Whenever possible, a new method or a new machine should be so

constructed as to apply to as large a proportion of the whole work as

possible, and every effort should be made toward the standardization of

materials and apparatus.

In attempting work in blasting, it should be remembered that the use

of new and untried explosives is attended with peculiar dangers. The

men are familiar with the use of the standard grades of powder; and

while they are ignorant of how dangerous it is to take liberties with

dynamite, they are at a great disadvantage when a new explosive is

given to them for trial. If it looks like dynamite and is exploded with

the ordinary detonating cap, its peculiarities do not receive much

attention.

Men in the field are instinctively opposed to new ideas, and it will

invariably be found that new methods meet with stubborn opposition.

A foreman to whom a new method is suggested will not expect it to be

successful, particularly if he has ever heard it condemned; and it

always seems as if the thought were father to the wish, for, when

ordered to try it in the field, if he can make it fail, he will do

so with unerring accuracy. As a general thing, however, when it is

successfully demonstrated, he will become a loyal supporter of it. In

presenting a new method to a foreman or superintendent, it is well

not to encourage the raising of objections. It is better to let the

objections raise themselves in the application of the process; and a

man who has not gone on record as saying that in his opinion a new

scheme is no good, is a much more loyal supporter of the new scheme

than when he has committed himself against it.

One of the difficulties in improving the efficiency of work, is the

extraordinarily ingenious line of excuses that the men will present

for not getting their work done properly. Of these, perhaps the most

hard─worked is that of improper and insufficient material. When a

man is berated for poor work, and presents the argument that he was

unable to do so and so because he ordered material for it several weeks

previously and the material has not yet arrived, the situation is

embarrassing. The best preventive of this is to have small requisition

blanks measuring about 2½ by 4½ inches, made up into pads of

about fifty each, and to give each foreman a pad. Each blank should

have a space for the date, the articles ordered, the time when the

article is needed, the particular part of the work where the article

is needed, the class of work for which the article is needed, and the

foreman's name. The foreman should then be instructed that material

will be purchased through the storekeeper, and that non─delivery of

material will not be accepted as an excuse. The storekeeper should

then go around a job at least once a day, and get from the foremen

their requisition slips; and an intelligent storekeeper will see to it

that useless and unnecessary material or superfluous material is not

ordered. Material that is ordered on requisition, and is not in the

storehouse, should be purchased if necessary on a rush order, because,

contrary to the ordinary apparent belief, it is economical to spend a

dollar for material in order to save two dollars in labor.

=The Field Layout.= In laying out the plan of campaign on starting a

new piece of work, it is important to consider the proposition from

the capitalization end, as well as from that of pure construction.

It is usually not appreciated by the engineer or the owner, that

the contractor is doing a piece of delicate financiering, for the

performance of which his own available money is usually inadequate,

and that he is therefore obliged to borrow money on the work as

it goes along, and to depend upon his monthly estimates. It is

sometimes specified in the contract, that the contractor shall own

all of his plant in fee, but it may be said that this arrangement

is seldom lived up to. He can in addition nearly always borrow the

amount of his pay─roll a month in advance, from his bank. He can

also sometimes borrow money, giving as security his interest in the

money retained on the contract, which is ordinarily something like

10 per cent. Therefore, provided that all goes well, if he gets his

estimates when they are due, if his pay─roll is not more than the

amount of his monthly estimate, and if no very large and disastrous

contingencies interfere with the progress of the work, the contractor

can swing a large piece of work with a comparatively small capital.

If, however, things do not go well; if, through the failure of the

owner's engineer, or through the insolvency of the owner, or through

liens and attachments upon the work brought by dissatisfied creditors,

the contractor does not receive his monthly estimates on time; if, in

order successfully to prosecute the work, it is necessary for him to

buy a large amount of additional machinery at a time when payments on

old machinery are due; or if the portion of the work that he is doing

is bringing him in less than the amount of his pay─roll and immediate

materials and supplies, unless he has a large capital back of him,

which capital is at once available, he is liable to be placed in an

exceedingly embarrassing position. At such a time, if there should

come a period of financial stringency, bankruptcy may stare him in the

face, even though he has at the same time a contract on which he can be

reasonably sure of making a large profit.

It is therefore of great importance that the work be prosecuted in

such a manner as to have a continuous running profit, if possible.

A contractor may turn in what is known as an _unbalanced bid_. In

that event it will be very easy for him to start a certain portion of

the work upon which he will lose money before he reaches the portion

on which he expects to make money. Unless, as above indicated, the

contractor is provided with a large fund for contingencies, great care

should be taken to avoid this. The nature of unbalanced bids will be

explained below.

As a case in point, on a certain contract involving over a million

dollars, the company that was organized to conduct the work was

provided with a small working capital, bought its plant on a time

basis, and proceeded with a small working capital, under the impression

that it would not be necessary to borrow any money, that the work

immediately commenced would be sufficient to pay all the expenses and

leave a profit, which profit would gradually accumulate and enable

a running fund to be maintained which would take care of future

contingencies. The idea was admirable. It happened that the work was

in earth and rock excavation also known as _unclassified_, and was

taken at a price which would admit of a large profit in any event. The

rock work, if taken economically, would cost more than the contract

price; the earth work, if taken economically, would cost considerably

less than the contract price. The original plan contemplated starting

the earth excavation at a point to which another contractor was

to excavate, and it was not deemed feasible to commence the earth

excavation until the other contractor had cut up to the line between

the two contracts. Dependence was placed upon the other contractor

doing his work on time, which he did not do; and it was then decided

that it would be impracticable to commence in the earth, and work

was accordingly commenced in rock, which work was conducted at a

considerable loss. The strong financial position of the contracting

company was the only thing that prevented it from going to the wall

with a most excellent contract partly completed and a lot of good money

tied up.

[Illustration: A VIEW IN THE STRUCTURAL SHOP OF THE MINNEAPOLIS STEEL &

MACHINERY CO., MINNEAPOLIS, MINN.]

We shall assume, for purposes of illustration, that a certain

contractor desires to bid on some public work involving the removal of

100,000 cubic yards of earth work and 50,000 cubic yards of rock work.

He estimates that he can do the earth work for 30 cents per cubic yard,

or $30,000, and rock work for 80 cents per cubic yard, or $40,000,

making a total of $70,000 for the entire 150,000 yards, or 46.66 cents

per yard for an average of the earth and rock; and he puts in his bid

at this figure.

If the contract has been obtained as one of the Erie Barge Canal

contracts, the work will be let _unclassified_, as it is called. By

this is meant that no discrimination in monthly estimates will be made

between rock and earth removed; that the earth and rock removed will

be measured in excavation, and the contractor will be paid for these

two materials indiscriminately. Now, we shall assume that he can make

a profit of 4 cents per yard on the earth, and 10 cents per yard on

the rock, so that his total profit on the contract will be $9,000.

According to the terms of his contract, he will be paid on the monthly

estimates 46.66 cents per yard removed, less 10 per cent──or 42 cents,

the 10 per cent being retained until the completion of the contract.

Suppose, now, that he starts in on the rock, and he excavates the

50,000 yards at a cost to him of $35,000.00 for which he will receive

42 cents per yard, or $21,000.00. He will then be out of pocket

$14,000.00; but there will be coming to him as held by the State

$2,333.33.

Before he can begin to "see daylight" on his contract, he must proceed

to excavate earth until he has made up the $14,000.00. He gets 42 cents

in cash, and it costs him 26 cents, so that he must excavate 87,500

yards of earth, for which he will get the $14,000.00, and he will have

held up $4,083.33 additional. There will then be remaining 12,500 yards

to be excavated on which he will get $5,250.00, with $583.33 held back.

He will have been obliged to do 91⅔ per cent of his contract before

he stops putting money into it; and the money that he has put into it

he will not be able to draw interest on, because he will not be drawing

interest on the 10 per cent retained. The amount of money that he had

to put up to cover shortage on his contract will have been $14,000.00,

on which he will have to pay interest to his bank. If, on the other

hand, he commences the earthwork first, he does 100,000 yards of

earthwork, costing him 26 cents, on which he gets back immediately 42

cents, and he has $16,000 for working capital, in addition to $4,666.66

held up. He then does the rock work, and the rock work never exhausts

his capital, and he has no interest to pay except on his plant, which

he can easily do out of his $16,000.

This is not only a practical problem in how to handle a contract

without being wiped out financially, but it is an exceedingly important

one as defining where the ultimate success in the operation lies. It

can readily be seen that when a contract is taken on close figures, the

entire success of the financial operation will depend upon the proper

layout, as indicated above.

=Unbalanced Bids.= We shall assume again, for purposes of illustration,

that a certain contractor desires to bid on some public work involving

the removal of 100,000 cubic yards of earthwork and 50,000 cubic yards

of rock work. He estimates that he can do the earthwork at a profit

for 30 cents per cubic yard, or $30,000; and rock work for 80 cents

per cubic yard, or $40,000. If the work in the above example were

_classified_, and the contractor were paid so much money for each

yard of rock and so much money for each yard of earth excavated, and

his bid read 80 cents for rock and 30 cents for earth, it would be

said to be a _balanced bid_. Other contractors, seeing his bid, would

know that he considered that he could do the rock work at a profit at

80 cents, and earthwork at a profit at 30 cents. In order to prevent

them from obtaining this information, the contractor can _unbalance_

his bid, as it is termed; and in this event he would bid perhaps as

follows──namely, 100,000 yards of earth at 40 cents, or $40,000; and

50,000 yards of rock at 60 cents, or $30,000. The total amount of this

contract would be the same, and he would make the same profit; but his

competitors would be deceived as to his basis of doing work.

The disadvantage of this from the contractor's point of view is that,

in the event of an error having been made in an estimate of quantity,

he might find himself doing less than 100,000 yards of earth and more

than 50,000 yards of rock, in which event he would stand to lose money.

=Material Supply.= In concrete work particularly, it is all─important

that material──cement, sand, and stone──be promptly shipped, and at the

same time not too promptly shipped. If the shipments are not promptly

made, there will be a failure of material to arrive, which will throw

the men out of work, with all that this implies in high costs. If

the material is shipped too rapidly, it will be necessary either to

unload it into a stock pile, which will involve the re─handling of the

material; or to pay demurrage charges to the railroad company, if the

shipments are made by rail.

In such work, at a time when there is likely to be any freight

congestion in the country, stock─pile facilities should be provided to

care for a supply of material to carry the work for one to two weeks.

On a piece of work involving, say, two large concrete mixers capable

of mixing 300 yards of material each per day, there will be used 900

yards of stone and sand per day, which, on a ten─day basis, will mean

a very respectable stock pile. This 9,000 yards of material, costing

perhaps one dollar per yard, means an investment of $9,000 in stock

pile, on which interest must be paid at the rate of, say, 6 per cent,

or $2.00 per working day, which means a trivial item compared with

the advantages derived from having a constant supply of material.

The total cost of this stock pile, in addition to interest, is the

cost of one re─handling of material out of the stock pile, which at 5

cents per yard would be $450. This amount is very much less than the

damage that would accrue from not having any stock pile at all. On

most concrete jobs, there is usually provided a large storehouse for

cement; and when the work has to go over from one working season to

another, it is frequently the custom to leave the cement in storage.

This is frequently a cause of loss of money, because the cement, being

hygroscopic, absorbs moisture from the atmosphere, and is liable to

spoil in consequence. This can be avoided by keeping the storehouse dry

and warm through the winter, but this again is an expensive matter.

=Old versus New Machinery.= In planning construction work, the question

always comes up as to whether to use old or new machinery. No hard

and fast rule can be prescribed. A case occurred upon an important

contract where there were needed some new boiler tubes for the boiler

that ran the main supply pump. The purchasing agent of the contracting

company, who happened also to be the President and Chief Engineer of

the company, bought some second─hand boiler tubes, which were forthwith

put into this boiler. The saving on the boiler tubes was probably $8 or

$10. The loss caused by a breakdown of the same boiler was nearly $50.

In purchasing second─hand material, if the material can be thoroughly

and rigidly inspected, it is perhaps wise to purchase it, and sometimes

money can be saved; but as a general proposition, no second─hand

material should be purchased for a contract, unless it is done with the

determination of putting this material in first─class condition before

it is used. The best inspection, as a general thing, will not disclose

the exact condition of old material. By this it is not meant to

intimate that new material should be purchased for every new contract.

=Use of Maps.= A precaution on construction work that is very seldom

taken by contractors generally, and one that is a most certain saver of

money, is to have a complete map of the work to a large scale carefully

prepared, on which should be indicated day by day the progress of

the work. This map, if kept up to date, will enable the manager of a

company, or the president and directors, to know in detail the progress

of the work, without necessarily going out on the work; and from it can

be found the quantities of needed materials, such as rail, pipe, etc.

=Standard Instructions.= Every organization doing field work would do

well to follow the custom admirably illustrated by Frank B. Gilbreth,

of issuing regular standard instructions to foremen and to employees

generally. These instructions have been published in book form by the

Myron C. Clark Publishing Company, and are an admirable example of the

type. The idea follows that of the old Railroad Company's "Book of

Rules" that will tend toward evading similar accidents in the future.

In this manner eventually a contractor can obtain a control of his

organization, and a freedom from accidents, that will be extremely

valuable.

=Chronological Charts.= These are intended to show the proposed time of

completion in certain parts of the work. A valuable aid to a manager on

work requiring a large amount of material, and where there is a small

amount of available space, is a chart showing the time and quantity

of expected materials and supplies. This will enable him to see at a

glance where he may expect to be in the matter of his materials, and

will tend to relieve his mind of one of its most annoying problems.

These same charts can also show him the estimated times of completion

of certain parts of the work.

REVIEW QUESTIONS.

PRACTICAL TEST QUESTIONS.

In the foregoing sections of this Cyclopedia numerous illustrative

examples are worked out in detail in order to show the application of

the various methods and principles. Accompanying these are examples for

practice which will aid the reader in fixing the principles in mind.

In the following pages are given a large number of test questions

and problems which afford a valuable means of testing the reader's

knowledge of the subjects treated. They will be found excellent

practice for those preparing for Civil Service Examinations. In some

cases numerical answers are given as a further aid in this work.

REVIEW QUESTIONS

ON THE SUBJECT OF

PURCHASING AND STORES DEPARTMENT

1. What information is required by the purchasing agent?

2. Outline a system of catalogue filing suitable for a business of your

own selection. What styles of files would you recommend?

3. Describe and illustrate with suitable forms, a system of catalogue

indexing.

4. Explain how special quotations can be recorded, and illustrate with

a suitable form.

5. What method would you suggest for keeping a record of orders placed?

6. Explain the routine of the purchasing department. Illustrate forms

for requisition and low stock reports.

7. Describe a system to be used in ordering goods, explaining the

purpose of each copy of the order.

8. How does the purchasing agent know when goods are received?

9. What papers in connection with an order are filed permanently in the

purchasing department? How are these papers indexed?

10. What are the functions of the stores department? Who should

supervise the stores department?

11. Describe a labor─saving system for taking an inventory.

12. Into what classes is the inventory in a manufacturing enterprise

divided? Illustrate a suitable inventory record form for one of these

classes.

13. Name three reasons why a stores record system is of value.

14. What general plan should be followed in locating storage places for

material and supplies in a manufacturing plant? How should the material

be arranged in the storeroom?

15. What steps are necessary to provide a record of the receipt of

material and supplies, and to prevent the acceptance of goods which

should not be received?

16. How are unauthorized deliveries guarded against? Illustrate a

suitable requisition form for a business of your own selection.

17. Into what two classes are stores records divided? Which class is

the more usual in the storeroom?

18. How should stores record forms be filed? How can the accuracy of

the stores records be verified?

19. Illustrate and explain a suitable form for a stores record of

materials and supplies, showing quantities only.

20. Illustrate a stores record form for supplies showing the

distribution to departments.

21. When a foreman draws from the storeroom more material than is used

on a job, and returns it to stock, what form of record should he make?

22. When material drawn for one job is transferred to another, what

form of report should be made?

23. Why should a complete record of machinery and equipment be

maintained?

24. Describe a suitable system for the tool─room.

25. Illustrate the necessary forms for a record of tools.

REVIEW QUESTIONS

ON THE SUBJECT OF

RECORDS OF LABOR

1. Into what general classifications are wage systems divided?

2. Describe the characteristics of the _day wage_ plan. In what

respects does the day wage plan prove inequitable?

3. Describe the _piece rate_ plan. Name its advantages and

disadvantages.

4. What is a premium system? What conditions are intended to be brought

about by a premium system?

5. What special points of merit does the Halsey plan possess?

6. What are the essential features of the Taylor differential wage

system?

7. Name the special features of the _Gannt bonus system_. What are its

apparent disadvantages?

8. What are the principles of the _Emmerson efficiency system_? Name

some of the conditions necessary to a successful operation of this

system.

9. What wage system or systems are used in the business with which

you are connected, or another selected for your illustration? Do you

consider the plan used the best suited to existing conditions; if not,

what changes would you suggest?

10. Into what two classes is time keeping divided? Which system is used

in a trading business? in a manufacturing enterprise?

11. Explain why time records are necessary when the pay of an employe

is based on the unit of production.

12. Explain the operation of the check system of time keeping. What are

its disadvantages?

13. Explain the operation of the time clock as used for recording total

time worked.

14. What is meant by _production time records_?

15. Illustrate a form of work order providing for a time record. Under

what conditions is the use of such a form justified?

16. Illustrate a form of time card which provides for an entire day's

production record. Why is this a dangerous form to use?

17. Illustrate a form of time card for a record of one job, suitable

for a business with which you are familiar. How is it used?

18. Describe the principal features of the different classes of

mechanical time recorders, designed to record the time worked on

specific jobs.

19. Name a business in which cumulative time records can be used to

advantage.

20. Illustrate and explain a form for a piece work record, suitable for

a business of your selection.

21. Illustrate a suitable form of pay─roll sheet to include records of

both total and job times.

22. If the total time shown by the job cards does not agree with the

clock record, how should the discrepancy be adjusted?

23. To what account should time shown by idle cards, and time

unaccounted for, be charged, and how should it be distributed?

24. How can standard costs be determined? Why should the inefficiency

burden be added as a separate charge?

25. Why should a detailed record of every employe be kept?

26. Illustrate suitable forms for applicants' and employes' record

cards. How should these be indexed?

27. What is a _production order_? a _shop order_?

28. Name and give examples of four classes of production orders.

29. Illustrate a form of production order, suitable for a business of

your selection.

30. How are the instructions of the superintendent given to the

foreman? Illustrate a suitable form.

31. Explain, and give an example of the use of, _standing orders_.

32. Name three good reasons why a record of manufacturing orders should

be maintained.

REVIEW QUESTIONS

ON THE SUBJECT OF

GENERAL EXPENSE AND COST SUMMARIES

1. Explain the relationship between expense and cost of production and

why the former should be absorbed by the latter.

2. Why is manufacturing expense related to cost rather than selling

price?

3. Why is the labor cost of production considered the most reliable

basis for calculating expense?

4. What is a safe rule to follow in the segregation of pay─roll into

productive and non─productive labor?

5. Why is expense not added to operating costs?