WORK METHODS

At the quarry, excavating continued summer and winter. The methods

employed were those that paleontologists had used for decades. There was

no compressed air, no labor-saving devices. The work was done by hand.

The crew, which seldom exceeded four men at any one time, became

veterans in the art of fossil extraction. The bone was brittle; the

encasing sandstone, hard. It required toil, patient direction, and a

knowledge of anatomy.

Judiciously placed charges of giant powder shattered the overburden.

Hand drills, wedge-and-feather, and crowbar worked the rock away, until

the bone layer was encountered. The slow attrition by hammer and chisel

accomplished the final delicate separation of the remains from the

enclosing matrix. Team-and-scraper and small handcarts removed the

rubble that swiftly accumulated in the cut. As the bones were chiseled

from the quarry face in large blocks of rock, they were encased in

strips of burlap dipped in flour paste. (Later, plaster of Paris

supplanted the flour paste.) Then they were lowered by rope onto a

mule-drawn skid and “snaked” down the trail into the gulch to await

boxing.

[Illustration: REMOVING A LARGE THIGH BONE FROM THE QUARRY WALL

DURING THE CARNEGIE MUSEUM OPERATIONS. (COURTESY, A. S.

COGGESHALL.)]

[Illustration: PLASTERED SPECIMEN REMOVED FROM THE QUARRY DURING THE

CARNEGIE MUSEUM OPERATIONS. (COURTESY, A. S. COGGESHALL.)]

Transporting the fossils from quarry to railhead was a major

undertaking. It required wagon trains—4-horse teams hauling high-wheeled

freight wagons over 60 miles of rutted roads to Dragon, Utah. There the

precious goods were loaded onto boxcars of the now abandoned narrow

gauge Uintah Railway, later to be transhipped to the standard gauge

Denver & Rio Grande line at Mack, Colo.

The Dinosaur Quarry. Dinosaur National Monument, Colorado-Utah · 第 21 / 28 题