COLD-WATER SUPPLY. TEST
The supplying of cold water to buildings and then piping it to the
various fixtures makes a very interesting study. We have gone over
the methods of laying and piping for the house service pipe. We
will go over the different systems now employed to supply the
water, quickly.
UNDERGROUND WATER.--In thinly populated districts the well is still
employed to supply water to the building. The water is brought to
the surface by means of a large bucket or by means of a pump. A
well point can be driven into the ground until water is reached and
then the water can be brought to the surface by means of a pump
operated by hand or by power. The water can be forced to a tank
that is open and elevated, or forced into a tank that is closed and
put under pressure. From either tank the water will flow to any
desired outlets. A windmill can be employed to furnish power to
operate the pump. Water supply that is received directly from
underground is by far the best to use. A cesspool or outhouse must
not be allowed on the premises with a well, otherwise the well will
be contaminated and unfit for domestic use. An open well is not as
sanitary as a driven well, as the surface water and leaves, etc.,
get into it and decay and pollute the water, and soon make it unfit
for domestic use.
STREAMS AND BROOKS.--The brooks and streams furnish a good source
of supply for water to a building or community of buildings. The
writer recently worked on a system of piping that supplied 15 or 20
buildings. The water supply came from a brook that was higher than
the houses. Each house had a separate pipe leading down from the
brook into a tank from which the house was piped. The owner of the
brook applied business ethics to the privileges of taking water
from it. He had a scale of prices, and the highest-priced location
was an inch or so below the bed of the brook, the next price was
level with the bottom, the next cheaper 2 inches above the bottom.
As the surface was reached, the privilege cost less. In the dry
time of the year those at the bottom of the brook always had water
while those at the top location had to wait for the water to rise,
and had to do without water during the dry time. Where the stream
is on a lower level than the building a hydraulic ram can be used.
RIVERS AND LAKES.--Rivers and lakes make an abundant supply for
water systems. A sluggish-moving river is bad, also a river that is
used for carrying off the sewage of a town. Special provision is
now made for the using of water that is polluted. A lake that is
supplied by springs is by far the best source of supply. The water
is pumped from the river or lake into a reservoir and then flows by
gravity into mains and from the mains into the buildings. The water
should always be filtered before it is allowed to enter the
distributing mains.
WATER PRESSURE.--Pressure at a fixture or outlet so that the water
will flow is generally obtained by the force of gravity. When this
method is not sufficient, a pneumatic system is employed. This
method is employed to force the water to the top floors or to
supply the whole building in high structures. The pneumatic system
requires a pump, an air-tight tank, and pipes to the various
outlets. The water pumped into the air-tight tank will occupy part
of the space generally occupied by the air. The air cannot escape
and is, therefore, compressed. Continued pumping will compress the
air until the limit of the apparatus is reached. If a valve or
faucet that is connected with the tank is opened, the air will
expand and force the water out of the opening. This explains in a
general way the operation of a pneumatic water-supply system. Water
can be pumped into this air-tight tank from a well, cistern, river,
lake, or from the city supply mains.
[Illustration: FIG. 70.--"Banjo."]
PIPING.--From the service pipe on which there has been placed a
shut-off, a line of piping, full size, is run through the basement,
overhead to a convenient place, perhaps to a partition in the
center of the cellar. The pipe is brought down and connected into
the end of a header. This header or banjo is made of Ts placed 4
inches center to center. From each T a line of pipe is run to each
isolated fixture or set of fixtures (see Fig. 70). A stop and waste
cock is placed on each line at such a point that all stop cocks
will come in a row near the header. A small pipe is run from the
waste of each stop and discharged into a larger pipe which connects
with a sink. This way of running pipes while it is expensive makes
a very neat and good job. Each stop cock has a tag on it stating
explicitly what it controls. If the building is a large one a
number of these panelled headers are used. A less expensive way to
run this pipe is to branch off from the main at points where the
branch pipe will be as short as possible and use as few fittings
as possible. Stop and waste cocks are then placed on each branch
near the main.
All pipe must follow the direct line of fitting with which it is
connected. The line of pipe should be perfectly straight. If it
seems necessary to bend the pipe to get around an obstacle, then
good judgment has not been used in placing the fitting into which
the pipe is screwed. The fitting should be re-located so that the
pipe can be run without bending. To have true alignment of pipes
the whole job or section of the job must be drawn out on paper
first and any obstacles noted and avoided before the piping is cut.
This not only saves time but it is also the forerunner of a good
job. When getting measurements for piping the same rule or tape
should be used to get out the pipe as was used to get the
measurements.
The water main and branches that run through the basement of a
building are generally hung on the ceiling. Rough hangers of wood,
rope, or wire are usually used to hold the pipe in place at first,
then neat and strong adjustable hangers are placed every 8 feet
apart. There are in use too many kinds of hangers to explain or
describe them here. The essential point of all good hangers is to
have them strong, neat, and so made that perfect alignment of the
pipe can be had. The hangers should be so placed that no strain
will come on the fitting or the valves. A hanger should be placed
near each side of unions so that when the union is taken apart
neither side of the pipe will drop and bend. Hooks and straps
should be used to hold vertical pipes rigid and in position. A
vertical pipe should be so held in place that its weight will come
on the hooks and straps that hold it rather than on the horizontal
pipe into which it connects. Where there are six or eight
horizontal lines of pipes close together, a separate hanger for
each pipe makes a rather cumbersome job and it consumes
considerable time to install them properly. A hanger having one
support run under all the pipes will allow space for proper
alignment and adjustment for drainage. Allowance must be made on
all lines of pipe for drainage. When a building is vacant during
cold weather, the water is drawn off; therefore, the pipes should
have a pitch to certain points where the pipes can be opened and
the entire system drained of water.
KINDS OF PIPE.--The kind of pipe that is used for cold-water supply
depends on and varies according to the kind of water, the kind of
earth through which it runs, and the construction of the building.
Wrought iron, steel, lead, brass, tin-lined brass, are in use.
The supply pipe to every fixture should have a stop on it directly
under the fixture. This will allow the water to be shut off for
repairs to the faucet without stopping the supply of other
fixtures.
The making of perfect threads on pipe is an important matter,
especially on water pipes. If the pipe and the dies were perfect,
and the mechanic used sufficient oil in cutting, and the fittings
were perfectly tapped to correspond to the dies used on the pipe,
of course a perfect union between pipe and fitting would result and
the joint would be found to be perfect on screwing the pipe home.
As all the above conditions are not found on the job, threads are
made tight by the use of red or white lead and oil. The lead is put
on the thread and when the thread is made up the lead will have
been forced into any imperfection that may be in the threads and
the joint will then be water-tight. White lead and oil should be
used on nickel-plated pipe as other pipe compounds are too
conspicuous and look badly. A pipe compound should be used with
discretion, for if too much is put on a burr of it will collect in
the bore of the pipe and reduce it considerably. This is not
tolerated, so only a small amount is used. Water pipes should be
run in accessible places, making it possible to get at them in case
of trouble. In climates that have freezing weather water pipes
should not be run in outside partitions. If it is found absolutely
necessary to do so, as in the case of buildings which have no
inside partitions on the first floor, the pipe should be properly
covered and protected. The different methods of covering pipes are
described in Chapter XV.