In preparing for a fifth attempt to bring the Colorado under control,

they determined to modify the plan of operations previously followed

by substituting rock for the materials that had before been used in

the construction of dams. Practical experience had shown that piling,

brush, sandbags and earth could not be made to support the pressure

of the river in full flood, while a series of rock-fill barrier dams,

of sufficient width and height, might be strong enough to stand even

a flood discharge of 115,000 cubic feet of water per second. In

making this change of plan, Mr. Randolph acted on his own judgment

and in direct opposition to the views and advice of experts who

were acquainted with the situation. Almost all of the engineers who

had visited the break, including many of national and international

reputation, regarded a rock-fill barrier dam as wholly unworthy of

consideration, for at least two reasons. First, the rock would probably

sink into the soft silt bottom, and keep on going down indefinitely.

It might perhaps be supported by a strong brush-mattress foundation,

but even then, the mattress would be likely to break under the weight

of the load and thus fail to answer its purpose. Second, the water

going over a rock-fill dam, while it was in course of construction,

would almost certainly wash away some one rock at the top. This, by

increasing the overflow at that point, would dislodge more rocks, and

finally create a breach that could not be closed. President Randolph

who had used brush-mattresses and rock-fill dams on the Tombigbee River

in Alabama many years before, fully considered these objections but did

not find them convincing and steadfastly adhered to his own plan.

The preparations made for the summer’s work were far more thorough

and comprehensive than any that had ever been made before. Realizing

the importance of adequate transportation, President Randolph and his

engineers immediately began the construction of a branch railroad from

the main line of the Southern Pacific to the scene of operations at

the crevasse, with ample sidings and terminal facilities at both ends.

Then they borrowed from the Union Pacific three hundred of the mammoth

side-dump cars known as “battleships,” which had been used in the

construction of the Lucin cut-off, and which had a carrying capacity

of fifty or sixty tons each. The California Development Company had

three light-draught steamers and a number of barges that could be used

on the river, and the Southern Pacific Company furnished complete

work-trains, from time to time, until a maximum of ten was reached. The

next requisite was material for levees and dams, and this they secured

by drawing upon all the rock quarries within a radius of four hundred

miles, and by opening a new one, with a face of six hundred feet and a

height of forty feet, on the granite ledge at Andrade near the concrete

head-gate. Clay they obtained from a deposit just north of the Mexican

boundary, and gravel they hauled from the Southern Pacific Company’s

“Mammoth Gravel Pit,” which was situated on the main line about

forty miles west of the crevasse spur. From Los Angeles they brought

1100 ninety-foot piles, 19,000 feet of heavy timbers for railway

trestles, and forty miles of steel cable to be used in the weaving of

brush-mattresses. The Southern Pacific Company furnished pile-drivers,

steam shovels for the granite quarry and gravel pit, several carloads

of repair parts, and a large quantity of stores and materials of

various kinds. It also detailed for service on the spur railroad and

at the crevasse as many engineers, mechanics and skilled workmen as

were needed. The chief reason, Mr. Cory says, “for having the railroad

company supply so great a quantity of labor, equipment and supplies,

was that it afforded an opportunity to assemble quickly a thoroughly

organized and efficient force of men; the advantage of obtaining

material and supplies through the purchasing department of the Harriman

systems; immediate shipment of repair parts not kept on hand; and the

ability to increase or decrease rapidly the force and equipment without

confusion.”

The requisite most difficult to obtain, in sufficient amount, was

unskilled labor. An attempt was made to get five hundred peons from

central Mexico; but it did not succeed, and Mr. Cory was finally

compelled to mobilize all the Indian tribes in that part of the

Southwest--Pimas, Papagoes, Maricopas and Yumas from Arizona and

Cocopahs and Diegueños from Mexico. These Indians fraternized and got

along together amicably, and constituted with their families a separate

camp of about two thousand people. The rest of the laborers were

Mexicans from the vicinity, and drifting adventurers from all parts of

the United States who were attracted to the place by the novelty of the

work and the publicity given to it in the newspapers. Arrangements were

made with the Mexican authorities to put the whole region under martial

law and to send a force of rurales with a military commandant to police

the camps.

[Illustration: Situation in June, 1906 (whole river going into Salton

Sink)]

Active work began on the 6th of August, 1906, when the summer flood

had fallen enough to reduce the flow through the crevasse to about

24,000 cubic feet per second. By that time the receding water had left

exposed extensive sand-bars on both sides of the river, which narrowed

the channel to 600 or 700 feet, and President Randolph’s plan was to

dam this channel sufficiently to throw all or most of the water through

the by-pass and the Rockwood head-gate, and then permanently to close

the break. As it was deemed essential to blanket the bed of the river

with a woven brush-mattress, to prevent bottom erosion and to make a

foundation for the rock, two shifts of men were set at this work. In

twenty days and nights, they constructed, with baling-wire, steel cable

and two thousand cords of brush, about 13,000 square feet of mattress,

which was enough to cover the bed of the river from shore to shore

with a double thickness of blanketing about one hundred feet in width.

When this covering had been completed and sunk, a railway trestle ten

feet wide was built across the crevasse, and on the 14th of September

work-trains of “battleships” began running across it and dumping rock

on to the mattress at the bottom of the stream. Meanwhile, the by-pass

to the Rockwood head-gate was completed and enlarged, and in less than

two weeks the dam was high enough to close the crevasse in part and

thus divert water through the by-pass and gate. On the 10th of October,

nearly 13,000 cubic feet of water per second was passing through the

gate, while only one-tenth of that amount was flowing over the dam. The

gate, however, under the pressure to which it was subjected, both by

the water and by great masses of accumulated driftwood, began to show

signs of weakness, and at two o’clock on the following day two-thirds

of it gave way, went out, and floated down stream. The by-pass then

became the main river, while the top of the diversion dam was left

practically dry. Thus ended, in almost complete failure, the fifth

attempt to control the Colorado. The river had been barred in one

channel, but it burst through another, carrying with it a 200-foot

head-gate which represented four months of labor and an expenditure of

$122,000.

Mr. Harriman and the Southern Pacific engineers were disappointed but

not disheartened. The steel-and-concrete head-gate at Andrade had

been ready for use since June, and powerful dredges were set at work

clearing out and enlarging the four miles of silted-up canal south of

it, so that water might be furnished to the Imperial Valley by that

route while another attempt was being made to close completely both the

Rockwood by-pass and the original intake.

An inspection of the rock-fill dam, which had been left exposed by

the diversion of the river, showed that the objections made to a

structure of this kind were not well founded. The brush-mattress had

not been broken by the weight of the rocks; the rocks themselves had

not sunk out of sight in the soft silt of the bottom, and the dam had

not been breached or seriously injured. It leaked a little, but its

good condition in other respects suggested the possibility of quickly

closing the by-pass and the intake with rock barriers of this type.

Additional trestles were built across both waterways; ten trains of

flat cars and “battleships” were set at work bringing rock from three

or four different quarries, and the laboring force was increased to

about a thousand men with seven hundred horses and mules. Operations

were pushed night and day, and in a little more than three weeks, high

rock-fill dams were built across both intake and by-pass, and were

connected by massive levees so as to make a continuous barrier about

half a mile in length. Leakage through the dams was stopped by facing

them with gravel and clay, forced into the interstices and puddled

with streams of water from powerful pumps, and the levees at both ends

were connected with those that had previously been built up and down

the river by the California Development Company. In the course of the

work there were used, first and last, about three thousand carloads of

rock, gravel and clay, while 400,000 cubic yards of earth were moved by

dredges and teams.

[Illustration: First Closure of Crevasse, Nov. 4, 1906]

On the 4th of November, a little more than two years after the cutting

of the lower Mexican intake, the crevasse into which it had grown

was closed, and the river was forced back into its ancient bed. The

danger had apparently been averted and the Imperial Valley was safe;

but where a treacherous river like the Colorado is concerned, danger

is never over and safety can be secured only by incessant watchfulness

and continual labor. On the 7th of December, another sudden flood came

down the Gila and increased the discharge of the Colorado from 9000 to

about 45,000 cubic feet per second. The rock-fill dam of the Southern

Pacific engineers stood fast; but, about midnight, a reconstructed

earthen levee of the California Development Company, twelve or fifteen

hundred feet further south, was undermined, began to leak, and finally

gave way. The breach at first was small; but it was so rapidly deepened

and widened by erosion and caving that it soon became a crevasse, and

in less than three days the whole river was pouring through a break a

thousand feet wide and again rushing down the slope of the basin to the

Salton Sea.

This new crevasse, taken in connection with the history and the

experience of the two preceding years, showed conclusively: 1, that

the tendency of the Colorado to flow into the Salton Sink was

increasing rather than diminishing; 2, that floods of from 180,000,000

to 360,000,000 cubic feet of water per hour were liable to occur

at almost any season of the year; 3, that the defensive dikes of

the California Development Company were everywhere inadequate or

untrustworthy; and 4, that in order to afford certain protection to the

Imperial Valley, it would be necessary not only to close the new break,

but to build a stronger, higher and more massive levee along the west

bank of the river for a distance of at least twenty miles.

These considerations raised of course the question whether it was worth

while for the Southern Pacific Company to continue this work, upon

which it had already spent about $1,500,000. The interests chiefly

imperilled were those of the national Government. It owned all the

irrigable land along the lower Colorado, including even that upon which

the Imperial Valley settlers had filed.[12] It was then constructing

an immense dam at Potholes, twelve miles above Yuma, upon which it

had already expended about $1,000,000 (the Laguna dam) and with the

water to be impounded thereby it expected to irrigate and reclaim about

90,000 acres of fertile land in Arizona and Southern California. If

the uncontrolled river should continue to “cut back,” by means of its

receding waterfalls, it not only would destroy the Laguna dam, and

the irrigation works upon which the Imperial Valley depended for its

very existence, but would eventually turn the whole bed of the lower

Colorado into a gorge, out of which water for irrigation purposes could

never be taken. This would make valueless more than two thousand square

miles of potentially fertile land, which, if intensively cultivated,

would support a quarter of a million people.

The interests of the Southern Pacific Company, on the other hand,

were comparatively unimportant. The traffic of the Imperial Valley,

at that time, amounted to perhaps $1,200,000 a year, from which the

railroad derived a revenue of only $20,000 or $30,000 for freight

transportation.[13] This, in its relation to the whole business of the

company, was so insignificant as hardly to be worth consideration. The

flooding of the valley, moreover, could not injure the road much more

than it had already been injured. A section of new line, about sixty

miles in length, had been surveyed and graded, and the ties and rails

for it were on the ground. At an additional cost therefore of only

$50,000 or $60,000, the imperilled part of the track could be moved to

a higher location where the rising waters of the Salton Sea could not

reach it.

President Randolph, after full investigation reported the existing

state of affairs to Mr. Harriman by telegraph, and informed him that

while the original break might be closed at a cost of from $300,000 to

$350,000, permanent control of the river would require about twenty

miles of muck-ditching[14] and levee reconstruction, and that if he

(Mr. Harriman) decided to proceed with the work, he might have to spend

$1,500,000 more. In view of this possibility, Mr. Randolph suggested

that the Government, or the State of California, be called upon to

render aid.

Mr. Harriman, who had implicit confidence in the sound business

judgment as well as the engineering ability of Mr. Epes Randolph,

accepted the latter’s view of the situation. He did not doubt that the

Colorado River might ultimately be controlled; but as the expense would

be very great, and as the chief interests imperilled were those of the

nation, he did not think that the Southern Pacific Company, of which he

was President, was equitably or morally bound to do the work alone and

at its own expense. In a long telegram to President Roosevelt, dated

New York December 13th, he fully set forth the state of affairs, but

did not comment upon it further than by saying: “In view of the above,

it does not seem fair that we should be called to do more than join in

to help the settlers.”

The following telegraphic correspondence then ensued:

Washington, December 15, 1906.

MR. E. H. HARRIMAN,

New York.

Referring to your telegram of December 13, I assume you are planning

to continue work immediately on closing break in Colorado River. I

should be fully informed as to how far you intend to proceed in the

matter.

THEODORE ROOSEVELT.

New York, December 19, 1906.

THE PRESIDENT,

Washington.

Further referring to your telegram of the 15th inst. our engineers

advise that closing the break and restoring the levees can be most

quickly and cheaply done, if the work is undertaken immediately,

at a cost of $300,000 to $350,000. The Southern Pacific Company,

having been at an expense of about $2,000,000 already, does not

feel warranted in assuming this responsibility and the additional

expenditure which is likely to follow to make the work permanent,

besides the expenditure which the company is already undergoing to put

its tracks above danger line. We are willing to coöperate with the

Government, contributing train service, use of tracks and switches,

use of rock quarries, train crews etc., and the California Development

Company will contribute its engineers and organization, the whole work

to be done under the Reclamation Service. Can you bring this about?

E. H. HARRIMAN.

Washington, December 20, 1906.

E. H. HARRIMAN,

New York.

Replying to yours of 19th, Reclamation Service cannot enter upon work

without authority of Congress and suitable convention with Mexico.

Congress adjourns today for holidays. Impossible to secure action at

present. It is incumbent upon you to close break again. Question

of future permanent maintenance can then be taken up. Reclamation

engineers available for consultation. That is all the aid that there

is in the power of the Government to render, and it seems to me clear

that it is the imperative duty of the California Development Company

to close this break at once.

The danger is ultimately due only to the action of that company in

the past in making heading completed in October, 1904, in Mexican

territory. The present crisis can at this moment only be met by the

action of the company which is ultimately responsible for it, and that

action should be taken without an hour’s delay. Through the Department

of State I am endeavoring to secure such action by the Mexican

Government as will enable Congress in its turn to act. But at present

Congress can do nothing without such action by the Mexican Government.

This is a matter of such vital importance that I wish to repeat that

there is not the slightest excuse for the California Development

Company waiting an hour for the action of the Government. It is its

duty to meet the present danger immediately, and then this Government

will take up with it, as it has already taken up with Mexico, the

question of providing in permanent shape against the recurrence of the

danger.

THEODORE ROOSEVELT.

Seldom, if ever before, in our country, had material and financial

interests of such tremendous importance been dependent upon the

decision of a single man. If Mr. Harriman should order a continuance

of the work, he would put at hazard a million and a half dollars of

his own money, or the money of the Southern Pacific stockholders, in

addition to the million and a half or two millions already spent.

He would have to do this, moreover, mainly for the benefit of the

Imperial Valley and the nation, without any assurance of reimbursement

or compensation, and without any certainty of success. If, on the

other hand, he should decline to sink any more capital in the effort

to retrieve a disaster for which neither he nor the Southern Pacific

Company was in the slightest degree responsible, the Laguna dam and the

Imperial Valley would both be destroyed; twelve thousand ruined and

impoverished people would be driven out into the desert, and 1,600,000

acres of Government land would be lost to the nation forever.

Mr. Harriman, at that time, was being prosecuted by the Interstate

Commerce Commission as presumably a malefactor, and President

Roosevelt, only a few weeks before, had characterized him as an

“undesirable citizen;” but in the supreme test of character to which

he was subjected, he showed magnanimity, courage and public spirit.

On the same day that he received the President’s telegram of December

20th, he replied in the following words:

“You seem to be under the impression that the California Development

Company is a Southern Pacific enterprise. This is erroneous. It had

nothing to do with its work, or the opening of the canal. We are not

interested in its stock and in no way control it. We have loaned it

some money to assist in dealing with the situation. What the Southern

Pacific has done was for the protection of the settlers as well as of

its own tracks, but we have determined to remove the tracks onto high

ground anyway. However, in view of your message, I am giving authority

to the Southern Pacific officers in the West to proceed at once with

efforts to repair the break, trusting that the Government, as soon as

you can procure the necessary Congressional action, will assist us

with the burden.”

The contention of the Government was that inasmuch as the Southern

Pacific Company loaned $200,000 to the California Development Company

in June, 1905, and assumed temporary control of the latter’s affairs

for the purpose of safeguarding its loan, the lending company thereby

made itself responsible for all the unforeseen consequences of a ditch

dug by the borrowing company almost a year earlier. This contention

will not bear a moment’s scrutiny. The Southern Pacific Company did

not, at any time, own any of the Development Company’s stock. The

shares pledged as collateral for the loan were in the hands of a

trustee. The Southern Pacific Company did not even elect the president

and three directors of the Development Company. They were elected by

the latter’s stockholders under the terms of the loan agreement.[15]

The Southern Pacific was a creditor of the Development Company, but in

no sense a “successor in interest” by virtue of ownership.

The lower Mexican intake, which admitted the river to the Valley and

caused the disaster, was dug long before the Southern Pacific Company

had any control whatever over the Development Company, and it would be

a violation of the most elementary principles of equity if a lender

were held responsible for all previous transactions of a borrower,

merely because the latter had voluntarily agreed to share control of

his business in order to obtain the loan. If a farmer goes to a bank,

gives a mortgage on his farm as security for a loan, and agrees that a

representative of the bank shall supervise his agricultural operations

until the loan is repaid, the bank does not become responsible for

a dam across a stream on the farmer’s property built by the farmer

himself a year before he had any relations with the bank. The bank

might be responsible for a dam built under the direction of its

representative, but not for a dam built by the farmer a year before

such representative was appointed.

When President Roosevelt received Mr. Harriman’s telegram of December

20th, saying that orders had been given to proceed with the work, he

replied in the following words:

“Am delighted to receive your telegram. Have at once directed the

Reclamation Service to get into touch with you, so that as soon as

Congress reassembles I can recommend legislation which will provide

against a repetition of the disaster and make provision for the

equitable distribution of the burden.”

[Illustration: Last Break in Defences, December 1906]

While the negotiations between President Roosevelt and Mr. Harriman

were in progress, the river-fighting organization on the lower Colorado

was kept intact. The rock quarry at Andrade was further developed;

sidings just across the Mexican boundary were lengthened to seven

thousand feet, and material and equipment of all possible kinds which

might be needed were gathered and held in readiness. When, therefore,

on the 20th of December, an order was received from Mr. Harriman to

go ahead and close the break, President Randolph, backed by all the

resources of the Southern Pacific, began a last supreme effort to

control the river and save the Imperial Valley. The crevasse, at that

time, was 1100 feet wide, with a maximum depth of forty feet, and the

whole current of the Colorado was rushing through it and discharging

into the basin of the Sink about 160,000,000 cubic feet of water

every hour. There was not time enough for the construction of another

brush-mattress, so the Southern Pacific engineers determined to build

two railway trestles of ninety-foot piles across the break, and then,

with a thousand flat cars and “battleships,” bring rocks and dump

them into the river faster than they could possibly be swallowed up

by the silt or carried down stream. Three times, within a month, the

ninety-foot piles were ripped out and swept away and the trestles

partly or wholly destroyed; but the pile-drivers kept at work, and on

the 27th of January the first trestle was finished for the fourth time

and the dumping of rock from it began.

Mr. F. H. Newell, Director of the U. S. Reclamation Service, in a

description of the final closure of the crevasse, says: