=16.= Where piece─rate or premium wage systems are in effect, is

it necessary to have accurate records of production, since the pay

of the worker is governed by the number of units of production.

It has already been stated, that to obtain the exact cost per unit

of production, time records must be kept on piece work. It is not,

however, absolutely necessary that the time be recorded for each

separate job or unit of production. The necessary requirement is that

the production records shall be so kept that they can be checked as to

time──that the time required for a given number of units of production

can be obtained, or that the units of production during a stated time

can be definitely known.

[Illustration: Fig. 26. Weekly Time Records for Piece Workers]

[Illustration: Fig. 27. Production Record of a Gang of Piece Workers]

Piece rates are applied to many distinct classes of work, each of

which necessitates a slightly different system of records. One of the

industries in which piece rates are largely used, is the manufacture of

garments of different classes. In this industry, each garment or lot

of garments passes through several operations, each operation being

performed by a different operator. Since practically all operations are

on a piece─rate basis, it is necessary to obtain a record of the name

or number of each operator.

[Illustration: Fig. 28. Individual Time Record Card Used with the

Calculagraph]

[Illustration: Fig. 29. Daily Record of Piece Work]

A form for a record of operations in an underwear mill is shown in Fig.

25. This is in the form of a shipping tag with particulars of the order

at the top, followed by a list of the operations. As fast as the goods

are cut, they are tied in bundles of one dozen garments. The tag is

then attached, the cutters' names or numbers are entered on the lines

opposite their operations, and the bundle is delivered to a storeroom

located conveniently to the machines.

[Illustration: Fig. 30. Record of Unfinished Piece Work]

[Illustration: Fig. 31. Production Record for Determining Piece Rates]

In the mill where this particular system is in operation, each

operator delivers her work to the storeroom and receives more work as

needed──always writing her name on the tag. When the work is received

in the storeroom, a clerk records the last operation on the operator's

time card, Fig. 26. One of these cards is used for each operator and

accommodates the record of work for an entire week. Provision is made

in the column at the left for a record of the kind of work, while

the record of dozens finished each day is shown in the proper daily

columns. At the end of the week, when extensions have been made, this

card shows the amount of wages due, the different kinds of work done,

and the quantities finished. In connection with this, the usual clock

record of total time is kept, and a comparison of the piece work and

clock records will show whether or not the operator is maintaining

standard time on the different classes of work.

[Illustration: Fig. 32. Sheet for a Record of Total Time]

In the manufacture of certain classes of cans, some of the operations

are paid for on a piece─rate basis; but payment is made on the basis of

the production of a crew. The operation of crimping tin ends on certain

cans, requires a crimper and several helpers, the latter preparing the

cans for the operation. For this operation, the pay of all members

of the crew is based on the number of cans finished; that is, if the

number finished by a crew consisting of one crimper and four helpers

is 2,000, the crimper will be paid for that number, while the helpers

will each be paid for 500. The form used for a record of production on

this operation is shown in Fig. 27. This is the assembled record, the

individual time records being made mechanically on a card, Fig. 28.

[Illustration: Fig. 33. Combined Piece Work and Time Record for

Pay─Roll Purposes]

On the operation above referred to, the speed of the helpers is limited

to the speed of the machine, but if three helpers instead of four can

do the work, the pay of each will be increased correspondingly. In the

operations handled by crews, there is nothing to limit production. The

result is that each member of the crew is obliged to maintain the pace

set by the most speedy member, which reduces the cost of production and

enables all members of the crew to earn a higher average wage.

A form of piece─work record, used in a factory where employes are

expected to keep their own time, is shown in Fig. 29. This ticket is

filled in by the employe, _O. K.'d_ by the foreman after inspection of

the work, and forwarded to the cost department. All unfinished piece

work is reported on the form shown in Fig. 30. This report enables

the cost department to determine the actual time of all piece─work

operations.

Before piece rates can be established for new work, it is necessary to

ascertain the average time required for the different operations. This

necessitates a very accurate record of production of employes working

on day wage rates, and the record must represent the average rate of

production of all employes, rather than the rate maintained by a few

of the most skillful. A form used in one factory for such a record

is shown in Fig. 31. When new work is started, one of these cards is

filled in for each employe assigned to the work, and a record kept of

each operation. When the records have been kept for a sufficient length

of time to obtain an average, the records of all employes for the same

operation are combined and, on the average thus obtained, the piece

rates are established.

PAYING EMPLOYES

=17.= The time records of all employes, no matter how kept, must be

assembled for the purpose of making up the pay─roll. Special forms of

time sheets or pay─roll records are designed to meet the requirements

of different classes of business. Several such forms are shown in other

papers in this series; others are illustrated herein.

A conventional form of time sheet is shown in Fig. 32. The names are

grouped on this sheet by departments, and opposite each man's name is

his number. The daily time records are kept for a period of one week,

then totaled, and the amount of wages extended in the last column.

Fig. 33 shows a form of time sheet intended for a tabulation of both

the clock record and job time. The bringing together of the total time

records (as shown by the clock) and the production time records (as

shown by the job time cards) is of very great importance in connection

with any system of cost accounting. One must be checked against the

other, for unless all of the time for which the employe is paid is

accounted for in the cost records, cost figures will be incorrect.

If the two records do not agree, even though the employe is paid for

the time shown by his clock record, the discrepancy should be adjusted.

Theoretically, every minute of a man's time should be accounted for by

his time cards and, when conditions permit, he should be paid only for

the time so accounted for. This rule should not be so rigidly enforced,

however, as to encourage a man in padding the time on individual jobs

to reconcile the total for the day with his clock record; it is far

better to have a few minutes unaccounted for. When a foreman fails to

have work ready, he should give the workman an idle or indirect labor

card, but the man should be impressed with the fact that accurate

records are kept of his time on every job, and that all lost time must

be either reported on an indirect labor card or left unreported.

The cost of time shown on indirect labor cards, and of all time

unaccounted for, should be charged to the department under some such

caption as _Department Waste_, never to the specific jobs on which the

man has worked. Time wasted between jobs or on account of a breakdown

or other unusual occurrence does not affect the legitimate time in

which a particular job should be done. It is rather a legitimate charge

against the efficiency of the department, and the aggregate of all such

inefficiency charges should be applied as an added burden to all of the

jobs in the department during the month.

Costs obtained, after adding this inefficiency burden, may be

considered the actual costs for the month, but cannot be safely used

as standard. Standard costs are the costs obtained under perfect

conditions──when the department, shop, or plant is running full time

at full capacity; when all of the time of every employe is accounted

for by his job time cards; when there is no wasted time or unusual

expense. While standard costs may not be attained──probably never will

be──this should be the goal, to reach which, managers, engineers,

superintendents, foremen, and workmen should strive constantly. As a

matter of record, therefore, to show what obstacles must be overcome

before the ideal is reached, the inefficiency burden should be added as

a separate item after all other items of cost have been computed.

As an example of the effect of the application of this principle

of considering efficiency in figuring costs, we will consider an

imaginary case. We will suppose that, in a certain month, the

pay─roll for direct or productive labor in our shop is $4,000; that

40 completed machines──identical in every respect──are produced; that

every minute of the time of every productive employe is accounted

for by his productive job cards. This gives a labor cost of $100 per

machine. During the next month the same men are employed at the same

cost──$4,000──but owing to an unusual breakdown, 2½% of the time of

these men is wasted; they are idle while the breakdown is repaired, and

but 39 machines are produced.

If the $4,000 wages paid is charged as direct or productive labor it

gives a cost of $102.56 each──an increase in cost with nothing in the

figures that shows the cause. If, however, an inefficiency charge of

$100 (2½% of $4,000) or $2.56 per machine is added as a separate

item, it is seen at once that here is an unusual item of expense. The

amount ($2.56 per machine) is included in the final costs, but in the

right place; there is no cause for confusion on account of an apparent,

but not real, increase in the productive labor cost. If the cost of

$100 per machine obtained during the preceding month is standard

for productive labor, it still is the attainable standard; the fact

of an unusual expense has in no way affected the legitimate cost of

productive labor.

Another great advantage in presenting the labor cost statistics in this

manner is that inefficiencies are shown in an understandable form.

The fact that indirect labor is increased, say 2%, might occasion no

comment; but if an inefficiency charge of even 1% is shown, it calls

for immediate investigation.

The establishment of standard or efficiency labor costs means

predetermined costs. This is a radical departure from established

custom; on its face, contrary to recognized accounting practice;

in results, wonderfully efficient. To determine standards in men,

material, and machines is a function of the engineer; the recording

of facts──the actual cost──is the function of the comptroller or

accountant. The two must work together. Properly prepared accounts,

showing actual costs with the items that make them segregated, show the

engineer how far short of possible standards the plant is running──the

extent of the inefficiency.

[Illustration: Fig. 34. Record Card for Applicants for Employment]

RECORDS OF EMPLOYES

=18.= In connection with the different time records designed to record

hours of service and units of production, there should be a personal

record of employes; and the more intimately personal it can be made,

the more valuable will the record become.

[Illustration: A BIRD'S─EYE VIEW OF THE PLANT OF STUDEBAKER BROS.

MANUFACTURING CO., SOUTH BEND, IND.]

Napoleon, it has been claimed, could call by name every man in his

armies, but, however great value may have been placed on such a memory

feat, the manager of the present─day great business organization, who

can call by name each of his employes, is an exception.

[Illustration: Fig. 35. Card for Record of Applicants]

[Illustration: Fig. 36. Card for Record of Employes]

It is not necessary that he should do so, for, as business is now

specialized and departmentized, he needs to know only the results

of the labor of those employes. By this is not meant that he should

not take an interest in the personality of his organization; on the

contrary, he should be very much interested, but he can be relieved

from burdening his mind with details by means of simple records.

Somewhere in the office there should be as complete a personal

record of each employe as is possible to obtain. This record should

include applicants, employes, and past employes, and it should be

the duty of some person or department to maintain the record. In the

smaller establishments, employes' records should be in charge of

the chief accountant, office manager, or superintendent; in larger

establishments, the employment department will keep these records.

[Illustration: Fig. 37. Card Showing Complete Record of an Employe]

=19. Application Card.= Fig. 34 shows a simple form of application card

to be filled out for every applicant who is not hired immediately,

but whose application receives favorable consideration. This card is

headed with the name of the position applied for, or the trade of the

applicant. Following this is the name and address, and such information

about the applicant as may be considered of special value.

These cards are filed in a regulation card index drawer and indexed

under the trade or position applied for. The index cards are headed

with the names of the trades employed, the departments, or such other

designations as may be best suited to the business. For instance, one

index might be headed _Machinists_. Back of this index the cards of all

applicants for positions as machinists will be filed in alphabetical

order.

A form of application card which provides for more detailed information

along certain lines is shown in Fig. 35. While this card is headed with

the name of the employe, it is filed under the trade, as described for

Fig. 34.

The value of these application records is apparent. When a man is

needed, reference to this file will show who has applied and assist in

getting a man quickly.

=20. Employe's Card.= One form of employe's card is illustrated by

Fig. 36. This card is filed as soon as a man is engaged. At the head

of the card is the name of the employe, the department to which he is

assigned, and his clock number. Following this is the address and other

essential information. Space is also provided for a record of changes

in wages, including both dates and rates. At the bottom of the card,

space is left for notes on the record of the employe, which can be

continued on the back of the card. The final record on this card is the

date the employe quits, or is discharged, with reasons.

[Illustration: Fig. 38. Card Record of a Past Employe]

Another form of employe's card is shown in Fig. 37. The special feature

of this card is that, for each increase in wages, the reason and name

of the person granting the increase is noted.

The cards of present employes are filed alphabetically by name.

However, in very large establishments, it is advisable to subdivide

them by departments and arrange the cards of all employes in the

department in alphabetical order. It is seldom necessary to arrange

the cards by trades for the reason that the names are, as a rule, so

classified on the pay─roll records.

The employe's record proves valuable in many ways. If, for any reason,

an employe is away from his work, and it is desired to communicate with

him, the address is quickly found; in case of an accident, resulting

in injury to the employe, the address is very convenient. Again,

when a man is wanted for a position a little above that occupied by

the average employe, it is best, if possible, to select a man from

the present employes. Whether the position be that of a gang boss,

a foreman, or the head of a department, a condensed record of past

performance, supplementing the personal observations of his superiors,

will be found of considerable assistance in selecting the right man.

Many other advantages might be named, but those given should be

sufficient to demonstrate the advisability of maintaining these records.

=21. Past Employe's Card.= In some respects, a record of past employes

is as important as the record of applicants and present employes. When

more men are needed, it is natural to suppose that past employes,

whose services were satisfactory, will be specially desirable. On the

contrary, a past employe who has been discharged, or whose work was

unsatisfactory, is unlikely to be desirable.

Any record that will show who the past employes are, why they left,

and their past record, will therefore be of value. Such a record

is provided by the card illustrated in Fig. 38. When an employe

leaves, for any reason, one of these cards is filled in and filed

alphabetically. At the same time, the employe's card is transferred

to another section of the file, and indexed under the name of the

department, or the trade or class of employment.

These cards furnish a very complete record of employes, past, present,

and future. If the number is small, all can be filed in one drawer,

with separate indexes to segregate them into classes. Or a large

cabinet, with one or more drawers for each class of records, may be

required, but, in any event, the records are complete.

MANUFACTURING ORDERS

=22.= One of the principles that must be kept in mind when installing a

system of any description is that provision must be made for recording

every detail of the work intended to be cared for by the system. While

this holds true in respect to the systems in every other department of

a business, it is of special importance in the manufacturing branch.

Accurate costs are out of the question unless every detail of the

operations of the plant is properly recorded.

Experience has shown but one method that will insure accurate

records, and that method is to manufacture all goods on definite

orders and to charge all work not applied to a specific manufacturing

order, to expense or operating accounts. The receipt of an order to

manufacture before starting the work, is of the same importance to the

superintendent as that the commercial department shall receive an order

from the customer before shipping goods.

Few managers will accept verbal orders for the manufacture of expensive

goods, without asking for a confirmation in writing. When those

orders are transmitted to the manufacturing department, it is just as

important that they shall be in writing.

Manufacturing orders are of two classes: general orders to the

superintendent to manufacture a certain quantity of goods, and specific

orders to shop foremen to do some part of the work. For convenience,

these orders will be referred to in this discussion as _Production_

orders and _Shop_ orders.

=23. Production Orders.= The production order is the written

instructions to the superintendent to manufacture certain goods. It

is his authority to secure the necessary material, to employ the

required number of men, and to convert that material and labor into the

finished product. The production order may call for the manufacture of

the quantity of goods of a certain type required to fill one or more

customers' orders; the manufacture of a certain quantity of goods to be

placed in stock, from which to fill future orders; the conversion of a

definite quantity of raw material into finished products; or even the

manufacture of an indefinite quantity of raw material into an equally

indefinite quantity of the finished product, but within a definite

period of time.

Usually the production orders of one factory will be confined to

one class, though there are some exceptions. In the first class, we

find shops manufacturing special machinery, jobbing foundries, and

mills manufacturing underwear and hosiery. In the latter business the

goods are sold in advance, from samples, and only the quantities or

particular styles required to fill orders are manufactured.

The second class includes furniture factories, typewriter factories,

the manufacture of tools, and numberless similar industries in which a

stock of standard goods is manufactured for future sale.

An example of the third class is found in a harness factory. In this

business, a certain number of sides of leather are issued to the

cutting room to be cut. Since the leather is not uniform in weight

or texture, it is not possible to cut an entire side of leather into

pieces of the same size, or the same parts of a harness──as lines or

traces. The cutter must use his best judgment, so cutting the leather

that it will produce the largest possible volume of usable stock, with

the least waste. The definite factor is the side of leather which is to

be converted into an indefinite quantity of finished, or semi─finished

product.

The last class is illustrated in the manufacture of salt. The

brine──raw material──is pumped from the wells into storage tanks,

from which it is drawn into evaporating pans or grainers. An order

may be issued to make what is known as _common fine salt_ in three of

these evaporators. Evaporating processes are influenced by atmospheric

conditions──the same heat will evaporate the brine much more rapidly

one day than another. Also, the brine is of different degrees of

strength──the same quantity does not always contain the same amount of

salt. The only definite factor is time──an indefinite quantity of brine

is converted, in a given time, into an indefinite quantity of salt and,

it might be added, of an indefinite quality.

When all these conditions are considered, together with the fact

that each manufacturer has his individual methods of conducting the

business──methods probably different from those of his competitors in

the same line──it will be seen that the variety of forms of production

orders is almost without number. But the important thing is to have an

order of some kind──to provide a record.

If there is one essential feature to be incorporated in the production

order, it can be expressed in two words──definite instructions. The

order should be made perfectly clear, leaving no room for doubt, as to

what is desired. When No. 3 dining─room chairs are wanted, the order

should state the fact very clearly, and not read _chairs_, leaving the

superintendent to guess the style and size.

[Illustration: Fig. 39. Production Order to Superintendent]

[Illustration: Fig. 40. Production Order Which is an Exact Copy of the

Customer's Order]

The form of the production order need not be complicated; indeed, a

simple form will serve the purpose much better, an illustration of

which is shown in Fig. 39. The heading of this order shows the number

and date, with instructions to the superintendent to carry out the

work as specified. The body of the order is blank, providing space for

entering such details as may be necessary. The blank at the bottom,

which is filled in by the superintendent's clerk, shows the date

received, date started, the shop order number, and the date finished.

[Illustration: Fig. 41. Sub─production or Shop Order]

This form is suitable for almost any kind of business or class of

order. The production order should always be made in duplicate, a copy

to be kept in the office. The office copy will be used to follow up the

manufacturing order.

In many lines of business, goods are manufactured only as required

to fill customers' orders. The order to manufacture should, in such

cases, be an exact copy of the customer's order as entered. With the

modern method of entering all orders in manifold──with a copy for each

record required──one blank should be included for the factory, this

becoming the production order. A form of this kind is shown in Fig. 40.

This is an exact copy of the order as entered, the instructions in the

heading taking the place of the name and address of the manufacturer.

The particulars include the number, date received, and date to be

shipped. The body of the order contains the necessary instructions; in

the column at the extreme left──quantity ordered, quantity shipped,

size, and description. This is one of a set of blanks that include the

invoice, office copy, cost department copy, and copy for the shipping

department.