Construction for the Quartermaster Department involved the building

of warehouses on a scale hitherto unknown in the United States. The

warehouse plan was carefully worked out as part of the strategy of

conducting the war, the Council of National Defense making the first

investigations of the proper locations of supply depots, and these

early findings being later amended by the General Staff. Several

important considerations determined the locations of these depots and

warehouses. In the first place we would require great storage and

shipping facilities at tidewater; yet, if these were all to be located

in one spot or in one general region, there was a possibility that a

submarine blockade off the Atlantic coast could stop the shipment of

supplies to the American Expeditionary Forces. Thus the first project

was to locate the great supply bases at New York, Boston, Philadelphia,

and Norfolk. But it was evident that a relatively small number of enemy

submarines operating in a comparatively restricted area could block

shipment from these four ports. Therefore Charleston, S. C., and New

Orleans were added to the supply-base project.

There was another thing to be taken into consideration, namely, the

providing of sufficient warehouse space, so that, if there should be

any blockade of ocean transportation, the manufacture of supplies

could continue at its war rate and still find places to which to ship

its important products. Yet if the storage were all provided at the

tidewater bases, there would be danger of railroad congestion at the

ports. Consequently, as auxiliary to the terminal warehouses, there was

provided a system of enormous warehouses built in the interior of the

United States.

The system eventually worked out to give seven expeditionary supply

bases located, six of them, at the cities just named, in addition to

one that had been built at Port Newark, N. J., during the winter of

1917, and nine interior depots located respectively at Baltimore,

Chicago, Columbus, Ohio, Jeffersonville, Ind., New Cumberland, Pa.,

Philadelphia, Pittsburgh, Schenectady, N. Y., and St. Louis. These

latter were central in various producing districts.

The terminal projects alone involved construction on a scale that

was without precedent. The interior depots and the huge terminal

bases provided 690 acres of storage space, all inclosed in reinforced

concrete of the most modern type. They were all built in a little over

12 months. Into them went construction enough to build a concrete

building 70 feet wide from New York to Philadelphia and a wharf nearly

8 miles long, with berthing accommodations for 65 ships at once. The

facilities included 650 miles of railroad and 1,000 miles of concrete

roadway.

[Illustration: NEW ORLEANS ARMY SUPPLY BASE.]

[Illustration: BROOKLYN ARMY SUPPLY BASE.]

[Illustration: BROOKLYN ARMY SUPPLY BASE.]

[Illustration: BOSTON ARMY SUPPLY BASE.]

The Army supply bases at Brooklyn and at Boston are examples of

the immensity of the expeditionary depots built along the Atlantic

seacoast. The base at Brooklyn has approximately 4,000,000 square

feet of storage space in its two huge 8-story reinforced concrete

warehouses. One of these warehouses is 980 feet long by 200 feet wide

and the other is 980 feet long by 300 feet wide. In addition to these,

the installation at the base consists of three double-deck piers, each

150 feet wide and 1,300 feet long, and one open pier 60 feet wide and

1,300 feet long. In its railroad yards there is storage space for 1,300

cars at one time. The capacity of the base is 700,000 tons of supplies,

or the equivalent of about 100 shiploads. Twelve ships of 8,000 tons,

dead weight each, can be loaded at one time, and the loading of these

vessels can be completed within 24 hours, so vast and complete are the

facilities at this project.

Construction started at the site on May 15, 1918. More than 7,000

workmen were engaged on this job at one time, and the entire project

was to be completed before July 1, 1919, while it was to be in partial

operation by January 1. When the armistice was signed, 4,387,360 square

feet of floor space had been completed and 187,173 cubic yards of

concrete had been poured.

The base at Boston is 8 stories high, built of concrete, and gives

2,750,000 feet of storage room. Its wharves are 4,000 feet long. The

work on it was started May 14, 1918, and ended October 3. In that

time 200,000 cubic yards of concrete had been poured, 22,000 tons of

reinforcing and structural steel put into position, 3,000,000 brick

laid, 30,000 piles driven, 1,500,000 cubic yards dredged, and 30 miles

of track laid. In all, 7,000 carloads of material were handled in this

building.

The Norfolk base is located at Bush Bluff, 4 miles from the city. The

chief feature of this project is a group of eight 1-story concrete

buildings providing 2,000,000 square feet of storage space. The pier

sheds are built of concrete blown by compressed air upon steel lath.

The docks total a mile in length. The base can handle 600 cars of

supplies in a day. In addition to the storage and shipping buildings

themselves, the Construction Division provided quarters for a regiment

of stevedores and a battalion of guards. A 120-bed hospital was erected

at the project. The wharfage front was made of concrete piles weighing

12 tons apiece, and 217 acres of land were made by dredging outside of

the piles and filling in behind them. The work was started in May and

was nearly finished when the armistice was signed.

The Norfolk and Hampton Roads district has the distinction of being

the center of more war construction than was conducted at any other

point in the United States. There were located here the Navy arsenal,

the Navy yard, the Navy training station, and the great Norfolk naval

base. The largest construction project of all at Norfolk was the

quartermaster terminal which the Construction Division built there. But

in addition to these there was the Pig Point ordnance depot, described

above, Camp Stuart and Camp Hill, both embarkation camps, the Artillery

school at Fortress Monroe, Camp Eustis, and the Langley aviation field

of the Army.

With so many construction undertakings going on at once, the

labor problem proved to be an early embarrassment at the Norfolk

quartermaster terminal job. However, good quarters and good food for

the construction gangs at the terminal largely solved this problem. At

one time in the development on the shores of this part of Chesapeake

Bay, the street car and electric lighting system of Norfolk broke down

under the strain. The Government thereupon took the power house and

operated it thereafter for the duration of the emergency.

The interior storage depots of the Quartermaster Department provide

12,000,000 square feet of storage. They are all of permanent

construction. They range in size from the one at Pittsburgh, with

184,000 square feet, to that at Schenectady with 2,500,000 square feet.

The depot at Chicago was built by the Central Manufacturing District

as contractor on a site sold by its trustees to the Government. This

structure, costing $3,000,000 and giving 29 acres of storage, was built

completely in the period between March 4 and September 15, 1918.

MOTOR TRANSPORT CONSTRUCTION.

There was extensive construction for the Motor Transport Corps. Few

civilians perhaps realize the size attained by this branch of the

Army, with its more than 3,000 officers and 100,000 men in the United

States and abroad. The Construction Division designed a standardized

repair shop to be used in this country or to be transported overseas as

desired. There were three centers of repair, shipment, and the training

of men for the Motor Transport Service, the largest being Camp Holabird

at Baltimore and the others, Camp Jesup at Atlanta, and Camp Normoyle

at San Antonio, Tex.

When the armistice was signed the Army had in this country thousands

of motor trucks, motorcycles, and ambulances. Perhaps 80 per cent

of these were located in the districts subsidiary to Camp Holabird.

Consequently, there were constructed at Holabird an enormous repair

shop and a shop for the taking down and shipping of motor vehicles.

The machine shops at these camps were of permanent construction. Large

storage facilities were also furnished.

The experiences of the Army in Mexico taught that to be effective motor

transport must have adequate facilities for repair. The standardized

army repair shop is of glass, steel, and concrete construction. It is

operated by 55 officers and 1,400 men.

[Illustration: QUARTERMASTER STORAGE DEPOT BUILT BY CONSTRUCTION

DIVISION AT ST. LOUIS.]

[Illustration: CHICAGO PERMANENT QUARTERMASTER DEPOT WAREHOUSES.]

One of the most interesting buildings provided for the Motor Transport

Corps was the crating shop at Camp Holabird. The first motor trucks

sent overseas were shipped completely assembled. In addition to taking

up unnecessarily much-needed cargo space on the transports, they

frequently arrived in poor condition, due to the effects of the salt

air upon their metal parts.

Consequently, it was decided to ship trucks disassembled in crates. One

of these huge vehicles could be taken apart and, except for its truck

body, wrapped up in a parcel 20 feet long, 40 inches wide and 40 inches

deep. The truck body could be packed in a crate 12 feet long and 6 feet

wide and 1 foot thick. These crates were moisture proof.

The crating of trucks saved 75 per cent of the ship space formerly

required. The crating crews became so facile that they could take down

and pack in a single day from a mile and a half to two miles of trucks.

This unique shop cost $500,000.

The construction at Camp Holabird started February 4, 1918. The camp

now occupies 144 acres and has a cantonment for 7,000 men. The 22

buildings of an abandoned distillery on the ground were remodeled to

serve as permanent storehouses for the millions of dollars' worth of

tools and motor-vehicle parts which the Government acquired in the war.

ARMY HOSPITALS.

For the Surgeon General's Department the Construction Division

constructed hospitals in this country providing accommodations for a

total of 121,000 patients, 12,000 nurses, 4,000 doctors, and 34,000

hospital operation and maintenance troops. There were 294 of these

hospitals in all, built at a total cost of $127,725,000 and divided

into three types: base hospitals located at the various training camps,

departmental hospitals located at various other Army posts, and general

hospitals for the reception of sick and wounded men returning from

France. The construction of general hospitals did not cease with the

signing of the armistice, and at a recent date it had provided 97,000

beds for patients.

The builders adopted a standardized type of hospital construction.

The unit in this type was a single-story ward building of frame

construction lined in the interior with gypsum board or some similar

material. An open porch along the entire length of one side of the ward

building provided opportunity for convalescents to be wheeled outdoors.

Each ward had room for 34 beds and also had a diet kitchen, a nurses'

room, a doctors' room, lavatories, and an inclosed solarium at the end.

These buildings were connected with each other by inclosed corridors

running through the clear. At the Fox Hills Hospital, Staten Island, N.

Y., there was a mile and a quarter of this corridor construction. The

corridors in each case fed in toward the central administration group

of buildings in which were located the operating rooms and the various

laboratories.

As crews developed their teamwork some marvelous instances of

speed were shown in putting up the buildings. One crew of 566 men

at Fox Hills erected a complete hospital wing in one working day.

At 7 o'clock in the morning the ground of the site was untouched.

That night at 6 o'clock a 40-bed ward was standing finished on the

site--painted, equipped with heating and ventilating apparatus, all

plumbing installed, the last electric bulb screwed in, and in every

respect ready for occupancy. It was like magic; yet soon thereafter the

Construction Division had set the period of 10 hours as the standard

time for building one of these wings.

General Hospital No. 3 located at Otisville, N. Y., has a capacity of

579 beds and is a complete military hospital plant designed for the

treatment of tubercular cases. A short summary of the work done upon it

will give an idea of the general nature of the construction problems

incident to the building of the military hospitals during the winter

and spring of 1918.

On February 2, 1918, the Constructing Quartermaster with a few officers

and clerks arrived at the site of the hospital, about 37 acres of land,

near the village of Otisville, Orange County, N. Y., on the southern

slope of Shawangunk Mountain. The contractor and his organization

came on the same day. They found the site covered with snow and with

no accommodations even for the office force of the Constructing

Quartermaster or the contractor, except an old creamery building, which

was promptly rented and into which the two organizations moved the next

day.

Actual work was started February 5 and continued through every severity

of weather until the project was completed in the early part of July.

The work was interrupted, hindered, and hampered by snow and mud, by

transportation congestion preventing the delivery of materials on

time, by the absence of local labor and the necessity for importing

labor from near-by markets wherever it could be procured, and by the

consequent necessity for running special trains to transport laborers

to and from the job. No local facilities existed for housing any of the

workmen, and temporary accommodations had to be built to accommodate

200 Italian laborers both in the matter of shelter and food.

The average height above sea level of the site of this hospital is a

little over 1,000 feet. It was found after construction began that the

site was full of springs, which caused further trouble and difficulty

in developing the building operations.

The cost of the project was $1,681,000. About 300 carloads of material

were used, including approximately 3,000,000 feet of lumber. The

largest number of laborers employed at any one time was 1,795, with a

working day, as a rule, of nine hours, union and nonunion labor being

employed without discrimination. Water supply, sewer construction,

roads, 330 feet of railway siding, sewage disposal plant, electrical

installation, and boiler houses, all had to be built. The work was all

completed early in July, 1918. In addition to the bed capacity of the

hospital, accommodations were provided for a hospital personnel of 224.

One of the largest hospitals involving entirely new construction is

General Hospital No. 21, Denver, Colo. This is also a hospital for

the treatment of tuberculosis cases. The construction is permanent,

hollow tile and stucco, and the hospital facilities are sufficient to

accommodate 2,000 beds for recuperative and curative work. The plant

consists of hospital wards, tuberculosis wards, officers' quarters,

nurses' quarters, mess halls, storehouses, laundry, schoolhouse, power

house, water and sewer installation, and all of the necessary utilities

for the adequate operation of a completely self-contained unit.

The original authorization covered only 1,000 beds. Subsequently there

was authorized an addition equally as large, and the entire project

was completed on March 1, 1919. The actual capacity of the hospital is

in excess of the capacity estimated when the work was begun, and it

is estimated that 2,486 patients can be cared for, the cost per bed

running less than $1,350. In view of the nature and character of the

permanent construction involved, and the fact that this is a military

hospital with the usual numerous construction details not found in

civilian hospitals, the construction at this figure is regarded as

exceptional.

INCIDENTS OF THE WORK.

When the Government undertook the whole enormous military construction

program, it was found that there were few builders in the United States

who had equipment enough to handle the bigger jobs. Consequently the

Construction Division adopted the policy of acquiring equipment of

various sorts, usually paying rent for it. Such equipment included

locomotive cranes, concrete mixers, locomotives for trench machines,

road machinery, and other heavy apparatus. This equipment was rented

under an agreement that whenever the rent paid had aggregated the cost

of the article rented, the latter should become the property of the

Government. In this way the Government has acquired property of this

sort worth about $3,000,000.

The Construction Division at all times procured raw materials for the

contractors engaged upon the projects. During the summer of 1918 the

division was procuring material at an average rate of nearly $1,000,000

per day.

There were many interesting incidents in connection with this activity.

In the summer of 1917, when the cantonments were going up, it became

necessary to provide some 60,000 stoves and heaters, yet there were not

that many stoves for sale in the country including all existing stocks,

nor was the capacity of the various stove works sufficient to make up

the number in the three months' period before the soldiers would be

going to the camps. Accordingly, officers of the division were sent

out to make addresses to the workmen at the stove factories, and as

a result of such efforts the companies speeded up their output until

they were able to supply all of the camps with heating facilities by

October 1, 1917. In this effort the Government went into the market and

procured the pig iron, coke, and other supplies for the stove foundries.

The Construction Division was also able to obtain 15,000 Army kitchen

ranges in three months, although that number is a normal year's output

of the entire manufacturing facilities of the country.

When the project for the expeditionary supply base at Port Newark was

taken up--in the late fall of 1917--the Construction Division set about

it to get 63,377 piles for the foundations of this construction. There

were 64 pile drivers on the job, driving in a total of 1,566 piles in

a day; and to supply these the woodsmen of Maryland, Virginia, North

Carolina, and New Jersey were called upon for their best efforts.

Due to the unforeseen severity of the winter, the rivers were frozen

and the railroads choked with freight. Near by was the Hog Island

shipbuilding project at Philadelphia, needing more piles than the

railroads could deliver. The trees in the woods were frozen and often

broke to pieces when they fell. In the southern logging districts the

negro woodsmen refused to stay on the job because of the cold. The

Construction Division then took hold, sent soldiers into the woods,

felled the trees, and then put guards on the cars of piling, to see

that they were not lost in transit. As a result, the piles for the Port

Newark job were delivered on time.

In addition to procuring materials for its own contractors, the

Construction Division also procured building materials for the Shipping

Board and for the Bureau of Industrial Housing. The peak load of labor

on the Army construction jobs came in the summer of 1918, when 230,000

men were on the pay roll, drawing $7,626,800 a week in pay, and still

the jobs were short 150,000 unskilled men. In general, the union

scale of wages and hours of labor were adopted, but the open shop was

maintained. Labor troubles were infrequent and not serious. To prevent

strikes the Government formed the Cantonment Adjustment Commission,

consisting of three members, the Army representative being Col. J.

H. Alexander, of the Construction Division. Of all the strikes that

hampered our war activities, less than 1 per cent were strikes of the

building trades.

When the labor shortage of 1918 was most acute the Construction

Division turned to Porto Rico and the Bahamas for unskilled labor,

importing 2,600 Bahamans and 13,000 Porto Ricans. This imported labor

was exclusively used on southern building projects and was sent back

home when the armistice was signed.

The Construction Division had charge of the operation and maintenance

of the utilities of the various training camps, a work requiring

a force of 452 officers and 16,559 men. In all there were 54,808

buildings at these camps to be kept in repair. This was done at the

cost of $8.10 a year for each man housed. The Government supplied

electricity to the camps at an average cost of $0.02½ per kilowatt

hour. In a single year of operation, the 32 camps burned about

2,000,000 tons of coal for heating. This was at a cost of approximately

$10 per man.

The utilities of the camps were under the management of men who could

qualify to be city managers. They had the operation of water systems,

fire departments, and other common conveniences of cities. Water was

supplied at the rate of 55 gallons daily per man. The purity of the

water and the adequacy of the sanitation may be gauged from the fact

that in July and August, 1918, the annual death rate at the camps was

2.8 per thousand. In our Mexican War the annual death rate of American

troops from disease was 110 per thousand; in the Civil War it was 65

per thousand; in the Spanish War 26 per thousand; and among Japanese

troops in the Russo-Japanese War it was 25 per thousand. The death rate

in civil life for men of the draft age is 6.7 per thousand.

Each camp and cantonment was adequately protected by fire companies

equipped with the most modern apparatus, nearly all of it motorized.

Each camp fire company had 60 men. A low annual fire loss in civil

life is $2 per capita. In 1917, 20 American cities of about 31,000

population each showed an annual fire loss of $2.15 per capita. The

average for the United States is $2.42 per capita. At the training

camps, in spite of their inflammable construction, the average annual

loss from fire per capita was only 46 cents.

TABLE 1.--_Army supply bases and interior depots built by

Construction Division between April, 1917, and January, 1919._

+-----------------------------+--------------+-------------+-----------------

Project. | Square feet | Approximate | General

|of floor area.| cost. | contractor.

------------------------------+--------------+-------------+-----------------

Port Newark terminal |{ 1,662,400 |}$10,260,000 |Mason & Hanger-

|{ [38]357,000 |} | McArthur Bros.

| | |

Norfolk Army supply base |{ 2,015,000 |} 25,975,770 |Porter Bros.

|{ [39]884,500 |} |

| | |

Philadelphia Army supply base | 345,570 | 15,510,112 |Snare & Triest

| | | Co.

Charleston quartermaster |{ 1,152,000 |} |

terminal |{ [38]379,200 |} 12,675,000 |Mason & Hanger.

|{ [39]269,000 |} |

| | |

Boston Army supply base |{ 1,651,104 |} 28,040,000 |W. F. Kearns Co.

|{ 882,000 |} |

| | |

Brooklyn Army supply base |{ 3,936,000 |} 32,500,000 |Turner Con-

|{[39]1,143,000|} | struction Co.

| | |

New Orleans Army supply base |{ 1,792,000 |} 11,660,875 |George W. Fuller

|{ 280,000 |} | Co.

| | |

_Interior storage depots._ | | |

| | |

Baltimore Interior depot | 663,800 | 2,143,676 |Sanford & Brooks.

| | |

Boston temporary warehouses | 327,600 | 1,265,079 |W. F. Kearns Co.

| | |

Chicago interior depot | 580,400 | 809,300 |Central

| | | Manufacturing

| | | District.

| | |

Chicago permanent warehouse | 1,230,400 | 3,691,800 | Do.

| | |

Columbus interior storage |{ 2,657,600 |} 6,128,022 |Hunkin-Conkey Co.

depot |{ [38]246,400 |} |

| | |

Jeffersonville quartermaster | 320,000 | 1,282,563 |Caldwell &

interior depot | | | Marshall Co.

| | |

Hoboken quartermaster | 162,540 | 201,000 |Barney-Hooks-

expeditionary depot | | | Ahlers.

| | |

New Cumberland interior |{ 1,568,000 |} |

storage depot |{ [38]400,000 |} 4,700,270 |Bates-Rogers Con-

| | | struction Co.

| | |

Philadelphia interior storage | 917,800 | 3,470,940 |William Steele &

| | | Sons.

| | |

Philadelphia quartermaster |{ 208,900 |} 1,091,050 | Do.

expeditionary depot |{ [38]51,400 |} |

| | |

Pittsburgh interior storage | 178,600 | 630,900 |The Austin Co.

depot | | |

| | |

Schenectady interior storage |{ 2,080,800 |} 6,051,550 |Feeney & Sheehan.

depot |{ [38]537,600 |} |

| | |

St. Louis interior depot | 384,300 | 1,368,540 |Westly Con-

| | | struction Co.

------------------------------+--------------+-------------+-----------------

[38] Sheds.

[39] Pier sheds.

TABLE 2.--_Hospitals built by Construction Division between

June, 1917, and January, 1919._

------------------+------------------+--------+-----------+------------------

Name. |Location. |Capacity|Approximate|Contractor.

| | (in| cost.|

| | beds).| |

------------------+------------------+--------+-----------+------------------

Azalea T. B. |Azalea, N. C. | 1,500| $2,715,000|Gude & Co.

| | | |

Boston City, west |West Roxbury, | [40]| 47,000|Chas. Logue

department |Mass. | | |Building Co.

| | | |

Cape May General |Cape May, N. J. | 700| 46,150|Cauldwell-Wingate

Hospital No. 11 | | | |Co.

| | | |

Carlisle General |Carlisle, Pa. | 120| 180,000|Warren Moore & Co,

Hospital No. 31 | | | |

| | | |

Colonia General |Colonia, N. J. | 1,650| 2,367,884|Cauldwell-Wingate

Hospital No. 3 | | | |Co.

| | | |

Cooper-Monitah |Chicago, Ill. | 500-625| 158,368|Chas. Logue

No. 32 | | | |Building Co.

| | | |

Denver General |Denver, Colo. | 2,265| 3,100,133|C. S. Lambie Co.

Hospital No. 21 | | | |

| | | |

Eastfield General |Westchester, N. Y.| 1,550| 237,000|Frank H. Goble.

Hospital No 38 | | | |

| | | |

Elks and Robt. |Boston, Mass. | 700| 8,000|Chas. Logue

Bringham | | | |Building

| | | |

General Hospital | | | |Co.

No. 10 | | | |

| | | |

Ford Hospital, |Detroit, Mich. | 2,000| 107,750|Albert A.

General Hospital | | | |Albreacht.

No. 36 | | | |

| | | |

Fort Bayard |Fort Bayard, N. | 1,046| 650,000|V. E. Vare.

General Hospital |Mex. | | |

| | | |

Fort Des Moines |Des Moines, Iowa | 1,266| 244,148|Chas. Welts Sons.

Hospital | | | |

| | | |

Fort Douglas |Fort Douglas, Utah| 227| 690,000|Lynch-Cannon Eng.

Hospital | | | |Co.

| | | |

Fort McHenry |Baltimore, Md. | 2,800| 2,327,975|J. Henry Miller

General Hospital | | | |Co.

No. 2 | | | |

| | | |

Fort McPherson |Fort McPherson, | 2,000| 680,000|Gude-Krebs & Co.

Hospital |Ga. | | |

| | | |

Fort Oglethorpe |Fort Oglethorpe, | 1,300| 967,377|Park-Grimes Co.

General Hospital |Ga. | | |

No. 14 | | | |

| | | |

Fort Ontario |Fort Ontario, N. | 660| 557,000|J. J. Turner &

Hospital No. 5 |Y. | | |Sons.

| | | |

Fort Root General |Little Rock, Ark. | 500| 16,455|

Hospital No. 33 | | | |

| | | |

Fort Sheridan |Fort Sheridan, | 5,000| 2,515,786|Summer-Sollitt Co.

General Hospital |Ill. | | |

No. 28 | | | |

| | | |

Fort Snelling |Fort Snelling, | 1,780| $489,600|H. N. Leighton Co.

Hospital |Minn. | | |

| | | |

Fox Hills |Fox Hills, Staten | 1,808| 2,929,556|Thompson-Starrett

Debarkation | | | |Co.

Hospital No. 2 |Island | | |

| | | |

General Hospital |New Haven, Conn. | 700| 360,670|Sperry

No. 16 | | | |Engineering Co.

| | | |

Grand Central |New York City | 3,500| 215,000|Day labor.

Palace | | | |

Debarkation | | | |

Hospital No. 5 | | | |

| | | |

Greenhut Building |New York City | 3,130| 420,000|Do.

Debarkation | | | |

Hospital No. 3 | | | |

| | | |

Infirmary |St. Louis, Mo. | 1,000| 65,000|March Construction

| | | |Co.

| | | |

Lakewood General |Lakewood, N. J. | 1,020| 282,735|Geo. D. Morrow.

Hospital | | | |

No. 9 | | | |

| | | |

Letterman General |Presidio, Calif. | 1,250| 112,716|

Hospital | | | |

| | | |

Madison Barracks |Madison, Wis. | 273| 125,535|J. J. Turner &

Hospital | | | |Sons.

| | | |

Markelton General |Markelton, Pa. | 500| 93,580|Dawson

Hospital | | | |Construction

No. 17 | | | |Co.

| | | |

Nassau General |Long Beach, | 1,500| 25,000|Day labor.

Hospital No. 39 |Long Island, N. Y.| | |

| | | |

Norfolk State |Norfolk, Mass. | 700| 120,000|Chas. Logue

General | | | |Building

No. 34 | | | |Co.

| | | |

Otisville General |Otisville, N. Y. | 1,020| 1,685,766|R. H. Howes

Hospital | | | |Construction

No. 8 | | | |Co.

| | | |

Park View General |Pittsburgh, Pa. | 1,200| 208,940|Day labor.

Hospital | | | |

No. 24 | | | |

| | | |

Plattsburg |Plattsburg, N. Y. | 2,000| 231,948|D. Callahan.

General Hospital | | | |

| | | |

Richmond College |Richmond, Va. | 960| 51,750|John T. Wilson Co.

Debarkation | | | |

Hospital No. 51 | | | |

| | | |

Roland Park |Baltimore, Md. | 500| 329,617|J. Henry Miller

General Hospital | | | |Co.

No. 7 | | | |

| | | |

General Hospital |West Baden, Ind. | 1,500| 125,000|Chas. W. Gindle

No. 35 | | | |Co.

| | | |

United States |Biltmore, N. C. | 551| 37,050|Gude & Co.

Army General | | | |

Hospital No. 12 | | | |

| | | |

United States |Waynesville, N. C.| 400| 73,700|Gude-Krebs & Co.

Army General | | | |

Hospital No. 18 | | | |

| | | |

United States |Hot Springs, N. C.| 750| 103,200|Do.

Army General | | | |

Hospital No. 23 | | | |

| | | |

Walter Reed |Takoma Park, | 2,093| 1,675,151|Skinker & Garrett.

General Hospital |Washington, D. C. | | |

| | | |

Whipple Barracks |Prescott, Ariz. | 1,000| 1,629,683|James E. Morgan.

General | | | |

Hospital No. 20 | | | |

------------------+------------------+--------+-----------+------------------

[40] Part of General Hospital No. 10, Boston, Mass.

TABLE 3.--_Approximate quantities of materials purchased by

materials branch, Construction Division, June 15, 1917, to Dec.

15, 1918._

-----------+--------------+-----------+----------------------------------

Item. | Quantity. | Cost. | Remarks.

-----------+--------------+-----------+----------------------------------

Brick | 325,783,400| $2,631,799| Would build a road 18 feet wide

| | | approximately 380 miles long,

| | | or equal to the distance from

| | | Indianapolis to Pittsburgh;

| | | loaded in cars having a

| | | capacity of 15,000 brick,

| | | would require 21,720 cars to

| | | load.

| | |

Lumber | 2,647,605,426| 69,773,825| If considered 1-inch pieces 12

| [41] | | inches wide and placed end to

| | | end, would reach 500,000 miles,

| | | or 20 times the circumference

| | | of the earth. It would take

| | | 175,000 cars to haul this

| | | material, figuring 15,000 feet

| | | board measure material to each

| | | car. Figuring each car 35 feet

| | | long, would make a train

| | | 1,160 miles long, or the

| | | distance from Washington,

| | | D. C., to Kansas City. Total

| | | weight, 5,000,000 tons.

| | |

Wood stave | [41]2,900,080| 2,325,000| If placed in one single line,

pipe | | | would extend 550 miles. This

| | | is approximately the same

| | | miles of pipe as all of the

| | | water and gas lines in the

| | | city of New Orleans, La.,

| | | which supplies a population

| | | between 400,000 and 500,000

| | | people.

| | |

Structural | [42] 64,000| 6,311,092| This would require 1,000 cars

steel | | | having a capacity of 80,000

| | | pounds each. It would require

| | | structural-steel shops

| | | employing 100 men fabricating

| | | 2,000 tons per month three

| | | years to complete the

| | | fabrication. This is

| | | sufficient material to erect

| | | twenty 20-story buildings

| | | 75 feet square.

| | |

Roofing | [43]1,400,000| $3,650,000| Sufficient to roof 5 square

| | | miles, or would roof 100,000

| | | ordinary houses of 14 squares

| | | to each house.

| | |

Cable | [44]1,103,560| 257,233| Approximately 210 miles.

| | |

Copper |[44]33,283,000| 1,409,600| 6,303 miles.

wire | | |

| | |

Cement | [45]6,181,194| 13,723,153| 36,148 car loads, approximately,

| | | of 171 barrels to car load.

| | | Loaded on cars 35 feet total

| | | length, would make one train

| | | 239 miles long, or greater than

| | | the distance from Boston to

| | | New York.

-----------+--------------+-----------+----------------------------------

[41] Feet.

[42] Tons.

[43] Squares of 100 square feet.

[44] Feet.

[45] Barrels.

Procurement branch during period of 18 months, June 15, 1917,

to December 15, 1918, purchased and allocated materials to the

amount of $245,115,443.

BOOK VII.

THE SIGNAL CORPS.

CHAPTER I.

SIGNAL CORPS MATERIAL.

The spent runner who hurled himself through the gate of ancient Athens

and with his dying breath gasped out the news of the brilliant success

of the Athenian troops against the Persian at Marathon in the year 490

B. C. was the first famous soldier of a signal corps; but since then

the exploits of the bearers of military tidings have filled the pages

of legend and story. Just as other branches of military science have

been brought to a high perfection in modern times, so in equal degree

has the art of military signaling progressed in efficiency.

Where the ancient athlete once exhausted his strength in bearing

military messages long distances in the field, the modern Mercury uses

the wireless phone. In Civil War days the pony express rider brought

from some desperate stand the story of the lack of ammunition; to-day

the ammunition-supply organization is in constant touch with the

front by means of telegraph or the long-distance telephone. In the

Indian campaigns in our own West messages from beleaguered parties

were sometimes conveyed by signal smokes; the "lost battalion" in the

Argonne sent news of its plight by carrier pigeon.

Modern warfare has indeed retained the old, but it has also developed

the new, in transmitting military tidings. So important is this branch

of fighting that it is put in the hands of a specialized organization,

which in the American Army is known as the Signal Corps. The Signal

Corps not only had charge of the operation of the various communicating

devices in 1917 and 1918 in the field of operations (except latterly in

the air), but it also had charge of the manufacture of the equipment

for this work.

The production of signaling equipment was far greater than the

uninformed person would imagine. As an instance, there was one special

type of telephone wire, a form unknown to commercial use before the

war, which, before November 11, 1918, was being produced at the rate

of 20,000 miles a month, at a cost of $5,650,000 per month, requiring

the complete capacity of the day and night operation of all fine wire

machinery in the United States, except that which was working on Navy

contracts. Many other production activities of the Signal Corps were

carried through on a similar scale.

Until after the Civil War, the operation of large units of troops

was greatly handicapped by the limitations of military signaling as

then known. A force could not be effective in combat that could not

be readily reached in all quarters by runners or riders or by visual

signals. The development of the telegraph and telephone and the

invention of radio changed all this, so that in the great war armies

stretched out on fronts 100 miles or more in length with every part of

them in immediate touch with every other part through the exact and

complete systems of signaling on the field.

Military signals to-day include the telephone, the telegraph, radio

telegraphy and telephony, the buzzer, the buzzerphone, panels,

pyrotechnics, flags, smoke signals, pigeons, dogs, mounted orderlies,

and runners. Each of these means of signaling is an adjunct to the

others; when one fails, another is employed to get the message through.

Some have special uses for branches of the service with peculiar

requirements. The radiophone is especially suited for communicating

from airplanes. Artillery fire is directed by wire and wireless

communication. Trained pigeons are sometimes able to get messages

through when all other means of communication have failed.

The Army did not have a great quantity of signaling equipment when it

went to war with Germany, but what it did have was good. The American

punitive expedition in Mexico, where long lines of communication over

rugged country were required, had given opportunity for testing modern

signal apparatus in the field. Many of the signaling devices used by

the American Expeditionary Forces were, at least in type, in common

use by the civilian population; yet the procurement of this equipment

offered heavy difficulties. This was because the Army was much more

exacting than was commercial demand as to the quality of material used.

For instance, a telephone instrument for use in the field hardly can

be compared with the telephone in a business man's private office. The

field set demands stronger connections, better insulation against the

dampness of outdoor work, and more rugged construction to withstand

rough usage by an army on the march.

One of the larger tasks of the Signal Corps in France was that of

providing facilities for communication for the service of supply. The

first Signal Corps officers sent to France soon realized that the

forthcoming American Army could not depend upon the French telegraph

and telephone systems in the various zones of operation, because those

systems were already overburdened by the uses of the French government.

Consequently, it became necessary to set up our own telegraph and

telephone systems, extending them from the ports of debarkation through

the various bases and zones up to the battle regions. The magnitude of

the system which finally was constructed is shown in the fact that on

November 11, the date of the armistice, there were in France 96,000

miles of American telegraph and long-distance telephone circuits. This

wire was all used by the service of supply and by the various Army

bases behind the front.

Yet in the field of fighting the requirements for wire were even

greater. At one time during the height of the operations it was evident

that the time was not far distant when the Signal Corps would need

68,000 miles a month of what was known as outpost wire, for use simply

in connecting up the telephone and telegraph systems carried along by

the troops in their advances.

Outpost wire was entirely a development of the war against Germany.

The original telephone system used at the front had been the single

telephone wire grounded to complete the circuit. But all the armies in

France perfected their listening instruments to such a degree that they

could hear conversations conducted on the grounded telephone circuits,

the sounds being detected in the earth itself. Consequently, it became

necessary to carry forward with troops two-wire telephone circuits,

thus doing away with ground connections. Even then care had to be

taken that the insulation of this double wire was perfected, lest the

impulses enter the ground through gaps in the insulation. Wireless for

outpost communication was equally impracticable, since the enemy could

easily listen in and hear radio phone messages.

Outpost wire insured secret communication at the front. Outpost wire

was a twist of two wires, each single wire being made up of seven

fine wires, four of them of bronze, and three of them of hard carbon

steel. These were stranded together, coated, first with rubber and

then with cotton yarn, and finally paraffined. The wire was produced

in six colors--red, yellow, green, brown, black, and gray--for easy

identification in the field, each unit employing its own color.

The wastage of outpost wire was enormous. In an advancing movement it

was folly to undertake to pick up the wire. The abandoned miles of

it had to be left in the field to be salvaged later by the clean-up

parties.

The proposition of producing 68,000 miles of outpost wire every month

staggered the wire manufacturers of the country. There were not enough

braiding machines to complete such an order, and new ones had to be

built before such a quantity of outpost wire could be attained.

In addition to the various means of communication, the Signal Corps was

also called upon to supply in large quantities such other articles as

wire reel carts, flag staffs, field glasses, photographic equipment,

chests, tools, meteorological apparatus, and wrist watches.

In the production of its supplies, the Signal Corps was confronted with

the same obstacles of inadequate industrial capacity, dearth of raw

materials, and congestion of railroad transportation, that embarrassed

almost every line of military production. To meet these difficulties

the Signal Corps organized an elaborate inspection force which not

only checked the work at the various factories for quality and rate

of production, but was also constantly on hand to help the harassed

manufacturer out of his difficulties as they arose. The Signal Corps

never slept. At night and on holidays there was at least one officer on

the job in Washington to receive telegrams or long-distance telephone

messages and to be ready to act quickly in any emergency.

From the production standpoint, signal equipment was divided into

several general classifications: (1) telephone and telegraph

apparatus; (2) radio apparatus; (3) line-construction materials; (4)

batteries; (5) wire and cables; (6) field glasses; (7) wire carts; (8)

photographic supplies, pigeons, and pigeon supplies; and (9) chests,

kits, and tools, mechanical signals, electric signals, meteorological

apparatus, and wrist watches.

TELEPHONES AND TELEGRAPHS.

In the early days of the conflict the construction of signal materials

in the United States was devoted to such basic supplies as wire, cable,

tools, and the standard types of telephone equipment, such as telephone

sets and switchboards. The first great task in France was to install

the lines of communication for the service of supply, a system that

required American equipment because it was planned to operate it with

American-trained telegraph and telephone operators.

Now, there were numerous styles of commercial telephone equipment

manufactured in the United States. The plan, therefore, was adopted

of allowing the various manufacturing concerns to bid on a tentative

production schedule, giving an exclusive contract to the lowest bidder

in each type of apparatus. This exceptional policy was adopted in order

to avoid multiplicity of types of equipment to be used abroad. If many

makes were adopted in each type they would necessitate the procurement

of many types of spare parts and replacement materials.

The concerns which produced the telephone equipment for the American

Expeditionary Forces were the Western Electric Co., of Kansas City; the

Kellogg Switchboard & Supply Co., of Chicago; the Stromberg-Carlson

Telephone Manufacturing Co., of Rochester; the Frank Black Co., of

Chicago; and the Reliable Electric Co., of Chicago.

At the signing of the armistice there were 282 American telephone

exchanges in France, with 14,956 telephone lines reaching 8,959

stations. The 282 exchanges ranged from the small four-line monocord

unit, such as may be seen in any business office, to the standard

American multiple board of the city telephone exchange. Of these latter

there were over 30 in use by the American Expeditionary Forces when the

armistice was signed.

[Illustration: MULTIPLEX PRINTING TELEGRAPH. SCHOOL OF RADIO AND

MULTIPLEX TELEGRAPHY.]

[Illustration: SIGNAL CORPS SCHOOL FOR TELEPHONE ELECTRICIANS,

UNIVERSITY OF MICHIGAN, INSTRUMENT AND SWITCHBOARD REPAIR CLASS.]

[Illustration: FIELD WORK WITH UNDAMPED WAVE TRANSMITTER AND TRENCH

ANTENNA.]

[Illustration: SIGNAL CORPS EQUIPMENT INSTALLED IN A DUGOUT.

Left to right--S. C. field telephone, type "EE-4;" field service

buzzer; signal lamp (projector), type "EE-6"; S. C. radio set, SCR-76

and S. C. radio set, SCR-54A.]

The special telephones adopted for use in the field were different

from any in commercial use in America. The Signal Corps had developed

certain special instruments combining both telephone and telegraphic

principles. The field telephone, model 1917, for instance, was a

telephone which included a telegraph buzzer on its telephone circuit.

This instrument was used when great secrecy in communication was

required. The messages were sent in telegraphic code, the buzzers

being heard by the receiver. Another instrument was known simply

as the buzzer. This was an instrument which utilized the telephone

receiver for telegraphic messages. It was a supreme development for

use over defective lines. An instrument closely related to the buzzer,

but which gave even greater secrecy, was known as the buzzerphone.

The buzzerphone was put into production just before the close of

hostilities.

The mobile switchboard in most general use by our troops at the front

was developed originally by the French and was known as the monotype.

It was designed in units and could be extended to accommodate up to

12 trunk lines leading away from the board. This apparatus was the

"central" of the front-line dugouts. It could be put into operation in

a few minutes and was easily carried by a soldier.

The switchboard of the dugouts was the only telephone equipment not of

American design used by the American Expeditionary Forces. It was put

into production in the autumn of 1917 in three American plants, under

the general policy of the Signal Corps to contract with more than one

factory for the production of any important device.

Another type of field switchboard when packed for transit resembled a

salesman's trunk. It was used in the camps and provided for 40 lines.

This board was being constantly redesigned as field needs developed. A

new type of camp switchboard was coming into heavy production at the

end of hostilities.

Still a third type of portable switchboard was built in units

resembling the units of a sectional bookcase and was set up in the same

way.

The telegraph apparatus of the lines of communication in the S. O. S.

was designed along purely commercial lines. It included the latest type

of printing telegraph equipment, the apparatus first adopted being the

multiplex printing telegraph as used by the Western Union Telegraph Co.

Later, the Morkrum printing telegraph was also adopted.

At the close of hostilities 133 complete telegraph stations with full

equipment were in operation in the service of supply. The peak load

of this service, just prior to the armistice, was 47,555 telegrams,

averaging 60 words each, sent from these stations in a single day. The

daily average in the final weeks of the fighting was 43,845 telegrams.

RADIO.

At the outbreak of the war, the field radio equipment in active use by

the Army was limited to two sets, both of comparatively high power.

On the other hand the allied forces had developed a complicated and

extensive use of radio sets of small power, many of them operated from

airplanes, and the Signal Corps found itself confronted with the task

of developing an entire new line of complicated electrical apparatus,

and putting it into large quantity production in the shortest possible

time. The progress made is indicated by the fact that at the signing of

the armistice the number of types of complete sets on which development

work had been carried out was 75. Of these approximately 25 were in

quantity production. When it is remembered that each of these sets

consisted of hundreds of parts, many of which required careful study

and experimentation as well as design, the magnitude of the problem is

appreciated.

The initial step in the reorganization of this branch of the Signal

Corps' work consisted in the establishment of a radio section

in Washington and a corresponding section in France. The former

was charged with the design of apparatus and the preparation of

manufacturing drawings and specifications, while the latter served as

the first hand observer of actual service requirements and approved all

equipment before it was used in the field. An important auxiliary of

the development organization in Washington was the radio laboratories

established at Camp Alfred Vail, where all necessary technical

facilities, such as model shops, drafting rooms, research laboratories,

a completely equipped flying field, etc., were maintained. With this

engineering organization and the production organization which handled

all Signal Corps equipment, the work here detailed was carried out.

Shortly after the declaration of war, the French government sent to

this country a distinguished commission which included the foremost

radio experts, who were thoroughly familiar with the latest military

developments. Technical information and samples of radio apparatus

were also obtained from British sources. With this beginning,

the engineering work naturally divided itself into two general

problems--first, to duplicate the approved foreign designs, and then

to create designs for new types of apparatus which would be superior

to any in service. Work on these two groups of problems was prosecuted

simultaneously with the result that there were soon in production

American equivalents of a number of French and British sets, together

with improved original types of American radio apparatus.

[Illustration: RADIO RECEIVING SET, SCR-54, USING CRYSTAL DETECTOR.]

[Illustration: REAR PANEL VIEW, RADIO TELEPHONE GROUND SET. TYPE

SCR-67.]

[Illustration: RADIO TELEGRAPH TRANSMITTING SET IN CASE.]

[Illustration: RADIO TELEGRAPH TRANSMITTING SET WITH CASE REMOVED.]

Probably the most noteworthy technical development during the war,

in so far as radio communication is concerned, was the extensive use

made of vacuum tubes. These "bottles," which make practical use of the

electrons of the new physics and which are sometimes called audions

or pliotrons, are literally marvels in the realms of engineering,

and their applications are as yet hardly realized. One form was used

for the reception of signals prior to the war; but the military

developments, particularly in France, had so progressed that when

this country entered the war they were used both for receiving and

transmitting signals, and most of the more important sets depended

on them. To meet this demand the services of the three foremost

vacuum-tube engineering organizations of the country were enlisted, and

under the direction of the Signal Corps radio engineers the progress

toward satisfactory design and construction of the required types was

rapid. Within less than six months standardized tubes were turned out

by the quantity production method at rates sufficient to insure the

requisite supply. Work was continued, however, on the development of

still better types of tubes. The improvements that have been made

from time to time have been incorporated in the tubes being produced

on a large scale, so that tubes of recent manufacture are a great

improvement over those made a year ago.

As indicative of the extent and variety of the radio development work

which was carried on, there is given below a partial list of the types

of sets which were completely developed and placed in production during

the war period:

LAND RADIO EQUIPMENT.

Spark sets, sending and receiving (three types).

Continuous-wave Army radio telegraph sets (three types).

Radio telephone set (one type).

Tank radio telegraph set (one type).

T. P. S. (earth telegraphy) (four types).

Wavemeters.

Battery-charging sets.

Radio operating and repair trucks.

Miscellaneous special equipment.

AIRPLANE RADIO EQUIPMENT.

Interphone sets (for use of two to five persons).

Radio telephone sets (three types).

Radio telegraph sets (three types).

Direction-finding radio-receiving set (one type).

The magnitude of the production of special items involved may be

gathered from such figures of expenditures as the following:

For vacuum tubes $1,650,600

For storage batteries 5,315,350

For dry batteries 602,470

For battery charging sets 1,524,400

These are, of course, only some of the items. The total production

authorized was valued at approximately $45,000,000.

The remarkable development and improvement of military radio equipment

which has taken place under the direction of the Signal Corps during

the last 18 months will undoubtedly materially change the system of

Army communications and even the tactical use of military equipment and

personnel. A typical example of this development is the airplane radio

telephone, described elsewhere, the use of which has made possible the

"voice-commanded air squadron." The military value of an air squadron

has been enormously increased by virtue of this device, which enables

the squadron commander to direct the movements of the individual

airplanes in any manner which circumstances may require.

Certain other radio devices recently perfected, the nature of which can

not be revealed, will undoubtedly affect the tactical use of troops

to such an extent as to make certain kinds of radio equipment as

indispensable to the operations of military units as the rifle or the

machine gun.

LINE EQUIPMENT.

The first requisition for line equipment for France called for the

construction of 500 miles of telephone and telegraph main pole lines,

carrying 10 copper telephone and telegraph wires. It was found that

ship space could not be spared for poles in such quantity. Consequently

a forestry unit was sent to France to get these poles from the French

woodlands. All of the other materials for the 500 miles of line,

together with materials for approximately 600 miles of extensions, were

procured in the United States and shipped to France within six months

after the requisition was received. This material was secured in such

short time only by the cooperation of the large commercial companies

in the United States, who literally stripped their warehouses bare of

their supplies.

In the late summer of 1918 the American Government began anticipating

the advance of the allied forces into Germany, and the Signal Corps

put into production a reserve equipment for long distance line

approximating 500 miles. Soon there was received from France a

cablegram asking for the shipment of this material, and it was all

floated before the armistice. However, as it turned out, this equipment

was never required, since the terms of the armistice gave the American

forces the German telephone and telegraph lines in the occupied

territory.

This line equipment was all of a type standard in the United States.

For the fighting zone special line equipment was required. Before the

war with Germany American signal troops had set up their emergency

telephone and telegraph lines on the standard "lance poles." These

poles served admirably in open warfare, but proved to be impracticable

for the static conditions of fighting in France. After a considerable

supply of lance poles had been shipped abroad their production was

curtailed. Thereafter the trench telephone and telegraph lines were

supported on short stakes with special cross arms, in appearance the

conventional telegraph poles in miniature. The enormous mileage of

trench lines called for a great quantity of insulators and cross arms.

The wastage of these fittings, due to their being exposed to artillery

fire, became increasingly greater in the closing months of the war.

In wire itself, the American production was enormous. This production

included the commercial type of copper line wire and the drop wire for

connecting up individual telephones to the pole lines. Much commercial

cable for connecting congested centers with branch switchboards

was also required. Yet all of this wire used in the system within

the Service of Supply was but a small quantity compared with the

requirements in the fighting zone.

The production of double-conductor wire, or the so-called outpost wire

of No Man's Land, which had relegated to the scrap heap the standard

field wire of open warfare, necessitated an extraordinary effort. The

wire had to be light enough for easy transportation and laying, strong

enough to withstand the abrasions from traffic crossing it as it lay

on the ground, and exceedingly well insulated. The first estimate was

that an American Army in the field might use 1,000 miles per month of

outpost wire. When the first American force actually went into action,

in the spring of 1918, a reserve supply of 20,000 miles of outpost wire

was in the American warehouses in France, with a vast quantity of cable

in reserve. Cable, at first used in large quantities at the front,

was invariably buried several feet underground and abandoned at every

change of headquarters.

As the fighting grew more intense and covered a wider and wider area,

the wastage of outpost wire became enormous. The demand of our forces

for cable dropped to a negligible quantity, but wire requirements rose.

Outpost wire became the main dependence of ourselves and the allies for

all communication in the active sectors. A higher quality of wire was

specified. So great was the destruction of wire that by July, 1918, the

original estimate of 1,000 miles per month to be supplied by American

factories had jumped to 20,000 miles.

As a substitute for outpost wire to fill the immediate needs the

familiar twisted drop wire, with which the ordinary telephone is

connected with the main circuit, was adopted. Our field officers liked

drop wire, its only objectionable feature being its relative bulk. All

available drop wire in the United States was shipped across, and its

manufacture was pushed until the new type of outpost wire could be

produced.

The Signal Corps supplied the mounting needs of the American

Expeditionary Forces through August and September, 1918, with the

available drop wire plus the growing production of the new outpost

wire. In early August all the wire makers in America were summoned to

a conference, in which the Signal Corps made known the necessity of

pushing production. The result was an expansion which reached a total

production of 40,000 miles of outpost wire in November.

Just before the armistice was signed, the American Expeditionary

Forces indicated that they would require 50,000 miles of outpost wire

every month, beginning in January, 1919. This requirement had already

been fully anticipated, since the American manufacturers had set for

themselves a maximum production of 68,000 miles per month by August,

1919.

To secure this production every wire mill in the United States worked

24 hours per day. When the production was at its height, inquiries

came from the allied governments, indicating that they would call on

American wire makers for a quantity of wire equal to what the latter

were already producing for the American Expeditionary Forces. In other

words, this proposition called for the doubling of a production which

had already attained great size. Yet, had the fighting continued, there

is every reason to believe that the industry would have risen to the

demand.

The production of outpost wire was an intricate operation. To fill the

demand for 50,000 miles of outpost wire a month called for 300,000

miles of steel strand and 400,000 miles of bronze strand every month.

The steel strand had to be given repeated heat treatments before it had

acquired the necessary tensile strength.

ELECTRIC BATTERIES.

The American Expeditionary Forces consumed great quantities of electric

batteries, the familiar dry battery of commerce being most used. Toward

the end of the fighting arrangements were being made to establish in

France a plant at which dry batteries would be assembled by French

labor, utilizing parts made in America. The necessary apparatus and

materials for the first operation had reached France prior to the

armistice, but the plant was not in production at that time.

Storage-battery requirements of the American Expeditionary Forces were

heavy and exacting. The storage battery was the only practicable source

of electrical energy for the operation of small portable radio outfits.

Field conditions required a storage battery that would not spill its

contents, with a jar not easily broken, the whole equipment being as

light as possible. A rubber composition jar was finally adopted.

The chief reliance of the American Expeditionary Forces was in storage

batteries of European manufacture, which were to be used until American

production got underway. When by the summer of 1918 America had

perfected her own designs of radio equipment, the Signal Corps took up

the matter of storage batteries for radio and decided upon types. This

was in July, 1918. A conference of battery manufacturers was called and

the orders were allocated among practically all the storage-battery

plants in the United States that were in a position to undertake

quantity production. The end of hostilities stopped this production on

the eve of heavy deliveries.

FIELD GLASSES.

When the war began, the Signal Corps had the duty of providing field

glasses for all branches of the Army, issuing them to noncommissioned

officers and selling them at cost to commissioned officers engaged in

combat. The first estimates showed that these glasses would be needed

by the tens of thousands, whereas the manufacturing facilities in the

United States had turned them out merely by the hundreds.

The optical-glass industry had never been developed in America, our

field glasses being supplied with lenses of European glass, and

principally German glass. In 1914 the imports of optical glass were

$641,000 in value. The following year they were almost nothing. The

advance of the German army toward Paris encompassed the glass plants of

Belgium and many of those of France. England needed the entire output

of her own glass factories.

In the autumn of 1914 the American optical-instrument makers began

to develop an optical-glass industry, largely stimulated by the

possibility of obtaining heavy orders at high prices from the British,

French, and Russian governments. The most important work was done by

the Bausch & Lomb Optical Co., of Rochester, N. Y.; the Spencer Lens

Co., of Buffalo, and the Pittsburgh Plate Glass Co., of Pittsburgh.

They were aided by the United States Bureau of Standards and by the

geophysical laboratory of the Carnegie Institution. The Bureau of

Standards established a laboratory at Pittsburgh where experiments were

conducted with 30-pound pots of glass.

Optical glass differs greatly from ordinary glass. It must be clear,

without striae, and there must be no strains in it, resulting from the

final stirring and cooling. It must give a high transmission of light.

About the time of America's declaration of war the American experiments

had produced glass suitable for optical instruments. This glass,

however, was being turned out in quantities quite insufficient to meet

the demand during the first few months.

In addition to the difficulties surrounding the glass supply, there

was only a limited number of establishments capable of manufacturing

field glasses after the glass was procured. These concerns were located

principally in Rochester, N. Y., where they had been manufacturing a

wide variety of optical instruments, including opera glasses, camera

lenses, scientific and educational apparatus, battery commanders'

telescopes, marine glasses, microscopes, and gun sights. In order to

meet the war requirements of America for field glasses, these factories

had to install large quantities of new equipment and to run day and

night. The equipment consisted of lens-grinding apparatus, lathes,

dies, and automatic screw machinery.

In addition to the Rochester factories there was a concern in Denver,

Colo., the Weiss Electrical Instruments Co., which in a smaller way had

been manufacturing surveyors' levels and other engineering apparatus.

The Talbot Reel & Manufacturing Co., of Kansas City, had been making

fishing reels in a small plant about 30 feet square. This factory was

purchased in 1917 by Mr. L. Harris, who, after finishing a contract

for gun sights for the Ordnance Department, built a factory especially

for the production of Army field glasses and reached the quantity

manufacture of these instruments before the armistice came. The chief

center of supply, however, continued to be Rochester, where the plants

of Bausch & Lomb, the Gundlach-Manhattan Optical Co., and the Crown

Optical Co. are located. These factories expanded many times, and the

output of field glasses went beyond what the executives at the outset

of the enterprise imagined could be possible.

The Bausch & Lomb Co. was started in Rochester about 50 years ago by

J. J. Bausch, who was born in Germany. The plant developed gradually,

making a full line of spectacle lenses and optical instruments. The

Carl Zeiss Works, of Jena, Germany, had a financial interest in the

plant, and Bausch & Lomb had a financial interest in the Zeiss plant.

This connection, however, was dissolved in 1915, when Bausch & Lomb

took on contracts for the manufacture of field glasses for the British,

French, and Russian governments.

Before 1914 this concern had never manufactured more than 1,800

pairs of field glasses in a year. The output was speeded up until in

November, 1918, a total of 3,500 pairs was being produced each week,

while the development was aiming toward an output of 5,500 pairs

of glasses per week beginning in January, 1919. At the date of the

armistice the Bausch & Lomb factory had a floor space of 32 acres and

employed 6,000 men and women.

The Gundlach-Manhattan Co., which had made camera lenses chiefly, was

eventually able to produce 600 pairs of field glasses a week. The Crown

Optical Co. was not so rapid in its expansion; and in late 1917 the

Navy Department commandeered it and thereafter operated it in charge

of Lieut. Commander L. C. Scheibla. Under naval management the output

of this factory increased so that the Signal Corps was able to obtain

from it about 1,200 pairs of high quality field glasses each week, the

plant continuing also to supply the needs of the Navy.

Out of a situation that seemed impossible at the outset the Signal

Corps built up an industry within a comparatively few months which

provided all the field glasses that were necessary in the operations of

the American Expeditionary Forces. Often to keep the optical factories

equipped with sufficient workmen the Signal Corps obtained the furlough

of drafted men with experience in this line so that they might go to

work making field glasses.

All Army organizations except Artillery were supplied with a six-power

glass having an angular field that took in a view 150 yards wide at a

distance of 1,000 yards. The glasses were of the prismatic type with

individual focus for each eye. Each glass was provided with a leather

carrying case and shoulder strap. On the top of the case a compass was

mounted.

The Artillery organizations were supplied with eight-power field

glasses, all of which were purchased in France.

The total requirements of the American Expeditionary Forces for field

glasses of the six-power type during the period of hostilities were

approximately 100,000 pairs. The total shipments from America were

approximately 106,000 pairs.

MISCELLANEOUS SUPPLIES.

The Signal Corps took up with three concerns--the Hampden Watch

Co., the Illinois Watch Co., and the Elgin Watch Co.--the matter of

providing wrist watches for the Army. A 7-jewel movement was adopted

as standard for issue to troops and a 15-jewel movement for sale to

officers. A waterproof case was adopted, bearing the serial number

of the movement on the outside, the case being so constructed as to

require a special tool to gain access to the movement.

The production of wire carts for the Signal Corps did not exceed 25

per year prior to 1917. The demand for these carts, which were hard

to build, increased at such a rate that during the autumn of 1918

the matter of procuring them was one of the most serious production

problems faced by the Signal Corps.

The Holmes Automobile Co., of Canton, Ohio, abandoned the production of

automobiles and in September, 1918, turned over its entire plant to the

production of wire carts. Other manufacturers were the George B. Marx

Co., of Brooklyn; the J. G. Brill Co., of Philadelphia; the American

Instrument & Tool Co., of New York; and the Wesel Manufacturing Co.,

of Brooklyn. In all, 721 wire carts were manufactured and 327 shipped

overseas.

A total of 2,402 tool chests for the Signal Corps was produced during

the war period. The plan eventually adopted was to split up the orders

for tools among the various manufacturers and to give the manufacture

of the empty chests to prison labor at Fort Leavenworth, where the

tools were to be shipped and packed in the chests. This plan, however,

required the construction of a special building at Fort Leavenworth,

and in the meantime the assembling of tool chests was conducted at

the Signal Corps supply depot at Philadelphia and at the port of

embarkation. The armistice stopped the construction of the assembling

factory at Fort Leavenworth.

The Signal Corps produced a suitable number of gas alarm signals known

as strombos horns. This equipment consisted of an alarm horn operated

by air pressure acting against a diaphragm and thereby producing a

loud and distinct chatter. Compressed air was supplied in small steel

cylinders connected to each horn by hose. The air tanks were charged

behind the lines from a portable air compressor which could pump

into several cylinders at once. The horns were manufactured by the

Klaxon Co., of Newark, N. J., the cylinders by the Harrisburg Pipe

& Pipe Bending Co., Harrisburg, Pa., and the air compressors by the

Ingersoll-Rand Co., of New York.

Flag kits were not used to any great extent by the American

Expeditionary Forces, although large quantities of these were produced

in this country.

The Signal Corps originally had jurisdiction over all war photography,

either of land or air, except for a small amount conducted by the

engineers in connection with their own operations; but later aerial

photography became a branch of the Military Aeronautics and Aircraft

Bureaus. After that the Signal Corps was charged with taking all

photographs of historical nature or other interest.

In connection with this work two types of cameras were necessary--still

cameras and motion-picture cameras. Later in the war there was being

developed a new motion-picture camera which was expected to be the

ideal type for use in the field.

It was with great difficulty that a sufficient number of photographic

lenses was obtained for the use of military cameras, since the large

lens factories of America were tied up with other war orders. A

campaign was conducted by the leading newspapers and magazines of

the country which resulted in the Government's securing from amateur

photographers a large number of high-grade lenses, mostly of foreign

manufacture.

The Signal Corps scattered its camera operators broadcast over the

country, photographing cantonments and other war activities to the most

minute details. These photographs and films were then made public in

newspapers, periodicals, and motion-picture theaters throughout the

United States, with the result that the people saw with their own eyes

how their soldiers were preparing themselves for the defense of the

Nation.

An interesting development of war photography was the production of

motion pictures showing the training of soldiers. Many pictures were

taken to show graphically on the screen the different chapters of the

Army drill regulations. These pictures will have a future use to the

Government in training soldiers efficiently in the shortest possible

time.

The Signal Corps photographers also developed a new kind of history of

the war, a history written entirely in pictures for future generations

to scan.

PIGEONS.

Although nearly every European army for 40 years has trained the

carrier pigeon to be a field messenger, the American Army never adopted

the bird until 1917. In a single year the Signal Corps established

hundreds of pigeon lofts in this country and overseas and bought and

trained more than 15,000 pigeons for service in France. In actual

use on the field the pigeons delivered more than 95 per cent of the

messages intrusted to them, flying safely through the heaviest shell

and gas barrages.

The standard pigeon loft adopted by the Signal Corps had a unique trap

arrangement which permitted the entry but not the exit of returning

pigeons, and an electrical alarm which automatically notified the

attendants of an arrival. Such lofts, however, were of the stationary

type and not practicable for use in France. For the American

Expeditionary Forces the Signal Corps purchased mobile lofts. It was

found that pigeons would come home as well to mobile lofts, which

were constantly changing position, as they would to stationary lofts.

The first mobile lofts built in the United States were top-heavy, but

this defect was overcome by increasing their width and adding heavier

wheels. They were all built by the Trailmobile Co., of Cincinnati, Ohio.

Civilian pigeon fanciers were appealed to and urged to breed young

birds to stock the Government lofts. The Signal Corps distributed small

aluminum bands to be put on the legs of squeakers, as the newly-hatched

pigeons are called, which were intended for sale to the Government. The

uniform price of $2 per bird was paid, and over 10,000 youngsters were

bought for stocking purposes.

Tons of pigeon feed were purchased and shipped to Europe. Some of

this grain, such as millet, Argentine corn, pop corn, hemp seed, and

Canada peas, was hard to obtain; but nevertheless the supply was well

maintained. It was shipped in hermetically sealed containers to prevent

it from becoming mildewed.

The American Army copied the French and English models of willow and

reed baskets to hold the birds. One type of basket was carried on the

back of the soldier and contained small corselets in which the pigeons

were securely fastened. Corselets were suspended from the sides of

the basket by elastic contrivances permitting considerable joggling

without injury to the birds. All of these baskets were made by the A.

L. Randell Co., of Chicago.

Message books were manufactured in accordance with a French model.

After the message had been written, it was placed in an aluminum

capsule which was fitted in a holder of aluminum. This holder was

attached to the pigeon's leg by means of aluminum bands. These

bands were found to break easily, and pure copper bands were later

substituted. The message holders were manufactured by Thomas A. Gey, of

Norristown, Pa.

Thousands of items of supply were included in the supply schedules of

the Signal Corps. In the following lists some of the more important

items are shown, the production indicated in each case being that

between April 6, 1917, and November 11, 1918.

_Telephone equipment._

----------------------------------------------+-----------+----------

| Produced. | Floated

| | overseas.

----------------------------------------------+-----------+----------

Batteries, dry | 970,171 | 396,427

Bells: | |

Extension | 865 | 470

Vibrating | 13,756 | 12,934

Blocks, connecting | 6,500 | 6,500

Cabinets, wire chief, testing | 225 | 225

Coils: | |

Induction | 255 | 50

Repeating | 801 | 801

Condensers | 10,205 | 6,788

Cords: | |

For telephones | 5,000 | 5,000

For switchboards | 23,539 | 11,890

Fuses, for monocord switchboard | 670,000 | 341,000

Receiver diaphragms | 2,700 | 2,050

Receivers, telephone | 12,950 | 9,354

Repeaters, telephone | 362 | 362

Staples, insulated | 912,300 | 809,800

Switchboards: | |

Camp, 40-line | 111 | 68

Commercial types | 304 | 304

Switchboard, telephone, monotype | 14,462 | 13,264

Telephones: | |

Artillery type (W. E. 1375) | 66,544 | 46,123

Camp | 38,456 | 32,668

Commercial types | 2,669 | 1,514

Telephone offices, truck | 1 | 1

----------------------------------------------+-----------+----------

_Telegraph equipment._

----------------------------------------------+-----------+----------

Buzzers, service | 3,983 | 3,478

Connectors, stud | 8,027 | 8,027

Disks, cipher | 6,157 | 6,157

Keys | 1,830 | 1,830

Relays | 1,672 | 1,147

Sounders | 1,998 | 1,998

Switchboard, telegraph | 1,321 | 550

Telegraph office, truck | 1 | 1

Typewriters | 920 | 880

Vibroplex, transmitter | 470 | 420

----------------------------------------------+-----------+----------

_Radio equipment._

----------------------------------------------+-----------+

| Total

| produced.

----------------------------------------------+-----------+

Airplane interphone set | 4,263

Airplane radio telegraph receiving set | 7,029

Airplane radio telegraph transmitting set | 3,971

Airplane radio telephone set | 3,186

Amplifiers | 1,250

Battery charging sets | 455

Ground radio telegraph receiving set | 8,052

Ground radio telegraph transmitting set | 2,637

Ground radio telephone set | 527

Storage batteries | 227,139

T. P. S. receiving sets | 2,510

T. P. S. transmitting sets | 1,995

T. P. S. two-way set | 2,010

Vacuum tubes | 446,818

Wavemeters | 8,042

----------------------------------------------+-----------+

_Photographic equipment._

----------------------------------------------+-----------+----------

|Production.| Shipped

| | overseas.

----------------------------------------------+-----------+----------

Chemicals pounds | 50,723 | 41,881

Cameras: | |

4 by 5 speed graphic | 541 | 283

4 by 5 RB graflex | 310 | 237

6½ by 8½ cycle graphic | 280 | 249

Miscellaneous still | 40 | 40

Motion-picture | 470 | 145

Paper, photo, all sizes gross | 21,364 | 16,364

Do. rolls | 5,186 | 3,686

Lenses | 2,797 | 696

Tripods, M.P. | 558 | 147

Plates dozen | 68,873 | 48,873

Holders, plate | 28,298 | 18,298

Film, M.P. feet | 7,500,000 | 4,000,000

Film, still rolls | 48,814 | 28,814

----------------------------------------------+-----------+----------

_Line construction material._

----------------------------------------------+-----------+----------

Anchors, guy | 17,360 | 17,120

Belts, lineman's | 6,733 | 5,332

Bolts, lag screws, etc. | 1,139,648 | 1,137,928

Braces, cross-arm | 123,162 | 98,440

Brackets: | |

Oak | 287,000 | 287,000

Pole, galvanized | 13,929 | 13,929

Transposition | 26,905 | 26,280

Cable: | |

Telephone, circular loom feet | 662,978 | 396,250

Telephone, lead covered miles | 80,202 | 1,696

Cable compound pounds | 6,160 | 3,760

Carts, reel | 737 | 227

Clamps, guy | 39,250 | 26,000

Climbers, with straps pairs | 11,828 | 10,619

Cross arms | 38,500 | 38,500

Gloves, lineman's pairs | 849 | 748

Hangers, cable | 51,000 | 51,000

Insulators, for lance poles | 291,124 | 26,700

Insulators, glass | 1,158,836 | 1,158,836

Insulators, porcelain | 2,411,670 | 1,798,220

Knives, electrician's | 264,754 | 141,920

Knobs, wooden | 953,540 | 400,000

Marlin pounds | 4,527 | 1,427

Muslin, cable-splicers yards | 1,251 | 1,251

Nails, for insulators pounds | 36,000 | 36,000

Pikes, wire | 1,992 | 1,728

Pins, cross-arm | 807,653 | 477,400

Pliers, lineman's | 193,533 | 84,642

Poles, lance | 209,000 | 23,685

Reels, breast | 6,109 | 6,108

Sleeves, copper, splicing | 146,934 | 51,934

Solder pounds | 21,808 | 14,606

Tape: | |

Friction do.| 106,042 | 90,318

Rubber do.| 20,523 | 16,713

Terminals, cable | 1,290 | 1,290

Wire: | |

Stranded, messenger feet | 2,470,577 | 2,470,357

Telephone-- | |

Copper, bare miles | 126,664 | 78,880

G.I. bare do.| 14,411 | 7,970

Single, insulated do.| 23,950 | 14,011

Twisted pair, Insulated do.| 75,022 | 45,457

Wire carts | 721 | 327

----------------------------------------------+-----------+----------

CONCLUSION.

The reader who has come to this point has before him the picture of

the Nation's industry at war--the whole teeming effort in its main

outlines, its myriad ramifications, its boundless activity, its

ten thousand enterprises, its infinite toil, its hosts of workers,

its wonders of scientific achievement, its attainments, even its

failures--in short that humming complex of work, planning, ambition,

disappointment, triumph, shortcomings, ability, and driving force which

was a mighty people concentrated with all of its powers upon a single

objective.

It remains now to describe the place occupied by this effort in the

whole strategic plan of the war against Germany. We did not go into

the struggle as if we expected to fight a single-handed war. Whatever

we did either with military personnel or with munitions we did with

reference to what the nations associated with us were doing or could

do in the same respects. The whole plan was coordinated more or less

perfectly, and these international understandings and agreements

touched and influenced even the most trivial of our enterprises.

The reader who has in mind the record set down on the preceding pages

is now prepared to comprehend the force and extent of the international

cooperation in the war and to judge how well America played her part in

the general scheme. Let us go back, therefore, and review the history

of these agreements.

For many months before America came into the struggle, England, France,

and Italy had been engaged in grappling with the scientifically

organized forces of German military autocracy. The world war had become

a conflict of materials, almost as much as of men. All participants

had mobilized their industrial resources in a manner and to an extent

undreamed of in times of peace.

The allies had marshaled all available raw materials and factory

production in their own lands, and still faced colossal deficiencies

in supplies for their military programs. They had been forced to reach

out into the markets of the world to meet these deficiencies. They had

come to America and placed huge orders for raw materials and finished

products. The normal capacity of America's peace-time production had

been insufficient to meet their overwhelming needs.

In August, 1914, the total factory capacity in the United States for

the manufacture of powder was 6,000,000 pounds a year. In April, 1917,

under the stimulation of orders placed by the allies, the capacity had

been increased more than sixty-fold. England, France, and Italy were

taking this entire production and asking for more. They had absorbed

our entire output. A huge stream of materials, supplies, and ammunition

was flowing steadily from America to the front line trenches in France.

The allied governments had moulded their military programs in reliance

upon the continuation of this source of supply. Their troops were

on the front and in contact with the enemy. Failure of supply meant

disaster.

The flow of materials from America to the armies in France could not,

under any circumstances, be interfered with or curtailed. This fact was

promptly recognized by the United States, and the allied governments

were assured that America's military program would be formulated and

performed without interference with the allied programs of supply from

this country.

America's industrial contribution to the war, as a nation, was to

be over and above the industrial contribution to the allies then

being made by our individual producers. This fundamental plank in

the interallied platform of cooperation was laid down at the very

commencement of America's preparation, and it was strictly adhered to

until the end of hostilities.

A comprehensive cooperative plan for America's industrial participation

in the war remained to be worked out. A survey had to be conducted of

the new partner's strength and weakness in supply. A determination had

to be made of what the allies could give to the new partner, and what

they must receive from her. This was done by the Interallied Munitions

Council sitting in Paris, by the foreign missions in Washington in

conference with the War Department, and by the allied war ministries

and Gen. Pershing abroad.

An analysis of the facts of the situation disclosed that:

A. The world over--

(1) There was a critical shortage of ocean tonnage which promised to

become more critical as time passed on account of the success of German

submarine operations.

B. In France and England--

(1) The output of factories was being seriously curtailed and limited

by lack of raw materials and semifinished products.

(2) If an adequate supply of raw materials and semifinished products

could be made available, the factories had a substantial surplus

manufacturing capacity which could be placed at the disposal of the

United States.

C. In the United States--

(1) A surplus of raw materials and semifinished products for transport

to France and England could quickly be made available.

(2) It would be impossible, within less than a year, to build up

additional manufacturing capacity in the United States sufficient to

supply a large army.

The lack of ocean tonnage was recognized by all as the vitals of the

problem. France, Italy, and the United States had comparatively little

merchant tonnage. England's vast tonnage was suffering rapid depletion

by submarine losses and was totally inadequate to meet allied needs.

Ships were the biggest single deficiency in the interallied program.

The cooperative industrial program of the Allies and the United

States had to be geared into the shipping problem. To do this the

determination of what materials should be shipped from the United

States had to be decided first on the basis of what economies could

be effected in shipping space. If raw materials for aircraft occupied

less cargo space than the finished product, the maximum utilization

of available tonnage demanded the shipment to France of these raw

materials to be made into the finished product there. If, on the other

hand, finished nitrocellulose powder for artillery shell propellants,

or finished picric acid for artillery shell explosives, occupied less

cargo space than the raw component materials used in their production,

the shipping shortage demanded manufacture of these explosives and

propellants in the United States. Not a single ship could be freighted

with an extra pound or cubic foot of cargo which by any effort could be

saved.

The French Mission in the United States early recognized this fact and

urged the manufacture in the United States of picric acid to be used as

explosive in 75-millimeter and 155-millimeter shell, pointing out that

the finished product occupied but one-nineteenth as much cargo space as

the raw materials.

Gen. Pershing recognized the point, and in August, 1917, cabled as

follows:

A joint French-American commission has examined the question of

the production in France of powders and explosives and reports

as follows: France must import by December 4 the greater part

of the raw materials used in the manufacture of powders and

explosives. The weight of raw materials required is 10 to

20 times the weight of the finished product. The shipping

situation is such that by December the output of France will

be limited by the amount of raw material produced in France

or easily obtainable. * * * The present outlook is that in

December the French output will not be more than half of the

present output. To avoid calamity the United States must not

only furnish powder and explosives for all of its own forces

but must supply about half of the French requirements. It is

therefore recommended: (A) that the United States Government

furnish all powders and explosives needed for present contracts

with French Government; (B) that the United States Government

prepare to furnish by December 300 tons per month of explosives

and 200 tons per month of powder for French consumption; (C)

that study be immediately commenced for the purpose of adapting

American powders to French cannon of different types, this

study to be made both in the United States and in France by

competent experts; (D) that the French Government put at the

disposition of the American Government competent experts both

in the manufacture and use of these powders in the guns. * * *

Subsequent computations made on this side of the ocean indicated that

in the case of picric acid and other explosives this ratio between raw

materials and finished product in bulk was too great, yet in principle

these computations did not affect the desirability of shipping the

finished product rather than the raw materials.

Again, Gen. Pershing cabled to the Chief of Staff in the United States

urging the purchase of completed artillery, artillery ammunition, and

airplanes abroad, in order that "saving of tonnage" might be effected,

and pointing out the saving of cargo space resulting from the shipment

to France of raw materials instead of finished products, saying:

Following is comparison in tonnage of the principal

manufactured articles of ordnance obtained in Europe and the

replacements in raw materials contracted for the same. All

tonnage ratios shown are in favor of raw materials:

Field Artillery guns 1 to 7½

155 millimeter howitzers and ammunition 1 to 1¼

8 millimeter ammunition 1 to 3-3/16

Trench mortars 1 to 12-1/3

Grenades 1 to 4

In airplane production:

Packed airplanes, in weight 1 to 2

Packed airplanes, in cubic capacity 1 to 2½

Packed airplanes in area covered by boxes on board ship 1 to 9

In the above comparison in the ammunition item, finished explosives are

regarded as raw materials.

The Interallied Munitions Council, sitting in Paris and containing

among its membership the best military and industrial brains at the

command of the allied cause, including Gen. Pershing, Gen. Robertson,

chief of the imperial general staff of Great Britain, and Gen. Foch,

then chief of the general staff of the French Army, came to the same

conclusion, and Gen. Bliss transmitted its findings in a memorable

cable, a part of which was reproduced in the preface to this report.

Every mind was in accord. Tonnage must be saved. It could be saved and

in vast amounts by calling upon the United States to supply the raw and

semifinished materials, and upon the French and British war factories

to utilize these raw and semifinished materials in the manufacture of

the finished products.

But could this solution of the vital shipping question be dovetailed

into the industrial situations of the various nations concerned? Could

the United States supply the essential raw and semifinished materials

in quantities equivalent to the amounts consumed in the manufacture

of the finished product? Did the French and British factories, with

these materials laid down in their yards, have available a sufficient

manufacturing surplus to supply the needs of their own armies and also

to produce in part for the armies of America?

The foreign missions were in Washington. They knew intimately the

economic and industrial situations in their respective countries;

they knew the military plans of their general staffs; they knew in

what respects their programs of supply for their armies in the field

needed assistance, and in what respects these programs could be met

or exceeded. With this information available, they were prepared to

furnish the answer as to the manufacturing capacities of allied Europe.

The British War Mission in Washington communicated to the War

Department a cable from the British minister of armament, setting out

the position of the British Government on reciprocal supply:

The British Government is willing as far as possible in matters

of urgency to manufacture for use of the Americans any products

necessary to the more speedy equipment of the Americans that

the Americans consider they can obtain in England more promptly

or better than in the United States. Furthermore, the situation

as to manufacture of steel products is better than it has been.

The British Government will help to its utmost ability without

making actual and immediate replacement of raw material an

indispensable condition when any order is given. On the other

hand the general principle of replacements of raw materials

as soon as possible should be observed. It has become more a

question of furnishing supplies promptly to the allies than a

mere question of replacing what has been furnished American

troops; in other words, the needs of the allies should be

considered as one, and England should manufacture for the

allies anything that is necessary or best got that way, and

America should in the general interest of the allies furnish as

soon as convenient raw material to replace that used. * * *

Writing to Maj. Gen. Crozier, Chief of Ordnance, the French high

commission urged the placement in France of orders for artillery and

artillery ammunition and pointed out the existence of surplus factory

capacity available for their production. The commission summarized the

industrial situation in France in the following language:

Even in such remarkable technical conditions as yours, it takes

time to realize such a program, to organize manufactures and to

have men to direct them. You will take less time than we did in

France, where the output of big guns was not adequate to our

needs before the end of 1916. But time--more or less--had to

be an essential factor, so that after careful consideration,

it has been found that the only plan to be carried out in

order to supply the first American divisions with material on

their landing in France was to avail ourselves of the surplus

capacity of production of the French factories, which had

been since the beginning of the war very powerfully equipped

and were able to turn out greater quantities than those

corresponding to our supply of raw material.

The allies could deliver the artillery, artillery ammunition, and

airplanes if America could deliver the raw and semifinished materials.

America answered that she could and would produce and transport to

Europe raw materials and semifinished products in amounts equivalent to

the amounts consumed by allied factories in manufacturing the completed

guns, shell, and airplanes.

The details remained to be worked out. The French high commission

submitted statements showing the amounts of each component material

consumed in French factories in the production of guns and ammunition

of the various calibers. There were to be supplied by America 6

tons of steel for each 75-millimeter gun, 40 tons of steel for each

155-millimeter howitzer, and 60 tons of steel for each 155-millimeter

gun, and proper proportionate amounts of necessary materials used in

the manufacture of artillery ammunition.

The program of industrial and economic cooperation between the United

States and the allies thus took form. It used in the most efficient

manner every nook and cranny of every available ship. It utilized to

the utmost the surplus manufacturing capacity of France and England.

It brought into the war at the earliest moment the resources of

America in raw and semifinished materials. It spanned the period

during which America could go forward with her gigantic mobilization

of manufacturing power and later convince the Central Empires of the

futility of further struggle.

With the program mapped out, reciprocal agreements for supply remained

to be made. Orders were promptly placed.

The United States ordered from France a total of 5,854 pieces of field

and trench artillery of various calibers, of which 3,834 were delivered

to the American Expeditionary Forces prior to the armistice.

By August, 1917, more artillery ammunition was on order with the French

Government than was fired by the American Expeditionary Forces from

January 18, 1918, when the first complete American division entered

the line, until November 11, 1918, when the end of hostilities was

announced to the world. Of the amount ordered 10,000,000 rounds were

delivered before firing ceased.

In aircraft equipment, the French factories also had a surplus capacity

and delivered to Gen. Pershing up to November 11, 1918, a total of

4,881 finished airplanes.

By the terms of our agreement with the French Government, America

obligated herself to supply the raw materials and component parts

of the finished products delivered to our forces in France. This

agreement America performed twice over. For every ton of raw materials

and semifinished products America agreed to furnish to France, she

furnished two tons. According to French statements, our replacement

obligation in raw materials was 350,000 tons. America furnished over

800,000 tons.

In exchange for the artillery and artillery ammunition of French

manufacture fired by Pershing, America supplied to France in metals

alone over 700,000 tons of steel, 30,000 tons of pig iron, 5,000 tons

of brass and spelter, and 50,000 tons of copper.

In addition, and for use in the artillery ammunition received from

French factories, America manufactured and supplied to France in a

finished state all the principal materials used in loading all shell

delivered to the American Army. These materials consisted of smokeless

powder, used as a propellant to drive the shell from the guns, and of

picric acid, used as a high-powered detonative to burst over the enemy

lines. The French used 12,000 tons of smokeless powder in our shell.

America delivered an equivalent amount of finished powder. The French

consumed 18,000 tons of picric acid in loading shell for American use.

America supplied 18,500 tons.

In exchange for the finished airplanes, again America supplied the

raw materials and component parts. For the framework of the French

planes driven by American aviators, America furnished 34,500,000

feet of spruce, fir, and cedar, enough to manufacture over 16,000

finished planes; for the propellors, America furnished 7,000,000 feet

of mahogany and walnut, enough for 40,000 propellors; 4,000 tons of

aluminum, enough for thousands of planes; and dopes for painting

airplane wings, and miscellaneous aircraft materials and supplies far

in excess of the number of finished planes delivered to Gen. Pershing.

Under special contract made in August, 1917, and in addition to the

above, America furnished to France all materials for 5,000 finished

planes and all parts for 8,500 finished airplane engines, which were

to be assembled in France for the American Expeditionary Forces. The

engine parts were in forgings and needed only to be machined. For the

use of the French Government in machining these engine parts, America

built and delivered the necessary equipment and machinery.

Thousands of additional smaller items of all kinds were supplied by the

various governments to each other from day to day. No deficiency in the

military programs of any of them was permitted to exist, if it could be

made good by any of the others.

All of America's vast contribution to the allied program of supply

was not only produced in America, but it was taken to France in army

transports. From August, 1917, to November 11, 1918, an average

of 2,000 tons of American materials for French factories left

American ports every day aboard American army transports. Through a

submarine-infested ocean, in which the Germans sank over 21,000,000

tons of dead-weight shipping, these materials were carried in army

transports manned by American crews, and laid down at the doors of

French factories.

By February, 1918, Gen. Pershing estimated that 2,000,000 tons of cargo

space had been saved by the adoption of this program of international

and reciprocal supply, a saving of more tonnage than was then available

for the use of the American Expeditionary Forces. The Franco-American

commission on explosives estimated a reduction of 75 per cent in cargo

space in the shipment of explosives alone.

So the silent drama of international cooperation was carried out.

The story of British and American mutual aid during the war is the

same story in substance as that of Franco-American cooperation, with

changes only in the figures. Economy of shipping was effected. British

and French factory capacity was utilized. The vast reservoir of

American raw materials and explosives was thrown against the enemy.

International cooperation on a scale and in a spirit of cordial, mutual

helpfulness, such as the world had never dreamed of, helped to equip

2,000,000 American soldiers in France.

And it was done, all of it, without curtailment of the huge stream of

material which was flowing from America to the allies when the United

States entered the war. France and England received ever-increasing

quantities to the last day. The more than 800,000 tons of replacement

materials for artillery, artillery ammunition, and airplanes delivered

to America was over and above the millions of tons secured by the

allies for their own use directly from American producers.

It was partly by reason of the adoption of this program and its

complete performance that Gen. Pershing, after the armistice, could say:

During active operations extending from January, 1918, when our

first division entered the line, until the close of hostilities

on November 11, our troops were supplied with the equipment

and ammunition necessary to carry their work to a successful

conclusion.

Beyond all this, our Government, as part of the interallied program,

created vast faculties for the manufacture of supplies which England,

France, and Italy still required for their own needs and which a

comprehensive consideration of the entire program, with particular

reference to shipping, showed could be best produced in this country.

Factories for the production of immense additional quantities of picric

acid, powder, and other materials were built by our War Department to

fill the deficiencies in the military programs of our associates in the

war.

And beyond and behind all this America went forward with her own

gigantic preparations for the conquest of the dark forces which

threatened world civilization. It was this mobilization of her might

almost as much as the effect of her immediate force which helped to

convince the German general staff of the futility of further resistance

and assisted to bring the war to an early end.

Transcriber's Notes:

P. 122 corrected table sum from 284,730 to 331,730.

P. 343 corrected table sum from 1,605,582 to 860,700.

P. 344 corrected table sum Total produced from 17,684,853 to

17,683,353 and Total manufactured from 125,800 to 123,800.

P. 350 corrected table sum from 1,818,182 to 1,818,172 and also

3,360,111 to 3,360,101.

P. 400 swapped title captions "FILLING HAND GRENADES WITH WHITE

PHOSPHORUS" and "FILLING MUSTARD GAS SHELL AT EDGEWOOD ARSENAL" so

the title agrees with the photo and the explanatory captions.

P. 451 corrected Hard bread Total Value from 3,614,365 to

3,614,865.

P. 493 corrected table Grand total from 20,520,251 to

20,520,254 and 22,799,263 to 22,799,266.

P. 505 corrected table sum from 4,043 to 3,443.

P. 513 corrected table Total from 9,203,577 to 9,203,575 and

305,909,719 to 305,909,715.

Simple spelling, grammar, and typographical errors were

silently corrected.

Anachronistic and non-standard spellings retained as printed.

Italics markup is enclosed in _underscores_.

Bold markup is enclosed in =equals=.

End of Project Gutenberg's America's Munitions 1917-1918, by Benedict Crowell

America's Munitions 1917-1918 · 第 22 / 22 章