CHAPTER XII

THE ELECTRICAL SCHEME

In such a country as Kashmir, with a great river flowing through it,

and with numerous mountain torrents and subsidiary streams running

into that river, there is obviously an immense amount of water-power

at hand. The difficulty is to make it available for practical

purposes. But this difficulty is now being overcome by converting the

water-power into electric power, which can then be transmitted to

considerable distances and applied in a variety of ways. The idea of

thus converting this vast amount of water-power in Kashmir into

electric power had of recent years, since the development of

electrical appliances, naturally occurred to many; but it did not take

definite shape till the Maharaja engaged the services of Major Alain

de Lotbiniere, R.E., to carry out a scheme of harnessing the waters

of the Jhelum River which that officer had formulated, and which has

just been completed.

Major de Lotbiniere, a Canadian by birth, and endowed with a full

measure of the energy, resource and hopefulness of his countrymen, had

already executed a very successful scheme by which the water-power in

the Cauvery Falls in Madras had been converted into electric energy,

and transmitted to a distance of a hundred miles, to supply the Kolar

gold-fields in Mysore with motive power, at a cost 50 per cent lower

than that which they were paying for steam-power. He had also

inspected many electrical projects on the Continent and in Canada and

America. He therefore came to the work in Kashmir in September 1904

fully primed with the knowledge of all the latest developments of

electrical science, and at once conceived the idea of harnessing, not

any of the minor rivers of Kashmir, but the river Jhelum itself, and

selected a spot a few miles above Rampur where he might entrap some of

the water, lead it along the mountain-side at practically a uniform

level, till he could drop it through pipes on to turbines--very much

in the same manner as a mill-stream is led along and then dropped on

to a water-wheel--and so by setting in motion various machines

generate electrical energy.

The theory of the electric installation is then very simple. The

valley falls rapidly. At the part selected it falls about 400 feet in

6-1/2 miles. Some of the water is taken out and kept at about the same

level so that at the end of the 6-1/2 miles it has a fall of 401 feet.

Consequently when it is dropped those 400 feet it falls with immense

force and velocity. By most ingenious machinery this force is turned

into electrical energy, and then transmitted by wires to wherever

wanted--it is hoped even to the plains of the Punjab, to Rawal Pindi

at least.

Meanwhile the water, after fulfilling its mission, returns into the

river, and might, if need be, be taken out again, led along the

mountain-side, and a few miles lower down dropped once more on to

another electrical installation, and generate still more electrical

energy. The same lot of water might, in fact, go on performing the

same duty time after time till the plains of India were reached. Then

when it got on to the level, and there was no further fall, it would

be impossible to utilise it for generating electrical energy. But it

would promptly be seized for another equally important purpose. For it

would be caught in the great new canal which is being constructed at

the point where the Jhelum River emerges from its mountain barriers

and enters the plain; and from that point it would be led over some

hundreds of miles to irrigate rich, but as yet uncultivated lands,

only needing the touch of life-giving water to burst forth into

luxuriant vegetation and attract great populations to them.

The latent capacity for good of these waters of the Jhelum, now

tossing heedlessly about as they rush along beside the road into

Kashmir, is then for practical purposes almost unlimited. Even the

present installation only takes out a small proportion, and that

portion is utilised only once. In the driest season the Jhelum River

runs with a volume of about 5000 cubic feet per second--what are known

for short as "cusecs." But of this amount only 500 cusecs are taken,

and these 500 cusecs are utilised only once, and not several times, as

they might well be in their fall between the valley of Kashmir and the

plains of India.

With these 500 cusecs electrical energy to the extent of 20,000

horse-power will be generated; but Major de Lotbiniere thinks that it

would be possible to economically develop an aggregate of at least

250,000 horse-power of electrical energy from the Jhelum River. It is

not possible to take out water and conduct it along the mountain-side

at any point. It is indeed a matter of some difficulty to choose a

site where safe headworks can be constructed to entrap the water of

the river, where the water can be taken along the hill-side, and where

a forebay or tank can be built from which to lead off the pipes to the

generating station below. In many parts the river runs between

precipitous banks so that it is impossible to get it out. In others,

even when it had been got out, the hill-sides would be found so loose

and unsafe it would be impracticable to take a water-course along

them. Still, in spite of the many difficulties in the way of making

practical use of the water-power in the Jhelum River, Major de

Lotbiniere still thinks that, as above mentioned, electrical energy to

the extent of a quarter of a million horse-power could be economically

developed.

Water for the present project has been taken out a couple of miles

above Rampur at a most charming spot, where the river comes foaming

down over innumerable boulders, and the banks are overshadowed by the

same graceful deodar trees which clothe the mountain-sides. Here very

strong and solid masonry headworks and regulating sluices have been

built under the lee of some friendly boulders; and elaborate

precautions have been taken to protect these headworks from the impact

of the thousands of logs which are annually floated down the river by

the Forest Department to be caught and sold in the plains below.

From these headworks what is called a flume has been constructed in

which the water will run along the mountain-side to the forebay or

tank immediately above the generating station. This flume, answering

to the channel which conducts the water to a flour-mill, is to the eye

absolutely level, but it has in reality the very small drop of 1.05

feet in 1000 feet--just sufficient to make the water run easily along

it. Its length is about 6-1/2 miles; and the main difficulty in the

whole project was found in constructing it. A road or even a railway

when it comes to an obstacle can very likely, by a change in the

gradient, rise over it or under it. But this flume had to go straight

at any obstacle in its way, for it obviously could not rise, and if it

were lowered it could not rise again, and so much horse-power would

have been lost at the far end. The flume, in fact, once it was started

off had to take things as it found them and make the best of them. The

first obstacle was a great spur of boulder conglomerate. This had to

be cut down into to a depth of forty feet. An arched masonry passage

had then to be made, and the whole covered over again. Five torrents

were negotiated by passing them clean over the flume. Over six other

torrents the flume--here made of wood--had to be carried on strong

iron bridges. And six tunnels were made through projecting rocky

spurs. Only one-third of the 6-1/2 miles' length of flume could be built

of masonry, and the remainder had necessarily to be built of timber.

This portion had an internal section of 8-1/3 feet by 8-1/2 feet, and

was constructed of tongued and grooved, machine-planed, deodar planking

2-3/4 inches thick, supported on cross frames 3-1/2 feet apart.

The chief danger to guard against in constructing this flume for

carrying the water to the generating station was the risk of the

hill-sides either bodily slipping downward, as they are very apt to do

in heavy rain, or falling in heavy masses on to the wooden flume and

breaking through it, and thus completely breaking off the source of

power, and bringing all machinery to a standstill. These risks cannot

be entirely counteracted. In heavy rain a portion of the wooden flume

may be carried away or broken. An alternative supply of water on

occasions of exceptional rain has therefore been tapped close up to

the generating station, where a strong dam has been thrown across the

bed of a mountain torrent, and its waters impounded to lead through a

tunnel in a rocky spur almost immediately on to the forebay. In

ordinary weather there is little water in this torrent, but in heavy

rain, when the flume is most likely to be damaged, it has ample water.

And although there is this alternative supply, great precautions have,

nevertheless, been taken to ensure the flume against damage, and where

slips are to be expected immensely solid timber shoots have been

erected over it for rocks or snow and mud floods to shoot over.

On emerging from the flume the water enters the brick-lined tank or

reservoir called the forebay, where it settles for a moment before

descending the great iron pipe which conducts it on to the machinery

in the power-house below. In this forebay there are, of course, sluice

gates to regulate the flow, and shut it off altogether at one or all

the pipes. And there is also a spill channel for the water to flow

away to waste when it is not wanted.

Then four hundred feet below we come to the power-house, with all the

most modern electrical plant transported from America, and much of it

from the farthest western coast of America, across the Atlantic and

the Indian Oceans, right across India, and then for 150 miles by road

over a range 6000 feet high. The water-power made available by the

flume is capable of generating 20,000 horse-power; but as that amount

of power is not at present required, electrical machinery to develop

not more than 5000 h.-p. has as yet been put in, though space and all

arrangements have been provided in the power-house for machinery to

develop 15,000 h.-p. more whenever that is required. The machinery is

by the General Electric Co. of New York, and the generators supplied

are of the three-phase 25-cycle type. The water-wheels upon which the

water from the forebay, led down the pipes and contracted through a

nozzle, impinges with such tremendous velocity that a hatchet could

not cut the spout, are made of specially toughened steel, and are so

cunningly designed that the utmost effect is obtained from the fall of

the water, and that immediately the water has done its work it is

allowed to pass away at once through a waste channel back again into

the river without further impeding the machinery. These wheels were

supplied by Abner Doble of San Francisco. They are sent revolving with

immense rapidity--five hundred revolutions per minute, or eight every

second--and they cause to revolve the electrical generators which are

placed on the same axis, and thereby electric energy is generated. By

a series of very ingenious machines this electric energy is regulated

and conducted to the transmission wires which are at present carried

through Baramula to Srinagar, and which will transmit the power at the

extremely high voltage of 60,000 volts from the generating station to

the spot where the power is required.

The carrying out of such an undertaking in a remote mountainous

country, where no railway has yet penetrated and where no great

industrial enterprises have yet been established, required no small

amount of organising capacity, driving power, and foresight. In the

spring the melting snow combined with rain, and in the summer the

heavy rain brings down the mountain-sides, impedes construction

progress, often filling up what has already been done, and sometimes,

alas! burying workmen with it. In winter, snow and frost stopped all

work. Labour difficulties were another source of trouble. Enough was

not available on the spot, and many hundreds were engaged from

distant Baltistan and Ladak, and even Afghanistan. Skilled labour had

to be imported from the Punjab. With contractors other difficulties

arose. They would not work without an advance of money, and when they

got an advance many would decamp. Again cholera created still other

difficulties, and drove labour away when it had with much persuasion

been collected.

All these are no mean difficulties. They have, however, now been

overcome, and this autumn the Maharaja, in the presence of many

guests, opened the installation and transmitted the power to Baramula

and Srinagar.

The 5000 horse-power at present available will be utilised for

carrying out Mr. Field's and Major de Lotbiniere's great scheme for

dredging the bed of the Jhelum River and neighbouring marshes, and

thus preventing floods, and for reclaiming some 60,000 acres of

cultivable land. It will also be used for heating the water basins in

the silk factory and turning the reeling machinery, as well as for

lighting Srinagar.

When the railway which has so long been contemplated is at last

constructed, more electric power will be needed. And if the Durbar in

any way encourage outside enterprise, there will be demand for

electric power for oil-crushing, for saw-mills, for wool factories,

match factories, and many other purposes. In any European country or

American State the whole amount of electric power would have been

already sold. Similar rapidity of progress cannot be expected in

Kashmir. But still we may hope that now every one can see that the

electric power is there, and that it is an eminently useful product,

the demand will gradually arise, and the financial success of the

project be worthy of the skill and enterprise displayed by the

engineers.