they allow water to trickle down them, which must either be absorbed by
the earth or find an outlet; a slippery surface is thus created and the
tenacity and continuity of the soil impaired or destroyed; separation
also takes place in non-homogeneous earths such as boulder clay and in
embankments formed of rock and earth tipped together. It is practically
impossible to fill or pun every fissure that may appear in a cutting or
an embankment, but as there are generally places where slips are more
probable than others, it may be advantageous in treacherous soils to
adopt a regular system of filling the fissures, especially before the
wet season commences.
Coverings can also be made of a thin coating of burnt ballast, hard
chalk, or gravel, which will reduce the number of cracks or crevices, or
a mattress of fascine work can be used at the toe of the slope in
submerged work, but care should be taken that the mattresses overlap and
that there are no open places between them, or, instead of being a
protection they will then be a source of danger by conducting water
between the joints; for this reason, as with any other material having
loose openings, it is advisable to use them over a continuous surface so
that percolation may be uniform and not simply for weak places or for
the purpose of repairing a slip in an earth embankment. The chief aim in
fascine work is to thoroughly bind the work together so that it is of
equal strength in all directions, and a little time after construction
should be allowed before deposition in order that the material may
settle, as an even surface is important. The most durable material
should be used in making a fascine covering, willow being the best, or
it may require constant renewing. Alder, aspen, and the best available
brushwood are also employed, and straw and ordinary matting for shallow
embankments, say up to 8 feet in height, which lasts only six to twelve
months. The best time for cutting should be locally ascertained, and
when they commence to deteriorate after being hewn, generally from three
months to a year, depending upon the season in which they are cut, &c.,
&c. In England, thorn switches have been used in lengths of 5 to 6 feet,
tied up with tarred rope in bundles having a diameter of about 1 foot,
every endeavour being made to bind and interweave them. Care must be
taken that the mattresses are well loaded or they will float; the
loading should commence at the centre, and be equally continued in all
directions, as that has been found to be the best method; they should be
made to sink evenly if they have to be lowered through water, and they
must be prevented from curling up at the edges. The props which fix them
must not be too close to the border, or near the centre, as then the
extremities will be torn away or bent upwards. The system of fascine
work may be very useful for protecting sandy and soft foundations in
such situations, to prevent slips in the slopes of an embankment and in
providing a firm bed, and also for making training banks, groynes, and
spurs, for correcting and directing a current in a desired channel, and
to secure freedom from slips in a river-bank. Depending upon the degree
of looseness of the sand or sandy bed, loaded fascine mattresses will
assume a slope of from 1 to 1 TO 5 to 1 if allowed to sink in the bed,
and after they have settled and reached the angle of repose which the
action of water will effect; the large number of structures standing
upon them for many years in considerable depths of water proves, when
they are properly made, that they are to be trusted in comparatively
unexposed situations.
A covering of stone pitching may be necessary, but in unsubmerged work
it has some disadvantages for, having joints, it allows unequal
penetration of water through them and impedes the equal discharge of
water from the earth, although its weight is a recommendation as it
opposes and may balance a pressure of water behind the slope. However,
unless it is bedded upon a layer of soil of equal permeability, such as
gravel laid upon a nearly impermeable bed of clay, which should always
be mixed with sand to prevent it fissuring and bursting by heat or
water, so as to convey the water that has percolated and also that which
exudes through the slope; it may cause a localization of the flow, and,
except in peculiar cases and provided the slopes are covered, there is
no occasion for pitching if merely used to prevent slips and not
erosion, as obviously weight and a secure protection may be obtained by
other means and at less expense. For the protection of the slopes of
rivers or canals or submerged work the case is different, as then
pitching prevents erosion and may be the only secure preservative in
exposed situations, although generally the most expensive. The pitching
should rest upon a bed of permeable material, and this layer should have
a power of suction and distribution more than equal to the quantity of
water that may penetrate the joints of the pitching; there should be a
bed of impermeable material next to the soil, and in exceptional cases
even two to carry off any water that has percolated, so as to obviate
any lodgment of water, due provision being made for the land drainage
discharge.
Sir James Brunlees, Past-President Inst. C.E., found by experiment that
at a slope of 2 to 1 pitching has the greatest resistance to extraction,
_i.e._, it requires a greater effort to extract a brick at that slope.
Taking the slope of 2 to 1 as unity, the relative resistances were found
to be as follows:—
1 to 1 slope 0·71
2 to 1 slope 1·00
3 to 1 slope 0·97
4 to 1 slope 0·66
The resistances at 2 to 1 and 3 to 1 are practically the same.
Should it be determined to pitch the lower part only of a slope, in
order to prevent slips, the pitching must continue to such a height that
a flow of water down the slope is impossible, or it may become detached.
If the pitching is not rough squared on the joints, but of various
forms, it is preferable that the face having the largest area be laid
downwards, smaller stones being carefully wedged in between the
interstices. Any defective execution is usually followed by a falling of
the stones, and should this happen the surface will be broken and
erosion and slips will ensue. In laying the stones they should be so
placed that if a few become removed those above or upon the sides will
not be disturbed, and in loose soil no pitching should be laid until an
embankment has had time to settle and consolidate, which the necessities
of rapid execution may prevent, for however even the pitching may be
when first laid, it will settle and become more or less uneven in such
soil as sand or estuary slake, and every effort should be made to leave
no hole or exposed surface, but to cause a continuous close covering.
Fascine mattresses may have to be used in such a situation, as they will
follow the contour of the slope. Should the slope be subject to
considerable wave action, smooth surfaces offering the least frictional
resistance, obviously aid the travel of a wave, which is undesirable,
and provided the embankment is sufficiently strong a rougher surface is
to be desired. Projecting stakes tend to subdivide a wave.
Should pitching be required to be placed partly upon the face of a
cutting and partly upon the slope of an embankment, as in the case of a
canal upon sidelong ground, care must be taken that it does not settle
unequally, and provision should be made by setting it upon a pervious
layer, so that any damming back of drainage waters may be prevented. The
weight of pitching upon a slope affords a counter-pressure to that of
any water in the slopes which may be trying to emerge. Chalk rubble,
also hard chalk, or gravel has been used in lieu of stone pitching for
protecting slopes against erosion.
With the exception of retaining walls, the preceding may be considered
as the principal means, used separately or in reasonable combination,
for covering the surface of a slope in a cutting or an embankment.
A frequent cause of instability of the slopes in countries having severe
winters is the melting of unequal masses of snow, the result of drifts,
and also from the thawing of a considerable snowfall. The chief
preventive measures against snowdrifts and consequent protection to the
slopes, although not a covering, may be stated to be as follows:—
1. Locate the line in a naturally sheltered position, which it is most
improbable can be done throughout its length.
2. Adopt tunnels, covered or sheltered galleries where the district is
subject to avalanches or snow-slips.
3. Prevent drifts by permanent or portable screens such as earth mounds,
trees, hedges, fences, &c.
4. Obstruct drifts by having deep trenches some distance from the top of
the slopes.
5. Avoid cuttings as much as possible, and make the line upon an
embankment of such a height as to be above the depth of the drift snow
in similar situations.
6. Construct the embankments from side cutting, instead of cutting, so
that the trenches may catch the snow before it reaches the railway.
7. Make the slope much flatter than its angle of repose.
8. Increase the width of the formation so as to lessen the depth of a
drift, and to enable a snow-plough to more readily discharge its
excavation.
With regard to the preventive measures enumerated.
No. 1.—As a rule this can only be practised to a limited extent
consequent upon traffic requirements and the configuration of the
country.
No. 2.—Shelter-galleries are found to be generally effectual, but
obviously are expensive; they may, however, be the only means to adopt,
as any obstruction to a snow-slip is avoided. The slope of the top of a
covered or shelter-gallery should not be steeper than that of the hill,
so as to offer no impediment to the free passage of the snow.
No. 3.—Experience has proved that permanent screens are to be preferred
to portable shields, and that ultimately they are the more economical.
The excavated material, either from a cutting, drains or fence-ditches,
is generally used for the earth mounds so as to save expense; their
height, which is often from 7 to 10 feet, of course is governed by the
greatest depth of the snowfall, degree of exposure and usual direction
of storms, wind, and drift. Should these vary much, in an open air line
it may be impracticable to entirely shut out or prevent drifts, but the
protective works will lessen drifting and may reduce it to manageable
proportions.
A simple earth dam is seldom sufficient, owing to the impelling power of
the wind upon the snow-flakes and the considerable height at which it
acts; therefore, fencing has been fixed in the top of the mound, or
trees and shrubs planted, also old sleepers have been successful when
simply closely driven into the surface of the original ground. A screen,
consisting of one or more rows of trees or shrubs placed at a little
distance from the top of the slope of a cutting, is that most generally
preferred. It is made either double or single, as may be thought
necessary. In Germany, hedges of fir trees similar to Christmas trees
have been found to afford excellent protection. In France, pine trees
planted upon the cess have effectually prevented serious snowdrifts.
In sloping ground, mounds or dams, screens, plantations of trees and
hedges in very exposed places have been insufficient to prevent some
drifting and accumulation of snow in a cutting, and a mound or fence has
consequently been erected upon the plateau at the top of the hill a
sufficiently safe distance from its face that snow-slips, which might be
increased into avalanches, were prevented from reaching the slopes or
formation. A drain should be cut upon the higher side of such a hill-dam
or fence so as to carry away the snow-water upon a thaw, and prevent the
earth becoming in an unstable condition.
No. 4.—This system is generally used when an earth mound is also adopted
and it has to be deposited from side cutting. The trench, of course,
should be on the side of the mound farthest from the main cutting. As a
snow-catcher it is successful, especially in shallow embankments, for it
not only retains snow that would otherwise heap, but drains an
embankment.
No. 5.—This depends upon the configuration of the country, but as
cuttings act as traps to catch snow, if possible they should be avoided;
and particularly when of little depth, as it is found they quickly
become choked, and want as much protection as deeper excavations, and
from being more exposed to the cold air, the snow in them becomes caked
and frozen, and requires breaking up before it can be removed.
Embankments of a height a little above the ground, and the greatest
depth of the uniform snowfall of the country, are to be preferred.
No. 6.—Generally approved, as not only affording an advanced
catch-trench, but because it acts as a permanent drain.
No. 7.—This is a controverted system. Some engineers object to it as
facilitating the deposition of snowdrifts; others approve, upon the
ground that by flattening the slopes the snow can drift freely and will
fall equally upon the formation. The balance of experienced opinion
seems to be rather against the adoption of flattened slopes, unless they
are made very flat, such as from 4 to 1 TO 10 to 1, at which latter
slope snow it is found does not usually accumulate but passes on
depositing only its general depth: and additional means of protection
are afforded, and appears to indicate that the unaided system is only
well adapted for countries in which winds of great force are generated,
such as the “blizzards” of North America.
No. 8.—It is found that increased width of the formation of a cutting is
an advantage, as it retards choking, facilitates clearing operations,
and provides room for shovelling snow from the permanent way, whether
effected by a snow-plough or by manual labour.
With regard to the formation width, _i.e._, the width of the bottom of a
cutting or the top of an embankment, and the prevention of slips in
earthwork, ample breadth is necessary in cuttings for the purposes of
drainage, although less in a rock cutting than in that of ordinary soil,
and the extent of the top of an embankment has some influence in the
promotion of stability. The required width of the formation must be
principally regulated by the character of the earth, the amount and
suddenness of the rainfall, the height of an embankment or depth of a
cutting, the degree of exposure, the exigencies of the traffic, and the
required drainage. In wet cuttings the formation should be wider than in
dry earth, and the side ditches should be made larger, especially when
there is a steep gradient in a long cutting, in order to keep the
formation and the permanent way in as dry a state as possible and aid
traction, for the coefficient of friction of the wheels of a locomotive
will then be greater than when the rails are damp and greasy. In cold
climates the width of the formation is often increased so as to lessen
the depth of snowdrifts, and to enable a snow-plough or men to more
readily deposit the excavated snow and clear the track, as has been
referred to in the immediately preceding pages; and in severe climates
in wet places ample width in cuttings is found necessary, as drains
frequently have to be cut in them as deep as 4 to 5 feet to afford a
free flow for and to prevent an accumulation of water. In temperate
climates the width can be much reduced. When the formation is narrow the
simple percolation of water through the slopes of an embankment, unaided
by any aqueous action caused by fissures, may gradually saturate the
mass, and as the wider the formation the larger the cross-sectional area
of an embankment, it follows that increased resisting power to
deterioration is obtained by widening the formation, as there is more
earth to absorb the water.
A train upon the permanent way will make a force act downwards until it
meets with sufficient resistance to cause reaction. The direction of the
resolution of these forces is towards a slope, therefore, the farther
the surface of a slope is from the line of action and reaction, the
greater is its distance from the disturbing force and the lateral
resistance it receives from the mass. In the case of a solid rock
foundation and a homogeneous embankment in the same state of
consolidation throughout its mass, the direction of the forces might be
accurately delineated, but as such a uniformly homogeneous and equable
condition seldom exists in railway embankments, it cannot be absolutely
said that the forces act throughout upon certain lines; however, it is
advisable to ascertain the probable direction of the forces.
The allowance for lateral settlement should be liberal and be regulated
by the nature of the earth, the height of an embankment, and other local
conditions of situation and rainfall that affect earth, many of which
are named in other chapters. It will vary greatly, and may be anything,
from 5 per cent. to 100 per cent. additional width of formation. An
addition of from 5 to 10 per cent. of the height of an embankment is
usually sufficient, but in clay sand and such soils an embankment may be
slowly washed away by rain until it has shrunk to half its required
width. As an embankment settles or weathers the width of the formation
should be maintained without having to steepen the slope, widen the top,
or erect a wall upon the formation in order to hold the added earth. The
additional formation width of embankments is also a provision against
the effects which the “lurching” of an engine may cause by its weight
temporarily acting upon one rail, and the pressure to be in the 4 feet
8½ inches gauge at a distance of about 2 feet 6 inches from the centre
of the permanent way. For some distance upon each side of the point of
junction of two high tip heads the top width should be increased, _vide_
Chap. IX., and in sidelong ground it is advisable to widen an embankment
more on the upper side than the lower, as slips seldom occur upon the
higher side; and in the case of railways, should the lower slope move,
the rails can be placed towards the hill, and perhaps away from the
slipped portion of the embankment.
With respect to the deteriorating influence of vibration as regards the
slope of a cutting or embankment, it is well established that vibration
will cause movement in a retaining wall which would otherwise be stable,
and that soils possessing considerable powers of cohesion are not so
easily affected by vibration as those of a looser character consisting
of particles having more or less rounded surfaces; but the action of
water may produce seams in such earths as clay, and create a smooth
greasy sliding surface upon which any reposing mass may but require the
least disturbing force, on the principle that the least impact is
sufficient to impart motion to the largest body; such as a man walking
upon it or the tread of an animal, to unbalance the delicate state of
equilibrium. This action may be gradual, continuous, and increasing, as
the earth will always be subject to changes of weather. On the contrary,
vibration in soils having particles insoluble in water, provided water
does not dissolve any cementing material between them, may cause them to
equally settle and become firmer by being pressed together than if they
were not subject to such operation, and should the particles wedge by
shaking and the slopes be sufficiently flat, vibratory motion may, under
these circumstances, tend to consolidate certain earths in an
embankment; but not so in the slopes of a cutting which vibration must
disturb by reason of it agitating and loosening the surface and making
it less dense. For instance, in sandy soils the surface friction on a
cylinder, when sinking operations are not being prosecuted and when the
material is being raised from the interior, is different; the latter
resistance being from 20 to 25 per cent. less than the former,
consequent upon the disturbance, and although fine, soft drift sand
usually presents greater frictional resistance than firm sand, it
obviously cannot be taken as equal to that of firm sand, as it is
quickly dissipated.
The conditions of earth being so very diverse no rules can be deduced,
for even the effects of such stupendous force as that of earthquake
vibrations vary according to the nature of the ground, however, the
weakening effects of vibration are undoubtedly very considerable. It is
known that the lateral thrust of earth is thereby much augmented, and,
therefore, that the strain upon the frictional resistance and the
cohesion of the earth is increased; and experiments have shown that when
a wall is nearly strained to the point of overturning, slight vibration
will quickly destroy the equilibrium, thus demonstrating that it adds to
the lateral pressure. An analysis of some reliable experiments proves
this increase to usually range from 10 to 60 per cent., but it is
evident that the practical effect of any increase may be very much
greater than a mere computation of the increment, for it may supply the
additional strain, however small, necessary to initiate a movement,
hence the danger.
As collateral testimony to the important effects of vibration may be
mentioned:—
A comparison of the coefficients of friction during motion and those at
the commencement of movement or of repose.
The existence of a nearly vertical face generally assumed, when unshaken
by artificial means, in the bared top earth in a quarry, shallow well,
gravel or sand pit, pond, and even a river-bank or a cliff, which
experience has proved could not be maintained when subject to vibration.
The fact that timber piles, which are chiefly supported by the
frictional resistance of their surfaces, will not sustain a rolling,
_i.e._, a vibratory, load equal to that of a fixed load, and also that
the method of driving in soils easily disturbed, such as sand, is also
considered as reducing the safe load according to the percussive action
and frequent vibration caused by a pile-driver, whether worked by steam,
hand, or by means of an explosive substance. As further proof may be
named that in pile-driving, especially in open soil, piles continually
driven penetrate the earth considerably quicker and easier than if
driven at intervals, as the latter system allows the soil to settle
round them and the loosening and friction destroying effects of
vibration are lessened.
The experiments made by Mr. J. A. Longridge, M. Inst. C.E., for Mr. G.
R. Stephenson, Past-President Inst. C.E., in Morecambe Bay, England,
showed that by vibration the bearing power of driven timber piles was
reduced to one-fourth or one-fifth of that when subject to a steady
non-vibratory load.
Its deleterious effect on the structure of such a solid substance as
iron, &c., particularly when it is loaded beyond its elastic limit.
It is generally agreed that a substance is broken sooner when a load is
intermittingly imposed than when the same load is permanently placed
upon a structure.
The experiments of Professor Stokes, 1849; M. Phillips, 1855; M.
Renaudot, 1861; M. Bresse, 1866; and recently of Dr. Winkler and others,
show that the increase of the intensity of strain consequent upon the
dynamic effect of a suddenly-applied moving load may be as much as 33
per cent. more than that of the computed statical pressure.
The fact that in masonry piers of considerable height and small
dimensions, as in piers of viaducts, the vibration caused by trains
loosens the brickwork or masonry and necessitates frequent repairs.
The theory that the particles of all solid bodies may be in a state of
continuous vibration and motion, though there may be no means of
rendering their motion visible, has not been refuted by deductive
reasoning; but, on the other hand, it is in accord with the theory that
“motion communicates itself among material bodies, and is never lost;
when it appears to be so, it in fact only passes from the moving body
into other bodies which are at rest, or are endued with a less velocity,
and at length it becomes insensible in consequence of its enormous
diffusion. In fact, motion can only be destroyed by motion; resistances
and friction disperse it, but do not destroy it.”
The laws of statics and dynamics are well established, and are fully
described in many admirable works upon mechanical philosophy; so far as
the subject of this book is concerned that which is required to be
answered is the question. Have the deleterious effects of vibration upon
earthwork in various conditions been determined so as to be of practical
value?
Not by experiment upon a large scale, nor is it probable that they will
be; but they have been deduced from experience, reasonable inference,
and experiments on a small scale, as has been before mentioned.
The effect of vibration is usually more marked in cuttings than in
embankments, although it may nearly approach when they are of little
depth or height: because a train in a cutting is contained within the
area excavated, whereas in an embankment it is without the area
deposited. In a cutting vibration commences upon the formation level and
the toe of the slopes, the latter the most vulnerable parts and those
most strained. In an embankment it proceeds through the formation to the
base and the toes of the slopes which are necessarily the most distant.
On the other hand, the material in an embankment is generally in a
looser and lighter condition, and therefore more inclined to move and to
suffer from vibration. It may also be greater upon one side consequent
upon the “lurching” of the engine and carriages.
Obviously, vibration is increased with the speed and weight of a train;
probably a short, heavy train travelling at high speed causes a more
deleterious effect than a long heavy train travelling at a slow speed:
also the higher an embankment or the deeper a cutting the greater the
area of the cross section. Assume a train weighs 100 tons, and the
weight of the earth is 112 lbs a cubic foot, or 0·05 of a ton; it might
be considered that the effects of vibration would be less as the areas
increased. Consider the formation to be 18 feet in width and the slopes
1½ to 1, the respective areas of cross section would be as follows:—
───────────┬───────────────────────┬───────────┬───────────┬───────────
Height. │ Area. │ Weight of │ Weight of │ Ratio of
Feet. │ │ the │the Train. │the Weight
│ │Embankment.│ Tons. │ of 1 Foot
│ │ Tons per │ │ Lineal of
│ │ Lineal │ │ an
│ │ Foot. │ │Embankment
│ │ │ │ to the
│ │ │ │ Weight of
│ │ │ │the Train.
───────────┼───────────────────────┼───────────┼───────────┼───────────
│Square Lineal Ton. │ │ │
│ Feet. Foot. │ │ │
10 │ 330 × 1 × 0·05 = │ 16·5│ 100 │0·165 to 1
20 │ 960 × 1 × 0·05 = │ 48·0│ 100 │0·480 to 1
30 │1,890 × 1 × 0·05 = │ 94·5│ 100 │0·945 to 1
40 │3,120 × 1 × 0·05 = │ 156·0│ 100 │1·560 to 1
50 │4,650 × 1 × 0·05 = │ 232·5│ 100 │2·325 to 1
60 │6,480 × 1 × 0·05 = │ 324·0│ 100 │3·240 to 1
───────────┴───────────────────────┴───────────┴───────────┴───────────
NOTE.—For the purpose of a comparison of ratios it is not necessary
to consider the length of the train.
A simple inspection of the above ratios would lead to a supposition that
the effects of vibration would be no less than 3·210/0·165 = 19·6 times
greater in a 10 feet than in a 60 feet embankment. Merely comparing the
weight of a train with that of an embankment, and assuming that the
results of vibration at the same rate of speed are so governed is
incorrect, for the effect of vibration at the formation level is not
regulated by the height of an embankment or the depth of a cutting. The
weight of a train may bear a very small relation to that of the quantity
of earth slipped, yet the soil may have gradually become in such a state
of delicate equilibrium that at last the least vibration will destroy
it, even a little of the top soil falling upon the slope; and it
frequently occurs that a slip commences by the detachment of a few small
lumps and increases until it becomes of serious dimensions; therefore,
the area of a cutting or embankment cannot necessarily be considered as
reducing vibration although the source of disturbance may be more
distant; but, of course, the heavier the mass the greater the weight and
speed required to cause the whole to vibrate.
Lighthouses and such exposed works being constantly subject to
vibration, the experience gained through their behaviour may be
considered as indicating the direction in which the stability of
structures in analogous situations has to be sought. It is generally
agreed that it favours weight and bulk, as they are unchangeable, and
shows that although the form, execution, and the material may be
perfect, a light fabric will gradually be deteriorated by constant
tremor and vibratory motion, at length culminating in the loosening and
separation of the parts.
Except from actual experiment in each case, it is impossible to
determine the greatest weight of and the speed at which a train should
be allowed to travel so as to prevent any deleterious effect from
vibration, and the circumstances are so various that a practical rule
cannot be deduced, except by assuming conditions from experience alone,
which would so modify a formula as to make it show any desired result,
and cause it to be regarded as too complaisant to be trusted. Perhaps
the best test of the effects of vibration that any earthworks can
receive is when a temporary railway is laid upon the formation or cess
for the carriage of materials, and in a lesser degree a steam excavator,
as the weight and vibratory action may show the weak places in a
cutting, or so shake portions of an embankment that should the earth be
unstable a slip will soon occur.
CHAPTER VIII.
EARTHWORKS IN OR UPON SIDELONG GROUND.—SOME INSECURE
CONDITIONS.—PRECAUTIONARY MEASURES.—EMBANKMENTS UPON SOFT
GROUND.—EMBANKMENTS COMPOSED OF SOFT EARTH.—THE PROMOTION OF
STABILITY AND CONSOLIDATION.
With regard to earthworks in or upon sidelong ground, the configuration
of the surface conduces to a movement of the hill-slope of a cutting,
and the centre of gravity of an embankment is not in the middle, and in
a narrow embankment may be outside the central portion, the tendency,
therefore, is for the slope of an embankment on the upper or hill-side
to assume a steeper inclination than that on the lower, as the earth is
tipped against the inclined ground until the point is reached where a
perpendicular erected upon the surface of the ground cuts the top of the
inside slope. This slope, if protected from weathering, might be allowed
to stand at the inclination at which it remains when tipped, and be
simply trimmed and covered; but the toe of the slope on the lower or
valley side is especially likely to slip, and therefore, every
precaution should be taken to prevent movement. A retaining wall is a
certain protection, benching the ground, weighting the foot of the
slope, dividing it into benches about 10 to 15 feet apart, varying in
width from 5 feet and increasing according to the depth; the benches
having sufficient inclination to prevent an accumulation of water;
counterforting the slopes in dry and mild weather with simple earth
counterforts 5 to 12 feet in width at intervals, and in length about
twice their height with a reasonable slope, the height being about half
that of the embankment; a dry retaining wall may also be erected in
temperate climates and in a comparatively unexposed situation: are all
precautionary measures that can be adopted. But in the case of a cutting
in drift or permeable soil upon rock or an impermeable surface liable to
become wet, which not infrequently occurs, the conditions of equilibrium
may easily be destroyed, and the slope upon the higher side may not
stand at a less inclination than that of the hill. Obviously this slope
cannot be obtained either in cuttings or embankments, therefore,
provided the drift is of considerable depth and treacherous, means must
be taken to prevent movement, and drains should be inserted so as to
make the earth capable of standing at a steeper inclination than it
naturally assumes; and in order to drain the ground at the seat of an
embankment, a trench on the valley side filled with stones or supported
by other means acting as a wall and drain can be made. Every precaution
should be taken to prevent any accumulation of water in earthworks in
sidelong ground, and to gently control them, and to promote this object
it is well that lateral outlets be opposite to each other so as to
afford through drainage and an unobstructed flow.
As drift soil upon the inclined surface of a rock may be held by
friction, the least change may impair it sufficiently to cause movement,
therefore it is advisable to have a narrow gullet or heading excavated
in short lengths, followed _pari passu_ with protective works, whether a
retaining wall or not, so that the earth is weakened as little as
possible by exposure and deprivation of its usual support; and there are
many places in which, unless the system of excavating in short lengths
be adopted, failure and slips must result.
In sidelong ground the formation is frequently partly in cutting and
partly in embankment, if so, and the drain is impermeable and can be
thoroughly relied upon, it may be advisable to make the formation
incline towards the hill, so as to drain it, lessen, and perhaps prevent
percolation into the semi-embankment or under its seat, for the soil
being loosened by the process of excavation and deposition is in the
mass more porous than in a cutting.
The chief aim of all drainage operations for the preservation of
earthworks in sidelong ground is to prevent the hill waters guidelessly
flowing into, upon, or under them, their accumulation, or any
obstruction to their easy discharge; and to attain this object it is
necessary to know the location of the sources of the supply, the
quantity, and other particulars, _vide_ Chap. IV. A proper system of
drains must therefore be made upon the hill-side to gather and gently
guide the waters, to lead them by channels across the formation and
discharge them outside it, care being taken to protect and line the
surface of the drains so that no leakage occurs or any erosion of the
face. In countries where the rainfall is excessive or sudden at certain
places or entirely, it may be sufficient to protect the slopes so as to
allow of a flow over them, and particularly upon the valley slope of an
embankment, and in a lesser degree upon the hill-slope of a cutting.
When the configuration of the country allows, it is advisable to avoid
cuttings, and particularly embankments, in or upon drift soil lying upon
an inclined surface of rock or impermeable soil, because it can so
easily be disturbed, become unstable, and of the difficulty of restoring
it to a state of equilibrium; in fact, this may be impossible, as
vibration may cause it to move. In such a case the only means of
preventing a slip is by erecting a wall at the toe of the slope, and as
it is necessary that the foundations be in the rock beneath the surface
earth, the simple operation of excavating may impel the drift down the
hill. Also should an embankment be required upon drift soil its weight
may be sufficient to cause the mass to slide and a diversion of a
railway may be imperative, for the cost of a retaining wall, because of
its height and the great pressure it would have to sustain, or be built
to sustain, would prohibit the adoption of such a remedy. Therefore, an
embankment is more to be feared than a cutting in such earth. Making
benchings in the rock below the drift to resist movement of an
embankment will most probably be impracticable, and the soil may be in
such a delicate condition that a shock or very little additional weight
may make it slip, and when once it has moved, its stability may not be
permanently restored. Such a case may be considered as one of the worst
that can be encountered, and certainly the simple removal of detached
masses of rock that may slide upon the formation is easier to effect
than to treat drift soil upon an inclined rock bed.
It is always well to remember that in sidelong ground a hill may be
reposing at the steepest slope of stability, and when the earth is rock
it may dip in the direction of a cutting or be imposed upon a perishable
stratum, such as porous or inferior shale. Support upon the valley side
is then absolutely necessary to restore its normal equilibrium, and
every care should be taken to prevent water reaching the embankment or
trickling under its base, and to control all water that may permeate
through fissures in the rock face, especially should it be loosely
bedded. Earthworks in such positions require to be regularly watched.
In forming an embankment upon sidelong ground every means should be
adopted to increase the friction between the tipped material and the
soil; consequently all turf or herbage should be removed in order that
the embankment may be upon the bare earth, care being taken that no
loose top mould or turf is deposited, but only the firm soil. It may be
advisable to only tip earth excavated from the solid hill-side, and not
top soil such as that obtained from side cutting, and unless in rock or
firm soil to avoid partly side cutting and embankment.
Should an embankment have to be tipped upon rock, care must be taken to
prevent the surface water flowing under its base, and to counteract
sliding movement the ground should be benched and a drain made on the
higher side; also in a deep cutting the slope or face should be stepped,
or have a cess at about mid-height, or where desirable, to lessen the
effect of the trickling of the surface water and to prevent a flow in a
direct line, which might make the velocity of any leakage waters
dangerous, especially after a rapid thaw. On a mid-cess a catchwater
drain should be cut to intercept the surface water, which may not
percolate but flow upon the slope, and, unless diverted and conducted to
an outlet, may saturate or erode the bottom.
Before a cutting in drift soil upon the side of a hill can be drained,
it may be necessary to sink a shaft upon the higher side some distance
from the slope and construct a complete series of drains under the
formation. Also should an embankment in sidelong ground be near to a
river, the exposed river-bank face must be protected, and in any case,
when a pier of a bridge has to be placed close to the edge of a rock,
the face of the earth should be preserved by a substantial Portland
cement concrete covering in order to prevent disintegration culminating
in a slip or subsidence.
In setting out a line of railway or a canal care should be taken to
avoid, if practicable, either cuttings or embankments in soil resting
upon inclined rock, as slips are almost sure to occur. However, should
it be unavoidable, their depth and height should be reduced to a minimum
and, if possible, the formation be raised until the bare rock crops out,
and this can frequently be effected within the limits of deviation. Also
deep cuttings in clay or earth, having particles soon affected by
weather, should be avoided, but they may be necessary; and should any
have to be located upon a sharp curve, it is advisable to excavate the
projecting spur on the convex side of the curve more than that required
to obtain the formation width, as it is peculiarly exposed, and
therefore more likely to slip. When cuttings are upon the escarpment of
a clay hill the slope upon the valley side need not be so flat as that
against the hill. An inclination of 3 or 4 to 1 may be necessary upon
the hill-side, whereas a 1½ to 1 slope may be sufficient upon the other.
When a slip may involve the destruction or injury of any adjacent
buildings, the best plan is to erect a retaining wall at the foot of a
slope, not less than about one-fourth of the height of an embankment or
the depth of a cutting, ample provision being made for drainage and the
expansion of the earth. It is a sure protection and support, and the
consequences of a slip may be most serious in such a position. The
protection of the slope and a breast wall may, however, be alone
necessary upon the valley-side.
The construction of embankments upon soft soil is here referred to so
far as regards lateral movement, or where vertical settlement causes
such action by drawing asunder. Whenever the surface of the ground
bulges or upheaves upon earth being tipped upon it or pressure applied,
it shows that the disturbing harbingers of instability are in action and
that its sustaining power has been reached, its surface ruptured, and
any more soil placed thereon will only sink and displace the earth until
it meets the solid ground beneath, or the material becomes sufficiently
compressed and dense for it to sustain the load; such a condition of
unrest generally proceeds from over-pressure and will loosen the soil,
increase percolation, and aid disintegration. When it is known that
soft, peaty, muddy, or silty earth overlies level solid ground, and it
is certain it cannot escape, and can only be condensed by weighting
until it will permanently bear the strain required, it can be built
upon; although should there be more pressure at one place than another,
or the character of the soil vary, in certain places be swampy and in
others dry, the surrounding ground will probably rise where the weight
is the least; therefore, increased bearing area of an embankment maybe
necessary until the sustaining power of the earth is not exceeded, or
slips and subsidences will occur, for the weight of an embankment in
such a situation cannot be diminished by retaining walls, as stable
foundations are not to be obtained. It is obvious the width of the
formation cannot be reduced and therefore the only way of lessening the
load upon the base per square foot, assuming the embankment to act as a
mass, and of distributing its weight, is by flattening the slope and
making a platform under the seat of an embankment. All earths, however,
that are not hard rock subside upon being weighted, and in the case of
tenacious clay soils, upon a considerable load being applied over a
small area, a trifling contiguous uplifting of the ground will generally
be noticed. If such rise of the soil does not exceed about one-sixth of
the settlement of the clay under the load it may be disregarded as not
likely to cause a slip or serious lateral movement.
When the foundation consists of a firm stratum of gravel, sand, or solid
earth overlying soft soil such as quicksand or silt, _i.e._, mud and
sand; or alluvial deposit, care must be taken that the latter is not
forced up at a weak place by the additional weight of an embankment, and
the firm stratum undermined, as then it will sink, fissure, and be
unsafe. Any disturbance of the bed or water of an estuary or lake other
than by the tides, currents, or wind is an indication that the earth
beneath the firm soil is overloaded, and that subsidences and slips will
ensue.
Before determining upon the necessary precautions that must be taken,
the deposits should be thoroughly examined and tests made of the amount
of soluble and insoluble material in a certain mass, as although the
earth may have the appearance of being mud, it may contain a
preponderating proportion of insoluble particles of sand, and its
character may hardly be that of mud or silt. When a marsh rests upon
clay it usually requires only reasonable care, but if upon mud or loose
sand it may always be in a more or less unstable condition.
The chief means of consolidation in the construction of embankments of
soft soil upon soft ground may be stated to be as follows:—
1. Draining, which must be deep, and should be effected before the earth
embankment is deposited.
2. Weighting the ground outside the slopes with firm material so as to
consolidate the soil by intermixture with it.
3. The formation of terraces of earth, and by allowing the ground to
subside until movement is arrested, but there may be a porous seam of
harder soil, such as gravel, under the soft ground, then care must be
taken not to dam back the flow of the underground waters by the
subsidence of the added earth or the whole embankment may slide, become
softened and finally be swept away; therefore, through drainage must be
maintained under an embankment.
4. Making the load as light as possible consistent with due
consolidation.
5. Constructing an embankment in equal and regular layers of ashes or
other dry, light, stable soil, and by drying the earth to be deposited
by separation, wind, sun, or by burning.
To prevent slips in such situations, draining, although causing
subsidence, should be executed as long as possible before the embankment
is tipped, is more effectual and certain in its action than any system
of lessening the load or of counterweighting the soil, which may thereby
temporarily be brought to rest but afterwards give way; and any damming
back of water may cause additional sinking, and change the condition of
the earth from a state of dampness to that of saturation. It may be easy
to calculate the weight per square foot that will have to be sustained
by the ground from an embankment and the heaviest train, but to make the
necessary allowance for the effects of vibration is not so readily
computed. The ground can be weighted to ascertain the limit of its
sustaining power. The test should extend for a period of several weeks
to be thoroughly reliable, which time can seldom be afforded upon works;
therefore a considerable excess of sustaining power over the load should
be allowed.
In draining the site of an embankment in peat soil, it is advisable
first to ascertain the depth to which trenches can be cut without the
sides falling in. It generally varies from about 1 foot 6 inches to 3
feet. As the ground becomes firmer the drains can be deepened if
required. The width should not be less than 2 feet 6 inches to 3 feet.
Cross drains can be cut at every 20 to 40 feet according to the state of
the soil. Peat usually drains freely at the surface when its level is
not at or below the water-bearing line of the country. A successful
method of thoroughly draining the surface of peat moorland is to first
make a drain about 1 foot 6 inches in width and the depth of an ordinary
spade, and leave it for a time until the top soil to that depth becomes
firmer, then repeat the operation until a depth of 3 feet is obtained,
the sides being excavated to a perpendicular face, the top turf being
carefully cut and stacked upon the surface to dry. Along the centre of
the bottom of the trench a small cut is made about 1 foot in depth and 6
inches in width, leaving a 6-inch ledge upon each side, then the dry
stacked turf 1 foot 6 inches in width previously excavated, is placed
upon the ledge, the grass downwards and the layers reversed in rotation
to the order in which they were excavated. This system in moss peat land
is cheaper and better than tile or rough stone drains, as they often
settle unequally. The underneath drain will not close up provided the
excavated turf is carefully deposited, and water will not disintegrate
the peat. These drains should be cut about 20 feet apart.
A more extensive system may be necessary, and a comparatively large area
may be required to be drained in order to obtain a firm foundation and
to prevent breaking away of the ground. In such event the first drain on
each side parallel to an embankment should be at a distance from the
centre line of the formation at least equal to the bottom width of an
embankment, and as deep as the soil will allow, so as to drain the land
within the fences. A cut should also be made outside the fencing at a
distance of not less than 10 feet from the inside drain, to catch the
surface waters and prevent their flowing upon the enclosed land. Cross
drains may be required at intervals of from 15 to 50 feet according to
the character and depth of the bog. The sides of the open drains may
require to be supported. Branches of trees and rough fascine work laid
in them have been used to an extent so as not to interfere with the
flow; and when a spoil or fence bank has to be deposited it should be
made a reasonable distance from the drains or they may become closed.
Every effort should be directed to make the drainage of the same degree
throughout the area; it is therefore necessary to know whether the water
can be discharged into a channel or adjacent river, or if the bottom of
the drains will be above the general water-discharge level of the
district so as to prevent the ground being in the condition of a sponge
always full of water and becoming a floating mass. When the peat soil is
of little depth and rests upon sand or clay, drainage can be effected by
side drains reaching to the underlying stratum, and the drains can be
open and be filled with gravel to prevent the sides falling or the
bottom rising. Few serious slips will take place in bog-land when the
precautionary works named in this chapter are more or less executed;
subsidence is then the chief difficulty. It cannot be entirely
prevented, but it may be lessened. It is frequently very considerable,
depending principally upon the depth, situation, and character of the
deposit and the proportion of water in it. Deep bog-lands upon being
drained have subsided as much as 4 to 5 feet the first year, and 10 to
12 feet the second, and in the worst situations they will continue to
subside until the earth is sufficiently compact to support the insistent
weight, and they have sunk as much as 30 feet before the ground became
consolidated. Burnt ballast, fine gravel, or sandy gravel, is to be
preferred as ballast upon peat embankments, as affording an even coating
and tending to consolidate the earth, whereas broken rock ballast breaks
up the surface, as the pieces are not uniform in size and are
fragmentary. The cost of maintenance on bog or marsh-land is sure to be
heavy for two or three years, but then the road will generally have
become firm. The chief points in maintenance are to cause equal loading
and to promote thorough drainage. Baulks laid under the sleepers, or the
longitudinal system of permanent way, is not advantageous in soft soil,
and even should a longitudinal bearer be placed upon the cross sleepers
the road is difficult to lift or pack, and less timber will be required
by a reduction of the distance between the cross sleepers. The rail
joints should also be stiffened so as to make the depth of the
undulations consequent upon the passage of a train as regular as
possible, and the number of the sleepers can be increased with this
object.
The sustaining power of peat moss, and peat which is sometimes found
under a bed of gravel and upon a substratum of clay or marl; and
bog-land varies greatly. As a rule high bog-land will bear the greater
weight. The only reliable method of ascertaining its sustaining
capabilities is by an actual test, and such experiments are the more
requisite in unreliable soils such as mud and slake, alluvial deposits,
peat and bog-land. It is known that some mossy peat and bog-land will
not even resist the weight of a stone of ordinary size, but will upheave
and shake upon very little pressure being applied. By draining and other
consolidating operations such land may be rendered capable of sustaining
a load if the weight be spread over a considerable area upon a platform
of poles, timber, or fascine work, as it then as it were, floats upon
the surface; but piling is not successful, as the piles disunite the
particles, destroy the continuity of the layers and make a passage for
water. The elasticity of bog-land is manifest even when a road-bed has
become sufficiently firm and even-bearing for traffic, by the agitation
of the water in any adjoining drains.
In low bog-land, peat-moss, or peat-land, it is important to ascertain
whether the deposit extends to a considerable depth, as in Holland it
has been found that some marshes simply rest upon a bed of water, being
nothing but floating peat moss, although having as great a thickness as
20 feet. It has also been noticed that marsh-lands often rest upon peat
mosses with a small layer or film of loam upon them, and that they are
floating masses, although the water upon which they float may not be
deep; its depth may be known by the insertion of a bar or boring-tool,
for when it sinks suddenly it has probably reached the water, and until
its downward movement stops it shows that water exists.
Peat bogs consist of decomposed mosses, grasses, aquatic plants, and
mud. In mountainous districts when they are superimposed upon hard or
non-weathering rock, such as quartz, they have little thickness; if upon
clay rock, or any that decomposes under weather influences, they are
usually of considerable depth. As a rule, the greater the specific
gravity of peat, the firmer it is and also the darker. The top layers
are generally the most fibrous and the driest, although spongy and
containing vegetable matter, and are of a light brown colour, and of
less specific gravity than the next deposit, which is of a darker brown
tint, and is denser and more decomposed; the peat then becomes brown
black or black in hue and approaches a coaly condition. Compact turf
usually contains little water, but should it be of a mossy nature it is
generally saturated. Wet bog, peat, or moorland may contain as much as
80 per cent. of water, and any soil having so large a proportion must
necessarily subside and change upon being thoroughly and regularly
drained, and have its bearing power increased in a ratio approximate to
the percentage of water in it before draining and that after such
operation has been effected, other conditions being similar. The depth
and character of the top layers will indicate the best method of
procedure, and whether it is advisable to excavate them and deposit an
embankment upon the lower and firmer bed.
In Holland, where the peat is superimposed upon sandy soil, in order to
prevent slips in embankments it is found advisable to excavate a trench
about 15 to 20 feet in width and as wide as the formation width of a
railway or road, until it reaches the subsoil, and to fill it with sand;
and when an embankment has to be formed of very porous earth, to make a
trench at the toe of each slope, and to fill it with sand so as to act
as a counterfort. Peat and sand have been found to laterally spread the
most, clay and sand less, and therefore the latter soil stands at a
steeper slope.
On the South Austrian system of railways marsh-land has been made firm,
and malaria-fever almost annihilated by depositing ashes over the earth.
When they are mixed with the bog or swamp deposit, it is found that they
cause it to become fertile.
Peaty soils and peat bogs, which latter it should always be remembered
may be almost floating upon water and have a surface layer of vegetation
and moss, must be differently treated to other soft soils, and thorough
drainage may be economically impossible in deep deposits. In such a
situation, as the peat is alone capable of bearing the pressure, it
should not be disturbed or the particles disunited, for the continuity
of the layers will then be destroyed, and probably cause an upward flow
or other passage of water upon pressure being applied. This state is
frequently met with where inland waters have existed, as in that case
the peat moss covering has sunk, the depression depending upon the depth
of the peat underneath it and the distance at which the firm ground is
reached. It is, therefore, advisable to ascertain this, as then some
idea of the probable subsidence may be known.
The system of a platform of poles, hurdles, or fascine-work is well
known, and has been proved to be effectual in preventing any dangerous
lateral or vertical movement. Sand, fine gravel, ashes, or other binding
material, spread over the surface of peat consolidates it and assists in
preventing movement, and it is well if such a covering extends for some
distance in front and at the sides of an embankment to keep the ground
from rising. Upon soft soil, a thick layer of clean sand, well wetted
and consolidated, 5 feet or more in depth, has been used in lieu of
piles for forming a bed upon which to deposit a Portland cement concrete
foundation to receive heavy masonry piers of a bridge, and at much less
expense and with greater expedition, and no slip or subsidence of the
ground has occurred.
It is obvious the earth should be deposited in even layers, similarly to
the general method of closing reclamation embankments from the bottom
upwards; staging is, therefore, necessary for the waggons to run upon
and discharge their contents, but piles should not be driven, as they
disturb and upheave the earth and do not consolidate any soil. A
successful system of depositing embankments of bog or peat earth is to
thoroughly cut up, pun, and tread down the soil in order that it may not
shrink in cakes. If an embankment subsides and must be raised, only
light earth or material should be used. “Forming” or embankments of
little height are usually made from the drain excavation, and when more
earth is required the outer ditches are widened and deepened so that the
fenced-in land is made as firm as possible upon which a railway or a
road has to be maintained.
Fascine mattresses, to prevent slips and subsidence in an embankment in
very soft ground, such as loose sand, are to be recommended, and
experienced engineers have expressed their belief that they are the best
means of procuring a firm foundation and securing it from scour in loose
sandy and soft deposits; and their employment may become necessary when
the earth is very wet, and the contour of the district renders effective
drainage or consolidation of the soil difficult or impracticable. Should
the ground after drainage be only damp, brushwood, or heather, so laid
as to offer the firmest and most even bed may be sufficient; and if sand
can be used with it, it is very advantageous; but the fascine or a more
solid method of distributing weight may have to be adopted. Fascines
should be laid over the whole base of an embankment and extend some
little distance upon each side, beyond the toe of the slope, and be made
stronger according to the load they have to support, which, of course,
increases towards the centre of an embankment, where it is greatest, in
order to prevent their breaking apart and becoming detached.
In peaty soils an embankment should be formed of light dry materials, be
spread out, have equal bearing, and be of as little height as possible,
and all hollows and depressions should be carefully filled. The worst
state of peaty or bog soils upon which an embankment has to be tipped is
when they are no better than a floating mass.
Where a stratum of sound firm soil, such as gravel, lies upon a soft bed
of great depth, by increasing the bearing area upon the firm earth and
not interfering with it, a stable foundation for an embankment may be
obtained. In such a case a cutting should be avoided, for if care be
taken not to impair or injure the firm top layer it may stand without
serious subsidence, but under other conditions it would be unstable, and
when a soft stratum is affected and its natural condition altered, it
may be very difficult to restore it to a state of permanent equilibrium
in consequence of it being in almost a constant state of mutation.
CHAPTER IX.
THE DEPOSITION OF AN EMBANKMENT.—PREPARATION OF THE GROUND UPON
WHICH AN EMBANKMENT HAS TO BE DEPOSITED.—METHODS OF
PROCEDURE.—CONSIDERATION OF SOME OF THE DIFFERENT SYSTEMS.—THE
EFFECT OF THE HEIGHT OF A TIP AND THE LENGTH OF A LEAD.—THE STEAM
NAVVY AND EMBANKMENTS.
With regard to the deposition of an embankment, one of the chief objects
to be accomplished is to make it homogeneous and prevent the formation
of solid layers, which may become detached along the line of
stratification from less compact strata. Careless and intermittent
tipping conducted in dry and wet weather and with different kinds of
earth, probably in various conditions, will cause slips and subsidences;
as also any local disturbance of the soil, which is always more porous
and absorbent of water than when in its natural unexcavated state,
although it may be free from water-pressure which may exist in a
cutting: and particularly so when fresh-tipped, as then the pressure and
strain upon it is at the maximum, its tendency to unstableness gradually
decreasing as it becomes consolidated. In hard granular soils this is
almost certainly the case, but consequent upon percolation of water into
a mass deposited in a dry state that expands; it may not be so in
aluminous or other earth having particles affected by moisture, for an
additional or an unequal load after a settlement may cause further
movement and irregular density. In countries where the ground becomes
caked or parched during the dry season, the change to a wet or saturated
condition affects them much more than in variable climates, as they are
then generally in a moist state.
It is easy to decree that no embankment shall be made of any earth of a
treacherous character, if the circumstances are known to conduce to
instability, and to rigidly specify what shall be done and what shall
not be done, but the exigencies of an undertaking may cause such
stipulations to be impracticable. For instance, it may be found that no
other earth may be available except that which is proscribed. No one
with a knowledge of earthwork would desire to erect an embankment of
considerable height of yellow or sandy clay, or excavate a deep cutting
in such soil unless a considerable allowance be made to provide against
contingencies; nevertheless, it has to be done, and will have to be
done. The precisianism and delicate refinement of a specification
replete with good intentions has, therefore, very frequently to be toned
down in order to allow of the execution of work.
It is obvious the care that is bestowed upon a reservoir embankment,
such as the damping, punning, rolling, mixing of the material, and
raising it in layers, is not necessary in a railway or ordinary
embankment; however, certain precautions should be observed and may be
effected at a small cost, and it is well to remember that errors of
construction will cause undue strain upon particular parts. A fruitful
cause of a slip or subsidence in an embankment is the variation of the
character and condition of the tipped earth. It seldom happens that the
soil of a cutting of considerable extent is the same throughout in
character and condition; and the earth in an embankment tipped at one
end may be different to that deposited at the other, and therefore the
point of contact of the two earths will probably be troublesome. When a
seam of unstable soil occurs in a clay cutting, it should not be tipped
but be run to spoil. Such layers are usually of small extent, yet in an
embankment they may cause portions to run in rainy or frosty weather.
Side cuttings are a protection against slips in embankments when they
are sufficiently far from the toe of the slope, as they form drainage
channels, but the excavation being top soil is loose and porous,
therefore, when the lower portion of an embankment is made from side
cutting and the upper from a cutting, the firm material may be at the
top and the more open earth at the base; consequently, if an embankment
in soil of a doubtful character must be partly constructed from side
cutting and partly from cutting, especial care is required in forming it
so as to prevent slips and subsidence, and also, in excavating any
ground for such purposes, it is advisable not to interfere with any
ditches, or join them, as by concentration a stream may be created. In
countries where land is of little value, contractor’s plant expensive,
not to be obtained in the district, and carriage costly, embankments in
most cases can be more cheaply and quickly deposited from side cutting
than cutting, the excavation from the latter being run to spoil instead
of tipped by waggons into the embankment, therefore, their erection by
such means becomes imperative for reasons of economy.
In depositing embankments it is well to remember that experience has
proved that materials uniform in size and homogeneous in character form
the most compact and impenetrable masses. The great stability of
breakwaters formed of materials of uniform size and the firmness of
macadamized roads are proofs of this. The same rule applies to soils. It
is the separation of the larger bodies from the smaller that causes a
want of cohesiveness and weight-sustaining power.
To prevent embankments of little height as in “forming,” spreading,
slipping or weathering, as they are usually constructed from side
cutting and loose top soil, the sods over the site of the side cutting
should be removed and a turf wall be made of them on each side of the
formation, the excavation being deposited within them, when it will
settle equally and become consolidated, the wall preventing it spreading
and also saving expense in maintenance.
In an embankment of soft earth that weathers quickly, the tipped
material should be allowed to take its natural slope, and then every
effort should be made to prevent its equilibrium being destroyed.
Where heavy and sudden rainfall occurs the edges of the formation have
been purposely tipped and maintained from 6 to 12 inches above the
height of the centre, in order to prevent during construction gutters or
eroded channels being formed upon the slopes, the central portion being
drained and the water led away. However, aqueous action may not
deleteriously affect earth when tipped into an embankment
notwithstanding that the soil cannot be made in the same state as before
excavation, and that deposited material is more open and subject to
percolation than the solid unexcavated earth; on the other hand,
although the percolation and degree of exposure to the atmosphere are
greater, in some soils this may tend to drain and render them harder and
more stable. In fact, special circumstances may alter the general
behaviour of any earth, but the material forming an embankment should be
regarded as in the same condition as if it had been exposed to
meteorological influences, and it should be remembered that in railway,
dock, or canal works the deposited earth is seldom uniform throughout,
it being either soft at one place and hard at another, or intermixed in
a manner unknown in nature, and that exceptionally difficult cases may
occur which can hardly be treated by any particular method of procedure
or even in the way which experience has proved to be effectual in
several instances in similar soils under apparently like conditions.
The system of tipping has some influence upon the stability of an
embankment and the prevention of slips and subsidences.
The first operation is the preparation of the ground upon which an
embankment will be deposited. Solid hillocks or firm mounds that in any
way tend to arrest motion should not be removed, but vegetable or bush
growth should be destroyed, and where slips and subsidences are likely
to occur, turf and all soft soapy matter should be stripped so that the
deposited earth rests upon a sound stratum. In the dyke countries of
North West Europe, before an embankment is deposited, care is taken to
remove all trees and roots so as to effect a thorough connection between
the ground and the earth forming the embankment.
It is well if the ground be ploughed, raked, or harrowed, so as to offer
a rough and similar surface to the tipped material, and also to obviate
any arrest of the percolation of water, which upon reaching a turf or
smooth or less permeable surface, may form a water seam at the foot of
an embankment. It may not be necessary to strip the turf for the full
width of the base of an embankment, but only for some 20 feet from the
toe of the slope on each side. As the earth is bared it should be
covered in order not to expose it to the weather, for should the surface
be coated with mud, water will accumulate, as it cannot drain away or
evaporate as quickly as when the ground at the seat is laid bare; and
also if the top soil be mere dust moisture will convert it into mud.
When the surface of the ground is inclined it can be benched or bared,
and it is open to question whether baring and harrowing the surface is
not a better practice than benching, as it gives uniform support and
increases friction and prevents a sliding surface, and is generally a
quicker and cheaper method to adopt as the soil need not be so prepared
for a greater depth than 6 to 9 inches. Benching may be the better
system to adopt, in loose and non-cohesive earths which require support
to prevent rolling, but it must be carefully made with the necessary
slopes and inclination of cess to prevent a localization of water, or
the ledges may slip and carry away the material deposited upon them. The
ground at the seat of an embankment can also be prepared by ploughing
over it and removing the disturbed earth with a scraper.
The drainage of the ground is most important in order that water cannot
reach the seat of an embankment. Many systems are referred to in Chapter
IV., and others are herein named. A complete system of drains may be
necessary, but much depends upon the character and sound condition of
the earth and whether the slopes and formation are protected. Simply
covering the whole area of the seat, or that upon which the base of the
slopes rests, with broken stone obtained from the cuttings may suffice,
the stone being so deposited that water flows from the centre to the
sides, with a rough drain here and there, or central, diagonal, and
lateral drains may be required; but the pressure of the deposited earth
frequently causes land springs to issue in the seat of an embankment,
the existence of which was not conjectured, hence the effect of tipping
should be watched.
Slips and subsidences are induced in embankments by the material being
deposited when the soil is dry, and in every state of humidity from
dampness to saturation; consequently the earth settles unequally, is
denser in parts, and a stratification is caused as if it were composed
of dissimilar earths. Should any soil be deposited in the same condition
throughout, and be punned or rammed in layers, it becomes as near its
original texture as is possible to quickly attain; but in depositing
railway embankments, which cannot be punned or rammed, the perfect
incorporation of any soil is not effected by the simple operation of
tipping from a spurn head, and stratification of earth is
disadvantageous, inasmuch as the layers may not be homogeneous, and in
railway embankments are, with a few exceptions, in a different state
owing to changes in the character of the soil, the effects of weather,
mode of excavation, and in a lesser degree the height and length of the
lead or distance from the cutting to the tip; the stratification,
therefore, becomes varied and irregular, and depressions are formed
which may hold water, and none should be permitted to accumulate in or
upon a freshly tipped embankment, for then it is in its most permeable
condition, and in retentive soil especially the existence of a wet place
may cause it to become so deteriorated that it cannot be made stable
without being drained, and when the earth is liable to become
alternately very wet and dry, every means must be taken to lessen the
deleterious effects.
Provided an embankment is tipped of one kind of earth, although it will
be in a more open state than the solid unexcavated ground, the slopes
given to it are flatter than the angle of repose, the weight brought
upon it does not exceed the safe load, that it is deposited upon level
ground in regular and equal particles and the soil of ordinary
character, there is no reason that it should slip or subside unequally
if it be not undermined by aqueous action. Under these conditions
settlement would be equal, or nearly so, and as all deep embankments
must necessarily subside from about 10 to 40 per centum, and in extreme
cases one-half, the object to be gained is to cause the settlement to be
even and regular towards the centre. Benching the ground so as to
prevent a movement of the toe, does not aid equal settlement nor keep
the portion of an embankment above the level of the ground from
spreading, except from the resistance offered by the cohesion and
friction of the soil; whereas, if the ground slopes inwards towards the
centre the earth has a tendency to rest and come together, and therefore
not to slip upon the slopes. This system is subsequently referred to.
All saturated or wet earth should, if practicable, be run to spoil, but
it is not easily effected, as it cannot well be filled into one waggon
of a set, for it may be present throughout the whole surface of a
cutting, nor in variable weather can operations be conveniently
suspended until the exposed faces of a cutting are dry, but means are
generally available by which any serious deterioration may be lessened.
No turf, mould, mud, peat-moss, soft pasty earth, frozen soil, or snow,
should be deposited in an embankment, but only firm earth; and no solid
lumps of large size intermixed with shovelled material unless they are
broken up and trimmed when tipped, as the absorption of water will be
greater in the earth having the smaller particles; and should it happen
that several waggon-loads of such material are tipped and are succeeded
by others containing large lumps, an embankment cannot be a homogeneous
mass, but will consist of more or less consolidated portions in a
comparatively dry state, and others which are less impervious and
therefore more subject to the effects of water and settlement. All snow
or frozen soil or muddy earth should be cleared away from the spurn
head, and if it can be avoided no material should be tipped in bad
weather.
With respect to the loosening of the soil by the process of tipping,
taking into consideration that railway embankments are almost invariably
formed in masses of 2, 3, or 4 cubic yards, according to the capacity of
a waggon, it is obvious almost the whole bulk has been disturbed, and
that the condition of the solid earth in a cutting is not maintained,
for the soil in addition to being unbound by the process of excavation,
casting into waggons, and shaking during transition, is ejected with
force down the slope of the tip, the impetus having to be dispersed. It
is certain the size of earth waggons cannot conveniently be much
increased, and that little would be gained if a cubic yard or two were
added to their contents; and that the higher an embankment the greater
the velocity of the soil down the slope of the tip and the loosening
action which causes the earth to be lighter and to take a flatter slope
than when deposited in layers from a moderate height, also the greater
the length of the lead, the greater the vibration and agitation. In the
case of certain soils the particles of which become soft or dissolved
when in a wet state, such as sandy clay, loamy soil, and some varieties
of clay, _vide_ Chapter II., the effect of a long lead or even a short
one will be that the more solid portion of the contents of a waggon will
settle, leaving the loose or mud at the top, and when a waggon is tipped
the loose top “slurry” will roll down the tip almost as a fluid and
proceed beyond the spurn head, thus making a wet sliding surface, the
bottom toil frequently remaining in the waggons and requiring to be
excavated from it. Nothing can be done in such a case but wait until the
earth has had time to dry, or preferably the wet mud should be run to
spoil. In fact a long lead, especially when aided by deposition from a
considerable height, will cause friable soil possessing particles
readily impaired or dissolved in water to become dust when in a dry
state, or mud if saturated.
The gradients and leads chiefly determine the manner in which earthwork
can be economically executed, and are, in great measure, governed by the
configuration and roads of the country; therefore, it will usually
happen that the length of the lead cannot be reduced, and the only
resource is to lessen the height of the tip, and, consequently, the
momentum of the earth down the slope, and to reduce the inclination of
the temporary road at the tip head to that sufficient to cause the
contents of a waggon to be freely ejected and no more. This cannot be
effected at the same cost as depositing an embankment to the full
height, although in the case of an uphill lead a down gradient upon
which the waggons will run freely by force of gravity can be made from
the commencement of a cutting to the required width, the embankment
being raised to its desired height without extra expense but assuming
the case of an embankment 60 feet in height, and that in order to make
it as dense and firm as possible it has to be tipped in three heights
averaging 20 feet, it involves the laying, maintaining, and removal of
three temporary roads instead of one, and cannot be erected without
extra expenditure. The large majority of railway embankments have been
deposited to the full height and width, and they stand; although the
effect of tipping loose soil upon loose soil, which has not had time to
consolidate, is at each addition to cause a movement of the surface. It
is obvious the higher the tip the greater the disturbance, but it may be
said in firm and hard granular earth, if always dry, this unbinding,
although temporarily a disturbing element, may really tend to produce
ultimate homogeneity and stability; on the other hand, in tipping dry
clay from a considerable height it often separates and becomes loose and
mere dust.
In an embankment of moderate height the day’s excavation from a cutting
will increase its length several yards, and the material from each set
of waggons will only be exposed to the weather for a short time. On the
contrary, in a high embankment, the effect of the deposition of the
contents of a set of waggons upon the tip head is hardly perceptible,
and is, until the toe of the slope is approached, the superimposition of
a thin layer of earth which a shower of rain can convert into mud or
cause to be in a soft or disunited condition, especially in the case of
soils having easily soluble particles. The deteriorating influence of
high deposition may be judged from the closing of an embankment of
considerable height, as it is often a tedious and somewhat anxious
undertaking, as might be expected from excavated, shaken, and loosened
earth being deposited upon soil in a similar condition, instead of upon
the solid ground like the other portions of an embankment. Also water
frequently percolates and trickles down the approaching slopes, and
penetrates them and loosens the soil, whereas if one tip is proceeding,
any surface waters may flow away upon the slope and the solid ground,
and the earth has time to become in a similar state throughout. To
lessen these disintegrating effects, if it can be done without
interfering with the due progress of the works, it is well to allow one
tip end to consolidate for some time, and to complete the closure of the
embankment solely from the other, suitable means being adopted to effect
a firm junction. Should closing from a single tip head be impracticable,
the earth from the meeting point of the toe of the slopes of the tip
heads should be similar in character and be deposited in the same
condition; in any case additional care should be taken to adopt every
reasonable precaution to secure equal consolidation. As evidence of the
dissipation of earth at and near to the junction of two high tip heads
may be stated that they require more material to close them than would
appear to be necessary from a computation based upon measurements taken
from cross sections. In non-granular earths few cases will occur in
which high tipping is an advantage; one of the few is when loose rock
and firm earth are deposited, then the rock having larger particles, and
consequently being heavier, will roll to the foot of the tip before the
smaller material, and so form a broken stone seat for the embankment. In
granular earths, such as gravel or sand, the height of a tip head is not
a matter requiring much careful attention, as the particles are not
deleteriously affected by water. When they are of nearly equal size, an
embankment will settle equally, but in gravelly sand the stone will
separate to some extent during transit and the process of deposition
will be at the base; a varying slope may then be assumed, and it may
here be named that it is known when sand is differently deposited,
although its appearance is unaltered, it will exert dissimilar thrusts.
An embankment of little height may be deposited in bad weather without
slipping or subsidence, but when a high embankment is similarly tipped
the surface of the earth is in an unfit state, and operations should be
suspended for a few days.
With regard to the systems of tipping and the prevention of slips, as a
general rule an embankment should be deposited to the full width, for if
it be not erected at one operation the earth may be of a different
character in diverse conditions, and will be more exposed to the
vicissitudes of weather; and in wide embankments, should the system be
adopted of tipping two outer roads and one central road, the three tips
should equally proceed in order that the earth may be in a similar state
and be subject to equal exposure; or weathered surfaces will be created
down which water will more easily percolate than through the solid mass.
In the three tip system the two sides have a tendency to lean towards
each other, and cause the greatest pressure to be upon the inner
material during construction, and therefore the embankment is supposed
to be more consolidated and less likely to slip; but, unless the
conditions are exactly similar, the advantage of this arrangement is
more fanciful than real, for should the inside slopes of the outer roads
meet first, the earth deposited from the centre tip has not an equal
distance to descend and, therefore, the mass has not been tipped from
the same height, the looser material, temporarily or permanently, being
upon the outer tips and the denser in the centre; whereas the slopes,
being the most exposed, should be the more compact, and when they settle
towards the centre without an outward movement at the foot, so much the
better for the stability of the embankment. The pressure upon the seat
is more regular when it is deposited to the full width, as weight is
then not irregularly added, probably after some settlement. Instead of
dividing the tips into two outer roads and one central road, and in that
way endeavouring to obtain permanent stability, it is better to diminish
the height the earth has to be cast, and to deposit it as far as
practicable in lifts, and to the full width. In treacherous soils such
as some of the clays, embankments that would not stand at a depth of 30
feet have been permanently stable when the seat was drained, and they
were tipped in lifts of 15 to 20 feet in soft clay, and 20 to 25 feet in
firmer clay, at double the height at which they previously slipped.
This method involves the expense of moving the temporary roads, but
allows more time for subsidence, and the mass of an embankment is not so
exposed to the weather; however, in a dry season, an embankment can
often be tipped to the full height, whereas in wet or changeable weather
it would not stand if so deposited, and two lifts may be required. Care
should be taken that the width is always sufficient to receive the top
lift. It is more in the direction of equally reducing the height the
material has to be tipped, especially in treacherous soils, that
solidity is to be attained, than in an attempt to consolidate earth by
endeavouring to cause it to fall together by deposition from two or more
separate parallel roads at the same level.
Many slips and failures of embankments have been caused by the central
portion being deposited of one material, such as clay, and the slopes
afterwards made of a different earth, as rock. The latter will then slip
upon the greasy surface of the clay, the porous nature of the broken
rock readily admitting water and air. In fact, a more flagrant example
of effecting that which on no account should be done is not easy to
imagine. In treacherous soil the system of tipping an embankment wider
than that required from considerations of lateral and vertical
settlement, and allowing it to stand at a steeper slope than its
permanent angle of repose, and paring down the top unnecessary width is
not to be commended, as the earth is then strained, and the lower
portion is in the looser condition and the toe the weakest part:
however, in the construction of a single line of railway with a narrow
formation width, it is very convenient as affording room for roads for
loaded and empty waggons, and in any soils other than aluminous and
calcareous earths it may be done with impunity, provided all slimy and
slippery surfaces are removed. No side tipping should be allowed in
depositing a new embankment, and any addition of soil to a slope should
be avoided as much as practicable, although in trimming some filling may
be necessary, but the slopes should be rough trimmed by the bank-head
men as the earth is deposited so as to prevent hollows and depressions,
form a comparatively even and regular surface, cause the mass to be
equally exposed to the weather, and prevent any lodgment of water. The
form a tip head naturally assumes will afford some indication of the
stability, for should it be regular and approach a semicircular shape it
shows the earth is of a comparatively uniform character and is subsiding
equally. When it is uneven and jagged, with streaks down the tip, it
indicates unevenness of soil and condition.
Circumstances arise which necessitate a departure from any generally
approved method, for frequently an embankment must be widened to provide
for increased traffic, and tipping upon a consolidated surface must be
effected. Chapter VIII. and this refer to such a condition of work. It
sometimes occurs when a slip has taken place that only a narrow tip can
be adopted, as the soil may not temporarily be able to bear the weight
of a larger mass unless equally diffused; then there is no other
reasonable course to pursue than to complete an embankment to the
required width and slopes by dry side-filling, such as ashes, broken
bricks, or other absorbent firm material regularly and carefully
deposited. In order to prevent slips and subsidence and increase
friction, when an embankment must be widened by tipping upon its side,
the existing slope should be stripped of all turf or covering, but only
so as to leave no uncovered surface exposed to the weather; and the
bared earth should be made to present an even surface. When the slope is
benched, care should be taken that the benchings do not localise water,
and that it cannot percolate down the face of the old bank at its point
of junction with the new; also in tipping an embankment upon sidelong
ground or upon the slope of an old bank, the seat should be bared,
particularly on the lower side, as the earth meets with no resistance
from the ground except from friction; but upon the upper side, the
material being tipped partly against the hill has a less distance to
travel, and, therefore, the upper or lesser slope is not so loose as the
lower or longer slope, which latter is the more likely to admit water,
and requires a flatter inclination than the denser portion of the
embankment. In the absence of other protective works, it is advisable to
form on the lower side an earth wall or counterfort covered with turf at
the toe of the slope in advance of the tip, and to make it of the
hardest and largest material deposited and with a foundation upon bared
soil, as it is the part most liable to injury. This is a simple
precaution against slips, and will save its cost in lessening the
expense of repairing and trimming the slopes.
As the steam navvy or excavator has now become necessary plant upon most
large public works, and greatly accelerates the speed at which cuttings
can be executed, always provided the excavation is not of a treacherous
nature, and is in such quantity that if not so used it would have to be
run to spoil, many narrow valleys in the near future will probably be
wholly or nearly closed with an earthen embankment, thereby effecting an
important saving of time and expense; or the number of spans of a
viaduct will be lessened, and only made sufficient to cross a road or
allow the required waterway for a river or the discharge of any drainage
or surface waters. The tendency, therefore, will be to increase the
height of embankments of earth; and in countries where the first cost of
an iron, masonry, or brickwork viaduct is too great, and the use of
timber rendered necessary, earth embankments, except in treacherous soil
or upon soft ground, are to be preferred to wooden pile and trestle
bridges or culverts, whose average life in America, which probably now
possesses as many as all other countries, is from eight to ten years,
and that of timber truss bridges nine to eleven years.
In addition to other recommendations, the steam navvy usually excavates
the earth in small pieces of nearly uniform size, and as it will perform
the work of many men it may be most useful in treacherous soil, as it
may enable a cutting to be excavated in dry weather and be protected
before the commencement of the wet season. The slopes should be
excavated in such earth as soon as possible after the gullet has been
removed so as to prevent a slip, and it may be necessary to
close-sleeper or consolidate the ground in order that the weight of the
machine can be supported upon soft ground.
CHAPTER X.
NOTES UPON THE LOCATION, PRESERVATION, AND PROTECTION OF SEA, ESTUARY,
RECLAMATION, CANAL, AND RESERVOIR EMBANKMENTS OF EARTH CONSTRUCTED
TO CONTAIN OR EXPEL WATER.
In the first place, care should be taken in determining the site of an
embankment across an estuary that there shall be no concentration or
alteration of the general direction of the currents, or scouring action
will be created; for the erosive and other deleterious effects of wave
action upon a shore are influenced by the angle at which they are
impelled against it. A prudent course to adopt is to carefully preserve
the usual channels by means of bridges, particularly in ground of a
loose character, such as is usually found in partly landlocked waters;
for if the velocity is increased, the earth which has been deposited by
the original current being reduced or impeded resulting in the suspended
matter in the water falling to the bottom, will be subject to a force
that will again disturb and cause it to return to its previous
suspensory condition; and any disturbance of the normal currents may
destroy the equilibrium of stability and alter the flow, and when they
are affected it may be most difficult to restore them to their original
state, for water will always endeavour to obtain the easiest channel.
It is essential to know the heaviest flood discharge of any river that
may flow into an estuary, the greatest depth and velocity of the river,
the normal and flood channels, their sectional area and direction, and
the extent and shape of the catchment area, so as to establish the
required opening to give the natural waterway; for it is important not
to interfere with the tidal capacity of an estuary or the volume or flow
of any upland waters into the sea, as a navigable channel may become
filled with silt, especially when the shore is flat or sandbanks exist;
and upon a sandy coast an embankment across an estuary with openings for
a navigable channel will probably cause it to become difficult to
navigate and, perhaps, impossible, without constant dredging and other
works of maintenance, as an embankment may obstruct and deflect the
currents and prevent them carrying away the suspended matter. An open
viaduct instead of an embankment is almost always to be preferred, and
may be necessary; for the power of a current to scour or move particles
is greatly augmented by a small increase of the velocity, and the earth
may be in such a delicately balanced condition that any increase of
scouring action may destroy the seat of an embankment.
To prevent leakage and scour of the base of an embankment near a river
resting upon loose soil, curtain walls are sometimes inserted upon both
sides extending to a considerable depth, thereby affording security
against an embankment merely resting upon a mound which may gradually
erode, with the result that it must finally slip and be destroyed; and
it may happen, unless the foundations are carried down into impervious
soil, that water may escape underneath and undermine it; such action is
obstructed by carrying the slopes a few feet below the ground so as to
prevent through surface percolation.
As a rule, an embankment across an estuary with one or two openings in
it is to be avoided, and it should be most carefully considered whether
it will not be better to expend a larger sum and erect a pile viaduct
which will not interfere with the currents or channels and only require
ordinary precautions to be taken against erosion, instead of depositing
an embankment with openings at the channels and the necessary protective
works which may consist of pitching the slopes, covering them with
fascines, mattress work, or sods, erecting short or long, low or high,
groynes, as the former may be ineffectual in causing a deposit or a
shoal in front of the toe of the slope and in preventing scour, for in
loose silty and sandy soil of considerable depth and not sufficiently
firm to resist erosion, they will probably fail by reason of the space
between them being washed away; and a complete covering of the foreshore
may be requisite, or a protecting apron of homogeneous impermeable soil,
and continuous training walls to prevent the creation of shoals: all of
which protective works will constantly need to be repaired, and the
failure of any one may cause not only an embankment to give way but the
remaining preservative works. Undoubtedly there are many estuaries upon
which if an embankment even with many openings for channels had been
deposited, it would have failed, the soil being in such a tender state
that the least additional weight upon the surface would destroy the
equilibrium. Also interference with the littoral currents is a risky
operation in any but a hard rock bed as regards the foundations, quite
apart from injury to navigable channels. When there are numerous
ditches, creeks, or channels crossing the line of a proposed estuary
embankment of variable stability, especially should hills be near and
the earth be so porous as to be saturated every tide, without doubt the
safer plan is to erect a low viaduct, as the old waterways will be an
endless source of trouble should the ground be anything but firm clay,
and interference with the currents will not be preventable, as either
their velocity will be increased or decreased, the result being scour or
fresh deposits which will affect the channels; and such alteration may
change the direction of the motion of the waters, which must be
prevented in front of an estuary embankment; or waves will be created by
the water travelling and rushing over shoals, for the even configuration
of the bottom is a wave lessener, and should there be a deep channel
near an estuary embankment severe wave action may be created. The piers
or piles of such a viaduct should be cylindrical, thus offering no flat
surface for the waves to break against, and yet temporarily to divide
them without serious shock to a structure. When of very considerable
length, a projecting embankment deposited upon a flat shore of a tidal
estuary has caused a heaping up of the water on one side at low tide,
and therefore it is unequally strained. This was found to be the case
with an estuary embankment on the Scheldt, 2½ miles in length.
The form of the slope has also to be considered, but all the principles
that determine the best profile in each case of a pier or breakwater do
not necessarily apply to an embankment in an estuary. The recoil of the
waves washing away the ground in front and at the toe is particularly to
be guarded against, and the action of spray or a broken mass of water
falling upon the formation, as also the direct action of the waves. A
concave form should not be adopted throughout, as waves roll up until
they approach the top portion, when they turn over and fall upon the
flatter portion and often breach it, but when the face is straight,
excepting for a few feet at the toe, the waves are diffused in
travelling up, although they proceed to a higher point upon a flat slope
than a steep one, and the recoil is greatly diminished, but with the
view of avoiding direct wave action, when the ground is inclined in
front of a sea or estuary embankment, it is well to curve the lower part
of the slope and to make it cycloidal to the surface of the ground and
the slope for a little distance, so as to reduce obstruction to a
minimum. The method of making a level terrace or stepping the slope
instead of a curved face has the advantage of checking the rising of the
sea up the face, altering its direction and acting as a wave-breaker,
and also combines these effects with giving as large an area of the base
as can be obtained by a curved face, and in bringing the centre of
gravity of the cross section of the embankment nearer to the seat, but
the face must be securely protected. The width of the cess should
increase according to the degree of exposure. If an embankment consists
of earth the slope of the cess should be from 6 to 10 to 1, or the
system is better avoided and a continuous face adopted.
Short groynes will often protect the toe of an embankment and prevent
any longitudinal current undermining it. As a rule, in a tidal estuary
the cost of protecting the slopes is considerable, and more above
low-water level than below it. In adopting groynes formed of single or
double rows of piles, in order to prevent erosion of the toe and a slip
and subsidence in an estuary or sea embankment, the littoral currents
must be considered before determining their direction and position, the
object of their erection being to prevent the waves, and especially the
prevailing waves, from scouring the shore, and also to cause a general
deposition of shingle, and, therefore, they are usually placed at an
angle to the set of the waves, so as to cause the latter to be diffused.
The angle will vary; the best guide is to examine the effects of any
that may be erected in a similar position to that to be built. An angle
of 50° to 70° with the foreshore, in a leeward direction is frequently
adopted, and with respect to the distance apart, this depends
principally upon the direction of the current and prevailing wind,
contour of the shore, degree of exposure, and the length of the groynes.
When the whole of an open coast has to be protected, no natural defence
existing, the line of the prevailing set of the current and wind on a
straight shore can be set off at the end of a groyne, and before the
point at which it meets the foreshore another can be erected. They are
generally successful when properly placed, and are most frequently
straight; if not, they have a concave face to the direction of maximum
eroding force; a convex must be avoided, as it will not permanently
retain the deposits; their practical effect being that the breach is
heaped up or retained upon the prevailing wind, set of current, or
wind-wave side to a height of some feet above the leeward side,
therefore, a groyne should be so constructed that planks can be added to
it as required. They have been proved to prevent the formation of bars
when judiciously located, but their success greatly depends upon their
proper position and direction, or in loose soils such as sand they may
cause a deposit upon the windward and prevailing current side, but an
erosion and falling away upon the other; and when placed in front of a
reclamation embankment upon shifting sand until the ground at the back
of the embankment becomes dry by the tidal waters being excluded, or the
surface is impermeably coated, they may be of comparatively little use
to prevent a slip or movement of the shore; for as the tide recedes
below the level of the toe of the slope, a seaward flow of the tidal and
land waters will be created in very porous soil under the seat of an
embankment, and may continue until the tide returns and rises to the
level of the ground, thus causing the shore to be constantly changing
place and permanently established accumulation impossible. Short
transverse spurs have been adopted to lessen this action but their
effect is hardly noticeable. As failure of a groyne will probably cause
erosion of the foot of an embankment and a slip, a cheap and effective
means, attested by the experience of nearly half a century, of
preserving the timber from the attacks of most marine worms may here be
named. It consists in scorching the piles, thus preventing fermentation
of the sap, and immediately tarring them: also in placing the wood in
the opposite direction to that in which it grew; the latter operation
has been found to increase the durability 50 per cent., the reason, it
is believed, being that the capillary tubes in the trees are so adjusted
as to oppose the rising of moisture when the wood is inverted.
In excavating for an enclosure embankment, the earth should not be
disturbed nearer than is economically necessary, and a cess should be
left of about 40 to 50 feet in loose permeable soil, the width being
governed by the character of the earth, the depth of the excavation, and
the height of the embankment. Should dredging have to be executed near
an embankment, a considerable distance should be left between the toe of
the slope and the line of operations. Before commencing an estuary or
enclosure embankment, it is advisable to notice whether a deposit is
left upon the shore by the incoming tide, and to ascertain whether it
forms in some degree a protective covering, for if this should be the
case, any increase of the velocity of the flowing water which might be
caused by dredging or a concentration of the littoral currents should be
avoided, or the tidal matter in a state of suspension will not gradually
sink to the ground. The tidal deposit, although the earth forming the
embankment should not be tipped upon it, may also be of importance as
tending to prevent or lessen any percolation of water through the
foreshore and under the seat of an embankment; for instance, on the
Nile, the deposited slime is found to make a practically watertight
covering on the loose sand. Mr. Thomas Stevenson has also stated that,
according to the depth below the surface of low water that mud reposes,
may be approximately judged the force of wave disturbance and degree of
exposure; the less the depth, the less the power possessed by the waves.
In the case of treacherous soil which circumstances compelled to be
partly used in a reclamation embankment of moderate height, but which it
was found would gradually become firm by compression, rough sheet piles
with a plank at top have been inserted, giving the outline of the
finished slope of the material to be afterwards tipped upon it, the
piles and planking not being removed, and, therefore, affording the
required temporary support before the earth became consolidated and
stable by compression and time.
In Chapter IX. the deposition of embankments is referred to as it
affects slips and subsidences in earthwork, but in an enclosure
embankment an additional precaution is particularly necessary, namely,
that immediately tipping from the ends increases the velocity of the
flow of the outgoing or incoming tidal water through the opening, and
consequently augments its scouring action; its deposition from a spurn
head should be abandoned, and the embankment be uniformly raised from
the base. The employment of cofferdams, piling and planking for
effecting a closure is now generally discarded in favour of the
horizontal system of equally raising the height of an embankment from
its base; and is even to be preferred to fascines, unless the latter are
merely used to distribute the weight over the base, to protect the
surface of a slope, or form a shield against scour either temporarily or
permanently.
In previous chapters the protection of a slope is examined; here some
reference is made to the particular preservation of the slopes of an
estuary or reclamation embankment.
When the protection afforded is not uniform care must be taken that
although it makes one part secure it does not weaken another. In the
case of river-banks in a soil that is in a delicate state of
equilibrium, it may occur that soon after one portion has been
protected, another is being scoured, whereas previously it was stable;
therefore, to prevent localization of the erosive action, whether on the
foreshore of an estuary, reclamation, or a river-bank, and consequent
slips and subsidences, the covering should extend over a considerable
length. In a sheltered position simply sodding the slopes may be
effectual. Some other means of protection are a hard chalk or gravel
counterfort founded a few feet below the ground at the toe of an
embankment, and a covering of similar chalk or gravel upon the slope,
should the soil be favourable. When an embankment of earth in an estuary
or river is of firm soil and only requires to be made proof against wave
action, stones may be simply deposited evenly upon a slope and so that
they will not be washed out, and pitching be not required, as the rough
face will tend to break up the waves; but where a simple covering is
adopted, whether close or comparatively loose, the slope should be
straight, as a concave form causing a recoil of the waves will in time
damage or separate the face shield. A coating of clay about 2 feet in
thickness, upon a slope with stakes driven into it, and large bushy
boughs of trees fixed thereon with the tops downwards, is frequently
used in India as a protective cover to a crumbling bank of a river, and
to training spurs erected to prevent erosion and slips. Mattresses,
fascine or wattled work, besides being expensive, will slide down a
slope unless well secured to it, and therefore a constant strain is
produced as in all stake-held coverings; it has also been observed by
the experienced that although so largely and successfully used in
Holland and on its coast, there is very little ground swell on the Dutch
shores, and that in a very exposed situation, or where heavy ground
swells exist, they may not answer, and may become disintegrated by the
much greater weight and force of the sea; and this, notwithstanding the
surface breakers of thin water and little mass broken up by the wind may
produce more visible agitation.
To prevent a river-bank slipping, and also to maintain a channel in a
muddy river, half-tide longitudinal training walls made of wattled work
or fascines have been used, so as to cause the deposition of the
suspended matter in the tidal water and to gradually restore the
impaired slope and secure it from crumbling into the river. The stones
brought down by heavy floods have also been used to maintain a river
channel and protect its banks from slipping, the interstices gradually
becoming filled with mud deposited by the water when the floods subside.
When sudden and unexpected scour of the slope or bed near an estuary
embankment upon soft soil has to be immediately arrested to prevent a
slip, gunny bags filled with sand afford a ready means of repairing any
cavities, the interstices between the bags usually being filled rapidly.
Material should be added as required and any concentration of the
erosive currents should be avoided.
The required height has to be determined of an embankment in an estuary
or the sea to prevent any flow over it or waves falling upon the inner
slope; 4 to 5 feet above the highest water mark appears to be adopted in
the lower reaches of the Thames and unexposed estuaries in England. In
Holland 10 to 15 feet, depending upon the degree of exposure. It is of
paramount importance to prevent any waves washing over the top, as
damage and, perhaps, a breach may be caused thereby. The height of the
highest known wave must therefore be ascertained.
Should the shore be sandy and loose, a characteristic of estuarine
accumulations, although its usual bed may be preserved in any storm,
when an embankment is erected the rapid and ceaseless process of wasting
of the sand and loose soil by the recoil of the waves from the face may
in time lay bare the toe of a steep slope and undermine it; for it has
been found where the foundation was sand and a rubble mound, which
should be so constructed that its interstices become filled in order to
make it more solid and stable, was placed upon it, and the
superstructure upon the mound, that the sea being resisted by a vertical
wall recoiled and made the soil a quicksand, although the sand would be
stable at its natural slope in still water. Obviously the less the
action of the waves is impeded, the less the looseness of the sand.
Experiments have shown that a slope of 1 to 1 will reflect waves, on a
flatter slope they are broken. In such situations light structures,
offering little resistance to the action of the waves and not causing an
impediment to the current, should be adopted in preference to a massive
or solid erection; but when an embankment is necessary, it should have a
long sloping mound or foreshore upon which the waves will gradually
become lessened and dispersed, the desired object being to prevent deep
water close to the work. When a railway or road follows the shore,
instead of erecting a retaining wall to protect an embankment, a
preferable plan to adopt may be to have open trestle-work offering the
least possible obstruction, and when the formation is at the base of a
cliff of variable and doubtful soil it is the best construction, as the
cliff is not touched, and slips and subsidences are avoided. Should the
deposition of an artificial beach be considered necessary for the
preservation of the foot of a cliff in addition to the trestle road,
experience seems to indicate that the contour affording the most
protection is one in which the slope has a flat terrace or cess at not
above three-fourths of the vertical height, another short slope, and a
nearly horizontal space some distance from the foot of the cliff; but a
storm will straighten the face, and it may be impossible to economically
maintain it; however, should such a slope be assumed it should not be
disturbed. _Vide_ Chapter VI. for information respecting slopes. When a
sea or an estuary retaining wall is necessary in order to prevent the
slipping of an embankment consisting of loose soil, an inner dwarf wall
at the edge of the formation upon the land side should be erected so as
to hold the embankment in a box, and not allow any spray or water
passing over the retaining wall to erode the inner portion.
Deep water is generally required close to the work in railway piers or
jetties to enable vessels to get alongside; a heavy and monolithic wall
must consequently be erected; however, in the case of loose soil, the
vertical system simply should not be used unless the foundation is
thoroughly protected and below the reach or effect of wave action, and
no re-entering or right angles should exist, as they increase the action
of the waves. When a rubble mound is cast in and a vertical structure
placed thereon, great care must be taken that there are no holes, except
the natural interstices between the stones, and that they have a firm
foundation and sink equally, or the random mound may give way and the
superstructure will then necessarily follow.
[Illustration: DATA.—Sand embankment: Width of formation, 30 ft.;
inclination of the slopes, 3 to 1; height of embankment from the surface
of the ground, 30 ft.; depth of water, 20 ft.; height of wave, 5 ft.]
As an illustration of the deleterious effects of the recoil of waves may
be mentioned that a high vertical wall with a parapet has been found to
endanger the toe, but when the parapet has been removed in order to
allow the head of the waves to leap over the top of the work, the
structure remained stable. To prevent the recoil of the sea and the
scooping away of the base and the foreshore in much exposed situations,
and consequent slips and subsidences, breakwaters which simply act as
wave screens, and not as wind screens, are sometimes kept a little below
high-water mark so that the heads of the waves may have free action,
although their onward motion is prevented. On the contrary, light open
work, such as a lattice screen, although it may somewhat lessen wave
action, does not prevent it passing through.
The principal causes of the failure of vertical walls when placed upon
an easily eroded foundation are by the scouring action of the recoiling
waves, therefore their magnitude should be reduced to the lowest limit:
by the impounded air driving out particles of the structure: by waves
travelling upon the top, therefore their forward motion should be
deflected and rendered vertical: by the hammering action of the mass
caused by its being alternately quickly submerged and unsubmerged; the
practical effect being that the foundation is intermittingly released of
a portion of the load and then fully strained, therefore the height of
the waves should be reduced as much as possible. Respecting the action
of falling water, experiments were recently made in India, which proved
that “the greatest intensity of pressure does not exceed that due to a
column of water of a height equal to the fall;” the greatest intensity
of pressure being always fractionally under the hydrostatic head.
As an illustration of the constant change of the load upon the
foundations of an embankment in tidal waters, the following calculations
have been made.
The weight of a cubic foot of sea water is taken as 0·028 ton.
The weight of a cubic foot of sand is here taken as 0·056 ton.
A. The weight of a lineal foot of the embankment when unsubmerged equals
201·60 tons, computed as follows:—
Cubic
ft.
The central portion 30 ft. × 30 ft. × 1 ft. = 900
The two inclined 90 ft. × 30 ft. × 1 ft. = 2,700
portions
————— Ton. Tons.
Cubic contents 3,600 × 0·056 = 201·60.
B. At high water the weight of the embankment is reduced by the weight
of the water displaced, which equals 84 tons, calculated as under.
The submerged contents of the embankment are—
Cubic
ft.
The central portion 30 ft. × 20 ft. × 1 ft. = 600
The two inclined portions 2/30 ft. × 20 ft. × 1 ft. = 1,200
60 ft. × 20 ft. × 1 ft. = 1,200
————— Ton. Tons.
Cubic contents 3,000 × 0·028 = 84.
From this must be deducted the weight of the water resting upon the two
slopes, which equals 33·60 tons—
Cubic ft. Ton. Tons.
60 ft. x 20 ft. X 1 ft. = 1,200 X 0·028 = 33·60.
C. Thus the insistent load at high water upon the whole area of the
foundation is reduced by
Tons. Tons.
84 – 33·60 50·40
—————————— = —————— = 0·25 = ¼.
201·60 201·60
D. At high water a vertical pressure is imposed upon the ground beyond
the toe of the slope due to the 20 feet head of water—
20 ft. × 1 ft. × 1 ft. × 0·028 = 0·56 ton per square foot.
This latter weight and element of stability tends to prevent movement of
the ground, and also the toe of the slope, but is entirely removed at
low water when the insistent pressure at the foot of the embankment is
the greatest.
For the purposes of illustrating the varying load upon the surface of
the ground caused by a rise and fall of a tide, it will be sufficient to
take one slope of the embankment.
E. The weight of a lineal foot of one slope, if unsubmerged =
Cubic ft. Ton. Tons.
90 ft. × 15 ft. × 1 ft. = 1,350 x 0·056 = 75·60.
F. The weight of water resting upon the slope per lineal foot at high
tide =
Cubic ft. Ton. Tons.
60 ft. × 10 ft. × 1 ft. = 600 × 0·028 = 16·80.
G. The weight of the water displaced by a lineal foot of the submerged
portion of one slope of the embankment at high tide =
Unsubmerged portion of one slope Cubic ft. Ton. Tons.
1,350 – (30 ft. × 5 ft. × 1 ft.) = 1,200 × 0·028 = 33·60.
H. The area of the base of the slope per lineal foot =
90 ft. × 1 ft. = 90 square ft.
I. Therefore the insistent pressure upon the surface of the ground at
the base of one slope at low water, when the bed is presumed to be dry,
is,
E
75·60
————— = 0·84 of a ton per square foot.
90
H
J. At high water it is
E F G
(75·60 + 16·80) – 33·60 58·80
——————————————————————— = ————— = 0·65
90 90
H
of a ton per square foot, or 22·60 per cent. less.
It has been shown that the vertical pressure of the water upon the
ground beyond the slope is 0·56 ton per square foot at high tide, _vide_
D., therefore the weight upon the seat of the slope is only in excess of
the normal weight of the water upon the ground beyond the slope,
J D
0·65 – 0·56 = 0·09 of a ton.
An inspection of the diagram shows that the flotation power of the whole
of the shaded portion of the slope is balanced by the weight of water
resting upon the whole of it, the areas of the triangles being similar;
and that the portion W. of the slope is that which loses weight by
immersion.
Calculating the pressures at low and high water upon the base of the
portion W., the relative vertical pressures would be—
AT LOW WATER.
Cubic ft.
30 ft. × 5 ft. × 1 ft. = 150
30 ft. × 20 ft. × 1 ft. = 600
———
750 × 0·056 = 42 tons.
K. The area of the base = 30 ft. × 1 ft. = 30 square ft., consequently
the pressure upon it =
42/30 = 1·40 ton per square foot.
AND AT HIGH WATER.
L. The unsubmerged portion =
Cubic ft. Ton. Tons.
30 ft. × 5 ft. × 1 ft. = 150 × 0·056 = 8·40
The submerged portion =
30 ft. × 20 ft. × 1 ft. = 600 × (0·056 – 0·028) = 16·80/25·20
25·20
Consequently the pressure = ————— = 0·84 ton per square foot,
30
K
a difference of 0·56 ton per square foot, or 40 per cent. less load.
M. And upon the base of the central portion—
AT LOW WATER.
Cubic ft. Ton. Tons.
30 ft. × 30 ft. × 1 ft. = 900 × 0·056 = 50·40.
50·40
The pressure is, therefore, equal to ————— = 1·68 ton per square foot.
30
K
AT HIGH WATER.
N. The unsubmerged portion =
Cubic ft. Ton. Tons.
30 ft. × 10 ft. × 1 ft. = 300 × 0·056 = 16·80
The submerged portion =
30 ft. × 20 ft. × 1 ft. = 600 × 0·028 = 16·80/33·60
33·60
Consequently the pressure = ————— = 1·12 ton per square foot;
30
K
also a difference of 0·56 ton per square foot, or 33 per cent. less
load.
The difference in weight, assuming a wave of 5 feet in height, measured
downwards from high water level, to simultaneously roll against the
embankment upon both slopes and completely recoil, would be equivalent
to the displacement of 5 feet depth of water for a strip =
(30 ft. + 30 ft. + 30 ft.) + (45 ft. + 30 ft. + 45 ft.)
——————————————————————————————————————————————————————— = 105 ft. in
width.
2
The cubic contents per lineal foot are—
105 ft. × 1 ft. × 5 feet = 525 cubic ft.
O. The flotation power =
525 cubic ft. × 0·028 ton = 14·70 tons.
For the purposes of this calculation, this weight is taken as if it were
spread over the whole area of the seat of the embankment at a depth of
15 feet from the top =
45 ft. + 30 ft. + 45 ft. = 120 ft. × 1 ft. = 120 square ft.
The vertical pressure per square foot therefore =
14·70/120 = 0·123 ton = 275 lbs.,
which is equivalent to a hammering action upon the foundations of
275/144 = say, 2 lbs. per square inch occurring each time the 5 feet
waves recoil.
The weight, 1·05 ton upon each slope, of the water upon that portion of
the slope which is alternately submerged and unsubmerged is not
considered.
This wave action may, and generally will, happen upon one side only of
an embankment owing to the direction of the wind, the current, and the
“fetch” of the water. In that event the lateral pressure upon the
embankment will also constantly change, and there will be a varying
horizontal force from the 5 feet in height wave and its percussive
action upon the slope tending to produce unequal strain and movement.
The object of the preceding calculations is to show _the variation of
pressures_ an embankment in an estuary or a tidal river has to sustain
in addition to those of an ordinary embankment upon dry land, and its
especial liability to slip and subside; and also to demonstrate that the
vertical and necessarily the horizontal pressures may be in a perpetual
state of mutation and vary considerably, and that the vertical pressure
of the water outside an enclosure embankment may reach a point when the
water may be forced upward upon the land side. Usually, subsidence is
greatest in the wet seasons and at the time of the lowest tides.
In choosing between two materials for submerged work practically equal
in other respects, the heavier should be preferred, as by reason of its
own weight it has greater power to resist the action of the waves and
scour, and the decrease of its specific gravity by the weight of the
bulk of water displaced is relatively not so large.
With respect to the earthwork of canals and embankments constructed to
hold water, each chapter of this book contains information relating to
the promotion of the stability of the soil, and it is not here intended
to refer to the most approved methods of construction, but only to name
some points requiring attention.
A barge or ordinary ship canal is usually placed at a shallow depth in
the ground and meanders through a district, avoiding deep cuttings and
heavy embankments, such an undertaking as the Suez, or the Panama, ship
canals being altogether exceptional undertakings; and also the
Manchester Ship Canal. Some of the most treacherous soils are named in
Chapter II., but probably the worst earth in which a canal can be made
is peat-bog land; the method of procedure is then different to that
required in making a railway or a road, and in such soil the
construction of a canal should be avoided, as it necessitates most
experienced and skilful treatment and extensive drainage, which causes
subsidence; difficult maintenance to preserve the channel and retain the
water of navigation, control the drainage waters, and keep unimpaired
the towing-path, which must be firmly covered throughout. Fine sand is
also an unfavourable soil as it so readily becomes a quicksand, but
almost all other earths usually met with can be so protected that
failure should be an improbable contingency, except when the cuttings
are of extraordinary depth, as on the Panama Canal; the chief danger
being when there is considerable diversity, irregularity, fissuring,
looseness, and upheaval of the soil, for varieties of almost every
surface earth may be encountered, each with its own characteristics and
behaviour when dry or water-charged, and requiring great attention,
especially at the joints, and not a few separate treatment, not only of
the soil but of the same earth in a cutting and in an embankment.
It sometimes happens that there is not enough clayey earth to form a
canal bank, but if the whole of the excavation, except the mere surface
earth, is used there is sufficient, and that it must be employed for
reasons of economical construction. In such a case the clayey earth
should be deposited upon the water side, and the gravelly or sandy soil
on the land side and as a towing-path covering, great care being
exercised that no stratification of the earth takes place, or it may
separate, and water seams be created. The bottom and slopes of a canal
embankment must be covered with an impervious layer, puddle or concrete
being most frequently used for the bottom, and puddle or a coating of
well rammed vegetable soil sown closely with grass seeds for the slopes,
or stone pitching in a wide canal liable to wash: also in loose or
doubtful soil. In canal cuttings when the water is drawn off the
counter-thrust against the slopes is removed, and unless this is
maintained the earth, if in a delicate or loosened condition, may slip,
as a flow may be caused of previously dammed up waters. Prior to any
works being commenced upon a canal embankment it is advisable to
strengthen it for a distance of not less than about 60 feet in length on
each side of a proposed railway bridge or other structure, particularly
when it will be subject to vibration.
Water will soon find a weak place in any earthwork and, certainly, when
an engineer can maintain heavy earthworks in treacherous soils in canal
construction, where part of one slope is submerged in an embankment and
the other dry, and in a cutting part wet and part dry, he should be able
to do so in any analogous situation, making due provision for vibration,
the chief disturbing agency canals are not subject to, but which is so
potent in its effect upon railway earthwork.
Canal and reservoir embankments are so similar as regards the stability
of earthwork that they are here considered under one head. The object of
a canal, reservoir, or river embankment is in a desired position to hold
water without leakage, subsidence, or deterioration of the earth, or
other works connected with the general construction. In dock, canal, or
any earthworks made for the purpose of containing or expelling water, it
is obvious the position is entirely dissimilar to that of railway works:
for whereas a slip or a subsidence in an embankment upon railway work
may be of slight moment and give comparatively little trouble or
anxiety, any movement in earthwork constructed for the purposes named is
of grave importance, as it may mean the destruction of the work, loss of
life and property, not only upon the site but also in the surrounding
district. No leakage or marked weeping of such an embankment should be
disregarded, as unless arrested it will gradually deteriorate the earth
until the equilibrium becomes so affected that the embankment fails. As
a rule, upon railway works, serious slips, except in very unstable soil,
such as drift earth, or those quickly decomposed by atmospheric
influences, seldom occur, _vide_ Chapter II., until a year or two has
elapsed, the process of disintegration from water being necessarily
slower in its action, the material having an opportunity to return to
its normal condition, and the surface being more equally exposed. In
earthwork for hydraulic purposes, although not subject to frequent and
sudden vibration, the slopes being unequally exposed and part generally
either permanently or temporarily submerged or alternately wet and dry,
and the top and land side unsubmerged and fully open to the action of
the weather, percolation cannot be equal and regular upon its surfaces,
and slips and subsidences therefore usually occur within a short time,
varying from a few weeks to a few months; and after about a year or a
cycle of seasons they are not frequent, unless the inherent design and
construction of an embankment is faulty, permitting leakage through the
submerged slope or bottom, pools of water to collect upon the top, and
the bank to become fissured and unequally wet or dry. Especial care
should be exercised to ensure a complete and impermeable connection with
the earth upon which it is placed.
In embankments to contain or expel water time should always be allowed
for an embankment to consolidate before the admission of the water, but
in the case of a cutting the presence of the navigation water as soon
after construction as practicable may be an advantage, depending upon
the nature of the earth in each case; as it may protect the submerged
portions of the slopes from the deteriorating effects of being in a
constantly changing degree of dryness and wetness, and shield them from
the sun and drying winds. Except under peculiar circumstances the
unstable places will be known in a few months, and provided a canal is
properly constructed, it will not cause much trouble after six months or
a year from earthwork movement if the embankments and cuttings receive
ordinary attention, as the navigation water will quickly indicate the
unconsolidated places. In clay, clay marls, clay loams, and where loamy
soil is intermixed with permeable and water-bearing strata, movement of
the earth in canals will speedily occur unless proper precautions have
been taken in the construction, as they are seldom homogeneous.
Earthworks to contain or expel water should be made proof against even
improbable deterioration and accident, and in proportion as the soil is
less solid and firm it should be consolidated by ramming or other means,
or be covered and protected to prevent it cracking, and only firm and
binding material should be used in canal embankments or those holding or
expelling water in order to prevent slips and subsidences. Chapter II.
treats of some conditions under which slips and subsidences may be
expected. No precaution should be omitted that will render the work
solid and uniform, and nothing should be left to chance. The location is
of great importance, for the earth may vary in stability within a very
short distance, not only in character but as regards the superimposition
of the strata. Upheaved and distorted beds should be avoided, and all
loose and fissured earths, especially rock or other soils having more or
less vertical seams: for all embankments constructed upon fissured soils
are sure to cause anxiety and trouble, and will always be liable to
become in a dangerous state from an excessive rainfall. Impermeable
horizontally deposited earth of considerable thickness is that to be
desired, or firm ground that cannot slide upon another stratum or be
affected by any artificially brought addition to the percolating waters
consequent upon the construction of waterworks. Having carefully
selected a site, which for waterworks purposes must almost invariably be
upon high ground and may have to be upon the top cap soil of a hill and
be peculiarly exposed, the next step to guard against a slip or a
subsidence is to prepare the foundations so that no leakage or trickling
of water can undermine or gradually deteriorate the seat of the
embankment; and, therefore, a thorough connection between the deposited
embankment and the ground must be established and the whole be prevented
from movement.
The selection of the best available earth is one requiring careful
consideration, and it may be necessary to experiment to test the
capability of the soil to be made watertight by compression or other
comparatively inexpensive means. In some cases none may be obtainable;
if so, the only course to pursue may be to consolidate the earth as much
as possible, and protect it with an impermeable homogeneous and durable
covering, and one that experience has shown can be trusted to equally
resist percolation. The whole practice of stable earth dam construction
is comprised in the employment of homogeneous, fine, and tenacious earth
uniformly deposited in thin layers, gently watered sufficiently to aid
ramming and consolidation, rolled, pressed, or trodden down by the
passage of carts, men, or animals, and in its due surface protection.
Heavy rolling is to be preferred, for it is more effective than ramming,
as may be judged by the greater compression; the thickness of the layers
and the weight being so regulated that it compresses the earth to its
state of maximum solidity, and does not pulverize it, as the compression
is more uniform, and irregularly compact masses are not created, which
not only destroy uniformity of condition of the mass, but cause seams
and veins and destroy homogeneity. After rolling, the compressed layer
should be gently watered, as the weight of the roller will have made the
top crust drier than the lower portion, unless it has been made into too
moist a state. The thickness of the layers should not exceed, when the
soil is to be heavy steam-rolled, about 6 inches in earth, and 4 inches
in clay soils; they may be compressed to about four-fifths to two-thirds
of their normal thickness, the degree of compression to ensure maximum
solidity indicating the openness of the original earth. In sand, the
layers when simply wetted and rammed with an ordinary rammer, should be
about 4 to 5 inches in thickness, and ordinary earth about 2 inches. The
volume of the sand will be reduced from 10 to 15 per cent. Simple
ramming of sand will only reduce it about 6 to about 9 per cent., and
water about 4 to 6 per cent., making the total compression as before
stated, the quantity of water used being some 20 per cent. of the volume
of the sand. Embankments of moderate height have been made of sand when
no other earth was available, except clay loamy soil in comparatively
small quantities, the surface of the embankment being worked by thin
bars, and the loam being incorporated with the sand and made to fill its
interstices, surface protection being thus afforded, and all the usual
means to promote consolidation being adopted. Wet earth well mixed with
a grout of quicklime has also been used to make a firm embankment of
little height. Clay is not a good material to use unless it is
incorporated with a considerable percentage of sand to prevent fissures
and to lessen expansion. Many prefer the sand to be in the proportion of
about two-thirds of the mass, only one-third being clay; the soil being
then a loam, and cannot be classed as a clay.
There is much diversity of opinion as to the relative value of a central
puddle wall or protection of the slope and toe. Such a wall is placed in
the centre, not only to give support to an earth embankment and prevent
any through leakage, but also to keep the puddle in a uniformly moist
condition, and therefore to prevent it fissuring and cracking from
exposure to the sun or air. In an embankment erected upon an earth
foundation it may be advantageous and warrant the expense, but when the
embankment of earth is placed upon rock it should not be erected, for it
is impossible to make a watertight joint between rock and clay puddle,
and should it be placed in a rock trench leakage will not be prevented
by it, and water will accumulate when it does not at once pass through
the seat of an embankment until the surface of its base becomes
softened, and the whole mass almost worthless either as a means of
support or of prevention of through percolation; and, moreover, there is
the danger that the clay will draw away from the sides of the rock. What
is wanted is, as it were, to insert as far as the top of an embankment
an artificial rock having a thorough connection with the foundation,
consequently a Portland cement concrete wall should be adopted in such a
case and not one consisting of clay puddle. Two great advantages of a
Portland cement concrete central support over that of a clay puddle wall
are that it does not settle and the weight is evenly distributed,
whereas a puddle wall in subsiding may draw away from the earth of the
embankment and cause cavities and cracks and consequent leakage. The
chief consideration is to produce an embankment having impermeability,
solidity, and homogeneity, and a thorough connection at the foundations;
and as the central puddle wall system rarely does so, and usually only
under circumstances which would probably hardly warrant the expense of
its adoption, it is in a state of obsolescence; and should central wall
support be necessary, which may not infrequently be the case, Portland
cement concrete is being adopted in its place, a solid and durable
material being used instead of one varying in shape and size, according
to its state of dryness or wetness, liable to fissure, and incapable of
being permanently and firmly joined to any material. This system may be
described as one of arresting the percolation of water in the interior
of an embankment; but the great aim is to prevent any percolation into
the mass, as when once a passage is made the water will escape along the
line of least resistance, and a fissure become a cavity, a cavity a
breach.
The protection of the slope and toe has for its object the prevention of
any percolation into the mass, and it may effect all that is requisite,
but its efficiency and completeness much depends upon the preparation
and deposition of the layers during the construction of an embankment,
and also the time that can be allowed for consolidation, so as to
prevent any cracking or fissuring of the face covering from settlement
of the embankment. It is obvious in the case of a reservoir embankment
or a slope alternately submerged and unsubmerged, that an exposed clay
puddle covering cannot be used, as heat or the sun’s rays will cause it
to crack, although if constantly wet it would succeed. A puddled clay
covering with a broken stone bed placed upon it to receive dry or
mortar-set stone pitching has been frequently adopted; a simple cement
concrete facing about 6 to 12 inches in thickness, depending upon the
depth of the water and the nature of the soil, or in conjunction with an
asphalt coating of ordinary thickness. In the two latter cases care must
be taken that they do not separate from the embankment either from the
force of pent-up water, frost, or shrinking of the earth embankment.
As any perforation of the surface must be prevented, in certain
districts the covering should be capable of resisting the attacks of
rodents and crustacea, and, therefore, a stone pitched or concrete
covered slope is necessary, or the puddle towards the surface must be
well incorporated with small stones or ashes or other tough material. In
European countries the effects of the burrowing of rats may be
insignificant, but in warmer climates, as, for instance, on the coast of
Coromandel and in some parts of Bengal, where rats may measure as much
as 2 feet in length, their attacks are not to be disregarded with
impunity.
The causes of failure of water-containing embankments afford an
indication of the direction in which especial care should be exercised
in their construction. Assuming a reservoir embankment to be of the
necessary form and bulk, and to be properly constructed, the principal
causes of failure are as follows:—
1. Leakage along the line of a culvert or pipe passing through the lower
portion of an embankment.
2. Leakage under the seat of an embankment.
3. Water overflowing the top and eroding the land slope and so
destroying the equilibrium.
4. Bursting of springs over the site. _Vide_ Chapter XII. on “boils” in
loose soils.
With regard to the first, the most frequent cause of the failure of a
water enclosure embankment; the culvert or outlet passages have been
rendered unnecessary by conducting the waters in a tunnel passage under
the seat of the embankment and without interfering with it; but this
method is expensive. One of the causes of failure is the weight of the
embankment owing to unequal settlement producing a breach in a culvert,
the probable result of insecure foundations or want of a firm concrete
base to the culvert to evenly distribute the weight; or it being placed
upon clay puddle, which should never be done; or the embankment being
constructed without due care. All culverts should be sufficiently large
for a man to easily pass through and should be equally watertight within
and without, for a leakage from the culvert to the bank is equally
dangerous, and means should be provided so that it can be closed in
short lengths. Reports on the temporary failures of reservoir
embankments almost invariably state, failure occurred from water
penetrating between the puddle and the culvert, from water percolating
between the rock foundation and the central puddle wall, or the
embankment gave way as water issued through interstices in it caused by
settlement of the masonry outlet passage.
Careless construction has often been shown by inspection to be the
reason of so many embankments yielding along the line of the culvert;
but when the latter is properly designed and built it seldom causes a
temporary failure of a well-made reservoir embankment. Respecting the
second cause of failure, it generally proceeds from want of care in
thoroughly binding an embankment to the solid ground and protecting the
toe; by “boils” in the foundations; or by a porous earth seam, such as
fine sand, existing under the stratum upon which the embankment is
erected becoming a quicksand on flowing water reaching it.