THE DEPOSITION OF AN EMBANKMENT—PREPARATION OF THE GROUND UPON
WHICH AN EMBANKMENT HAS TO BE DEPOSITED—METHODS OF
PROCEDURE—CONSIDERATION OF SOME OF THE DIFFERENT SYSTEMS—THE
EFFECT OF THE HEIGHT OF A TIP AND THE LENGTH OF A LEAD—THE
STEAM NAVVY AND EMBANKMENTS 156–170