Flooding in the Basin

The subject of floods is fraught with more drama than that of water

shortages, for a flood can be not only a hardship but a catastrophe. For

this reason, accounts of floods tend sometimes toward exaggeration, and

appeals and proposals for protection against flood threats often take on

the highpitched tones of impending disaster. The subject badly needs

sober public understanding, despite the fact that for decades a good

many knowledgeable scientists and engineers and planners have been

laying out their conclusions for general perusal.

Rivers are supposed to run out of their banks occasionally.

Topographically, stream flood plains--the expanses of flat bottomland

that have been deposited over long periods of geological time by the

streams they border--are similar to what legal terminology calls

"attractive nuisances." Men have always known that they were dangerous

and yet have always utilized them to some degree, because they contain

the best farm land, are convenient to water, and are easier places in

which to build houses and factories and roads than are the safer hills

and uplands.

In times before engineering technology was able to erect such effective

control structures as today, populations who had lived along "flashy"

watercourses long enough to learn their habits tended to build their

more valuable structures back away from the parts of the flood plain

that got wet most often, leaving those parts for cropland and timber, or

sometimes for shacktown, promenades, and parks. Thus long-settled

countries and regions have often developed through trial and error a

degree of what is now called "passive flood protection," which simply

means recognizing that the flood plain is sometimes a rather perilous

place, and treating it accordingly. It was valid in past ages, and it is

still valid today.

The Potomac Basin has been inhabited by civilized men since long before

modern engineering evolved. Possibly early town-builders' wariness of

floods contributed to the fact that the problem of flood damages here,

though quite real, is somewhat less severe than in certain other

sections of the nation. At specific points of concentrated flood plain

development--Petersburg, W. Va., on the South Branch; Cumberland, Md.,

and the areas upstream from it on the North Branch; and metropolitan

Washington at the head of the estuary--figures show significant amounts

of average annual destruction by rampaging stream waters. In headwater

areas or small urban watersheds scattered throughout the Basin, there

are a number of other places where some damage takes place, whether

agricultural or structural. The total average annual damages for the

Basin, as computed in the 1963 Army _Report_, amount to about $8.6

million.

Along small streams, whether urban or rural, the same principles apply

as along large ones, and the proper protective measures are similar if

smaller in scale. Leaving the worst parts of the flood plain in fields

or parks is the usual and effective form of passive protection. Where

existing development demands structural measures, it has been common

practice to cover streams over as sewers or to confine them to

straightened concrete channels that sluice rainwater and mud away as

fast as they will flow--though often this is not fast enough, as is

shown by occasional messy and costly overflows of Four Mile Run between

Arlington and Alexandria. And the loss of pleasant brooks and creeks

through such practices is a heavy price to pay.

More and more often lately in such cases, a combination of some passive

protection with the small headwater dams that "catch the water where it

falls" and soil conservation measures to protect the watershed lands

above the reservoirs, has proved to be a better solution. This is what

has been done in the Rock Creek watershed in the District of Columbia

and Montgomery County, Md., and its value was shown during the heavy

rains of September 1966. Here stream valley parks have given passive

protection for a long tune, though the popularity and heavy use of the

parks have caused a big investment in picnic areas, playgrounds, and

other facilities, which themselves have often suffered expensive flood

damages. As a result of long effort by a watershed association, two S.

C. S. dams had been finished shortly before the September flood at the

only useful sites on the creek's upper branches that rapidly spreading

residential development had left available. They kept runoff from the

big sudden rains entirely in hand in Maryland and reduced damage in the

Federal park in the District to a point far below what it would have

been without them.

Ideally, of course, such planning should be done before heavy

development, and a pilot urban watershed program of this sort is being

undertaken in the Pohick Creek basin on the metropolitan fringe in

Fairfax County, Virginia. With freedom to locate necessary structures in

the right places and to protect them against silt and ruinous runoff by

requiring good land treatment and a sensible distribution of buildings,

pavements, and wooded or grassy open space, planners there ought to get

good flood protection while preserving a pretty valley and stream for

the people who will be living in the neighborhood. From any number of

standpoints, this is vastly preferable to the more usual traditional

procedure of letting growth run wild and then trying to cope with

trouble when it comes up.

The headwater dams are equally effective in reducing flood damages in

small rural watersheds where losses warrant their installation. But even

on a massive scale of installation they have little influence on

downstream flooding along the main rivers. In such places--at

Cumberland, Petersburg, and the Washington metropolis, and at certain

other river towns where less damage occurs--other measures are going to

have to be selected and applied in each individual case according to

costs and benefits, physical possibilities, and the best interests of

the region.

Cumberland and the lesser damage centers on the North Branch are

scheduled for the classic engineering solution of big dams upstream. The

existing Savage River reservoir, finished in 1950, has cut down flooding

notably in that area, and a dam at Bloomington above Westernport,

already authorized by Congress, will relieve it still more, as well as

fitting into the complex clean-up task along the North Branch and

furnishing water for local and Washington use.

The 1963 plan proposed similar protection for metropolitan Washington

and for Petersburg, West Virginia, in the form of major reservoirs at

Seneca and Royal Glen. Physically and culturally, there is very little

similarity between the two communities, but their flood situations and

the potential effects of the proposed protective structures have a

certain kinship.

At both places there has been development of the flood plain, with the

result that damages occur when the communities' respective rivers get

out of their banks. In relation to its size--around 2000

people--Petersburg is subject to much heavier trouble of this sort than

the metropolis. It sits near the head of the lovely narrow farming

valley through which the main downstream South Branch flows, a few miles

below the point where two principal forks of the river join after

rushing out of the mountains. In June of 1949, a flood there claimed

five lives around Petersburg and three at Moorefield downriver, where

still another main fork comes in, and wrought major destruction through

the neighborhood.

The 1963 Army _Report_ calculated Petersburg's average annual flood

damages at over $200,000, and advocated construction of a $30 million,

multipurpose reservoir at Royal Glen just upstream from Petersburg, to

do away with most of the damage and to permit further industrial

development of the flood plain, as well as to provide a great deal of

water for downstream use and for regional recreation. People and groups

in the area with interests standing to benefit from the reservoir were

naturally in favor of it. Under present Federal policy--which will be

mentioned again--its flood-protective function would cost them nothing,

whereas levees or other locally effective approaches would demand a good

deal of local effort and outlay, besides disrupting the town's aspect

and its relationship to the river.

[Illustration]

Opposition developed also. The very name of Royal Glen suggests the

scenic qualities of the country roundabout. As at Seneca, a dam here

would flood out some country with unique scenic and recreational values,

including the famous Smoke Hole Gorge down which the clean South Branch

runs between steep mountains dotted with caves and flavored with the

quiet simplicity of the life that isolated hill folk lived there up into

modern times. It is a section much appreciated by whitewater canoeists

and hikers and horsemen and others from that region and elsewhere, who

care about rugged and unspoiled places. Despite its remoteness, the

proposal that it be inundated aroused more vigorously hostile comment

among conservationists and nature lovers in general than perhaps any

other item in the Army program except Seneca. The State of West Virginia

declared itself opposed to the project, and to date has maintained that

position.

Again like Seneca, the Royal Glen site does have certain unique

advantages for use as a reservoir. But, as at Seneca also, its

functional virtues do not appear to be nearly so unique as those of the

scenery and natural values whose obliteration would be a heavy part of

the reservoir's price. In 1965, the immense scenic value of a large part

of the country it would wipe out was recognized by its inclusion in the

big Spruce Knob-Seneca Rocks National Recreation Area. It is strongly to

be hoped that that recognition is never withdrawn.

The issue of scenic destruction at both Royal Glen and Seneca tends to

obscure another set of even more basically relevant considerations

having to do with the whole question of flood plain occupancy and use,

the extent to which those who benefit from it should share the cost of

such protection as may be necessary, and possible ways of reversing a

present trend toward inexorably larger national flood damages each year

despite ever larger and more expensive structural protective measures at

public expense.

[Illustration: THE HYDROLOGIC CYCLE]

It is a complex subject that can only be summarized here. What it

amounts to is that America has strayed too far from the ancient hard-won

wisdom of treating flood plains with respect. It has been lulled by the

achievements of engineering, encouraged by a general absence of

inadequacy of State and local planning that takes such matters into

account, and conditioned to a set of Federal laws and policies

piece-built over a long period of time, with consequent inequities,

imbalances, and loopholes that tend to emphasize structural protection

at Federal expense for indiscriminate flood plain development. The

result has been a neglect of the possibilities of flood plain

management, which undoubtedly in the long run--as in the long past--will

prove to be the most valuable tool for reducing these damages, for it

will bring about a restriction on ill-advised and uneconomic

encroachment in these streamside areas.

The reason most such encroachment is bad, with or without a dam

upstream, with or without levees, is that it establishes the certainty

of further and larger flood damages in the future, with the certainty of

further and larger expenditures to combat them. It has been pointed out

that no such thing really exists as flood _control_, but only a given

degree of flood _protection_. Economics and technology dictate that

reservoir capacities devoted to the storage of flood water, for example,

be considerably smaller than the maximum runoff conceivably possible.

This means that sooner or later there is going to be a great flood

against which the reservoir or reservoirs will not suffice. If the

reservoirs' presence, as is most often the case, has directly encouraged

a lot of flood plain speculation and construction downstream, then the

great flood is going to do more damage than was ever done before, and

more reservoirs and other protective measures, most often Federally

financed, are going to be demanded, at a price that rises sharply as

less desirable sites and methods have to be employed, and with

frequently catastrophic scenic effects. These considerations apply to

small watersheds as well as large ones.

This costly cycle, which frequently makes the general public pay both in

tax money and the sacrifice of amenities to protect the investment of a

relatively few who profit from the wrong kind of flood plain use--in

plain words, makes the public subsidize their ventures--has established

itself widely. In some places, of course, certain kinds of development

can take place only on the flood plain, and planning for its structural

protection may be amply warranted, with equitable cost-sharing. But the

difference between this sort of flood plain use and the much more

common, thoughtless, quick-profit type needs to be more widely

recognized and established in policies at all levels of government. The

subject has been much studied. In August 1966 the findings of a

distinguished Task Force on Federal Flood Control Policy, which made

detailed recommendations for injecting some sense into the situation,

were submitted to the attention of Congress by President Johnson. At the

same time, he issued Executive Order 11296 on the subject, directing all

Federal executive agencies with influence in such matters to do

everything possible to discourage uneconomic and unwarranted use of the

nation's flood plains. This, of course, includes the present Potomac

planning effort.

[Illustration: FLOOD PLAIN DELINEATION POTOMAC RIVER AT HANCOCK, MD.]

At Petersburg, there is little question that the wisest approach to

present and future flooding problems would be one that would seek to

give reasonable protection to the development already on the flood plain

but at the same time deter further construction unless it is

floodproofed or houses activities that find a flood plain location so

advantageous as to be well worth the risk. In currently available

terms, this could be accomplished most feasibly and at the least net

expenditure--though not, under present policy, as cheaply to the

community itself as by the Royal Glen dam, and not without some notable

changes in the town's landscape--by combining a levee system around

present development with rigid zoning of the unoccupied part of the

flood plain, or its acquisition as parkland.

[Illustration]

Another approach that may shortly be possible was suggested by the

President's Task Force and is the subject of legislation proposed to

Congress by the Department of Housing and Urban Development. Under this

legislation, owners of existing flood plain residences and small

businesses would be given a chance to buy Federally subsidized

insurance against flood damages at reduced rates, while new construction

in flood hazard areas would be subject to rates based on the full true

risk involved. After 1970, under this proposed legislation, such

insurance could be sold only in areas with enforceable codes and

ordinances or other measures for sound flood plain management. Such a

program could go a long way toward eliminating casual and expensive

flood plain clutter, if it were backed up by adjustments in other phases

of Federal flood control policy that would similarly place a share of

any protective costs where they belong, and hence give an additional

strong nudge to citizens and local and state governments to bring the

situation into balance.

At Washington, because a high proportion of the flood plain on both

shores is in Federal ownership and the use it is put to is determined by

Federal agencies, Executive Order 11296 has special relevance in

forestalling future increases in the amount of flood damage. Existing

damages in the whole urban area are estimated to average $1.4 million

each year. The most damaging flood in the metropolis' history occurred

in March of 1936, and if a flood of the same dimensions were to strike

today, it would cause estimated damages of about $21 million.

These are not small figures, though if they are considered in the light

of the area's population and extent and the total value of construction

there, they seem less formidable. Obviously the threat of damages of

this magnitude must be dealt with, but just as obviously as at

Petersburg, the manner chosen for dealing with them should not be

allowed to stimulate unwise flood plain construction that would lead to

still greater longterm damages.

The Seneca reservoir as proposed in 1963 provided floodwater storage

calculated to reduce metropolitan damages by 46 percent. This is a

significant though not startling amount of reduction, and it constitutes

the most economical one-shot measure of protection that could be

attained. However, if the construction of Seneca is precluded for the

time being or for good, that measure is not available. Second-best, by

Army calculations, would be a combination of several large multipurpose

reservoirs on main tributaries farther upstream. But quite aside from

other considerations of desirability, these could only be justified

economically if a great part of their stored water were destined to

furnish massive flow augmentation to ease pollution in the upper

estuary. As will be noted in the following chapter, recent studies have

raised doubt that such augmentation would be likely to help the estuary

nearly as much as had been thought and it is no longer being considered

a primary tool for that purpose.

This leaves passive devices and local protection works as the main

available instruments for coping with floods at the metropolis. They

will probably be most effective if applied in a carefully selected

combination of means, with levees and other protective works installed

where feasible and desirable, and backed up in other areas by zoning,

flood warning systems, and good design including flood-proofing,

elevated structures, and similar devices. Some of these principles of

design are already being incorporated in new buildings and renewal

projects, but the task of planning and locating such things as levees

usefully on a flood plain containing a good part of "monumental

Washington," the beauty of which is a national concern, is not going to

be simple. A good program must be instituted soon, and the extent of the

Federal interest in the lands involved should considerably ease the job

of coordination.

Interestingly, certain floods to which Washington is susceptible can be

partially guarded against only by such approaches as the ones mentioned

above, and not at all by upstream dams. One of them occurred in August

of 1933, when a hurricane pushed the water in the estuary upstream and

raised it to flood stage at the capital.

[Illustration]

[Illustration]

[Illustration]

The Nation's River: A report on the Potomac From the U.S. Department of the Interior · 第 20 / 44 题