Other reasons will suggest themselves, but these just referred to are

quite sufficient to show that the selling price is too erratic and that

expense will be found more reliable when figured at cost price, which

method has, therefore, been adopted as the best practice.

=5. Expense Based on Cost of Labor or Material.= Having decided that

expense should be reduced in some manner from the direct cost price

rather than the selling price, it is remembered that we still have two

items of cost to choose from: The labor cost and that of the material.

There are those who maintain that the material cost is the correct

starting point for calculations, but there are few manufacturers, if

any, who do this.

An attempt has been made to use the combined total of labor cost and

material, but this method is hardly worthy of serious consideration.

The best practice points almost without argument to the labor cost as

the true basis of expense; this is not only the logical conclusion but

common sense:

(a) It is easy to see that the elements which go to make up the expense

of operating a factory──foremen, sub─foremen, supervision, shop clerks,

toolkeepers and grinders, helpers, the up─keep of tools and machines,

lighting, etc.──are all closely related and largely dependent upon

the number of men employed. Reduce the number employed and it will be

seen at once that some of the above mentioned items of expense can

be cut; less supervision is required and the wear and tear on tools

and machinery is also reduced. It is difficult to see wherein any

difference in cost of the material used would of itself cause any

increase or decrease in the factory expense or even be influenced by

it. It is quite contingent on the labor.

(b) That the cost of the material is not a reliable basis for

calculating expense can be quite satisfactorily demonstrated. If the

cost of an article is, say, labor $25.00, material $50.00, with expense

to be figured at 50% on material, or $25.00, it is seen at once that

the manufacturing cost would be:

Labor $25.00

Material 50.00

Expense 25.00

────────

Cost $100.00

Suppose this article were duplicated under the same identical

conditions and cost, using only this time material that cost $60.00.

It is a fair proposition that the total cost would be but $10.00 more

than in the first instance, or $110.00. But if the percentage is added

on the material as before, it is found that the expense this time is

$30.00, which would make the cost appear thus:

Labor $25.00

Material 60.00

Expense 30.00

────────

Cost $115.00

It is now noted that the cost figures $15.00 more than in the first

instance, while we are quite ready to admit it should be but $10.00,

the only difference being in the cost of the material.

=6. Conclusions.= Having established the fact that the expense is a

legitimate charge to the cost of production, we are now quite safe

in laying down for our foundation the proposition that expense is

contingent on, and should be figured from, the direct labor value of

the cost price.

METHODS OF DISTRIBUTION

=7.= Time is continually bringing improvements; old methods once

thought practical and satisfactory are replaced by more efficient

ones to meet the exacting conditions of to─day. Examine a _Practical

Bookkeeping─Manufacturer's Edition_ of thirty or forty years ago

and you will probably find nothing on this subject of _expense

distribution_, while to─day it is one of the most important and most

discussed of any in factory accounting in general, and cost accounting

in particular. Since that time different methods of handling expense

have been devised, some with more or less merit. It will be the intent

of this section to consider at some length three of the most frequently

used of these methods, endeavoring to find one which will, in the most

equitable manner, distribute into production the operating expense of a

factory with the least amount of detail and unnecessary figuring on the

part of the accountant; and at the same time prove satisfactory from

the manufacturer's standpoint.

=8. The Man─Hour Rate Method.= This method, once quite popular, is now

but little used, and it is doubtful if it can be found in operation

in many up─to─date plants at the present time. The name of the method

suggests its intent, which was to distribute factory expense over the

various production job orders according to the amount of time spent by

the workmen at an hourly rate. This rate is easily calculated, and was

established by dividing the total expense for any period by the total

number of hours spent on productive work for the same period, reducing

the rate of distribution to so much per hour. If 100 hours of labor

were spent on a productive job, the cost of the wages paid the workman

for this time was not considered, the expense to be borne by the job

being figured at the hourly rate for the 100 hours. It will be seen

that this is hardly an equitable arrangement, and to rectify a serious

defect in the method, some adjustment must be made:

(a) The inability to fix a standard for the efficiency of the labor

lays the man─hour rate open to criticism. Could this be done, this

method would in many cases prove a very equitable way of distributing

expense. It will, however, be seen at once that as it is, a skilled

workman carries no more expense than an apprentice boy, and if both

work on a productive job a full week, the expense in either case is the

same regardless of the wages paid. This is hardly a fair proposition.

Either the apprentice's time must be accepted as standard and the

skilled workman considered twice as efficient in work─hours, or _vice

versâ_. To do this would lead to endless complications, yet the

quantity and quality of the output between these two classes of labor

should be considered and adjusted in some way so that the injustice

done the manufacturing cost may be corrected. But this is not an easy

matter to regulate, and means extra work on the part of the cost

clerks in recording the time spent on job work and adjusting these

inequalities in the labor.

(b) The man─hour rate requires that the hours worked be carefully

recorded and totaled, as well as the cost. Many concerns with heavy

pay─rolls to be apportioned over a large number of job orders, ignore

the footing of the long columns of hours and fractions, and use only

the totals of labor cost, which are of course necessary for entry in

the commercial books. It is obvious that in doing this an immense

amount of clerical labor is saved. The man─hour method requires that

both hours and labor cost should be recorded and totaled──a double

operation and duplication of work, which, unless it can be simplified,

should be avoided, as it means time and unnecessary expense.

=9. Machine─Hour Rate Method.= This machine─rate plan of distributing

expense was designed to meet the needs of a shop where the product is

largely the result of a machine or tool operation, rather than the

labor of the mechanic himself. It somewhat resembles the man─hour plan

in that the rate of distributing expense is reduced to an hourly rate

for the time the machine is working on the job instead of the time of

the operator. Each machine is intended to have its own rate.

The method of arriving at the machine rate is easily understood, and

reduces itself to the item of depreciation on the original cost price

of the machine with its shafting, belting, tools, and installation cost

figured at, say, 5%, the power to operate machine at an estimated cost

per horse─power, ordinary repairs, divided by the number of hours the

machine is estimated to be in operation for the same period; this will

give the hourly rate of cost to operate. Some mechanical engineers

advocate including in the above cost, interest on the investment at

6%, also insurance and taxes; and by others, the value of the floor

space occupied by the machine is also included; but in all these latter

points referred to, engineers greatly differ in opinion, and it is

generally decided by each manufacturer for himself according to his own

ideas.

On the question of the value of machine rates there is probably more

argument by mechanical engineers and accountants than on any question

in factory accounting; in fact, engineers themselves are very far

apart in their opinions and do not seem to agree among themselves.

Accountants generally are inclined to take a somewhat different view of

the situation from our mechanical friends. While it is admitted there

is good argument for both positions, it is to be remembered that we are

considering the question of machine rates as a means of distributing

the expense account, and it seems to be the prevailing opinion among

accountants that as such it is found wanting. While, theoretically,

it is undoubtedly the correct solution of the problem, it is more

often found in practice to be a case of a "distribution that does not

distribute," and for this reason is not used by the very class of

factories and machine works for which it was designed and intended to

benefit.

Let us consider in detail a few of the objections that may be raised to

the machine─rate method:

(a) It will be noticed there are other expenses in the shop than

that of operating the machines and not covered at all by the machine

expense. Machine rates are absolutely worthless for bench labor and

the assembling room, for these two must also share in carrying the

shop burden. Not to do so would be manifestly unfair. It is therefore

necessary that a second distribution must be made entirely different in

its calculation, to handle this undistributed expense not covered by

the machine rates, which means two different operations for the same

shop.

This necessitates two different time records to be kept, one card

for each machine showing jobs worked on and hours idle, and another

time card for the workman. Is is easy to appreciate that this double

operation greatly increases the clerical work in the shop, besides two

sets of entries by the cost clerks, and more detail for all concerned.

If a method can be found which requires but one time record to be kept,

this double process can be done away with and the duplication of work

avoided.

(b) The principal factor in the calculation of the machine rate, in

fact, the real key to a successful calculation, is in establishing a

standard of work─hours for each machine. It is noted that the higher

the standard, the lower will be the rate, and the lower the hours

operated, the higher will be the rate; in other words, when the

machine is idle in excess of the standard, the rate changes. In some

shops where the output is a stable product, always in demand, and the

machine in continuous operation, a good estimate may be made, but in

most shops a machine is frequently idle on account of "no work" or

"laid up" for repairs the same as is its operator. The practice in most

shops is such that it is extremely difficult to estimate ahead what the

work─hours of a machine will be, and it resolves itself generally into

an intelligent guess with two estimators far apart in their estimates,

yet a satisfactory distribution requires a standard which will work out

in figures close to the actual facts.

Who can successfully estimate ahead for any time the activity of each

machine in a large factory? Our factory engineers are at wide variance

on this point. One authority says "full time," 300 days a year, is the

proper basis for calculation. It would seem as if this were rather an

unusual position to take; it apparently being his belief that the time

idle would be offset by the time the machine was operated overtime, or

else he expected the machinery once put in motion to neither shut down,

nor break down. Either appears to be rather a dangerous assumption on

which to base a careful calculation for rate of distribution.

Another engineer says 80% of a full day will be found to be the

maximum, and further adds: "It will doubtless fall much below that

figure." One naturally asks "How much lower?" There is quite a large

field of figures to choose from between an 80% activity and a dead

standstill for the machine.

It is quite unnecessary to attempt to demonstrate at length that the

work─hour standard may be a very elastic figure, and it is often

found that after distribution has been made, the results are very

unsatisfactory and the machine rates used have proved "way off."

(c) Again, having settled on the work─hour standard, other adjustments

appear necessary to equitably handle the machine rate question. For

instance, two machines may be of the same book valuation and in cost

of operation practically alike, yet one may be far more efficient than

the other and possibly turn out two or three times as much work. This

condition is constantly found in different shops, and whether or not

the two machines should carry the same rate, and, if not, how this

inequality shall be adjusted, forms a very interesting question for

discussion.

(d) It is noted that the essentials in the calculation of machine rates

are all based on estimates which may or may not prove correct; that

positive book figures are lacking; and that the calculations are made

on assumptions. One of the best professional opinions noted is that

expressed by one of our leading accountants, who, commenting on the

question of machine rates, observes that "it begins with estimating and

is estimating all the way through." This appears to be rather severe

criticism, yet one has but to give the subject careful consideration to

note that it quite correctly sums up the situation in a few words.

As previously stated, the machine─rate method is without doubt

theoretically correct, but, until the subject has been more thoroughly

elucidated and worked out in all its details to fit shop conditions and

furnish a satisfactory means of distributing expense, it is doubtful if

it will be used to any great extent. This method certainly requires an

elaboration of system and detail, with questionable results, and with

many serious objections apparent; it seems pertinent, therefore, to ask

the question "Is it worth while; cannot something better be devised?"

=10. The Percent Method.= A third plan of distribution, commonly

referred to as the _percentage method_, differs from the two already

outlined, in which the time employed was the basis of operation, in

that the rate of distribution is a percentage on the direct labor cost

of the product, which is, of course, commensurate with the amount of

time expended. In the first division of our subject, it was shown that

expense figured on direct labor would prove the most reliable.

This method is based on the principle that the production of each

department of a plant should shoulder its own expense, and also a share

of the general expense. In other words, the cost of the output from the

_Blacksmith Department_, for instance, would be the total productive

labor of the department, plus the material used, plus the operating

expense of the department, plus its share of the general expense of

the whole plant. It is only necessary, then, to establish the relation

between the productive labor and the expense, and express the same in

a percentage. It is immaterial how many departments or processes there

may be in the factory; this relation should be found in each case,

based on its own productive labor and expense, each department having

its own percentage ascertained from its own actual conditions; no

estimating about it. The expense, then, is figured on the labor cost.

If, in the _Blacksmith Department_ already referred to, it is found

that the expense at which the department is operated is one─fourth

of its total productive pay─roll for the same period, it is at once

apparent that if to the labor cost of every productive job, 25% is

added for shop expense, the total of these expense items added will

equal the total expense of the department. In other words, the shop

expense is split up and added to each job in proportion to the labor

expended on it.

The general expense is handled the same way. If the total general

expense is found to be one─third of the total productive labor in

the plant, it is likewise apparent that, if to the labor of every

productive job, 33⅓% is added to cover general expense, the sum

total of these percentage items added will equal the total general

expense of the plant.

Following, then, the formula outlined at the opening of our discussion

under the heading of _True Cost_, the cost of a job done in the

_Blacksmith Department_, on which the direct labor cost was $100.00,

would appear on our records as follows:

Direct labor $100.00

Material 50.00

Factory expense at 25% 25.00

────────

Factory cost 175.00

General expense 33⅓% 33.33

────────

Manufacturing cost $208.33

This is the _percentage method_. While it is quite natural in anything

of value and merit to look for its imperfections, this method is

criticised by some accountants who point to flaws in its logic and

method of computation; nevertheless, it stands to─day as the best

solution of the vexed question of expense distribution that has yet

been devised, for it not only has the approval of our best technical

authorities, but that of the practical accountant as well. It commends

itself to the intelligent judgment of the manufacturer, who is quick to

realize its superiority, and it can be recommended for many reasons:

(a) It is based on actual figures, easily extracted from the regular

books of account, and which are a true statement of fact; no guess─work

or estimating about it. There is no better way to figure what is to be,

than to use results of what can be conclusively demonstrated already

has been.

(b) It can be used in any manufacturing plant, or in all the

departments of the same plant, thereby insuring uniformity of method,

which is always desired. No argument is necessary to convince that two

methods in the same factory are undesirable when one can be found that

is satisfactory.

(c) It accomplishes its purpose──it distributes. If it is found

that factory conditions are changing, the percentages used may also

be changed so as to increase the amount of expense distributed, or

diminish it, as necessary.

(d) It requires less work for the cost accountant. The man─hour plan

requires the hours worked to be recorded and footed in addition to

the labor cost. The machine─rate plan requires not only two different

calculations, as already shown, but also necessitates the adding of

all the hours worked. The percentage plan requires only the labor cost

in money value, and renders the recording and adding of long columns

of hours entirely unnecessary, which, as can readily be seen, is an

immense saving of labor. In a large plant with an elaborate system of

job orders to be handled, the value of the percentage method, in doing

away with this double calculation, will be appreciated immediately.

[Illustration: BROOKLYN, N. Y., PLANT OF THE H. W. JOHNS─MANVILLE CO.]

(e) Figuring by percentages can be done rapidly, and in many instances

it is but a mental calculation and almost instantaneous. Were hours

recorded, the frequent use of fractions would render the process of

figuring expense less rapid.

(f) It is an equitable means of distribution, for it is based on the

direct labor cost, which is not only the most reliable element of cost

to use as a basis, but which is one of the principal factors by which

the amount of expense is influenced.

(g) It has the endorsement of our best factory accountants and

auditors, and it is noted that where "systems" are being installed by

factory organizers to─day, the percentage method is continually being

adopted as the most satisfactory, for it brings the best results with

the least machinery to operate.

PERCENTAGE METHOD EXEMPLIFIED

=11.= Before proceeding to show in detail the method to be pursued in

arriving at the various percentages to be used in distributing expense

by the _percentage method_, it may be well at the outset to clearly

understand what constitutes _productive labor_ and _expense_, or

_non─productive labor_, for it is on the former that all calculations

are based.

=12. Productive Labor.= The wages paid to the workmen for labor spent

on productive work which is offered by the manufacturer for sale,

and from which the business derives its regular revenue, is properly

classed as _productive labor_. In other words, the amount of productive

labor is commensurate with the productive output.

It is frequently asked whether labor spent on plant extensions or new

equipment, when made for one's own use, may be considered productive

labor and should carry its share of the expense in its distribution.

Most assuredly, yes. If this same work were performed to be sold again

in trade it would be considered productive labor and the expense would

be added. The reverse is also true; if it were purchased from another

manufacturer he would treat it as productive labor, and include expense

in his cost and selling price, and the purchaser would have to pay

for it, and would carry same in his ledger, in his plant or equipment

accounts, and on his balance sheet as an asset. The only difference,

if any, is in making new equipment himself, in which case it goes on

his books at the cost price to him, thereby saving the manufacturer's

profit he would have to pay if he purchased it. Is it, then, any less

productive labor because a manufacturer prefers to make his plant

extensions or new machinery, himself, instead of buying? It does not

appear so; it certainly is productive labor.

=13. Non─Productive Labor.= All other labor, not distinctly productive

as just outlined, must be classed as non─productive. This includes

_clerks_ and _offices_, _foremen_, _assistants_, _watchmen_, _repairs_

and _renewals_, _small tools_, etc., and all the many expense men

not working on product but necessary to keep the plant in repair and

operation. Non─productive labor is a question of keeping the factory

organization and management up to concert pitch, and is not regulated

by the quantity of production.

Inter─department work in a plant often raises an interesting question.

Shall labor expended by one department on repairs for another

department receive credit for same as productive labor? The foreman

of the department often claims that the repairs his men are doing

for another department are just as much production, so far as he is

concerned, as though his men were building a machine for sale, and

should shoulder part of his expense. In a certain sense, all labor is

productive, and from a selfish point of view, the foreman's argument

is a fair one. But from the broader view of the manufacturer, all

such inter─department repairs, or similar work, are a part of the

operating expense of the plant, and are necessary for the up─keep of

the equipment; they are not made for sale, as is a production order,

and must be carried as expense──non─productive labor.

=14. Expense and Production Cost Ledgers.= Without digressing from

our general subject, it may not be out of place at this point to

call attention to a most convenient method of keeping cost records.

Inasmuch as the cost of production must absorb the expense costs of

manufacturing, it will be found advantageous to keep these two classes

of accounts in separate binders, putting all the non─productive labor

cost records in one binder, calling it _Expense Ledger No. 1_, and all

the productive labor in _Production Ledger No. 2_. When the expense

distribution is to be figured, it will be noted that all the entries

will be made in _Ledger No. 2_, while _Ledger No. 1_ furnishes the

amount and details of expense to be distributed.

=15. Period for Comparisons.= Having shown that our percentages of

distribution are based on the relationship of total expenses to total

of productive labor, the first step in our calculation is to draw off

from our ledgers a statement of each for the same period as a basis for

comparison.

[Illustration: Fig. 1. Private Ledger Labor Account]

Cyclopedia of Commerce, Accountancy, Business Administration, v. 02 (of 10) · 第 8 / 23 段