EARLY DEVELOPMENT OF THE NATIONAL MONUMENT

Under the general direction of the NPS, various relief agencies such as

the Emergency Relief Administration (ERA), the Resettlement

Administration, the Works Progress Administration (WPA), and the

Civilian Conservation Corps (CCC) worked on development projects in the

area. Only a few scattered reports are now available on the work of

these agencies. About 150 persons were employed at the area in January

1937 on such projects as resurfacing, backsloping, ditching, and grading

roads.[147] This included major reconstruction of the Sheep Mountain

Canyon road, completed the same year.[148]

One project of interest completed June 30, 1940 by ERA labor, under the

Public Roads Administration, was the obliteration of two tunnels along

the Pinnacles-Cedar Pass road. They were constructed during the first

half of the 1930’s (see Figure 19) when the road was built by the State

of South Dakota; the road was completed in 1935. The tunnels proved to

be impractical because of inadequate width and maintenance

problems.[149]

In July 1940 the ERA project in the area was discontinued. Among the

types of work accomplished since July 1, 1938, when the project was

initiated, were the construction of five project headquarters buildings,

prospecting for water on the national monument, the development of a

well near the site of the old Pinnacles Checking Station, and ten road

jobs which included road construction, widening, graveling, building

culverts, and banksloping. The construction of parking overlooks, and

the obliteration of buildings and clearing of 16 farmstead tracts, also

took place during that time.[150]

During the 12 months between July 1939 and July 1940, the ERA project

employed an average of 150 relief workers.[151]

Since the national monument is located a relatively short distance from

Wind Cave National Park, the older area co-ordinated the business of

Badlands during its early years. On August 11, 1939, Chief Ranger Howard

B. Stricklin of Wind Cave became acting custodian of the newly

designated area and was later placed in charge of the local ERA and CCC

projects.[152] Although the ERA project was terminated in July 1940, the

CCC work continued until June 1942.[153]

When Stricklin arrived to take charge, there were no living quarters of

any kind in the area. He lived at the CCC camp at Quinn Table while his

family remained at Wind Cave. Temporary offices were established in Wall

pending a decision regarding the location of permanent

headquarters.[154]

Considerable thought was given to the selection of a headquarters site.

For a time the Pinnacles area was considered.[155] However, in late 1939

it was finally decided to locate the center of operations at Cedar

Pass.[156] This decision was due, in part, to the offer by Mr. Ben H.

Millard, owner of Cedar Pass Lodge,

to donate approximately 28 acres of strategically located land in the

Cedar Pass area to the Service to be used as a headquarters area.[157]

[Illustration: Figure 20 CEDAR PASS LODGE,

early 1930’s

The lodge was begun in 1928 at about the same time the large dance

pavillion building in the background was constructed. People from as

distant as Rapid City came here to dance to the music of Lawrence

Welk and other name bands. More cabins for the lodge were built from

its lumber when the pavillion was removed in about 1934.[159]]

The Department of the Interior accepted Millard’s donation in May

1941.[158]

The decision to develop the Cedar Pass area for headquarters greatly

altered development plans. The CCC enrollees numbering 207 in February

1940 were encamped at Quinn Table some 35 miles west of Cedar Pass.

Since much of the development was taking place at Cedar Pass, it was

necessary to drive them between these two points each day.[160]

One of the great handicaps of Cedar Pass as a headquarters area was the

lack of water. To develop a satisfactory supply, the NPS found it

necessary to go to the White River, three miles south. One of the major

projects undertaken soon after selecting the headquarters site was to

dig a trench and lay pipe to the river. Since this stream is

intermittent above ground, but has a dependable subsurface flow, water

was collected in perforated pipes laid on hard clay and shale about

eight feet below the river bed. The pipe brought water to a sump on the

river bank where it was pumped to a 100,000-gallon storage tank above

the headquarters area.[161] Work was begun on this reservoir in April

1940 and completed by the CCC in September 1941. At the same time the

CCC also erected a checking station at Pinnacles which Stricklin and his

family occupied from November 15, 1940, until about May 15, 1943.[162]

Handicapped by the location of the original CCC camp at Quinn Table, a

new camp was authorized at Cedar Pass and work on it began in June 1941.

Five months later the new camp was occupied.[164]

At that time the only visitor-contact point in the Cedar Pass area was

at Cedar Pass Lodge. During the summer season Mr. Millard lectured

nightly to lodge guests on the geologic history of the Badlands, thereby

initiating interpretive programs. He also showed movies of the Badlands

and other scenic areas. A temporary park ranger, who checked travel in

the Cedar Pass area during the day, took part in the evening

programs.[165]

[Illustration: Figure 21 PINNACLES RANGER

STATION AND CHECKING STATION, 1941

Completed in 1941, the ranger station also served as quarters until

January 1965 when the new Pinnacles ranger station-residence was

completed. The checking station was removed about 1958 to make way

for road improvement, and the old ranger station was razed in April

1967.[163]]

The problem of stock grazing in the national monument grew increasingly

worse during the 1940’s. The acting custodian complained early in 1940:

Until the boundary is fenced and we are in a better position to know

what is private and what is monument land, there appears to be very

little that can be done to prevent this.[166]

In December 1941 he wrote in a similar vein:

During past winters it has been the practice of local stockmen to

allow herds of horses and cattle to drift into the monument area to

graze unrestrictedly over public as well as private lands and along

the monument highways. There is such a large amount of private and

county-owned land within the monument boundaries (31,000 acres out of

a total of 150,000) that it is difficult to restrain stock from

grazing on National Park Service land as well as on the land that is

owned or leased by private individuals.[167]

It soon became obvious that Badlands National Monument would be a

popular attraction because of its location near U.S. Highways 14 and 16,

both well-known national highways going through the Black Hills. In 1941

there were 70.02 miles of road in the national monument. Of this, 61.52

miles were constructed by the state and 8.5 miles by the federal

government; 29.87 miles were graveled and 40.15 were dirt roads.[168]

Although the roads through the area were only partially developed,

thousands of travelers turned off the through highways to view the

scenic Badlands.

Stricklin reported in September 1941:

More than a quarter of a million visitors had passed through Badlands

National Monument by the close of the travel season on September 30,

representing an increase of approximately 30 percent over the previous

year, for the period during which an actual count was made.[169]

The entrance of the United States into World War II in December 1941 had

a great impact on the area and its operations. Since many of the CCC

enrollees would be absorbed into the armed forces, the project work soon

came to an end. The acting custodian reported in the spring of 1942, “On

March 25, after two years and five months of productive work in Badlands

National Monument, CCC Camp Badlands, NP-3 [located at Cedar Pass], was

abandoned.”[170] Work was continued on several projects undertaken at

Camp Badlands by a CCC side camp with the view toward completing the

projects or leaving them “in such condition that the facilities involved

may be used, and the materials, all of which have been on hand for some

time, may be protected against deterioration and loss.”[171] However,

the side camp was also closed in the following June, leaving practically

all of the construction projects in various states of completion.[172]

In December 1942 most of the CCC buildings at Cedar Pass were dismantled

and removed by the armed services.[173]

Another result of the nation’s entrance into the war was a sharp drop in

visitors to the Badlands. Stricklin wrote in June 1942 that “Most of

these visitors appeared to be genuine vacationists ... [who] had a

vacation coming, and were trying to get it in before gas rationing

became nation-wide.”[174] He estimated that travel in March 1943 was 87

percent under that for March 1942, and that “All foreign [out-of-state]

visitor cars stopping for information were headed for defense jobs, or

were military personnel, changing their headquarters from one part of

the country to another.”[175] The effect of the war on travel to the

national monument is reflected in the travel figures of the area for the

years from 1941 to 1945. (See Appendix A.)

Efforts at the national monument during the war were devoted largely to

preventive maintenance. Changing his headquarters from Pinnacles to

Cedar Pass in June 1943, Stricklin was able to give closer attention to

the headquarters area.[176] Such routine tasks as filling washouts,

cleaning ditches, reclaiming gravel, cutting roadside weeds, repairing

guard rails, cleaning up debris, and temporary patching of roads

occupied most of the staff’s time. Other tasks, such as repairing water

lines, painting signs, keeping the buildings in repair, and servicing

and repairing the area equipment also required much attention.[177] The

cottage that the custodian and his family rented from Millard at Cedar

Pass was destroyed by fire on November 27, 1943.[178]

[Illustration: Figure 22 CEDAR PASS, June 1950

The buildings of Cedar Pass Lodge can be seen behind the white frame

structure, which served as a visitor center and headquarters until

1959. Remnants of two spires on Vampire Peak remain on the left. It

was observed on November 22, 1950, that one of the two spires of

this famous landmark had fallen, apparently during a thunder

storm.[189]]

During the ten years following the end of World War II, there was slow

progress in the area’s development. Work on the custodian’s residence at

Cedar Pass, begun in 1941, was completed in 1946.[179] Early in 1953 two

additional houses, both prefabricated, were completed.[180] In January

1948 commercial power was brought to Cedar Pass and Interior with the

completion of a single-phase power line by the Rural Electrification

Administration.[181] The Northwestern Bell Telephone Company extended

telephone service to the national monument headquarters in September

1952.[182] (This service was officially taken over by the Golden West

Telephone Cooperative, Inc., in October 1960.)[183]

During the travel seasons of 1946 and 1947 there was much adverse

criticism of the national monument roads. The maintenance equipment was

in poor condition and usually undergoing repairs when most needed.[184]

In the summer of 1948 about 4 miles of road was black-topped between the

Cedar Pass junction and Norbeck Pass; this represented the first paving

of U.S. Route 16A in the national monument.[185] The present northeast

entrance road, about 3½ miles long, was completed in October 1951. It

opened up a new area of the Badlands known as the Window Section.[186]

This road was made possible by the donation in 1946 of a 160-acre,

strategically located land parcel by Mr. Ben Millard who had purchased

it from Jackson County in March 1941 for this purpose.[187]

During the late 1940’s and early 1950’s buildings constructed as

temporary structures in the ERA and CCC period were remodeled and

continued in use for headquarters and utility purposes.[188]

Both the grazing and the land ownership problems at the national

monument were compounded by the war. With increased rainfall in the

region during the decade of the 1940’s and the rising price of beef, the

situation of the ranchers greatly improved. Under a plan suggested by

Congressman Case in January 1943 to help in the “Beef for Victory

Program,” the Service authorized for the first time in April the

issuance of grazing permits on federally owned grasslands within the

national monument. Under this program, the lands were divided into seven

grazing units. An orderly grazing plan was established with the

cooperation of the Soil Conservation Service.[190] Stricklin was able to

identify and locate all cattle and sheep outfits that claimed to be

using the national monument lands in conjunction with their SCS

allotments.[191] Following the war authorized grazing remained one of

the area’s major management problems for over a decade.

Stricklin wrote about an interesting sidelight of the grazing problem:

The roundup and disposal of several hundred head of unclaimed and

so-called wild horses in the Sage Creek basin was a source of much

concern on the part of both ranchers and the Custodian, the ranchers

claiming the wild stallions were enticing away their mares. The

Custodian’s concern was partly because of the damage these herds were

doing to the range, but largely because it was practically the only

program of any kind on which the National Park Service and the

ranchers could even remotely agree. Several roundups were collaborated

in, during which the herds were drastically reduced. Airplanes were

used on at least one of the roundups to flush horses out of the

canyons and keep them from breaking back on their route to Scenic and

the loading chutes. Jack and Mamie Close, ranchers on Quinn Table,

were the leaders among the ranchers in this work.[192]

Feral horses were eventually eliminated through roundups and returned to

their owners. The last roundup took place in the national monument in

1963.[193]

With the improvement of their lot, many ranchers who had been destitute

only a few years earlier were in a position to purchase county lands

within the national monument boundary. The custodian reported in April

1943 that practically all such land within the boundary was leased for

grazing and that much of it was recently bought by sheep and cattle

ranchers.[194] In 1946 Stricklin reported a considerable change in land

ownership where much of the land formerly controlled by Pennington

County had passed into private ownership.[195] Later the same year

Jackson County auctioned all of its 3,000 acres of land within the

boundary to private individuals. Practically all of the 14,000 acres

which was owned by the two counties two years earlier had passed into

private ownership.[196]

The location of the boundary had been a subject of discussion since the

national monument was established in 1939. The area contained a large

acreage of grassland which the Soil Conservation Service believed should

be released for grazing purposes. There was also overlapping

jurisdiction between the two federal agencies.[197]

After several years of study, the NPS and the SCS arrived at an

understanding on the national monument boundary and mutual land

problems. In 1946 the two agencies signed an agreement known as

Recommended Program of Procedure for boundary adjustment of Badlands

National Monument. The NPS agreed:

(1) to transfer to the Soil Conservation Service NPS lands outside the

existing national monument boundary in order to compensate for

1,220 acres the SCS had turned over for inclusion in the national

monument prior to its establishment in 1939;

(2) to transfer to the SCS equivalent lands (computed on a

livestock-carrying-capacity basis) for lands that were to be

acquired from the SCS by the NPS as the result of revised boundary

studies;

(3) to transfer to the SCS federal lands which the NPS planned to

eliminate from the national monument to use in exchange for

non-federal lands remaining in the national monument after the

boundary changes were made.[198]

The plan made it possible to transfer, without legislation, 3,678.19

acres of NPS lands lying outside the park boundary to the SCS. This was

done by order of the Secretary of the Interior in July 1949.[199] These

lands were acquired under the Resettlement Administration program and,

in 1936 were transferred to the NPS. When Badlands National Monument was

established in 1939, these lands were not within the boundary.[200]

In order to carry out the main objectives of the plan, Congressional

action was necessary. In 1950 bills (H.R. 7342 and S. 3081) were

introduced in the 81st Congress by Representative Case and Senator

Chandler Gurney to implement the proposed land exchange. H.R. 7342 was

passed by the House without amendment, but later the bill died in the

Senate. The senate bill (S. 3081) was not considered.

In 1951 Senator Francis H. Case, who had just been elected to that

office, and Congressman E.Y. Berry introduced identical bills (S. 896

and HR. 3540) in the 82nd Congress. These were similar to the ones

proposed a year earlier. Berry’s bill passed the House on July 2, 1951,

without amendment. The House Act was referred to the Senate Committee on

Interior and Insular Affairs, which recommended that section five of

H.R. 3540 be dropped. This section would have provided authority to

include 4,000 acres of the Pine Ridge Indian Reservation in the Sheep

Mountain area provided certain conditions were met. The committee

believed “that a satisfactory solution should be worked out with the

Tribal Council of the Oglala Sioux Tribe of Indians, and any others

interested, before legislation with regard to these lands is

enacted.”[201] The bill in its amended form, including another minor

change recommended by the committee, passed the Senate on January 24,

1952.[202]

[Illustration: Figure 23 AREA CHANGES IN

BADLANDS NATIONAL MONUMENT[203]]

Area authorized in 1929 (dashed line) 50,830.40 acres

Area upon establishment in 1939 154,119.46 acres

Area after changes of 1952 122,642.52 acres

Area after changes of 1957 (heavy line) 111,529.82 acres

Acreage figures are latest available and may be different from figures

which were current during each of the four times the park boundary has

been redesignated. Because of these acreage revisions, additions to and

deletions from the park do not total correctly.

Badlands National Monument

South Dakota

One section (1 mile square—640 acres)

Eliminated in 1952 31,442.52 acres

Added in 1952 4,449.29 acres

Eliminated in 1957 11,234.09 acres

Added in 1957 241.39 acres

Shortly afterwards on February 8, telegrams were sent to Congressmen

Berry, Senator Case, and Senator Karl Mundt by the executive committee

of the tribal council of the Oglala Sioux Tribe. The messages urged the

congressmen to do their best to get Section 5 restored so it would be

possible for the tribe to negotiate with the federal government for

exchange of the land in the Sheep Mountain area for other lands.[204]

The House, however, did not heed this resolution but voted instead to

concur with the Senate’s amended version. The bill became Public Law 328

after being signed by President Harry S Truman on May 7, 1952.[205]

Under this law, the Secretary of the Interior was authorized to adjust

and redefine at his discretion the exterior boundary of the national

monument by appropriate reductions or additions. The law specified,

among other things, that the adjusted area could not exceed the existing

154,119 acres.[206] (An official figure of 150,103.41 acres was used as

the total acreage of the area at the time it was proclaimed as a

national monument in 1939. A revised figure, listing 154,119.46 acres

for the same area, was used as the total acreage from about 1943 until

October 1952.[207])

Immediately after the bill became law, proposed boundary changes

received considerable attention. Some believed that the area of the

national monument should be reduced. A strong supporter of this view was

the South Dakota Stock Growers Association. It was the organization’s

belief that the size could be reduced by about one-half without

destroying any of its scenic value. They estimated that 3,000 head of

cattle would be without grass if the NPS carried through its plan to

fence the area and eliminate grazing from the national monument. One of

the biggest problems was the large acreage of private lands located

within its boundary. Many ranchers believed that these lands ought to be

eliminated “from the Badlands National Monument wherever a reasonable

boundary adjustment can be made.”[208] Others contended “that all of the

grassland west of Pinnacles [Sage Creek Basin] could be removed from the

Park and that such removal would in no way destroy the attraction to the

tourist.”[209]

A 1953 memorandum from the Regional Director to NPS Director Conrad L.

Wirth explained how Sage Creek Basin had become largely

government-owned:

Sage Creek Basin was a submarginal waste in the 1930’s due to

prolonged and severe drought conditions and considerable acreages of

private lands were acquired by the Resettlement Administration in

connection with its submarginal land program.... Other private parcels

became tax delinquent and were ultimately sold to private owners by

Pennington County in the 1940’s. Because of favorable climatic

conditions of the past several years, the basin has recovered from its

condition of the 1930’s; it now contains a considerable acreage of

good grasslands.... We venture the opinion that had vegetative

conditions of the basin in the 1930’s resembled those of today, a

submarginal land program would not have been undertaken so far as the

basin is concerned.[210]

Owing to the great interest generated by the proposed boundary changes,

the NPS issued a statement in July 1952 giving reasons why it would not

be “advisable to eliminate from the Monument the grasslands west of the

Pinnacles, as suggested by the South Dakota Stock Growers

Association.”[211] It said in part that

These flatter lands with their cover of native grasses and

wildflowers, typical of the surrounding prairie country, are valuable

for park and wildlife purposes. The preservation of this relatively

small exhibit of native grass is an important responsibility in

itself, since no comparable section of the Great Plains has been set

apart to be preserved in its natural condition.[212]

The statement also indicated that about 31,700 acres of other lands were

to be eliminated from the national monument, including more than 12,000

acres of privately owned lands. It indicated that the Soil Conservation

Service agreed to these revisions and that they were “the same as those

which the Congress considered when it authorized boundary revisions by

enacting Public Law 328.”[213]

On October 3, 1952, Assistant Secretary of the Interior Joel D. Wolfsohn

issued an order revising the boundary of the national monument. The

order showed that 30,802.52 acres, more or less, were “hereby

transferred from the Department of the Interior to the Department of

Agriculture for use, administration, and disposition in accordance with

the provisions of Title III of the Bankhead-Jones Farm Tenant Act....”

This reduced the size of Badlands National Monument, according to the

order, to 121,883.12 acres.[214]

The Order was performed to provide lands for the Soil Conservation

Service to enable those persons having private land in the monument to

trade for Soil Conservation Service lands outside the monument, and to

make a few administrative adjustments in the monument boundary.[215]

However, discrepancies in the land records led the NPS to investigate

the status of lands within the former boundary.[216] By late 1953 it was

found that 31,442.52 acres were eliminated from the national monument by

the October 3 order instead of 30,802.52 acres. Of these 12,916.32 acres

were private lands; the remaining 18,526.20 acres were transferred to

the Soil Conservation Service of the Department of Agriculture.[217]

There were also lands totaling about 4,449 acres added to the national

monument by the October 3 order; these lands included

“2,581.88 acres of public domain, 336.88 acres of purchased land,

981.79 acres of Soil Conservation Service land and 548.56 acres of

private land.... The net result of the boundary adjustments was a loss

of 26,993.23 acres of land in Badlands National Monument.”[218]

Even before the October 3 order was enacted there was already talk about

further reduction of the area boundary. In a memorandum dated December

5, 1952, Director Wirth wrote to the Regional Director in charge of

Badlands National Monument:

[Illustration: Figure 24 A PORTION OF SAGE

CREEK BASIN

In 1953 over 25,000 acres were recommended by the NPS for deletion

from this section of the national monument.[219] Later, studies

revealed that the area should be retained. Today it is home for

bison, deer, pronghorn, prairie dogs, and other animals. Sage Creek

Primitive Campground is located in its northwest section.]

The basis for a final solution [of the boundary problem at Badlands

National Monument] lies in a reassessment and restatement of Monument

objectives and significance. If it is found, as appears likely, that

our chief concern and purpose should be with the badlands formations,

then the boundaries should be drawn accordingly, with due regard for

badlands protection, interpretation and attendant development needs.

If we are to retain some or all of the grasslands, we must have strong

and valid justification for doing so and be prepared to disclose and

defend what specific Monument purposes and uses they are to

serve.[220]

In order to determine if the grasslands west of Pinnacles should be

kept, the NPS contracted with a number of prominent scientists to make

studies of the area in 1953. Dr. Theodore E. White, a paleontologist

with the Smithsonian Institution, determined in June 1953 whether or not

potentially fossiliferous areas would be excluded by proposed boundary

readjustments.[221] Late that summer archeological investigations were

undertaken by Archeologist Paul L. Beaubien of the NPS Regional Office

in Omaha, Nebraska. He recorded some 30 prehistoric Indian sites and one

historic Indian site believed to have been used by Chief Big Foot’s band

a few days before the infamous battle at Wounded Knee in December

1890.[222]

Professor F.W. Albertson of Fort Hays Kansas State College submitted a

Report of Study of Grassland Areas of Badlands National Monument in

September. In brief he said, “it seems to me that the Park Service has

an extremely interesting area, which should be preserved for all

interested public through the years to come.”[223]

Meanwhile, support grew for retention of the boundaries as spelled out

by the October 3, 1952, secretarial order. The Rapid City Chapter of the

Izaak Walton League of America, the South Dakota State Highway

Commission, the South Dakota Department of Game, Fish and Parks, the

Black Hills and Badlands Association, and prominent local persons,

including Sid Soma, Dr. G.W. Mills, Ted Hustead, and Leonel Jensen, all

from the town of Wall, were but a few of the many who advocated

retention of the present boundary.[224]

Although the South Dakota Stock Growers Association and some local

ranching interests continued to advocate “the transfer of administration

of all grazing lands within the monument not needed for road and

development purposes,” it became evident to these people that opposition

was building up against further acreage reduction in the park.[225]

In April 1954 the NPS recommended no boundary changes until the problem

was explored further. Director Wirth said:

it seems apparent that there is a very considerable number of people

... which strongly support the retention of the Badlands National

Monument not only as a striking example of geological formations, with

areas of paleontological interest, but also for preservation of a

segment of the plains grassland and native wildlife as added

attractions. On the other hand, there is also a difficult problem of

inholdings and grazing complications, with strong sentiment from the

livestock owners for a reduction of the Monument.[226]

He recommended, among other things, that exchanges of private land

inside the boundary for federal lands outside be pushed vigorously, and

that Dr. Adolph Murie, NPS Biologist, should study the wildlife

possibilities of the national monument.[227]

In his report Dr. Murie said:

Badlands National Monument has national significance, first of all

because it is a sample of the Badlands. The values of this monument

are of outstanding significance in the fields of geology,

paleontology, archeology, and biology. The eroded terrain has scenic

value for many, and in Sage Creek Basin and in the section north of

Cedar Pass one finds the atmosphere of the early scene, when this

country was far beyond the frontier....

In Sage Creek Basin we have an opportunity to preserve the prairie

dog-blackfooted ferret community, with many other associated species

of the region.... Likewise the rare kit fox may possibly be preserved

in the basin. The value of Sage Creek Basin for preserving these rare

native species is contingent on size and its present size is none too

large....

Concerning boundaries in general over the monument it appears that any

eliminations would be harmful to public values. Only in minor details,

in connection with land adjustments, should any territory be

sacrificed. Sage Creek Basin, especially, should not be

reduced....[228]

Also during the summer of 1954, the NPS requested Dr. James D. Bump,

Director of Museum of Geology of the South Dakota School of Mines and

Technology at Rapid City, to make a geological and paleontological

appraisal of Badlands National Monument. Quotations from his report

point out his strong feelings for the area:

The Big Badlands of South Dakota, from a paleontological standpoint,

probably constitutes the richest Oligocene region in the world....

[The quantity of] paleontological materials given up to man over the

past 100 years is of astounding proportions. This prehistorical

treasure represents more than 250 species of the vertebrate life of

thirty million years ago....

The Badlands National Monument is a part of the greatest

badland-eroded section in North America.... I can think of no other

geographic area of like-size that has the unusual natural beauty, the

undisturbed plant and animal life and the wealth of scientific

information to offer the public....[229]

He ended his report by making a number of recommendations, some of which

follow:

The present boundaries must remain intact. Removal of any lands,

except perhaps some thin scattered fringes, would seriously cripple

future development and greatly reduce the attractiveness of the

Monument....

Under no circumstances should any part of the Sage Creek Basin be

withdrawn. Its scientific and natural value cannot be overestimated

and it is my opinion that this section will in the future become one

of the most interesting and educational of the entire Monument.[230]

As a result of Dr. Murie’s wildlife study and Dr. Bump’s geological and

paleontological appraisal, the Service began formulating definite ideas

in April 1955 concerning further revision of the boundary. An

elimination of 11,124 acres including 4,234 acres of privately owned

lands was proposed. This is only about one-third of the 32,000 acres

which was being widely talked about as a possible reduction in size

during 1953. The larger reduction would have included much of the

grasslands west of Pinnacles. Addition of 4,460 acres, including 3,954

acres of Pine Ridge Indian Reservation lands and 246 acres of Department

of the Army lands located on the Indian reservation, was also proposed.

Net reduction in area would be about 6,664 acres.[231]

Since the mid-1930’s there have been various suggestions that a road be

constructed to connect Sage Creek Basin with the Sheep Mountain

locality. Although it was not in the master plan for the national

monument in the 1950’s, planning for the ultimate boundary was done so

that the road could be built if ultimately needed.[232] However, Dr.

Murie recommended against the road proposal in his report.[233]

[Illustration: Figure 25 BADLANDS NATIONAL

MONUMENT VISITOR CENTER

Dedicated in 1959, the building houses the national monument’s

administrative offices, exhibits on the Badlands, and a small

theater in which there are narrated slide programs on the highlights

of the Badlands. The facility is open all year.]

On April 12, 1956, an open meeting was held in Wall, South Dakota, to

discuss proposed boundary changes with ranchers, stockmen, and local

businessmen. No opposition to the proposals was voiced. The meeting also

provided an opportunity for discussion of development plans, including

fencing and grazing matters.[234]

On March 22, 1957, Acting Secretary of the Interior Hatfield Chilson

issued an order eliminating 11,234.09 acres from the national monument,

of which about 4,000 acres were private land. The total area of Badlands

National Monument was fixed at 111,529.82 acres. This also included an

addition of 240 acres of federal land which, among other things,

increased the utility area at headquarters and provided a much needed

disposal area. An additional 1.39 acres of federal land, located along

the White River three miles south of headquarters, were added, since

water storage tanks and a water pump, all part of the area’s water

system, are located there. More than 7,000 acres of the 11,234.09-acre

reduction were transferred to the Department of Agriculture, under

provisions of the Bankhead-Jones Farm Tenant Act, and became available

for exchange for private land remaining inside the new boundary. As a

result of the secretarial order, there was a net reduction of 10,992.70

acres in the size of the national monument. The new boundary included

98,486.39 acres in federal ownership and 13,043.43 acres of non-federal

land.[235] Since then, the Service has acquired title to 6,356.71 acres

of the non-federal land within the boundary. As of December 1967 there

were 104,843.10 acres of federal land and 6,686.72 acres of non-federal

land within the boundary of Badlands National Monument.[236]

On January 2, 1954, the Secretary of Agriculture transferred the Land

Utilization Program, including lands in the vicinity of the national

monument, from the Soil Conservation Service to the U.S. Forest

Service.[237] This, in part, prompted a Program of Procedure for Land

Exchanges, a revision of the Recommended Program of Procedure, to be

drafted. The new agreement was signed in September 1954 by officials of

both services. It states in part that all future land exchanges are to

be handled by the Forest Service. This includes exchanges with private

parties who own land inside the national monument boundary. One

objective of such land exchanges is to eliminate all non-federal lands

from within Badlands National Monument.[238] Since 1954 elimination of

such lands has come about largely through exchanges, although in a few

instances actual purchases were made.

[Illustration: Figure 26 RIBBON-CUTTING CEREMONY

AT BADLANDS NATIONAL MONUMENT DEDICATION, SEPTEMBER 16, 1959

Left to Right: NPS Regional Director Howard Baker, Region Two (now

Midwest Region); Conrad Wirth, NPS Director; Fred Seaton, Secretary

of the Interior; Congressman E.Y. Berry; Mrs. George H. Sholly,

widow of Badlands National Monument Superintendent; Mrs. Ralph

Herseth; and Governor Ralph Herseth of South Dakota.]

Concurrently with boundary adjustments, the NPS gave considerable

thought to a grazing management plan for the area whereby grazing might

be eliminated without serious hardship to the local ranchers. As a

result the Service presented a plan in May 1948 to grazing permittees

outlining a schedule for the gradual termination of grazing on federally

owned national monument lands by December 31, 1961.[239]

The History of Badlands National Monument and the White River (Big) Badlands of South Dakota · 第 11 / 14 题