CHAPTER XIII

COLD-WATER SUPPLY. TEST

The supplying of cold water to buildings and then piping it to the

various fixtures makes a very interesting study. We have gone over

the methods of laying and piping for the house service pipe. We

will go over the different systems now employed to supply the

water, quickly.

UNDERGROUND WATER.--In thinly populated districts the well is still

employed to supply water to the building. The water is brought to

the surface by means of a large bucket or by means of a pump. A

well point can be driven into the ground until water is reached and

then the water can be brought to the surface by means of a pump

operated by hand or by power. The water can be forced to a tank

that is open and elevated, or forced into a tank that is closed and

put under pressure. From either tank the water will flow to any

desired outlets. A windmill can be employed to furnish power to

operate the pump. Water supply that is received directly from

underground is by far the best to use. A cesspool or outhouse must

not be allowed on the premises with a well, otherwise the well will

be contaminated and unfit for domestic use. An open well is not as

sanitary as a driven well, as the surface water and leaves, etc.,

get into it and decay and pollute the water, and soon make it unfit

for domestic use.

STREAMS AND BROOKS.--The brooks and streams furnish a good source

of supply for water to a building or community of buildings. The

writer recently worked on a system of piping that supplied 15 or 20

buildings. The water supply came from a brook that was higher than

the houses. Each house had a separate pipe leading down from the

brook into a tank from which the house was piped. The owner of the

brook applied business ethics to the privileges of taking water

from it. He had a scale of prices, and the highest-priced location

was an inch or so below the bed of the brook, the next price was

level with the bottom, the next cheaper 2 inches above the bottom.

As the surface was reached, the privilege cost less. In the dry

time of the year those at the bottom of the brook always had water

while those at the top location had to wait for the water to rise,

and had to do without water during the dry time. Where the stream

is on a lower level than the building a hydraulic ram can be used.

RIVERS AND LAKES.--Rivers and lakes make an abundant supply for

water systems. A sluggish-moving river is bad, also a river that is

used for carrying off the sewage of a town. Special provision is

now made for the using of water that is polluted. A lake that is

supplied by springs is by far the best source of supply. The water

is pumped from the river or lake into a reservoir and then flows by

gravity into mains and from the mains into the buildings. The water

should always be filtered before it is allowed to enter the

distributing mains.

WATER PRESSURE.--Pressure at a fixture or outlet so that the water

will flow is generally obtained by the force of gravity. When this

method is not sufficient, a pneumatic system is employed. This

method is employed to force the water to the top floors or to

supply the whole building in high structures. The pneumatic system

requires a pump, an air-tight tank, and pipes to the various

outlets. The water pumped into the air-tight tank will occupy part

of the space generally occupied by the air. The air cannot escape

and is, therefore, compressed. Continued pumping will compress the

air until the limit of the apparatus is reached. If a valve or

faucet that is connected with the tank is opened, the air will

expand and force the water out of the opening. This explains in a

general way the operation of a pneumatic water-supply system. Water

can be pumped into this air-tight tank from a well, cistern, river,

lake, or from the city supply mains.

[Illustration: FIG. 70.--"Banjo."]

PIPING.--From the service pipe on which there has been placed a

shut-off, a line of piping, full size, is run through the basement,

overhead to a convenient place, perhaps to a partition in the

center of the cellar. The pipe is brought down and connected into

the end of a header. This header or banjo is made of Ts placed 4

inches center to center. From each T a line of pipe is run to each

isolated fixture or set of fixtures (see Fig. 70). A stop and waste

cock is placed on each line at such a point that all stop cocks

will come in a row near the header. A small pipe is run from the

waste of each stop and discharged into a larger pipe which connects

with a sink. This way of running pipes while it is expensive makes

a very neat and good job. Each stop cock has a tag on it stating

explicitly what it controls. If the building is a large one a

number of these panelled headers are used. A less expensive way to

run this pipe is to branch off from the main at points where the

branch pipe will be as short as possible and use as few fittings

as possible. Stop and waste cocks are then placed on each branch

near the main.

All pipe must follow the direct line of fitting with which it is

connected. The line of pipe should be perfectly straight. If it

seems necessary to bend the pipe to get around an obstacle, then

good judgment has not been used in placing the fitting into which

the pipe is screwed. The fitting should be re-located so that the

pipe can be run without bending. To have true alignment of pipes

the whole job or section of the job must be drawn out on paper

first and any obstacles noted and avoided before the piping is cut.

This not only saves time but it is also the forerunner of a good

job. When getting measurements for piping the same rule or tape

should be used to get out the pipe as was used to get the

measurements.

The water main and branches that run through the basement of a

building are generally hung on the ceiling. Rough hangers of wood,

rope, or wire are usually used to hold the pipe in place at first,

then neat and strong adjustable hangers are placed every 8 feet

apart. There are in use too many kinds of hangers to explain or

describe them here. The essential point of all good hangers is to

have them strong, neat, and so made that perfect alignment of the

pipe can be had. The hangers should be so placed that no strain

will come on the fitting or the valves. A hanger should be placed

near each side of unions so that when the union is taken apart

neither side of the pipe will drop and bend. Hooks and straps

should be used to hold vertical pipes rigid and in position. A

vertical pipe should be so held in place that its weight will come

on the hooks and straps that hold it rather than on the horizontal

pipe into which it connects. Where there are six or eight

horizontal lines of pipes close together, a separate hanger for

each pipe makes a rather cumbersome job and it consumes

considerable time to install them properly. A hanger having one

support run under all the pipes will allow space for proper

alignment and adjustment for drainage. Allowance must be made on

all lines of pipe for drainage. When a building is vacant during

cold weather, the water is drawn off; therefore, the pipes should

have a pitch to certain points where the pipes can be opened and

the entire system drained of water.

KINDS OF PIPE.--The kind of pipe that is used for cold-water supply

depends on and varies according to the kind of water, the kind of

earth through which it runs, and the construction of the building.

Wrought iron, steel, lead, brass, tin-lined brass, are in use.

The supply pipe to every fixture should have a stop on it directly

under the fixture. This will allow the water to be shut off for

repairs to the faucet without stopping the supply of other

fixtures.

The making of perfect threads on pipe is an important matter,

especially on water pipes. If the pipe and the dies were perfect,

and the mechanic used sufficient oil in cutting, and the fittings

were perfectly tapped to correspond to the dies used on the pipe,

of course a perfect union between pipe and fitting would result and

the joint would be found to be perfect on screwing the pipe home.

As all the above conditions are not found on the job, threads are

made tight by the use of red or white lead and oil. The lead is put

on the thread and when the thread is made up the lead will have

been forced into any imperfection that may be in the threads and

the joint will then be water-tight. White lead and oil should be

used on nickel-plated pipe as other pipe compounds are too

conspicuous and look badly. A pipe compound should be used with

discretion, for if too much is put on a burr of it will collect in

the bore of the pipe and reduce it considerably. This is not

tolerated, so only a small amount is used. Water pipes should be

run in accessible places, making it possible to get at them in case

of trouble. In climates that have freezing weather water pipes

should not be run in outside partitions. If it is found absolutely

necessary to do so, as in the case of buildings which have no

inside partitions on the first floor, the pipe should be properly

covered and protected. The different methods of covering pipes are

described in Chapter XV.