CHAPTER II

THE MANUFACTURE OF THE LINE

Design and Construction--Ships--Testing, Shipment, and

Stowage--Paying-out Machinery--Staff--Preparations for the

Expedition.

The construction of the cable was taken in hand the following February

(1857).

The distance from Valentia, on the western Irish coast, to Trinity Bay,

Newfoundland--the two landing-points selected[14]--being 1,640 nautical

miles, it was estimated that a length of 2,500 N.M.[15] would be

sufficient to meet all requirements. This would provide sufficient

margin for a considerable amount of "slack" cable for accommodating the

irregularities of the bottom. The Gutta-Percha Company of London were

entrusted with the manufacture of the "core," consisting of a strand of

seven No. 22 B.W.G. copper wires (total diameter No. 14 gage) weighing

107 pounds per N.M. insulated, with three coatings of gutta-percha (to

3/8-inch diameter) weighing 261 pounds per N.M., the conductor being, in

fact, covered to No. 00 B.W.G.

This formed a far heavier core than had been previously adopted, and on

this account the difficulties of manufacture were proportionately

increased. The enormous pressure of the ocean at such depths involved

also a much severer test for the core.

On the other hand, as we now know, the conductor--and consequently also

the insulator--should have been still larger, to a material degree. The

engineer of the line strongly urged a conductor weighing 392 pounds per

N.M., with the same weight for the insulator;[16] but his fellow

projectors (the business element of the undertaking) were all for

getting the work done, while the weather permitted, that year; and they

were perhaps overquick to recognize the difference in the capital

required. Moreover, they were here supported technically by the views of

the responsible electrician, as well as by such high authorities as

Michael Faraday and Morse. The latter reported that "large coated wires

used beneath the water or the earth are worse conductors--so far as

velocity of transmission is concerned--than small ones; and, therefore,

are not so well suited as small ones for the purposes of submarine

transmission of telegraphic signals." Faraday had stated: "The larger

the wire, the more electricity was required to charge it; and the

greater was the retardation of that electric impulse which should be

occupied in sending that charge forward."[17]

Thus it will be seen that although Faraday laid the foundations of a

large proportion of the electrical engineering of to-day, his views in

this instance did not prove to be correct. The theoretical resemblance

of a cable to a Leyden jar--in reference to the effect of charging

either--seems to have been prominently in mind, without proper regard to

the _resistance_ offered by the wire to the electric current--a

resistance which becomes less the greater the bulk of the wire. Besides

the engineer being overridden in this matter, the word of the electrical

adviser on the Board (Professor Thomson) regarding the carrying capacity

or working speed that would be obtained with such a core as that decided

on--in view of the length involved--was also unavailing.

While no one can fail to appreciate the businesslike manner in which

this undertaking was pushed through from the moment of inception--comparing

only too favorably with some experiences of to-day--it was, without

doubt, a vast pity that more time was not devoted to a fuller

consideration of some of the problems, such as that involved over the

dimensions of the conductor and insulator. No serious fault could,

however, be detected with its actual manufacture, though the methods of

those days were primitive as compared with present practise, and a

system of efficient electrical testing altogether wanting.

After various experiments had been made with sample lengths of different

iron wires made up into cable, the contract for the outer sheathings

was, in order to get through the work quickly, divided equally between

Messrs. Glass, Elliot & Co., of Greenwich, and Messrs. R. S. Newall &

Co., of Birkenhead--both originally pit-rope makers.

The insulated core was first surrounded with a serving of hemp

saturated with a mixture of tar, pitch, linseed-oil, and wax; and then

sheathed spirally with an armor of eighteen strands, each containing

seven iron wires of No. 22 B.W.G., the completed strand being No. 14

gage in diameter.

[Illustration: FIG. 5.--Manufacture of the Core.]

The cable (Fig. 8) was then finally drawn through another mixture of

tar. Its weight in air was 1 ton per N.M., and in water only 13.4

hundredweight, bearing a strain of 3 tons 5 hundredweight before

breaking--equivalent to nearly five miles of its weight in water.

For each end approaching the shore, the sheathing (see Fig. 9) consisted

of twelve wires of No. 0 gauge, making a total weight of about nine tons

to the mile. This type was adopted for the first ten miles from the

Irish coast, and for fifteen miles from the landing at Newfoundland, at

both of which localities rocks had been found to abound plentifully--so

much so that the armor was insufficient, and present practise provides

double the weight under similar conditions.

[Illustration: FIG. 6.--Serving the Core with Hemp-Yarn.]

[Illustration: FIG. 7.--Applying the Iron Sheathing.]

[Illustration: FIG. 8.--The Deep Sea Cable.]

[Illustration: FIG. 9.--The Shore-End Cable.]

Only four months was allowed for the manufacture of this 2,500 miles of

cable, which had to be delivered in June of that year (1857). This

involved the preparation and drawing of 20,500 miles of copper wire

(providing for the lay) and stranding into the 2,500 miles of conductor.

For the insulation nearly 300 tons of gutta-percha required to be

prepared, and the three separate layers of gutta-percha required to be

applied to the wire, subsequently followed by the spiral serving of

yarn. Finally--and with a due allowance for lay--367,500 miles of wire

had to be drawn, from 1,687 tons of charcoal iron, and laid up into

50,000 miles of strand for the outer sheathing. The entire length of

copper and iron wire employed was, therefore, 340,500 miles--enough to

engirdle the earth thirteen times, and considerably more than enough to

extend from the earth to the moon. The work was enormously increased, of

course, on account of the sheathing being composed of a number of

strands instead of several single wires. While having certain mechanical

advantages at the outset, this stranded sheathing is not a durable type

of cable--besides being somewhat costly--and is never adopted nowadays.

The contract price for the entire cable was £225,000, the core costing

£40 and the armor £50 per mile.[18]

As fast as the cable was made at the respective factories, it was coiled

into iron tanks ready for shipment.

[Illustration: FIG. 10.--Coiling the Finished Cable into the Factory

Tanks.]

_Ships and Paying-out Machinery._--The race against time--resulting from

an unfortunate arrangement with American interests--was truly appalling;

for, besides the manufacture of the line itself, ships had to be

selected and prepared for receiving the cable, and machinery for paying

out the line had to be designed and made. So far as the manufacture

went, the machinery for that was already in existence, in view of the

cables that had previously been laid--apart from the fact that the

sheathing machinery was practically the same as had already been used

for making ropes with. But this being the first _ocean_ line, special

apparatus had to be worked out for submerging a cable satisfactorily in

deep water. So far as ships were concerned, the British and United

States Governments had already expressed willingness to furnish these.

The former undertaking took shape by the Admiralty placing H.M.S.

Agamemnon (a screw-propelled line-of-battle ship and one of the finest

in the British navy) at the company's disposal for the expedition. She

had been Admiral Lyons's flagship during the bombardment of Sebastopol a

couple of years before; but, in her coming mission, was to do more to

bring about the reign of peace--by drawing together in closer commune

the several nations of the earth--than any man-of-war was ever called to

do, before or after. With a somewhat peculiar construction, she was

admirably adapted for her work. Her engines were quite near the stern,

while amidships she had a magnificent hold, forty-five feet square and

about twenty feet deep. In this capacious receptacle nearly half the

cable was stowed from the works at Greenwich. The American Government

sent over the largest and finest ship of their navy, the U.S. frigate

Niagara (Fig. 11), a screw-corvette of 5,200 tons. As a consort, the

U.S. paddle frigate Susquehanna was also detailed for the expedition,

while H.M.S. Leopard and H.M. sounding-vessel Cyclops were similarly

provided by the British Government. The latter was to precede the

fleet--nicknamed the Wire Squadron--to show the way.

[Illustration: FIG. 11.--U.S.N.S. Niagara.]

The paying-out apparatus for the two laying vessels H.M.S. Agamemnon and

U.S.N.S. Niagara had to be somewhat hurriedly put together; consequently

not as much attention was paid to its design as the novelty of the

undertaking really demanded. The previous, and somewhat primitive, gear

hitherto used had proved to possess too little strength, the cable--when

being laid in anything but quite shallow water--having more than once

obtained the mastery, through meeting insufficient restraining force. In

the new machine (Fig. 12) there was certainly no lack of holding-back

power. It erred, indeed, the other way, being so heavy and powerful that

it was liable to break the cable under any material strain. The degree

of retardation was regulated by a hand-wheel actuating a frame-clutch

surrounding the outside of a brake-wheel. The details of this machine

were worked out by Messrs. C. de Bergue & Co., the manufacturers. The

engineer-in-chief also furnished external guards to the propelling

screws of each laying vessel to prevent a foul with the cable in the

case of going "astern." This cage was nicknamed a "crinoline" (then in

fashion with ladies), which, indeed, it somewhat resembled. The above

screw-guard may be seen in several of the illustrations of either ships

farther on. Were it not for the necessity of sounding operations, it

would be applied to all telegraph-ships to-day.

_Preparations for Starting._--By the third week in July (within the

course of as many weeks) the great ships had absorbed all their precious

cargo--the Agamemnon in the Thames and the Niagara in the Mersey. The

process of coiling the cable on board the Agamemnon is illustrated in

Fig. 13.

[Illustration: FIG. 12.--The Paying-out Machine, 1857.]

_Staff._--For such an undertaking the staff had, of course, to be

considerable. Besides the engineer-in-chief (Mr. Bright), the

engineering department was composed as follows: Mr. (afterward Sir

Samuel) Canning, formerly a railway engineer, who had laid the Gulf of

St. Lawrence and other cables; Mr. William Henry Woodhouse, who had laid

some of the cables in the Mediterranean; Mr. F. C. Webb, with much

experience in early cable work; and, finally, Mr. Henry Clifford, a

mechanical engineer, destined to be responsibly associated with a large

proportion of the cables since laid.

Besides Mr. Whitehouse (whose health, however, did not permit him to

accompany the expedition) there were on the electrical staff Mr. C. V.

de Sauty, Mr. J. C. Laws, Mr. F. Lambert, Mr. H. A. C. Saunders, Mr.

Benjamin Smith, Mr. Richard Collett, and Mr. Charles Gerhardi, all of

whom were afterward prominently connected with subsequent submarine

cable undertakings. Their respective energies were divided up between

the two laying ships.[19] The expedition was to be further strengthened

by a representative of The Times, as well as of the Daily News and New

York Herald.

[Illustration: FIG. 13.--Coiling the Cable on Board.]

On the vessels being fully loaded ready for the start, "send-off"

festivities occurred, in which all classes of those engaged on the work

took part. The Times recounted the function on board the Agamemnon as

follows:

The three central tables were occupied by the crew of the

Agamemnon, a fine, active body of men, who paid the greatest

attention to the speeches, and drank all the toasts with an

admirable punctuality--at least, so long as their three pints of

beer per man lasted. But we regret to add that with the heat of the

day and the enthusiasm of Jack in the cause of science, the mugs

were all empty long before the chairman's list of toasts had been

gone through. Next in interest to the sailors were the workmen and

their wives and babies, all being permitted to assist. The latter,

it is true, sometimes squalled at an affecting peroration, but that

rather improved the effect than otherwise, and the presence of

their little ones only marked the genuine good feeling of the

employers, who had thus invited not only their workmen, but their

workmen's families to the feast. It was a momentary return to the

old patriarchal times.

This function having come to an end, the Agamemnon set out for

Sheerness. When leaving her moorings, opposite Glass & Elliot's works,

the scene was one of considerable interest. It is recorded that many

thousands of persons thronged the riverside as far as Greenwich

Hospital. In the immediate neighborhood of the factory a salute was

fired as the proud vessel moved away, and a deafening cheer was raised

by the assembled crowds. The crew of H.M.S. Agamemnon manned the

gunwales, and returned the cheer with lusty lungs, while from the stern

gallery, ladies waved their handkerchiefs, and _savants_ forgot for a

while the mysteries of electricity and submarine-cable work, as they

returned the hearty cheers which reached them from the shore.

Similar proceedings took place on board the Niagara, and the two ships

met at Queenstown, County Cork, on July 30, 1857. They were moored about

three-quarters of a mile apart, and a piece of cable run between the two

to enable the entire length of line (2,500 N.M.) to be tested and worked

through. The result was all that could be desired, and the Wire Squadron

set sail for the rendezvous at Valentia Bay on Monday, August 3d.

Besides the vessels already named, there were H.M. tender Advice and the

steam-tug Willing Mind to assist in landing the cable at Valentia, as

well as the U.S. screw-steamer Arctic and the paddle-steamer Victoria

(Newfoundland Telegraph Company) on duty in Trinity Bay, Newfoundland,

to await the arrival of the fleet and assist in landing the cable at

that end.

On arrival in harbor the following day, the ships were hospitably

welcomed by his Excellency the Lord-Lieutenant of Ireland (the Earl of

Carlisle), who had journeyed from Dublin Castle for the purpose. A

_déjeuner_ banquet was given by the Knight of Kerry (Sir Peter

Fitzgerald), the lord of the manor for many miles round, and this little

corner of Ireland--"the next parish to America"--was quite _en fête_ for

the occasion.