850. Though each girder has
been made continuous over the four spans it has not quite the proportions
over the piers which a continuous girder should have, and must be regarded
as an imperfectly continuous girder. The spans were in fact designed as
independent girders, the advantage of continuity being at that time
imperfectly known. The vertical sides of the girders are stiffened so that
they amount to 40% of the whole weight. This was partly necessary to meet
the uncertain conditions in floating when the distribution of supporting
forces was unknown and there were chances of distortion.
[Illustration: FIG. 16.--Britannia Bridge.]
[Illustration: FIG. 17.--Britannia Bridge (Cross Section of Tubular
Girder).]
Wrought iron and, later, steel plate web girders were largely used for
railway bridges in England after the construction of the Conway and Menai
bridges, and it was in the discussions arising during their design that the
proper function of the vertical web between the top and bottom flanges of a
girder first came to be understood. The proportion of depth to span in the
Britannia bridge was 1/16. But so far as the flanges are concerned the
stress [v.04 p.0540] to be resisted varies inversely as the depth of the
girder. It would be economical, therefore, to make the girder very deep.
This, however, involves a much heavier web, and therefore for any type of
girder there must be a ratio of depth to span which is most economical. In
the case of the plate web there must be a considerable excess of material,
partly to stiffen it against buckling and partly because an excess of
thickness must be provided to reduce the effect of corrosion. It was soon
found that with plate webs the ratio of depth to span could not be
economically increased beyond 1/15 to 1/12. On the other hand a framed or
braced web afforded opportunity for much better arrangement of material,
and it very soon became apparent that open web or lattice or braced girders
were more economical of material than solid web girders, except for small
spans. In America such girders were used from the first and naturally
followed the general design of the earlier timber bridges. Now plate web
girders are only used for spans of less than 100 ft.
Three types of bracing for the web very early developed--the Warren type in
which the bracing bars form equilateral triangles, the Whipple Murphy in
which the struts are vertical and the ties inclined, and the lattice in
which both struts and ties are inclined at equal angles, usually 45° with
the horizontal. The earliest published theoretical investigations of the
stresses in bracing bars were perhaps those in the paper by W.T. Doyne and
W.B. Blood (_Proc. Inst. C.E._, 1851, xi. p. 1), and the paper by J.
Barton, "On the economic distribution of material in the sides of wrought
iron beams" (_Proc. Inst. C.E._, 1855, xiv. p. 443).
[Illustration: FIG. 18.--Span of Saltash Bridge.]
The Boyne bridge, constructed by Barton in Ireland, in 1854-1855, was a
remarkable example of the confidence with which engineers began to apply
theory in design. It was a bridge for two lines of railway with lattice
girders continuous over three spans. The centre span was 264 ft., and the
side spans 138 ft. 8 in.; depth 22 ft. 6 in. Not only were the bracing bars
designed to calculated stresses, and the continuity of the girders taken
into account, but the validity of the calculations was tested by a
verification on the actual bridge of the position of the points of contrary
flexure of the centre span. At the calculated position of one of the points
of contrary flexure all the rivets of the top boom were cut out, and by
lowering the end of the girder over the side span one inch, the joint was
opened 1/32 in. Then the rivets were cut out similarly at the other point
of contrary flexure and the joint opened. The girder held its position with
both joints severed, proving that, as should be the case, there was no
stress in the boom where the bending moment changes sign.
[Illustration: FIG. 19.--Newark Dyke Bridge and Section of Newark Dyke
Bridge.]
By curving the top boom of a girder to form an arch and the bottom boom to
form a suspension chain, the need of web except for non-uniform loading is
obviated. I.K. Brunel adopted this principle for the Saltash bridge near
Plymouth, built soon after the Britannia bridge. It has two spans of 455
ft. and seventeen smaller spans, the roadway being 100 ft. above high
water. The top boom of each girder is an elliptical wrought iron tube 17
ft. wide by 12 ft. deep. The lower boom is a pair of chains, of
wrought-iron links, 14 in each chain, of 7 in. by 1 in. section, the links
being connected by pins. The suspending rods and cross bracing are very
light. The depth of the girder at the centre is about one-eighth of the
span.
[Illustration: FIG. 20.--Fink Truss.]
In both England and America in early braced bridges cast iron, generally in
the form of tubes circular or octagonal in section, was used for
compression members, and wrought iron for the tension members. Fig. 19
shows the Newark Dyke bridge on the Great Northern railway over the Trent.
It was a pin-jointed Warren girder bridge erected from designs by C.M. Wild
in 1851-1853. The span between supports was 259 ft., the clear span 240½
ft.; depth between joint pins 16 ft. There were four girders, two to each
line of way. The top flange consisted of cast iron hollow castings butted
end to end, and the struts were of cast iron. The lower flange and ties
were flat wrought iron links. This bridge has now been replaced by a
stronger bridge to carry the greater loads imposed by modern traffic. Fig.
20 shows a Fink truss, a characteristic early American type, with cast iron
compression and wrought iron tension members. The bridge is a deck bridge,
the railway being carried on top. The transfer of the loads to the ends of
the bridge by [v.04 p.0541] long ties is uneconomical, and this type has
disappeared. The Warren type, either with two sets of bracing bars or with
intermediate verticals, affords convenient means of supporting the floor
girders. In 1869 a bridge of 390 ft. span was built on this system at
Louisville.
Amongst remarkable American girder bridges may be mentioned the Ohio bridge
on the Cincinnati & Covington railway, which is probably the largest girder
span constructed. The centre span is 550 ft. and the side spans 490
ft.--centre to centre of piers. The girders are independent polygonal
girders. The centre girder has a length of 545 ft. and a depth of 84 ft.
between pin centres. It is 67 ft. between parapets, and carries two lines
of railway, two carriageways, and two footways. The cross girders,
stringers and wind-bracing are wrought iron, the rest of mild steel. The
bridge was constructed in 1888 by the Phoenix Bridge Company, and was
erected on staging. The total weight of iron and steel in three spans was
about 5000 tons.
[Illustration: FIG. 21.--Typical Cantilever Bridge.]
[Illustration: FIG. 22.]
10. (e) _Cantilever Bridges._--It has been stated that if in a girder
bridge of three or more spans, the girders were made continuous there would
be an important economy of material, but that the danger of settlement of
the supports, which would seriously alter the points of contrary flexure or
points where the bending moment changes sign, and therefore the magnitude
and distribution of the stresses, generally prevents the adoption of
continuity. If, however, hinges or joints are introduced at the points of
contrary flexure, they become necessarily points where the bending moment
is zero and ambiguity as to the stresses vanishes. The exceptional local
conditions at the site of the Forth bridge led to the adoption there of the
cantilever system, till then little considered. Now it is well understood
that in many positions this system is the simplest and most economical
method of bridging. It is available for spans greater than those
practicable with independent girders; in fact, on this system the spans are
virtually reduced to smaller spans so far as the stresses are concerned.
There is another advantage which in many cases is of the highest
importance. The cantilevers can be built out from the piers, member by
member, without any temporary scaffolding below, so that navigation is not
interrupted, the cost of scaffolding is saved, and the difficulty of
building in deep water is obviated. The centre girder may be built on the
cantilevers and rolled into place or lifted from the water-level. Fig. 21
shows a typical cantilever bridge of American design. In this case the
shore ends of the cantilevers are anchored to the abutments. J.A.L. Waddell
has shown that, in some cases, it is convenient to erect simple independent
spans, by building them out as cantilevers and converting them into
independent girders after erection. Fig. 22 shows girders erected in this
way, the dotted lines being temporary members during erection, which are
removed afterwards. The side spans are erected first on staging and
anchored to the piers. From these, by the aid of the temporary members, the
centre span is built out from both sides. The most important cantilever
bridges so far erected or projected are as follows:--
[Illustration: FIG. 23.--Forth Bridge.]
(1) The Forth bridge (fig. 23). The original design was for a stiffened
suspension bridge, but after the fall of the Tay bridge in 1879 this was
abandoned. The bridge, which was begun in 1882 and completed in 1889, is at
the only narrowing of the Forth in a distance of 50 m., at a point where
the channel, about a mile in width, is divided by the island of Inchgarvie.
The length of the cantilever bridge is 5330 ft., made up thus: central
tower on Inchgarvie 260 ft.; Fife and Queensferry piers each 145 ft.; two
central girders between cantilevers each 350 ft.; and six cantilevers each
680 ft. The two main spans are each 1710 ft. The clear headway is 157 ft.,
and the extreme height of the towers above high water 361 ft. The outer
ends of the shore cantilevers are loaded to balance half the weight of the
central girder, the rolling load, and 200 tons in addition. An internal
viaduct of lattice girders carries a double line of rails. Provision is
made for longitudinal expansion due to change of temperature, for
distortion due to the sun acting on one side of the structure, and for the
wind acting on one side of the bridge. The amount of steel used was 38,000
tons exclusive of approach viaducts. (See _The Forth Bridge_, by W.
Westhofen; _Reports of the British Association_ (1884 and 1885); _Die Forth
Brücke_, von G. Barkhausen (Berlin, 1889); _The Forth Bridge_, by Philip
Phillips (1890); Vernon Harcourt, _Proc. Inst. C.E._ cxxi. p. 309.)
(2) The Niagara bridge of a total length of 910 ft., for two lines of
railway. Clear span between towers 495 ft. Completed in 1883, and more
recently strengthened (_Proc. Inst. C.E._ cvii. p. 18, and cxliv. p. 331).
[Illustration: FIG. 24.--Lansdowne Bridge.]
(3) The Lansdowne bridge (completed 1889) at Sukkur, over the Indus. The
clear span is 790 ft., and the suspended girder 200 ft. in length. The span
to the centres of the end uprights is 820 ft.; width between centres of
main uprights at bed-plate 100 ft., and between centres of main members at
end of cantilevers 20 ft. The bridge is for a single line of railway of 5
ft. 6 in. gauge. The back guys are the most heavily strained part of the
structure, the stress provided for being 1200 tons. This is due to the half
weight of centre girder, the weight of the cantilever itself, the rolling
load on half the bridge, and the wind pressure. The anchors are built up of
steel plates and angle, bars, and are buried in a large mass of concrete.
The area of each anchor plate, normal to the line of stress, is 32 ft. by
12 ft. The bridge was designed by Sir A. Rendel, the consulting engineer to
the Indian government (_Proc. Inst. C.E._ ciii. p. 123).
(4) The Red Rock cantilever bridge over the Colorado river, with a centre
span of 660 ft.
(5) The Poughkeepsie bridge over the Hudson, built 1886-1887. There are
five river and two shore spans. The girders over the second and fourth
spans are extended as cantilevers over the adjoining spans. The shore piers
carry cantilevers projecting one way over the river openings and the other
way over a shore span where it is secured to an anchorage. The girder spans
are 525 ft., the cantilever spans 547 ft., and the shore spans 201 ft.
[Illustration: FIG. 25.--Quebec Bridge (original design)]
(6) The Quebec bridge (fig. 25) over the St Lawrence, which collapsed while
in course of construction in 1907. This bridge, connecting very important
railway systems, was designed to carry two lines of rails, a highway and
electric railway on each side, all between the main trusses. Length between
abutments 3240 ft.; [v.04 p.0542] channel span 1800 ft.; suspended span 675
ft.; shore spans 562½ ft. Total weight of metal about 32,000 tons.
[Illustration: FIG. 26.--Jubilee Bridge over the Hugli.]
(7) The Jubilee bridge over the Hugli, designed by Sir Bradford Leslie, is
a cantilever bridge of another type (fig. 26). The girders are of the
Whipple Murphy type, but with curved top booms. The bridge carries a double
line of railway, between the main girders. The central double cantilever is
360 ft. long. The two side span girders are 420 ft long. The cantilever
rests on two river piers 120 ft. apart, centre to centre. The side girders
rest on the cantilevers on 15 in. pins, in pendulum links suspended from
similar pins in saddles 9 ft. high.
[Illustration: FIG. 27.--Coalbrookdale Bridge.]
11. (f) _Metal Arch Bridges._--The first iron bridge erected was
constructed by John Wilkinson (1728-1808) and Abraham Darby (1750-1791) in
1773-1779 at Coalbrookdale over the Severn (fig. 27). It had five cast iron
arched ribs with a centre span of 100 ft. This curious bridge is still in
use. Sir B. Baker stated that it had required patching for ninety years,
because the arch and the high side arches would not work together.
Expansion and contraction broke the high arch and the connexions between
the arches. When it broke they fished it. Then the bolts sheared or the
ironwork broke in a new place. He advised that there was nothing unsafe; it
was perfectly strong and the stress in vital parts moderate. All that
needed to be done was to fish the fractured ribs of the high arches, put
oval holes in the fishes, and not screw up the bolts too tight.
Cast iron arches of considerable span were constructed late in the 18th and
early in the 19th century. The difficulty of casting heavy arch ribs led to
the construction of cast iron arches of cast voussoirs, somewhat like the
voussoirs of masonry bridges. Such a bridge was the Wearmouth bridge,
designed by Rowland Burdon and erected in 1793-1796, with a span of 235 ft.
Southwark bridge over the Thames, designed by John Rennie with cast iron
ribs and erected in 1814-1819, has a centre span of 240 ft. and a rise of
24 ft. In Paris the Austerlitz (1800-1806) and Carrousel (1834-1836)
bridges had cast iron arches. In 1858 an aqueduct bridge was erected at
Washington by M.C. Meigs (1816-1892). This had two arched ribs formed by
the cast iron pipes through which the water passed. The pipes were 4 ft. in
diameter inside, 1½ in. thick, and were lined with staves of pine 3 in.
thick to prevent freezing. The span was 200 ft.
[Illustration: FIG. 28.--Arch of Bridge at Coblenz]
Fig. 28 shows one of the wrought iron arches of a bridge over the Rhine at
Coblenz. The bridge consists of three spans of about 315 ft. each.
[Illustration: FIG. 29.--St Louis Bridge.]
Of large-span bridges with steel arches, one of the most important is the
St Louis bridge over the Mississippi, completed in 1874 (fig. 29). The
river at St Louis is confined to a single channel, 1600 ft. wide, and in a
freshet in 1870 the scour reached a depth of 51 ft. Captain J.B. Eads, the
engineer, determined to establish the piers and abutments on rock at a
depth for the east pier and east abutment of 136 ft. below high water. This
was effected by caissons with air chambers and air locks, a feat
unprecedented in the annals of engineering. The bridge has three spans,
each formed of arches of cast steel. The centre span is 520 ft. and the
side spans 502 ft. in the clear. The rise of the centre arch is 47½ ft.,
and that of the side arches 46 ft. Each span has four steel double ribs of
steel tubes butted and clasped by wrought iron couplings. The vertical
bracing between the upper and lower members of each rib, which are 12 ft.
apart, centre to centre, consolidates them into a single arch. The arches
carry a double railway track and above this a roadway 54 ft. wide.
The St Louis bridge is not hinged, but later bridges have been constructed
with hinges at the springings and sometimes with hinges at the crown also.
The Alexander III. bridge over the Seine has fifteen steel ribs hinged at
crown and springings with a span of 353 ft. between centres of hinges and
358 ft. between abutments. The rise from side to centre hinges is 20 ft. 7
in. The roadway is 65½ ft. wide and footways 33 ft. (_Proc. Inst. C.E._
cxxx. p. 335).
[Illustration: FIG. 30.--Viaur Viaduct.]
The largest three-hinged-arch bridge constructed is the Viaur viaduct in
the south of France (fig. 30). The central span is 721 ft. 9 in. and the
height of the rails above the valley 380 ft. It has a very fine appearance,
especially when seen in perspective and not merely in elevation.
[Illustration: FIG. 31.--Douro Viaduct.]
Fig. 31 shows the Douro viaduct of a total length of 1158 ft. carrying a
railway 200 ft. above the water. The span of the central opening is 525 ft.
The principal rib is crescent-shaped 32.8 ft. deep [v.04 p.0543] at the
crown. Rolling load taken at 1.2 ton per ft. Weight of centre span 727
tons. The Luiz I. bridge is another arched bridge over the Douro, also
designed by T. Seyrig. This has a span of 566 ft. There are an upper and
lower roadway, 164 ft. apart vertically. The arch rests on rollers and is
narrowest at the crown. The reason given for this change of form was that
it more conveniently allowed the lower road to pass between the springings
and ensured the transmission of the wind stresses to the abutments without
interrupting the cross-bracing. Wire cables were used in the erection, by
which the members were lifted from barges and assembled, the operations
being conducted from the side piers.
[Illustration: FIG. 32.--Niagara Falls and Clifton Bridge.]
The Niagara Falls and Clifton steel arch (fig. 32) replaces the older
Roebling suspension bridge. The centre span is a two-hinged parabolic
braced rib arch, and there are side spans of 190 and 210 ft. The bridge
carries two electric-car tracks, two roadways and two footways. The main
span weighed 1629 tons, the side spans 154 and 166 tons (Buck, _Proc. Inst.
C.E._ cxliv. p. 70). Prof. Claxton Fidler, speaking of the arrangement
adopted for putting initial stress on the top chord, stated that this
bridge marked the furthest advance yet made in this type of construction.
When such a rib is erected on centering without initial stress, the
subsequent compression of the arch under its weight inflicts a bending
stress and excess of compression in the upper member at the crown. But the
bold expedients adopted by the engineer annulled the bending action.
The Garabit viaduct carries the railway near St Flour, in the Cantal
department, France, at 420 ft. above low water. The deepest part of the
valley is crossed by an arch of 541 ft. span, and 213 ft. rise. The bridge
is similar to that at Oporto, also designed by Seyrig. It is formed by a
crescent-shaped arch, continued on one side by four, on the other side by
two lattice girder spans, on iron piers. The arch is formed by two lattice
ribs hinged at the abutments. Its depth at the crown is 33 ft., and its
centre line follows nearly the parabolic line of pressures. The two arch
ribs are 65½ ft. apart at the springings and 20½ ft. at the crown. The
roadway girders are lattice, 17 ft. deep, supported from the arch ribs at
four points. The total length of the viaduct is 1715 ft. The lattice
girders of the side spans were first rolled into place, so as to project
some distance beyond the piers, and then the arch ribs were built out,
being partly supported by wire-rope cables from the lattice girders above.
The total weight of ironwork was 3200 tons and the cost £124,000 (_Annales
des travaux publiques_, 1884).
The Victoria Falls bridge over the Zambezi, designed by Sir Douglas Fox,
and completed in 1905, is a combination of girder and arch having a total
length of 650 ft. The centre arch is 500 ft. span, the rise of the crown 90
ft., and depth at crown 15 ft. The width between centres of ribs of main
arch is 27½ ft. at crown and 53 ft. 9 in at springings. The curve of the
main arch is a parabola. The bridge has a roadway of 30 ft. for two lines
of rails. Each half arch was supported by cables till joined at the centre.
An electric cableway of 900 ft. span capable of carrying 10 tons was used
in erection.
12. (g) _Movable Bridges_ can be closed to carry a road or railway or in
some cases an aqueduct, but can be opened to give free passage to
navigation. They are of several types:--
[Illustration: FIG. 33.]
(1) _Lifting Bridges._--The bridge with its platform is suspended from
girders above by chains and counterweights at the four corners (fig. 33 a).
It is lifted vertically to the required height when opened. Bridges of this
type are not very numerous or important.
(2) _Rolling Bridges._--The girders are longer than the span and the part
overhanging the abutment is counter-weighted so that the centre of gravity
is over the abutment when the bridge is rolled forward (fig. 33 b). To fill
the gap in the approaches when the bridge is rolled forward a frame
carrying that part of the road is moved into place sideways. At Sunderland,
the bridge is first lifted by a hydraulic press so as to clear the roadway
behind, and is then rolled back.
(3) _Draw or Bascule Bridges._--The fortress draw-bridge is the original
type, in which a single leaf, or bascule, turns round a horizontal hinge at
one abutment. The bridge when closed is supported on abutments at each end.
It is raised by chains and counterweights. A more common type is a bridge
with two leaves or bascules, one hinged at each abutment. When closed [v.04
p.0544] the bascules are locked at the centre (see fig. 13). In these
bridges each bascule is prolonged backwards beyond the hinge so as to
balance at the hinge, the prolongation sinking into the piers when the
bridge is opened.
(4) _Swing or Turning Bridges._--The largest movable bridges revolve about
a vertical axis. The bridge is carried on a circular base plate with a
central pivot and a circular track for a live ring and conical rollers. A
circular revolving platform rests on the pivot and rollers. A toothed arc
fixed to the revolving platform or to the live ring serves to give motion
to the bridge. The main girders rest on the revolving platform, and the
ends of the bridge are circular arcs fitting the fixed roadway. Three
arrangements are found: (a) the axis of rotation is on a pier at the centre
of the river and the bridge is equal armed (fig. 33 c), so that two
navigation passages are opened simultaneously. (b) The axis of rotation is
on one abutment, and the bridge is then usually unequal armed (fig. 33 d),
the shorter arm being over the land. (c) In some small bridges the shorter
arm is vertical and the bridge turns on a kind of vertical crane post at
the abutment (fig. 33 e).
(5) _Floating Bridges_, the roadway being carried on pontoons moored in the
stream.
The movable bridge in its closed position must be proportioned like a fixed
bridge, but it has also other conditions to fulfil. If it revolves about a
vertical axis its centre of gravity must always lie in that axis; if it
rolls the centre of gravity must always lie over the abutment. It must have
strength to support safely its own overhanging weight when moving.
At Konigsberg there is a road bridge of two fixed spans of 39 ft., and a
central span of 60 ft. between bearings, or 41 ft. clear, with balanced
bascules over the centre span. Each bascule consists of two main girders
with cross girders and stringers. The main girders are hung at each side on
a horizontal shaft 8-5/8 in. in diameter, and are 6 ft. deep at the hinge,
diminishing to 1 ft. 7 in. at the centre of the span. The counterweight is
a depressed cantilever arm 12 ft. long, overlapped by the fixed platform
which sinks into a recess in the masonry when the bridge opens. In closed
position the main girders rest on a bed plate on the face of the pier 4 ft.
3 in. beyond the shaft bearings. The bridge is worked by hydraulic power,
an accumulator with a load of 34 tons supplying pressure water at 630 lb
per sq. in. The bridge opens in 15 seconds and closes in 25 seconds.
At the opening span of the Tower bridge (fig. 13) there are four main
girders in each bascule. They project 100 ft. beyond and 62 ft. 6 in.
within the face of the piers. Transverse girders and bracings are inserted
between the main girders at 12 ft. intervals. The floor is of buckled
plates paved with wood blocks. The arc of rotation is 82°, and the axis of
rotation is 13 ft. 3 in. inside the face of the piers, and 5 ft. 7 in.
below the roadway. The weight of ballast in the short arms of the bascules
is 365 tons. The weight of each leaf including ballast is about 1070 tons.
The axis is of forged steel 21 in. in diameter and 48 ft. long. The axis
has eight bearings, consisting of rings of live rollers 4-7/16 in. in
diameter and 22 in. long. The bascules are rotated by pinions driven by
hydraulic engines working in steel sectors 42 ft. radius (_Proc. Inst.
C.E._ cxxvii. p. 35).
As an example of a swing bridge, that between Duluth and Superior at the
head of Lake Superior over the St Louis river may be described. The centre
opening is 500 ft., spanned by a turning bridge, 58 ft. wide. The girders
weighing 2000 tons carry a double track for trains between the girders and
on each side on cantilevers a trolley track, roadway and footway. The
bridge can be opened in 2 minutes, and is operated by two large electric
motors. These have a speed reduction from armature shaft to bridge column
of 1500 to 1, through four intermediate spur gears and a worm gear. The end
lifts which transfer the weight of the bridge to the piers when the span is
closed consist of massive eccentrics having a throw of 4 in. The clearance
is 2 in., so that the ends are lifted 2 in. This gives a load of 50 tons
per eccentric. One motor is placed at each end of the span to operate the
eccentrics and also to release the latches and raise the rails of the steam
track.
At Riga there is a floating pontoon bridge over the Duna. It consists of
fourteen rafts, 105 ft. in length, each supported by two pontoons placed 64
ft. apart. The pairs of rafts are joined by three baulks 15 ft. long laid
in parallel grooves in the framing. Two spans are arranged for opening
easily. The total length is 1720 ft. and the width 46 ft. The pontoons are
of iron, 85½ ft. in length, and their section is elliptical, 10½ ft.
horizontal and 12 ft. vertical. The displacement of each pontoon is 180
tons and its weight 22 tons. The mooring chains, weighing 22 lb per ft.,
are taken from the upstream end of each pontoon to a downstream screw pile
mooring and from the downstream end to an upstream screw pile.
13. _Transporter Bridges._--This new type of bridge consists of a high
level bridge from which is suspended a car at a low level. The car receives
the traffic and conveys it across the river, being caused to travel by
electric machinery on the high level bridge. Bridges of this type have been
erected at Portugalete, Bizerta, Rouen, Rochefort and more recently across
the Mersey between the towns of Widnes and Runcorn.
[Illustration: FIG. 34.--Widnes and Runcorn Transporter Bridge.]
The Runcorn bridge crosses the Manchester Ship Canal and the Mersey in one
span of 1000 ft., and four approach spans of 55½ ft. on one side and one
span on the other. The low-level approach roadways are 35 ft. wide with
footpaths 6 ft. wide on each side. The supporting structure is a cable
suspension bridge with stiffening girders. A car is suspended from the
bridge, carried by a trolley running on the underside of the stiffening
girders, the car being [v.04 p.0545] propelled electrically from one side
to the other. The underside of the stiffening girder is 82 ft. above the
river. The car is 55 ft. long by 24½ ft. wide. The electric motors are
under the control of the driver in a cabin on the car. The trolley is an
articulated frame 77 ft. long in five sections coupled together with pins.
To this are fixed the bearings of the running wheels, fourteen on each
side. There are two steel-clad series-wound motors of 36 B.H.P. For a test
load of 120 tons the tractive force is 70 lb per ton, which is sufficient
for acceleration, and maintaining speed against wind pressure. The brakes
are magnetic, with auxiliary handbrakes. Electricity is obtained by two gas
engines (one spare) each of 75 B.H.P.
On the opening day passengers were taken across at the rate of more than
2000 per hour in addition to a number of vehicles. The time of crossing is
3 or 4 minutes. The total cost of the structure was £133,000.
14. In the United States few railway companies design or build their own
bridges. General specifications as to span, loading, &c., are furnished to
bridge-building companies, which make the design under the direction of
engineers who are experts in this kind of work. The design, with strain
sheets and detail drawings, is submitted to the railway engineer with
estimates. The result is that American bridges are generally of
well-settled types and their members of uniform design, carefully
considered with reference to convenient and accurate manufacture. Standard
patterns of details are largely adopted, and more system is introduced in
the workshop than is possible where the designs are more varied. Riveted
plate girders are used up to 50 ft. span, riveted braced girders for spans
of 50 ft. to 75 ft., and pin-connected girders for longer spans. Since the
erection of the Forth bridge, cantilever bridges have been extensively
used, and some remarkable steel arch and suspension bridges have also been
constructed. Overhead railways are virtually continuous bridge
constructions, and much attention has been given to a study of the special
conditions appertaining to that case.
_Substructure._
15. The substructure of a bridge comprises the piers, abutments and
foundations. These portions usually consist of masonry in some form,
including under that general head stone masonry, brickwork and concrete.
Occasionally metal work or woodwork is used for intermediate piers.
When girders form the superstructure, the resultant pressure on the piers
or abutments is vertical, and the dimensions of these are simply regulated
by the sufficiency to bear this vertical load.
When arches form the superstructure, the abutment must be so designed as to
transmit the resultant thrust to the foundation in a safe direction, and so
distributed that no part may be unduly compressed. The intermediate piers
should also have considerable stability, so as to counterbalance the thrust
arising when one arch is loaded while the other is free from load.
For suspension bridges the abutment forming the anchorage must be so
designed as to be thoroughly stable under the greatest pull which the
chains can exert. The piers require to be carried above the platform, and
their design must be modified according to the type of suspension bridge
adopted. When the resultant pressure is not vertical on the piers these
must be constructed to meet the inclined pressure. In any stiffened
suspension bridge the action of the pier will be analogous to that of a
pier between two arches.
_Concrete in a shell_ is a name which might be applied to all the methods
of founding a pier which depend on the very valuable property which strong
hydraulic concrete possesses of setting into a solid mass under water. The
required space is enclosed by a wooden or iron shell; the soil inside the
shell is removed by dredging, or some form of mechanical excavator, until
the formation is reached which is to support the pier; the concrete is then
shot into the enclosed space from a height of about 10 ft., and rammed down
in layers about 1 ft. thick; it soon consolidates into a permanent
artificial stone.
_Piles_ are used as foundations in compressible or loose soil. The heads of
the piles are sawn off, and a platform of timber or concrete rests on them.
Cast iron and concrete reinforced piles are now used. _Screw piles_ are
cast iron piles which are screwed into the soil instead of being driven in.
At their end is fixed a blade of cast iron from two to eight times the
diameter of the shaft of the pile; the pitch of the screw varies from
one-half to one-fourth of the external diameter of the blade.
_Disk piles_ have been used in sand. These piles have a flat flange at the
bottom, and water is pumped in at the top of the pile, which is weighted to
prevent it from rising. Sand is thus blown or pumped from below the piles,
which are thus easily lowered in ground which baffles all attempts to drive
in piles by blows. In ground which is of the nature of quicksand, piles
will often slowly rise to their original position after each blow.
_Wells._--In some soils foundations may be obtained by the device of
building a masonry casing like that of a well and excavating the soil
inside; the casing gradually sinks and the masonry is continued at the
surface. This method is applicable in running sands. The interior of the
well is generally filled up with concrete or brick when the required depth
has been reached.
_Piers and Abutments._--Piers and abutments are of masonry, brickwork, or
cast or wrought iron. In the last case they consist of any number of hollow
cylindrical pillars, vertical or raking, turned and planed at the ends and
united by a projection or socket and by flanges and bolts. The pillars are
strengthened against lateral yielding by horizontal and diagonal bracing.
In some cases the piers are cast iron cylinders 10 ft. or more in diameter
filled with concrete.
[Illustration: FIG. 35.--Cylinder, Charing Cross Bridge.]
_Cylinder Foundations._--Formerly when bridge piers had to be placed where
a firm bearing stratum could only be reached at a considerable depth, a
timber cofferdam was used in which piles were driven down to the firm
stratum. On the piles the masonry piers were built. Many bridges so
constructed have stood for centuries. A great change of method arose when
iron cylinders and in some cases brick cylinders or wells were adopted for
foundations. These can be sunk to almost any depth or brought up to any
height, and are filled with Portland cement concrete. They are sometimes
excavated by grabs. Sometimes they are closed in and kept free of water by
compressed air so that excavation work can be carried on inside them (fig.
35). Sometimes in silty river beds they are sunk 100 ft. or more, for [v.04
p.0546] security against deep scouring of the river-bed in floods. In the
case of the Empress bridge over the Sutlej each pier consisted of three
brick wells, 19 ft. in diameter, sunk 110 ft. The piers of the Benares
bridge were single iron caissons, 65 ft. by 28 ft., sunk about 100 ft.,
lined with brick and filled with concrete. At the Forth bridge iron
caissons 70 ft. in diameter were sunk about 40 ft. into the bed of the
Forth. In this case the compressed air process was used.
16. _Erection._--Consideration of the local conditions affecting the
erection of bridges is always important, and sometimes becomes a
controlling factor in the determination of the design. The methods of
erection may be classed as--(1) erection on staging or falsework; (2)
floating to the site and raising; (3) rolling out from one abutment; (4)
building out member by member, the completed part forming the stage from
which additions are handled.
(1) In erection on staging, the materials available determine the character
of the staging; stacks of timber, earth banks, or built-up staging of piles
and trestles have all been employed, also iron staging, which can be
rapidly erected and moved from site to site. The most ordinary type of
staging consists of timber piles at nearly equal distances of 20 ft. to 30
ft., carrying a timber platform, on which the bridge is erected. Sometimes
a wide space is left for navigation, and the platform at this part is
carried by a timber and iron truss. When the headway is great or the river
deep, timber-braced piers or clusters of piles at distances of 50 ft. to
100 ft. may be used. These carry temporary trusses of timber or steel. The
Kuilenburg bridge in Holland, which has a span of 492 ft., was erected on a
timber staging of this kind, containing 81,000 cub. ft. of timber and 5
tons of bolts. The bridge superstructure weighed 2150 tons, so that 38 cub.
ft. of timber were used per ton of superstructure.
(2) The Britannia and Conway bridges were built on staging on shore, lifted
by pontoons, floated out to their position between the piers, and lastly
lifted into place by hydraulic presses. The Moerdyk bridge in Holland, with
14 spans of 328 ft., was erected in a similar way. The convenience of
erecting girders on shore is very great, but there is some risk in the
floating operations and a good deal of hauling plant is required.
(3) If a bridge consists of girders continuous over two or more spans, it
may be put together on the embankment at one end and rolled over the piers.
In some cases hauling tackle is used, in others power is applied by levers
and ratchets to the rollers on which the girders travel. In such rolling
operations the girder is subjected to straining actions different from
those which it is intended to resist, and parts intended for tension may be
in compression; hence it may need to be stiffened by timber during rolling.
The bending action on the bottom boom in passing over the rollers is also
severe. Modifications of the system have been adopted for bridges with
discontinuous spans. In narrow ravines a bridge of one span may be rolled
out, if the projecting end is supported on a temporary suspension cable
anchored on each side. The free end is slung to a block running on the
cable. If the bridge is erected when the river is nearly dry a travelling
stage may be constructed to carry the projecting end of the girder while it
is hauled across, the other end resting on one abutment. Sometimes a girder
is rolled out about one-third of its length, and then supported on a
floating pontoon.
(4) Some types of bridge can be built out from the abutments, the completed
part forming an erecting stage on which lifting appliances are fixed.
Generally, in addition, wire cables are stretched across the span, from
which lifting tackle is suspended. In bridges so erected the straining
action during erection must be studied, and material must be added to
resist erecting stresses. In the case of the St Louis bridge, half arches
were built out on either side of each pier, so that the load balanced.
Skeleton towers on the piers supported chains attached to the arched ribs
at suitable points. In spite of careful provision, much difficulty was
experienced in making the connexion at the crown, from the expansion due to
temperature changes. The Douro bridge was similarly erected. The girders of
the side spans were rolled out so as to overhang the great span by 105 ft.,
and formed a platform from which parts of the arch could be suspended.
Dwarf towers, built on the arch ring at the fifth panel from either side,
helped to support the girder above, in erecting the centre part of the arch
(Seyrig, _Proc. Inst. C.E._ lxiii. p. 177). The great cantilever bridges
have been erected in the same way, and they are specially adapted for
erection by building out.
_Straining Actions and Working Stresses._
17. In metal bridges wrought iron has been replaced by mild steel--a
stronger, tougher and better material. Ingot metal or mild steel was
sometimes treacherous when first introduced, and accidents occurred, the
causes of which were obscure. In fact, small differences of composition or
variations in thermal treatment during manufacture involve relatively large
differences of quality. Now it is understood that care must be taken in
specifying the exact quality and in testing the material supplied.
Structural wrought iron has a tenacity of 20 to 22½ tons per sq. in. in the
direction of rolling, and an ultimate elongation of 8 or 10% in 8 in.
Across the direction of rolling the tenacity is about 18 tons per sq. in.,
and the elongation 3% in 8 in. Steel has only a small difference of quality
in different directions. There is still controversy as to what degree of
hardness, or (which is nearly the same thing) what percentage of carbon,
can be permitted with safety in steel for structures.
The qualities of steel used may be classified as follows:--(a) Soft steel,
having a tenacity of 22½ to 26 tons per sq. in., and an elongation of 32 to
24% in 8 in. (b) Medium steel, having a tenacity of 26 to 34 tons per sq.
in., and 28 to 25% elongation. (c) Moderately hard steel, having a tenacity
of 34 to 37 tons per sq. in., and 17% elongation, (d) Hard steel, having a
tenacity of 37 to 40 tons per sq. in., and 10% elongation. Soft steel is
used for rivets always, and sometimes for the whole superstructure of a
bridge, but medium steel more generally for the plates, angle bars, &c.,
the weight of the bridge being then reduced by about 7% for a given factor
of safety. Moderately hard steel has been used for the larger members of
long-span bridges. Hard steel, if used at all, is used only for compression
members, in which there is less risk of flaws extending than in tension
members. With medium or moderately hard steel all rivet holes should be
drilled, or punched 1/8 in. less in diameter than the rivet and reamed out,
so as to remove the ring of material strained by the punch.
In the specification for bridge material, drawn up by the British
Engineering Standards Committee, it is provided that the steel shall be
acid or basic open-hearth steel, containing not more than 0.06% of sulphur
or phosphorus. Plates, angles and bars, other than rivet bars, must have a
tensile strength of 28 to 32 tons per sq. in., with an elevation of 20% in
8 in. Rivet bars tested on a gauge length eight times the diameter must
have a tensile strength of 26 to 30 tons per sq. in. and an elongation of
25%.
18. _Straining Actions._--The external forces acting on a bridge may be
classified as follows:--
(1) The _live_ or _temporary load_, for road bridges the weight of a dense
crowd uniformly distributed, or the weight of a heavy wagon or traction
engine; for railway bridges the weight of the heaviest train likely to come
on the bridge. (2) An allowance is sometimes made for _impact_, that is the
dynamical action of the live load due to want of vertical balance in the
moving parts of locomotives, to irregularities of the permanent way, or to
yielding of the structure. (3) The _dead load_ comprises the weight of the
main girders, flooring and wind bracing, or the total weight of the
superstructure exclusive of any part directly carried by the piers. This is
usually treated as uniformly distributed over the span. (4) The _horizontal
pressure_ due to a wind blowing transversely to the span, which becomes of
importance in long and high bridges. (5) The _longitudinal drag_ due to the
friction of a train when braked, about one-seventh of the weight of the
train. (6) On a curved bridge the _centrifugal load_ due to the radical
acceleration of the train. If w is the weight of a locomotive in tons, r
the radius of curvature of the track, v the velocity in feet per sec.; then
the horizontal force exerted on the bridge is wv^2/gr tons. (7) In some
cases, especially in arch and suspension bridges, changes of temperature
set up stresses equivalent to those produced by an external load. In Europe
a variation of temperature of 70° C. or 126° F. is commonly assumed. For
this the expansion is about 1 in. in 100 ft. Generally a structure should
be anchored at one point and free to move if possible in other directions.
Roughly, if expansion is prevented, a stress of one ton per sq. in. is set
up in steel structures for each 12° change of temperature.
i. _Live Load on Road Bridges._--A dense crowd of people may be taken as a
uniform load of 80 to 120 lb per sq. ft. But in recent times the weight of
traction engines and wagons which pass over bridges has increased, and this
kind of load generally produces greater straining action than a crowd of
people. In manufacturing districts and near large towns loads of 30 tons
may come on road bridges, and county and borough authorities insist on
provision being made for such loads. In Switzerland roads are divided into
three classes according to their importance, and the following loads are
prescribed, the designer having to provide sufficient strength either for a
uniformly distributed crowd, or for a heavy wagon anywhere on the
roadway:-- [v.04 p.0547]
| Crowd, | Wagon,
| lb per sq. ft. | tons per axle.
| |
Main Roads ....... | 92 | 10 with 13 ft. wheel base
Secondary Roads .. | 72 | 6 " 10 " "
Other Roads ...... | 51 | 3 " 8 " "
In England still larger loads are now provided for. J.C. Inglis (_Proc.
Inst. C.E._ cxli. p. 35) has considered two cases--(a) a traction engine
and boiler trolley, and (b) a traction engine and trucks loaded with
granite. He has calculated the equivalent load per foot of span which would
produce the same maximum bending moments. The following are some of the
results:--
Span Ft. |10. |20. |30. |40. |50. |
| | | | | |
Equivalent load in tons per ft. run, | | | | | |
Case a ............................. |1.75|0.95|0.70|0.73|0.72|
Do. Case b ......................... |3.25|1.7 |1.3 |1.2 |1.15|
Large as these loads are on short spans, they are not more than must often
be provided for.
_Live Load on Railway Bridges._--The live load is the weight of the
heaviest train which can come on the bridge. In the earlier girder bridges
the live load was taken to be equivalent to a uniform load of 1 ton per
foot run for each line of way. At that time locomotives on railways of 4
ft. 8½ in. gauge weighed at most 35 to 45 tons, and their length between
buffers was such that the average load did not exceed 1 ton per foot run.
Trains of wagons did not weigh more than three-quarters of a ton per foot
run when most heavily loaded. The weights of engines and wagons are now
greater, and in addition it is recognized that the concentration of the
loading at the axles gives rise to greater straining action, especially in
short bridges, than the same load uniformly distributed along the span.
Hence many of the earlier bridges have had to be strengthened to carry
modern traffic. The following examples of some of the heaviest locomotives
on English railways is given by W.B. Farr (_Proc. Inst. C.E._ cxli. p.
12):--
_Passenger Engines._
Total weights, tons ......... 84.35 | 98.90 | 91.90 | 85.48
Tons per ft. over all ....... 1.58 | 1.71 | 1.62 | 1.61
Tons per ft. of wheel base .. 1.92 | 2.04 | 1.97 | 1.95
Maximum axle load, tons ..... 19.00 | 16.00 | 18.70 | 18.50
_Goods Engines._
Total weight, tons .......... 77.90 | 78.80 | 76.46 | 75.65
Tons per ft. over all ....... 1.54 | 1.50 | 1.54 | 1.51
Tons per ft. of wheel base .. 2.02 | 2.02 | 2.03 | 2.00
Maximum axle load, tons ..... 15.90 | 16.00 | 13.65 | 15.50
_Tank Engines._
Total weight, tons .......... 53.80 | 58.61 | 60.80 | 47.00
Tons per ft. over all ....... 1.60 | 1.68 | 1.70 | 1.55
Tons per ft. of wheel base .. 2.45 | 2.52 | 2.23 | 3.03
Maximum axle load, tons ..... 17.54 | 15.29 | 17.10 | 15.77
Farr has drawn diagrams of bending moment for forty different very heavy
locomotives on different spans, and has determined for each case a uniform
load which at every point would produce as great a bending moment as the
actual wheel loads. The following short abstract gives the equivalent
uniform load which produces bending moments as great as those of any of the
engines calculated:--
Span in Ft. | Load per ft. run equivalent
| to actual Wheel Loads in Tons,
| for each Track.
|
5.0 | 7.6
10.0 | 4.85
20.0 | 3.20
30.0 | 2.63
50.0 | 2.24
100.0 | 1.97
Fig. 36 gives the loads per axle and the distribution of loads in some
exceptionally heavy modern British locomotives.
[Illustration: Express Passenger Engine, G.N. Ry.]
[Illustration: Goods Engine, L. & Y. Ry.]
[Illustration: Passenger Engine, Cal. Ry.
FIG. 36.]
[v.04 p.0548] In Austria the official regulations require that railway
bridges shall be designed for at least the following live loads per foot
run and per track:--
| Span. | Live Load in Tons. |
| - - - - - - - -|- - - - - - - - - - - - - - - -|
|Metres. | Ft. | Per metre run. | Per ft. run. |
| | | | |
| 1 | 3.3 | 20 | 6.1 |
| 2 | 6.6 | 15 | 4.6 |
| 5 | 16.4 | 10 | 3.1 |
| 20 | 65.6 | 5 | 1.5 |
| 30 | 98.4 | 4 | 1.2 |
It would be simpler and more convenient in designing short bridges if,
instead of assuming an equivalent uniform rolling load, agreement could be
come to as to a typical heavy locomotive which would produce stresses as
great as any existing locomotive on each class of railway. Bridges would
then be designed for these selected loads, and the process would be safer
in dealing with flooring girders and shearing forces than the assumption of
a uniform load.
Some American locomotives are very heavy. Thus a consolidation engine may
weigh 126 tons with a length over buffers of 57 ft., corresponding to an
average load of 2.55 tons per ft. run. Also long ore wagons are used which
weigh loaded two tons per ft. run. J.A.L. Waddell (_De Pontibus_, New York,
1898) proposes to arrange railways in seven classes, according to the live
loads which may be expected from the character of their traffic, and to
construct bridges in accordance with this classification. For the lightest
class, he takes a locomotive and tender of 93.5 tons, 52 ft. between
buffers (average load 1.8 tons per ft. run), and for the heaviest a
locomotive and tender weighing 144.5 tons, 52 ft. between buffers (average
load 2.77 tons per ft. run). Wagons he assumes to weigh for the lightest
class 1.3 tons per ft. run and for the heaviest 1.9 tons. He takes as the
live load for a bridge two such engines, followed by a train of wagons
covering the span. Waddell's tons are short tons of 2000 lb.
ii. _Impact._--If a vertical load is imposed suddenly, but without
velocity, work is done during deflection, and the deformation and stress
are momentarily double those due to the same load at rest on the structure.
No load of exactly this kind is ever applied to a bridge. But if a load is
so applied that the deflection increases with speed, the stress is greater
than that due to a very gradually applied load, and vibrations about a mean
position are set up. The rails not being absolutely straight and smooth,
centrifugal and lurching actions occur which alter the distribution of the
loading. Again, rapidly changing forces, due to the moving parts of the
engine which are unbalanced vertically, act on the bridge; and, lastly,
inequalities of level at the rail ends give rise to shocks. For all these
reasons the stresses due to the live load are greater than those due to the
same load resting quietly on the bridge. This increment is larger on the
flooring girders than on the main ones, and on short main girders than on
long ones. The impact stresses depend so much on local conditions that it
is difficult to fix what allowance should be made. E.H. Stone (_Trans. Am.
Soc. of C.E._ xli. p. 467) collated some measurements of deflection taken
during official trials of Indian bridges, and found the increment of
deflection due to impact to depend on the ratio of dead to live load. By
plotting and averaging he obtained the following results:--
_Excess of Deflection and straining Action of a moving Load over that due
to a resting Load._
Dead load in per cent | | | | | | | |
of total load .... | 10 | 20 | 30 | 40 | 50 | 70 | 90 |
Live load in per cent | | | | | | | |
of total load .... | 90 | 80 | 70 | 60 | 50 | 30 | 10 |
Ratio of live to dead | | | | | | | |
load ............. | 9 | 4 |2.3 |1.5 |1.0 |0.43|0.10|
Excess of deflection | | | | | | | |
and stress due to | | | | | | | |
moving load | | | | | | | |
per cent ......... | 23 | 13 | 8 |5.5 |4.0 |1.6 |0.3 |
These results are for the centre deflections of main girders, but Stone
infers that the augmentation of stress for any member, due to causes
included in impact allowance, will be the same percentage for the same
ratios of live to dead load stresses. Valuable measurements of the
deformations of girders and tension members due to moving trains have been
made by S.W. Robinson (_Trans. Am. Soc. C.E._ xvi.) and by F.E. Turneaure
(_Trans. Am. Soc. C.E._ xli.). The latter used a recording deflectometer
and two recording extensometers. The observations are difficult, and the
inertia of the instrument is liable to cause error, but much care was
taken. The most striking conclusions from the results are that the
locomotive balance weights have a large effect in causing vibration, and
next, that in certain cases the vibrations are cumulative, reaching a value
greater than that due to any single impact action. Generally: (1) At speeds
less than 25 m. an hour there is not much vibration. (2) The increase of
deflection due to impact at 40 or 50 m. an hour is likely to reach 40 to
50% for girder spans of less than 50 ft. (3) This percentage decreases
rapidly for longer spans, becoming about 25% for 75-ft. spans. (4) The
increase per cent of boom stresses due to impact is about the same as that
of deflection; that in web bracing bars is rather greater. (5) Speed of
train produces no effect on the mean deflection, but only on the magnitude
of the vibrations.
A purely empirical allowance for impact stresses has been proposed,
amounting to 20% of the live load stresses for floor stringers; 15% for
floor cross girders; and for main girders, 10% for 40-ft. spans, and 5% for
100-ft. spans. These percentages are added to the live load stresses.
iii. _Dead Load._--The dead load consists of the weight of main girders,
flooring and wind-bracing. It is generally reckoned to be uniformly
distributed, but in large spans the distribution of weight in the main
girders should be calculated and taken into account. The weight of the
bridge flooring depends on the type adopted. Road bridges vary so much in
the character of the flooring that no general rule can be given. In railway
bridges the weight of sleepers, rails, &c., is 0.2 to 0.25 tons per ft. run
for each line of way, while the rail girders, cross girders, &c., weigh
0.15 to 0.2 tons. If a footway is added about 0.4 ton per ft. run may be
allowed for this. The weight of main girders increases with the span, and
there is for any type of bridge a limiting span beyond which the dead load
stresses exceed the assigned limit of working stress.
Let W_l be the total live load, W_f the total flooring load on a bridge of
span l, both being considered for the present purpose to be uniform per ft.
run. Let k(W_l+W_f) be the weight of main girders designed to carry
W_l+W_f, but not their own weight in addition. Then