THE AMERICAN SHELL COMPANY

Paterson, N. J.

In reference to our method of producing toolroom outfits most

economically and with a large output:

This is chiefly accomplished by anticipating our machine shop

requirements or demands far enough in advance so that the majority of

work passing through the toolroom can be manufactured in quantities

great enough to be produced economically, and also bringing the

toolroom work nearer to an actual manufacturing basis. This also

eliminates a lot of down or lost time, including the unnecessary

losses, such as occur between jobs on work of this nature.

It also decreases the percentage of losses due to spoiled work as

workers become more skilled in performing one kind of work rather

than a number of different classes of work, which is invariably the

case in toolrooms.

We also find this gives us the opportunity to take advantage of

present conditions and hire a man who sometimes is inclined to call

himself a toolmaker, although he is not an all-around man but is

still quite suitable under our conditions of working.

We find, too, that on quantity production in toolroom, we are in

a position to effect some very great savings in time and money,

as it permits standard jigs and fixtures, such as in ordinary

manufacturing; for instance, we at one time machined all our flat

tool bits made of high speed steel before hardening and grinding,

while our present method is to heat bars of steel in gas furnace and

then punch out with die under heavy hammer or press. This method

alone in a couple of hours gives us a supply ahead that would

ordinarily take one machine or more in continuous operation to

produce.

The classes of work in toolroom are also segregated as much as

possible; we have one gang for machine repair and reconstruction

only. Another gang does all the roughing work on tools and gauges so

that the finishing work only on gauges is done by the gauge-makers

who are also practically a separate gang. The grinding of tools is

under one skilled mechanic who is a working gang boss and leader of

men trained to do this work only.

Our tool supply is never permitted to get below the fixed minimum

quantity, and record of this condition is always before the toolroom

foreman and maintained by his clerk. His clerk is advised hourly on

this through the disbursements which he receives from various shop

cribs.

We also make a daily record of these same disbursements as against

operations and production, thereby keeping in close touch with this

situation, obviating any unnecessary tool wastage which very quickly

may become extremely expensive, and which also may cause dangerous

delays in production in shop due to shortages in tool supply.

(Signed) GEORGE DE LAVAL,

_Vice-President and General Manager_.