In the establishment of a wage rate, the factor of time must be

considered, or the rate will not be equitable as between employer and

employe. The employer must furnish the shop, the tools, the power,

the heat and light. The cost of these items does not necessarily vary

in direct ratio with the increase or decrease in production. These

expenses must be absorbed by the finished product, therefore, even

under a piece─rate plan, the rate of production (the factor of time)

has an actual bearing on the rate per unit.

From the standpoint of the employer, the rate per unit should be based

on the productiveness of the individual, and should insure to the

most skillful, a wage as high as, or slightly higher than, he would

receive under the day─wage plan. This would, in theory, give to the

less skillful man a wage exactly commensurate with his skill. But as

workers become more and more skillful, and increase at the same time

their productiveness and their earning capacity above normal, there is

a tendency on the part of the employer to reduce the rate per unit to

bring the aggregate wage back to normal. The result is that the worker,

fearing a reduction in the rate, limits his production to the number of

units that will insure an average wage.

Thus the system fails in its object. It does not reduce the cost

of production to the lowest point. However, when piece rates are

intelligently applied they are found very satisfactory in certain

lines. But in all cases, the piece rate tends toward a uniform rate of

production, and, while reducing the cost of superintendence, involves

the expense of inspection. The latter, however, is not necessarily an

added expense, for, as a rule, inspection is required regardless of the

wage system in use.

=5. Premium Systems.= To obviate the difficulties found in both the

day─wage and piece─rate plans, the _premium_ or _bonus_ system was

evolved. This improved system of wages is intended to fulfill the

following conditions:

1. A guaranteed rate per hour for each grade of work for a contract

period.

2. An average earning power continuously higher than usual.

3. A lower cost per unit to the employer as wages automatically

increase.

4. A supplemental earning power, or bonus, to the worker above the day

wage, the bonus being based on efficiency.

The premium system is a combination of day wage and piece rate,

involving the establishment of standard times for stated tasks. It

is based on the theory that if, when a standard time has been fairly

established, the worker performs a task in less than standard time, he

is entitled to a bonus, or extra pay, for the time saved. The bonus is

based on the wage rate paid for standard time.

For what part of the time saved the workman should be paid, depends

on circumstances. It might be argued that the workman is entitled

to full pay for all of the time saved, but other factors than the

dexterity of the workman enter into the time saving. The employer

supplies additional power, there is an extra cost for wear and tear on

machinery, and an extra quality of material; all have a bearing on time

saving. The employer is, therefore, entitled to a part of the saving.

The original premium system is known as the _Halsey_ plan. There are,

however, several well─known modifications of the plan, all based on

efficiency, but each having certain distinguishing characteristics. No

more clear presentation of the essential features of the best known

premium systems has been made, than is found in a review by Mr. Carl

Bender, published in the Engineering Magazine, from which the following

is quoted:

HALSEY PREMIUM PLAN

To mitigate to some extent the evil workings of piece rates, Mr. F.

Halsey invented the premium plan shown in Fig. 1.

The slant of the wage line may be at any angle from horizontal,

straight piece rate, to coalescence with day rate line. This system

possesses at least four valuable points:

1. It pays day rates if a longer time is taken than standard.

2. It is a very flexible system and can be adapted to different

conditions.

3. It lessens but does not obviate the necessity of changing rates.

4. It lessens but does not wholly remove the inclination to limit

output.

It is in one respect a step backward, since it substitutes uncertainty

for definiteness as to wage costs. Nevertheless, the Halsey system

was an admirable step in advance. Usually the worker is given either

one─half or one─third the time he saves. Psychologically it is much

better than piece rate, since most workers are more inclined to lessen

their time than to increase the number of pieces turned out. A man

will deliberately decide that he ought not to turn out more than five

pieces a day, but he will not feel the same desire to avoid breaking

his own record of two hours per piece.

Under the Halsey system, no limit is placed on a man's earning power

per hour, and also a minimum piece rate of one─half or one─third the

initial rate per piece is allowed, so that if a man worked on his

own time, he would at least receive per piece one─half or one─third

standard pay.

[Illustration: Fig. 1. Diagram of the Halsey Premium Wage System]

TAYLOR SYSTEM

A fundamental departure was made by Mr. Fred W. Taylor, in his

differential piece─rate system, a diagram of which is shown in Fig. 2.

Mr. Taylor does not establish an initial time by guess or by assuming

a more rapid gait than on day work, nor does he appropriate other

unscientifically determined times. His method is to standardize all

conditions in the shop, to make them as perfect and smoothly acting

as circumstances will permit, and then to determine a reasonable

minimum time in which the job can be done. As a result, Taylor's

standard times are very much lower and also very much more carefully

and accurately determined than any system hitherto considered. Mr.

Taylor scorns the suggestion that by any chance the worker could earn

excessive wages. Any wages that an unusually efficient worker can

earn are legitimately his own. Assuming that under the Taylor system

a worker should do four pieces in four hours, his wages for the time

would be $1.00, but Mr. Taylor allows an increase of 20 per cent, 25

per cent, 30 per cent, or even more, according to the class of work,

for ascertaining standard time. Let us assume 20 per cent increase.

The worker then receives for four pieces in four hours, $1.20, a rate

of $0.30 each. For less than four pieces the maximum hourly rate is

$0.25, therefore $0.25 each. If the worker only delivers three pieces

in four hours, his earnings are only $0.75, or $0.1875 per hour. Mr.

Taylor's system awards, therefore, a heavy and increasing premium for

high efficiency, a heavy penalty for low efficiency.

The method of standard time determination is so rigorous that the

worker cannot figure on curtailing his output. He has to hustle to

make wages even at the low piece rate, and if he succeeds in this, a

very little extra effort will give him a higher piece rate.

The excellence of the system lies in the accuracy with which proper

rates are predetermined. It is, however, somewhat inflexible and not

so well adapted to work in which unforeseeable variations in time

occur.

[Illustration: Fig. 2. Diagram of the Taylor Differential Wage System]

THE GANTT BONUS SYSTEM

Mr. Gantt, a disciple of Mr. Taylor, introduced at the Bethlehem Steel

Company a bonus plan, see Fig. 3.

As in Mr. Taylor's system, the proper time is most carefully and

accurately predetermined. If the worker reaches the proper time, he is

given a bonus of 25 per cent above normal wages for the time. If he

does still better, he is given half of what he makes, as in the Halsey

plan. If he does not reach standard time, he is paid only 75 per cent

of normal wages for the excessive time, provided bonus earned permits

the imposition of this fine. If he had bonus to his credit he would not

be fined, however much he fell below standard.

This system has shown certain psychological disadvantages in practice:

1. The men have made it a point of semi─honor, among themselves, not to

do better than standard times.

2. Although the actual fines for failing to reach standard times were

insignificant, the men claimed that they were being robbed of thousands

of dollars in this manner. Neither fall─downs nor ability to lessen

standard time are always up to the man. It is therefore unfortunate

when a favorable chance occurs to lessen time, that the worker

deliberately holds back. It is also often unjust that he should be

fined for what may not be his fault.

Actual experience with these different wage systems brings out the fact

that psychology accounts for quite as much as any fair condition, and

that a good wage system must not only be fair but must also hit the men

right.

EMERSON EFFICIENCY SYSTEM

The most recent wage system is the Efficiency System, evolved

and perfected in theory by Mr. H. Emerson and his assistants and

practically applied by the officials in the shops of the Santa Fé

Railway.

[Illustration: Fig. 3. Diagram of the Gantt Premium Wage System]

This wage system superficially resembles the Halsey line, Fig. 4,

but in theory and in fact differs radically from all previous wage

systems, although it embodies much that was best in all of them. It

retains the principle of day pay irrespective of performance. It

retains in modified form the principle of a flat piece rate. Like the

Halsey system, it pays more per piece for less competent work. Above

all, it retains Mr. Taylor's and Mr. Gantt's principle of accurate and

scientific shop organization, including standard times for every job

and operation.

It pays a high premium above wage or piece rate for coöperation or

assistant foremanship on the part of the worker, and finally, as part

of regular and daily shop practice, it revises erroneous schedules

whether they be too low or too high, and it makes this revision

without lessening the earning power of the worker. In addition it

substitutes for the costly, annoying, inaccurate time recording of

each job, a general monthly efficiency record which covers the shop as

a whole, each department, gang, foreman, worker and job, and, based

on accurate study and efficiency, it predetermines, before work is

begun, the absolute cost of every operation.

These results are facilitated by recognizing that the attainment of

standard conditions as to all operations depends on four totally

different elements:

(1) The shop itself must be highly organized and efficiently operated.

This is a duty that devolves solely on the management, and for poor

organization and operation the worker is not responsible.

(2) The character of the work itself, the quality of materials, etc.,

may vary greatly on the same job at different times. Neither manager

nor worker is wholly responsible for this variation.

[Illustration: Fig. 4. Diagram of the Emerson Efficiency Wage System]

(3) Assuming standard shop and work conditions, the worker himself

can do much to coöperate with the management in making the other

conditions as well as himself effective.

(4) Costs should be standardized for the shop on a basis of normal

conditions and be adjusted in the counting room on the basis of the

monthly efficiency factor.

(a) As an incident to high shop organization and efficient operation,

the standard time required for every job should be scientifically

ascertained.

(b) To eliminate accidental and unavoidable variations in material,

etc., the worker is allowed to sum the standard time of all his jobs,

gaining on some, losing on others, averaging closely even.

(c) For coöperating with the management in eliminating wastes, the

worker is paid a 20 per cent bonus for the efficiency of 100 per cent,

which means, that the time taken for all his jobs must be equal to

the standard times allowed for all his jobs. If he takes 10 hours on

a 1─hour job and 1 hour on a 10─hour job, his average remains 100 per

cent.

(d) The same work is assumed to be done always in the same standard

manner. Variations from standard are a general charge or credit to

shop efficiency, not a specific variation in cost. A train passenger

is not charged more because his train has been delayed by a snowstorm,

or less because a fair wind and a clear track made the particular

train run less costly than usual.

Under the efficiency system the worker is entitled to standard day

rates, even if he is doing nothing. If, however, by reason of special

individual effort or skill, he does his work faster, he is entitled,

not to a part (one─third or one─half, as in the Halsey system), but he

is entitled to be paid in full for all the time he saves. As he has not

less coöperated with the management, he is, in addition, entitled to 20

per cent bonus for all the time he works.

Therefore, if a worker whose pay is $0.25 per hour delivers 300 hours

of jobs in a month of 250 working hours, he receives:

1. 250 hours at $0.25 $62.50

2. 50 hours saved, at $0.25 12.50

3. 20 per cent on 250 hours' pay 12.50

──────

Total $87.50

If, however, the worker does not so coöperate with the management as to

make the shop operate at high efficiency, himself included, he does not

receive as much extra pay, but a lessening amount until at 67 per cent

and below he is paid day rate and no more.

The diagram shows plainly the efficiency wage line beginning at 6

hours, showing 20 per cent increase at 4 hours, standard time, and

paying 4 hours time even if the work took no time at all──a condition

that arises practically quite often, as when a worker runs two jobs at

the same time, or when he does work on his own time.

While the diagram can be applied to a 4─hour job, the worker is not

paid by the separate job, but is paid straight day wages and a bonus

for his full─pay period efficiency. For each per cent of efficiency

there is a corresponding increase in pay.

For 100 per cent efficiency the increase is 20 per cent, and for each

1 per cent increase in efficiency above an efficiency of 100 per

cent, the pay also increases 1 per cent; therefore, for 120 per cent

efficiency the pay is increased 40 per cent. Below 100 per cent the pay

table runs as follows:

Efficiency Additional Pay

Per Cent Per Cent

67 0.00

74 1.

80 3.27

85 6.17

90 9.91

95 14.53

100 20.

The system has other merits:

(1) It standardizes not only the work of each worker, but also of every

foreman, every department, and of the shop as a whole.

(2) It therefore standardizes the shop cost of every job, whether it is

done by a cheap apprentice in two hours, or a high priced mechanic in

10 hours. The average shop or department efficiency factor equalizes

accidental variations.

(3) It separates absolutely all questions of wage rate from questions

of output, shop conditions, or individual excellence.

(4) It fines the management heavily if shop conditions are not

maintained so as to realize standard times.

(5) It puts no limit on the ambition or earning power of any man.

(6) Standard times are being constantly corrected. If the standard man

cannot average 100 per cent on his schedules, it is evident that some

of them are too short and ought to be lengthened. If on the other hand,

a new machine tool is introduced, new schedules are drawn up for it,

but the worker will not, on that account, make less than he did on the

old schedule.

It is too much to expect that any system of paying wages will

prevent an outbreak of selfish interests whether of employer or wage

earner. There will, however, be a distinct gain if the nature of the

disagreement can be made entirely distinct and plain. Clear thinking

must precede clear acting, and this description of different wage

systems may contribute towards clearer conceptions and more just

practice.

To establish a modern wage system, standard times must be determined

on a scientific basis, and the rate must not only be equitable as

between employer and employe, but, as Mr. Bender has said, "it must

hit the men right." Shop conditions must be right and every facility

given the workmen to attain standard time or better, including teaching

him how to do the work in standard time. The _speeder_ or _task

setter_ employed under the day─wage plan must be superseded by the

_instructor_, who, instead of selecting the most speedy worker and

basing standard times on his operations, first determines as closely

as possible what the time should be, and then teaches his men how to

attain that time. Where stop─watch methods foster discontent and breed

antagonism, instruction is followed by coöperation. The average man

does not object to doing a task in a stated time when he is given the

facilities for doing the work that will make that a reasonable time.

Add to this the incentive of extra pay for equaling or bettering that

time, and his coöperation is insured.

METHODS OF TIME KEEPING

=6.= Time keeping may be divided into two classes. The first class

includes methods of recording the total time that the employe works

during a pay─roll period. The second class includes methods of

recording the results of the labor of each employe──the quantity

produced, expressed in the units adopted by the trade in which he is

employed.

[Illustration: BATTERY OF HYDRAULIC PRESSES (3000 AND 4000 TONS

CAPACITY) IN HEAVY FORGING SHOP OF THE J. G. BRILL COMPANY,

PHILADELPHIA, PENNA.]

Ordinarily, trading concerns require records of the first class only,

the pay of the employe being based on the time spent, rather than on

the quantity of his production. This is because of established custom

and the difficulty of measuring his production. Primarily, the pay of

the employe is based on his efficiency, but it is not always practical

to attempt to reduce the results of that efficiency to standard units.

Manufacturers require records of both classes. Not only is it necessary

to know how many hours each employe has worked, but the quantity of

production must be known.

It is true that a manufacturing business requires the services of some

employes whose productiveness is not readily expressed in standard

units, in which cases the first method only can be used. These are

the men who are necessary to the economical operation of a department

or shop, or of the plant as a whole, but whose time cannot be charged

to a particular job. Labor of this class is termed _indirect_ or

_non─productive_.

The labor of most employes in a manufacturing plant is applied directly

to the production of specific articles, or to the completion of certain

definite jobs. This makes it possible to reduce the results of their

labor to definite units. Labor of this class is termed _direct_ or

_productive_.

Records of production, as well as records of time, are necessary for

two reasons. First, when the piece rate or the more modern premium

system is used, employes are paid according to the number of units

produced. Second, to obtain accurate records of costs, it is necessary

to have accurate records of production.

For the purpose of determining the amount of wages due the piece

worker, time records are not needed; records of production supply the

information required. But to determine the actual labor cost per unit,

time records are needed even in the case of piece workers. Piece rates

are based on continuous production at a uniform rate. A marked falling

off in production means a perceptible increase in the cost per unit for

overhead expense. For example, we will suppose that a manufacturer has

$50,000.00 invested in machines operated by piece workers. One of the

definite items of expense to be apportioned to the product of these

machines is interest, at say five or six per cent. If production falls

to one─half of the normal quantity, because one─half of the machines

are idle, the amount of this one item of expense that must be borne

by each unit of production is doubled. Or, we may have two workers

operating identical machines on the same class of work, the production

of one being twice that of the other. The overhead expense is the

same for each employe and each machine, consequently the cost of the

finished product is affected by the factor of time. The piece worker

who fails to maintain the rate of production established as standard in

his or her trade, is not a profitable worker.

=7. Time─Keeping Systems.= There are several systems or methods of

time keeping in use. No one system is adapted for use under all

conditions. Like all other classes of records, the time─keeping system

must be selected with reference to the conditions under which it is to

be operated. The system used in a factory, where all operatives are

housed in one or more buildings, is not well adapted to the needs of a

contractor whose men may be working on jobs located at points widely

separated.

In this discussion, we will consider first the systems used to record

the total time employed. This will be followed with descriptions of

systems for obtaining records of production.

=8. Time Book and Check Systems.= Of the time─keeping systems that have

been at some time considered standard, the oldest is the time book kept

by the time─keeper. This system required the time─keeper to identify

each man at work, and to record, opposite his name in the time book,

the number of hours worked each day. Sometimes a special time─keeper

was employed, or the foreman might keep the time book for his own men,

the time books of all foremen being turned in for the purpose of making

up the pay─roll. A system so dependent on the memory of one man never

could become satisfactory.

With the object in view of doing away with the mistakes that were

continually being made in the operation of the time─book system, the

check system was introduced. This was probably the first attempt at

automatic time recording.

Under the check system, each man is assigned a number and given a

brass check on which his number is stamped. In entering the works the

men are required to pass in front of the time─keeper's office and to

hand in their checks. The time─keeper has, in his office, a large board

with hooks numbered to correspond with the check numbers. As the checks

are handed in they are hung in their proper places on this board. The

checks on the board show what men are in the works, and from them the

necessary entries are made in the time books.

When the men pass out at noon their checks are handed to them. Every

man must pass out and take his check; otherwise he will not receive

credit for the half─day's time.

The system does not prove entirely satisfactory for several reasons.

It is not exact, for no accurate record of the time a man enters is

possible. Usually the time─keeper's window is closed at starting time

and opened fifteen minutes later to take care of the late arrivals.

Thus the man who is one minute late pays the same penalty in lost time

as the man who comes in fifteen minutes after the whistle blows. As a

natural result, when a man finds that he cannot reach the works on time

he takes the full fifteen minutes.

While the handing in of a check furnishes reasonable proof that the man

has entered the works, it furnishes no proof that he is at his work.

Many a man has turned in his check in the morning, left the works by

another exit, returned a few minutes before noon, received his check

and full pay for the half day.

In some manufacturing plants where the check system is still used, this

difficulty has been overcome to a certain extent. The operation of the

system is reversed, the men receiving their checks from the time─keeper

as they enter the works. In the shops there are check boards on which

the men hang their checks. These boards are hinged and provided with

locks, the keys being carried by the foremen. Five minutes after

starting time the boards are locked, and late arrivals are required to

turn in their checks to the foreman who makes records of the time of

arrival. Once during each working period, the time─keeper makes the

rounds of the shops and takes the time records in his time book. At the

quitting hour the boards are unlocked, the men take their checks as

they pass out, and turn them in at the time─keeper's office.

=9. Time Clocks.= The modern system of time recording makes use of a

time clock or mechanical recorder. Instead of trusting to the accuracy

of a time─keeper, or depending on the workmen to keep records of their

own time, the modern recorder automatically records the time of arrival

and departure of every employe.

Cyclopedia of Commerce, Accountancy, Business Administration, v. 02 (of 10) · 第 4 / 23 段