BY S.B. FOWLER.

The numerous disastrous storms of the last winter have brought out very

vividly the advantages of having all wires placed underground, and many

inquiries have been addressed to the companies operating underground

circuits as to their success. It is not probable that all of the answers

to these inquiries have been of the most favorable character. To many

central station managers an underground system means frequent

break-downs and interruptions of service, with, perhaps, slow and

expensive repairs, which bring in their turn numerous complaints, loss

of customers, and reduced profits. In many installations burn-outs both

underground and in the station are frequent, with the natural result

that the operating of circuits underground is not there considered an

unqualified success. The writer has in mind two very different

experiences with underground cables. Several miles of cable were bought

by a certain company, carefully laid, and up to to-day not a single

burn-out or interruption of service can be attributed to failure of

cables; at about the same time another company bought about an equal

amount of the same kind of cable, and in a comparatively short time the

current had to be shut off the lines and the whole installation repaired

and parts of it replaced. Both of these experiences have been repeated

many times and will be again, although it is simply a distinction

between a good cable properly laid and a good cable ruined by careless

and incompetent workmanship.

Every failure can be traced to poor work in the original installation or

to the use of a cheap cable, both causes being due, generally, to that

false economy which looks for too quick returns. A poorly insulated line

wire and a poorly insulated cable are two very different things.

However, it is a fact that by the use of a good cable it is not

difficult to construct an underground system for light, power, telegraph

or telephone uses that will be superior to overhead lines in its service

and in cost of maintenance. The ideal underground system must have as a

starting point a system of subways admitting of the easy drawing in and

out of cables and affording means of making subsidiary connections

readily and with the minimum of expense and interruption of service.

This is practically accomplished by a subway consisting of lines of pipe

terminating at convenient intervals, say at street intersections, in

manholes, for convenience in jointing and in running out house

connections. These pipes, or ducts, as they are called, should be for

two kinds of service; the lower or deeper laid lines for the main or

trunk circuits, and a second series of ducts laid nearer the surface,

running into service boxes placed near together for lines to "house to

house" connections. In some cities where it is allowed to run overhead

lines, the plan of running but one service connection in a block is

followed, all customers in the block being supplied from a line run over

the housetops or strung on the rear walls.

This makes unnecessary all subsidiary ducts except a short one from the

manhole to the nearest building in the block, and effects a considerable

saving in pipe, service boxes, cables and labor. The manholes should

have their walls built up of brick, the floors should be of concrete,

and there should be an inside lid which can be fastened down and the

manhole thus made water-tight.

For ducts wood, iron or cement lined pipe may be used. To preserve the

wood it is generally treated with creosote, which, in contact with the

lead cover of the cable, sets up a chemical action, resulting in the

destruction of the lead. Wood offers but little protection for the

cable, as it is too easily damaged and broken through in the frequent

street openings made by companies operating lines of pipe in the

streets, and as one of the main purposes of a subway is that of a

protection to cables, wooden ducts have little to recommend them except

their cheapness.

Iron pipes are either laid in trenches filled in with earth or are laid

in cement. Iron pipe will of course rust out in time, and if absolute

permanence in construction is desired, should be laid in cement, for

after the pipe rusts out, the duct of cement is still left. However, if

we are going to the expense of laying in cement, it would be much

preferable to use cement lined pipe, which is not only cheaper than iron

pipe, but makes the most perfect cable conduit, as it affords a

perfectly smooth surface to draw the cable over and give a good duct

edge.

It is not necessary, however, in small installations of cable,

especially where additional connections will not be of frequent

occurrence, to go to the expense of subways, for cable may be safely

laid in the ground in trenches filled in with earth, or can be inclosed

in a plain wooden box or a wooden box filled with pitch.

There are, of course, many localities where, if the cable is laid in

contact with the earth, a chemical action would take place which might

result in the destruction of the cable.

Underground cables are of the following classes: 1. Rubber insulated

cables, insulated with rubber or other homogeneous material. 2. Fibrous

cables, so called from the conductors being covered with some fibrous

material, as cotton or paper, which is saturated with the insulating

material, paraffine, resin oil, or some special compound. Under this

latter head is also included the dry core paper cables.

The first thing to do is to get the cable drawn into the ducts, and on

the proper accomplishment of this depends to a great extent the success

or failure of the whole installation. Probably the ducts have been wired

when the subway was constructed, but if not a wire must be run through

as a means of pulling in the draw rope. There are several kinds of

apparatus for getting a wire through a duct--rods, flexible tapes,

mechanical "creepers," etc.; but probably the best is the sectional rod.

This simply consists of three or four foot lengths of hard wood rods,

having metal tips that screw into each other. A rod is placed in a duct

at a manhole, one screwed to that, both are pushed forward, another one

added and pushed forward, and so on until they extend the entire length

of the duct. Then the wire is attached and the rods are pulled out and

detached one at a time and with the last rod the wire is through. At

least No. 14 galvanized iron or steel wire should be used, for any

smaller size cannot be used a second time, as a rule. In starting to

pull in the draw rope a wire brush should be attached to the wire and to

this again the rope, and when the brush arrives at the distant end of

the duct it very likely will bring with it a miscellaneous collection of

material which for the good of the cable had better be in the manhole

than in the duct.

The reel or drum carrying the cable should be mounted on wheels or jacks

and placed on the same side of the manhole as the duct into which the

cable is to be drawn, and must always be so placed that the cable will

run off the top of the reel.

There are several methods of attaching the draw rope to the cable. As

simple and strong a method as any is to punch two of these holes through

the cable, lead and all, and attach the rope by means of an iron

wire--some of the draw wire will do--run through these holes. Depending

on the length and weight of cable to be pulled it can be drawn either by

hand or by a multiplying winch. The rope should run through a block

fastened in the manhole in such a position that the rope shall have a

good straightaway lead from the mouth of the duct.

The strain on the cable should be perfectly uniform and steady; if the

power is applied by a series of jerks either the lead covering may be

pulled apart or some of the conductors broken. At the reel there must

always be a large enough number of men to turn it and keep the cable

from rubbing on anything, and in the manhole one or more men to see that

the cable feeds into the duct straight and to guide it if necessary. If

the ducts are of iron and are not perfectly smooth at the ends, these

should be made so with a file, and in addition a protector of some sort

should be placed in the mouths of the duct, both above and below the

cable. Six inches of lead pipe, split lengthwise and bent over at one

end to prevent being drawn into the duct with the cable, makes a very

good protector. The cable should be reeled off the drum just fast enough

to prevent any of the power used in pulling the cable through the duct

being utilized in unreeling it. If this latter is allowed to occur the

cable will be bent too short and the lead covering buckled or broken,

and also the cable may be jammed against the upper edge of the duct and

perhaps cut through.

If the reel is allowed to turn faster than the cable is drawn in, the

first three or four turns on the reel will slacken up, and the lead

covering may either be dented or cut through by scraping on the ground.

If the cable end when pulled through up to the block is not long enough

to bend around the hole more than half way, the rope should be

unfastened from its end, a length of rope with a well frayed out end

should be run through the block, and by fastening to the cable close to

the duct, with a series of half hitches, as much slack as necessary can

be pulled in. If this is properly manipulated there need not be a

scratch on the cable, but unless great care is taken the lead may be

pressed up into ridges and the core itself damaged.

Immediately after the cable is drawn in, if the joint is not to be at

once made, the open end or ends should be cut off and the cable soldered

up, as most cables are very susceptible to moisture and readily absorb

water even from the atmosphere. Where practicable it is always a good

plan to pull the cable through as many manholes as possible without

cutting the cable; for the joint is, especially in telephone or

telegraph cables, the weak point. To do this the rope should be pulled

through the proper duct in the next section without unfastening it from

the cable; the winch should be moved to the next manhole, and pulling

through then done as before. There should always be a man in every hole

through which the cable is running to see that it does not bind anywhere

and to keep protectors around the cable.

It is not advisable to pull more than one cable into a duct, and never

advisable to pull a cable into a duct containing another cable, but if

two or more cables have to go into the same duct, they should always be

drawn in together. Lead covered cables and those with no lead on the

outside should never be pulled into the same duct, for if they bind

anywhere the soft cable will suffer where two lead covered cables would

get through all right. Some manufacturers are now putting on their

cables a tape or braid covering, which saves the lead many bad bruises

and cuts, and is a valuable addition to a cable at very little

additional expense.

Practically all electric light and power cables are either single or

double conductors, and the jointing of these is comparatively a simple

matter, although requiring considerable care. The lead is cut back from

each end about four or five inches, and the conductors bared of

insulation for two or three inches. The bare conductors should be

thoroughly tinned by dipping in the metal pot or pouring the melted

solder over them. A sperm candle is better than resin or acid for any

part of the operations where solder is used. A lead sleeve is here

slipped back over the cable, out of the way, and the ends of the

conductors brought together in a copper sleeve which is then sweated to

a firm joint. This part must be as good a piece of work mechanically as

electrically. The bare splice is then wrapped tightly with cotton or

silk tape to a thickness slightly greater than that of the insulation of

the cable, and is thoroughly saturated with the insulating compound

until all moisture previously absorbed by the tape is driven off.

The lead sleeve is then brought over the splice and wiped to the cable.

The joint is then filled with the insulating compound poured through

holes in the top of the sleeve; these holes are then closed and the

joint is complete, and there is no reason why, in light and power

cables, that joint should not be as perfect as any other part of the

cable. When the cable ends are prepared for jointing they should be hung

up in such a position that they are in the same plane, both horizontal

and vertically, and firmly secured there, so that when the lead sleeve

is wiped on the conductor may be in its exact center, and great care

must be taken not to move the cables again until the sleeve is filled

and the insulation sufficiently cooled to hold the conductor in

position.

It is also very important to see that there are no sharp points on the

conductors themselves, on the copper sleeve, on the edges of the lead

covering or on the lead sleeve. All these should be made perfectly

smooth, for points facilitate disruptive discharges. Branch joints had

better be made as T-joints rather than as Y-joints, for they are better

electrically and mechanically, although they occupy more room in the

manholes. They are of course made in the same way as straight joints, a

lead T-sleeve being used, however. For multiple arc circuits copper

T-sleeves and for series circuits copper L-sleeves are used.

Telephone and telegraph cables are made of any required gauge of wire

and with from 1 to 150 conductors in a cable. In jointing these the

splices are never soldered, the conductors being joined either with a

twist joint or with the so-called Western Union splice. Each splice is

covered with a cotton or silk sleeve or a wrapping of tape, the latter

being preferable, although considerably increasing the time necessary

for making the joint. Great care must be taken that no ends of wire are

left sticking up, for they will surely work their way through the tape

and grounds, and crosses will be the result. The wires should always be

joined layer to layer and each splice very tightly taped in order to get

as much insulating compound around each splice as possible in the

limited space. The splices should be "broken" as much as possible, so as

to avoid having adjoining splices coming over each other. After the

joint has been saturated with insulating compound the wires should have

an outside wrapping of tape to keep them in shape, and then the sleeve

is wiped on and filled. If the insulation resistance of the jointed

telegraph or telephone cable is a quarter of what the cable tested in

the factory, it may be considered that an exceptionally good piece of

work has been done. I have spoken more particularly of fibrous lead

covered cables, as the handling of them includes practically every step

of the work on any other kind of underground cable. In insulating dry

core paper cables a paper sleeve is slipped over the splice, and in

rubber cables the splice is wrapped with rubber tape; all other details

are the same for these as for the fibrous cable.

In the laying of light and power cables every joint, as made, should be

tested for insulation with a Thomson galvanometer, as the insulation

must necessarily be very high, and if one joint or section of cable is

any weaker than another it may be very important in the future to know

it. All tests must be made after the joint has cooled, for while hot its

insulation resistance will be very low.

Tests for copper resistance should also be made to determine if the

splices are electrically perfect; an imperfect splice may cause

considerable trouble. In telegraph and telephone cables the conductors

should be of very soft copper, for in stripping the conductor of

insulation it is very easy to nick the wire, and if of hard drawn copper

open wires will be the result.

All work should be frequently tested for continuity with telephones,

magnetos, or small portable galvanometers. It is only necessary to

ground the conductors at one end and try each wire at the other end. For

this sort of work a telephone receiver used with one cell of some dry

battery is most convenient, and has the additional advantage of

affording a means of communication while testing, and is by far the best

thing for identifying and tagging conductors.

These cables should be frequently tested during the progress of the work

for grounds and crosses with a Thomson instrument, and when the cable is

complete, a careful series of tests of the capacity, insulation

resistance, and copper resistance of each wire should be made and the

exact condition of the cable determined before it is put in service, and

thereafter an intelligent oversight of the condition of the circuits

can thus be more readily maintained.

Where a company has extensive underground service, a regular cable gang

should be in its employ, for quick and safe handling of cables demands

the employment of men accustomed to the work. If the cable has been

properly laid and tests show it to be in good condition before current

is turned on, almost the only trouble to be anticipated will be due to

mechanical injury. Disruptive discharge, puncturing the lead, may occur;

but the small chance of its occurring can be greatly lessened by the use

of some kind of "cable protector," which will provide for the spark an

artificial path of less resistance than the dielectric of the condenser,

which the cable in fact becomes.

If a fault suddenly develops on a circuit, the chances are it will be

found in a manhole, and an inspection of the cable in the manhole will

generally reveal the trouble without resorting to locating with a

Wheatstone bridge. The cable is often cut through at the edge of the

duct, or damaged by something falling on it, or by some one "walking all

over it." To guard against these, the ducts should always be fitted with

protectors both above and below the cable. The cables should never be

left across the manholes, for they then answer the purpose of a ladder,

but should be bent, around the walls of the hole and securely fastened

with lead straps, that they may not be moved and the lead gradually worn

through.

In telegraph cables, when one or two conductors "go," it will probably

be useless to look for trouble except with instruments; but if several

wires are "lost" at once it will probably be found to be caused by

mechanical injury, which can be located by inspection. If it is ever

necessary to loop out conductors, a joint can be readily opened and the

conductors wanted picked out and connected into the branch cable and the

joint again closed without disturbing the working wires. In doing this a

split sleeve must be used, and the only additional precaution to be

taken is in filling the sleeve to have the insulating compound not hot

enough to melt the solder and open up the split in the sleeve. In

cutting in service on light and power cables it is entirely practicable

to do so without interruption of service on multiple arc circuits, even

those of very high voltage; but they require great precaution and

involve considerable risk to the jointer, and where possible the circuit

to which the connection is to be made should previously be cut dead.

Where the voltage is not dangerous to human life, almost any service

connection can be made without interruption of service.

I have only indicated a very few of the operations that may be found

necessary, and the probable causes of troubles that may be encountered

in the operating of underground circuits, believing that the different

problems that arise can, with a little experience, be successfully met

by any one who has a fair knowledge of the original construction of

cable lines.--_Electrical World_.

* * * * *