CHAPTER IX.

THE DEPOSITION OF AN EMBANKMENT—PREPARATION OF THE GROUND UPON

WHICH AN EMBANKMENT HAS TO BE DEPOSITED—METHODS OF

PROCEDURE—CONSIDERATION OF SOME OF THE DIFFERENT SYSTEMS—THE

EFFECT OF THE HEIGHT OF A TIP AND THE LENGTH OF A LEAD—THE

STEAM NAVVY AND EMBANKMENTS 156–170

Earthwork Slips and Subsidences upon Public Works Their Causes, Prevention, and Reparation · 第 9 / 15 章