CHAPTER XX

THE MANUFACTURE OF PIPE AND TUBES

Tubes of some sort have been in use by man since very early times.

Nature provided the first ones in the way of hollow stems of shrubs,

such as alder and bamboo. Some of these we saw in use by the early

smiths conveying the blast of air from their goat-skin bellows into the

crude clay furnaces built in the hillside.

Tubes made of clay, stone, lead and bored logs were also used. Much

later pipes made of cast iron came into rather extended use for the

conveyance of water. The general use of gunpowder greatly accelerated

the manufacture of small tubes which the smiths produced for gun barrels

by hammering and welding together long, red-hot strips of wrought iron

about round rods or “mandrels.” About 1815 illuminating gas came to be

used in England for house lighting. This brought a demand for tubes of

considerably greater length, which were first made by screwing or

otherwise fastening together old gun barrels which were very plentiful

at that period.

The first patents for the making of welded pipe as we know it were taken

out in 1824 and 1825, the latter for the butt-welding method of pulling

a narrow iron plate, called “skelp,” through a bell-shaped orifice which

curled it and welded the edges together very much as is done to-day by

this process.

Our modern pipe of both butt-weld and lap-weld varieties is manufactured

either from wrought iron or from soft steel.

The Butt-Weld Process

[Illustration:

EARLY WATER PIPES

]

[Illustration:

HOW BUTT-WELD PIPES ARE MADE

]

From the double refined puddled iron, in the case of wrought iron, or

from billets of soft Bessemer or open-hearth steel, long narrow plates

are rolled. The width and thickness of these plates, which are known as

“skelps,” are exactly such as will give pipe of the desired diameter and

gauge. In order that the weld may be solid all along, the skelp as it

leaves the rolls has edges not exactly square but very slightly beveled,

so that the surface which is to form the interior of the pipe is

slightly narrower than the other.

After trimming the pieces of skelp so that each has one end with a sort

of point where the tongs are to take hold, they are laid side by side in

a heating furnace and left there until they have become white-hot.

Just in front of the furnace is the “bell,” with a second and slightly

smaller one in front. With strong tongs the workman reaches into the

furnace and fastens onto the pointed end of a piece of the white-hot

skelp. Hooking the handle of his tongs into the draw chain the skelp is

drawn through the first and second bell, the first bending it almost

into tube shape, the second completing the operation and pressing

together the edges of the plate in the top of the bell so tightly that

they weld.

[Illustration:

PLATES CALLED “SKELP” ARE FIRST ROLLED

]

The pipe now goes through what are known as cross rolls, the axes of

which are somewhere near parallel with the axis of the pipe. In these

the pipe is rapidly spun around, surface-cleaned and straightened. Going

up a cooling incline it goes to tables where the ends are cut off and

the product inspected.

A very important part of the inspection is the hydrostatic or water

test. One at a time the pieces are tightly fitted in between two

water-tight caps, water is turned into the pipe and gradually brought up

to the testing pressure of 600 pounds or more per square inch according

to specifications.

[Illustration:

CHARGING SKELP INTO THE HEATING FURNACE

]

[Illustration:

DRAWING BUTT-WELD PIPE

]

Pipes of diameters between ⅛″ and 3″ are usually made by the butt-weld

process.

Lap-Welded Pipes

Pipes larger than 3″, and boiler tubes or other particularly high grade

welded tubes of 2″ and over are usually “lap-welded.” This process gives

a considerably more reliable product than does the butt-welding process,

for reasons which are readily seen.

[Illustration:

HOW LAP-WELD PIPES ARE MADE

]

[Illustration:

BENT SKELP FOR LAP-WELDING BEING CHARGED INTO FURNACE

]

Skelp for lap-welding is rolled in just the same way as is skelp for

butt-welding except that the edges are “scarfed” or decidedly beveled so

that the two edges can make a considerable lap without increase of

thickness of that part of the wall. These pieces of skelp are charged

into the heating furnace just as occurred in the butt-weld process and,

after coming to a white heat, they are drawn through a sort of bell or

die which curves them so that one edge considerably overlaps the other.

Back they go into the furnace to regain any heat that has been lost,

for, to weld properly, the skelp must be hot enough that any scale which

had covered it drips off.

[Illustration:

THE LAP-WELDING ROLLS WITH MANDREL IN POSITION

]

The welding rolls are very short rolls, almost “sheaves” or wheels, with

concave edges of exactly the outside diameter of the pipe to be formed.

Between these two rolls, at the end of a long straight bar, is a mandrel

or projectile-shaped ball of high-speed steel over which the white-hot

tube must be pushed.

The reheated, curved skelp is pulled from the furnace and the forward

end forced into the rolls which shoot it through and over the mandrel at

high speed, forcing together and welding under heavy pressure the

overlapping edges of what was formerly the plate. Amid the noise and the

shooting sparks an unsuspecting bystander is quite startled by the

suddenness of it all.

While still hot the pipes pass to “sizing” rolls which correct any

variation in inside and outside diameters. The cross or straightening

rolls next smooth and clean their surfaces while straightening the pipes

or boiler tubes.

After the first trip through the welding rolls, boiler tubes and certain

other high grades of pipe go back into the furnace where they are

reheated. They are again put through the welding rolls to make

absolutely sure of a tight weld.

After cooling, the ends of each pipe are cut off. Because of the

“scarfing” of the edges and the great pressure of the rolls, it is

difficult to tell where the welds occur, the thickness of the walls

being practically uniform all around. Lap-welded pipe of as great as 36″

diameter has been made in this way.

[Illustration:

PIPES IN SIZING AND CROSS ROLLS

]

The water-pressure test is given to all lap-welded pipe as are certain

tests for tensile and torsional strengths, and for ability to flatten

without breaking. In the case of boiler tubes, a piece is cut from each

end of each tube, which must stand flanging or spreading “cold” and also

must crush down endwise under the heavy pressure applied in the testing

machine without fracture or opening of the welds.

The pipe may be “threaded” to order or shipped as it comes from the

testing bench.

[Illustration:

THE FINISHING END

]

As remarked, both butt and lap-welded pipe is regularly manufactured

from wrought iron and from steel.

[Illustration:

HYDROSTATIC TEST OF THE PIPES

]

It was suggested during the discussion of the manufacture of wrought

iron, that, owing mainly to high labor costs, wrought iron was with

difficulty competing with the soft steels. Wrought iron is noted for its

welding properties and it has always had its loyal admirers. Aside from

its application as “bar iron” which always has been and still is in

favor with many metal workers for miscellaneous purposes and its use as

Swedish bar iron or low phosphorus melting bar by makers of crucible

steel as a base for their product, wrought iron probably finds its next

most favored place as a material for pipe as is shown by the table given

in Chapter VI.

While not as strong as steel pipe under hydrostatic test, many pipe

users insist that, presumably on account of its slag enclosures and

cinder films which are supposed by some to surround and protect the

fibers, wrought iron pipe outlasts steel pipe when used under conditions

which induce corrosion. Others are as strenuous in their denial of this

assertion and this subject of comparative wrought iron pipe and

steel-pipe corrosion is still a very live issue. For many years this

matter has been under investigation. Hundreds of tests have been made

and discussed by learned societies and their committees. The

laboratories and testing departments, too, of the large pipe

manufacturers and their customers, have made extended investigations.

However, the conditions under which pipe is used are so varied and the

time required for any true and decisive test is so long that really

conclusive results have not been forthcoming. With other materials, each

condition and corrosive influence is largely a “law unto itself,” and

one wonders if such may not prove to be the case with these materials

also. As suggested, a great quantity of published information giving

comparative service tests is available for those who are particularly

interested in this subject. How much of the decline in tonnage and in

percentage of the total skelp produced, is due to the approximately 30%

greater cost of wrought iron pipe and how much to satisfactory

performance of its competitor must be left to you to judge.

Fortunately pipe of both kinds is available, meanwhile, and one can get

whichever he prefers.

The uses of pipe are almost innumerable. Great quantities are used for

conveyance of water, oils and gases, for ice-making and refrigeration,

the heating and draining of buildings, for dry kilns, hospital beds and

apparatus, electric light, railway and telegraph poles, pipe railings,

for conduit work, etc. For many of these applications, the seamless

variety is now utilized, however.

For many purposes coated pipe is highly desirable. This may be by hot

asphalt, or other liquid dip, by surface electro-galvanizing or by the

hot galvanizing method of dipping in molten zinc, by which method

probably the greater portion of coated pipe is treated. Certain other

protective coatings are used to a limited extent.

Non-technical chats on iron and steel, and their application to modern industry · 第 20 / 23 章