Excavating, foundation, and first story brick wall $904.00

Lumber:

149 pieces, 1 x 4 x 16 Y. P.

31 " 1 x 4 x 14 Cypress

16 " 1 x 4 x 12 "

165 " 1 x 6 x 16 Y. P.

17 " 1 x 6 x 14 "

226 " 2 x 4 x 12 "

20 " 2 x 4 x 16 "

6 " 2 x 4 x 14 "

15 " 4 x 4 x 14 "

120 " 2 x 12 x 16 "

23 " 2 x 12 x 14 "

100 " 2 x 6 x 20 "

144 " 2 x 6 x 16 "

67 " 2 x 6 x 18 "

4 " 2 x 6 x 26 "

60 " 2 x 6 x 12 "

30 " 2 x 6 x 22 "

4 " 2 x 6 x 24 "

6 " 2 x 8 x 10 "

9 " 2 x 8 x 16 "

4 " 2 x 10 x 14 "

11 " 2 x 10 x 12 "

1 " 2 x 10 x 22 "

1 " 1 x 10 x 12 "

1 " 1 x 10 x 14 Cypress

2 " 1 x 12 x 14 "

22 " 1-1/8 x 8 x 10 Cyp. S2S

2 " 1 x 1-1/8 x 12 x 14 "

2 " 1 x 1-1/8 x 12 x 16 "

6000 feet of 8-inch ship lap

3150 feet of 10-inch ship lap

71 M 5/2 red cedar shingles

165 Lineal feet of 2-inch Cr. molding

240 Lineal feet of Cr. molding

270 feet of 4-inch Y. P. S1S

4000 feet of 6-inch rough pine

62 feet of 3/8-inch Y. P. Ceiling

850 feet of 6-inch No. 1 flooring

230 feet of 6-inch fence flooring

56 lineal feet of 1/2 x 3-inch battening

32 lineal feet of lattice

444 lineal feet of 4-inch cypress

3 10-foot cedar posts

Total cost of lumber $1,313.63

Mill work:

Window sash and doors $270.00

Window and door frames 71.00

Sawing lumber for silo, roof, bridge and stanchions 29.78

Cost of hardware 96.57

Carpenter work:

Head carpenter 518 hrs. @ 40c = $207.20

Carpenters 1057 hrs. @ 35c = 369.95

Common labor 429 hrs. @ 20c = 85.80

-------

Total cost for carpenter work 662.95

Tiling around barn and silo, sewer from dairy room,

retaining wall, cement floor in alley, dairy,

doorway of barn, and steps and tanks 128.54

Plastering dairy room and inside of silo 104.60

Painting 89.54

--------

Total cost of barn $3670.61

[Illustration: FIG. 26. BARN NO. 2. 80 FEET IN DIAMETER; ENGINE ROOM IN

FOREGROUND.]

The cost of this barn, if built on the ordinary dairy farm, could be

materially reduced without shortening the life of the barn. Owing to the

conditions under which this barn was built, it was necessary to pay for

hauling all material to the farm, two and one-half miles from town. All

of the labor had to be hired, and as it was necessary for the men to

board themselves the wages paid were proportionately higher. The farmer

usually does the excavating and hauls the brick, sand, and lumber with

his own teams, tends the mason, and does quite an amount of the rough

work with his own help, besides boarding the men, all of which would

greatly reduce the cost. The construction could also be cheapened by

using drop siding to cover the outside, instead of shingles, which in

this case were used over ship lap on the side walls to improve the

appearance. This barn could be still further cheapened by putting hoops,

five feet apart, around the studs, and covering with common 1 x 12

boards, put on vertically, as is done in some cases. A saving could also

be made on the mill work and large doors by having the carpenters make

these plainer and leave the windows out of them.

Anyone wishing to build a round barn can get local bids on the lumber

bill, and determine approximately the cost in his locality. This will

vary with both the location and the year.