ENGINEERING AND ARCHAEOLOGY

During the Civil War, the rapids at Alexandria were composed of rocky

outcroppings of sandstone and siltstone forming shoals along a mile

stretch of the Red River, even at times of high water. At low water, the

upper and lower ends of the rapids were exposed. Long before the war,

the rapids had been a problem to river traffic. When the water was low,

goods being transported by steamboat up and down the river had to be

unloaded, carried past the rapids by wagon, and reloaded on different

boats.

Numerous ideas had been proposed to improve the river passage; even the

famous Henry Miller Shreve proposed a solution, but no action was taken.

By 1864 the only navigational aid at the rapids was a small channel cut

out of the rocky river bottom. While this was an improvement, the water

was still too low to navigate the rapids during the campaign.

It is a strange twist of history, but we can say that today we know more

about some details of Bailey’s dam construction than did the soldiers

who built it. Those men were laboring day and night to build the dam as

quickly as possible. In the confusion and fury of activity, there was

little time for anyone but Bailey to fully comprehend the plan. Today,

historians have studied the many reports and eyewitness accounts of the

dam construction to piece together what happened. In addition, careful

archaeological excavation of the actual dam remains provided undeniable

evidence of the techniques used. In 1984 a combined historical and

archaeological study was undertaken by a historian from the Corps of

Engineers and archaeologists from Coastal Environments, Inc. The results

of their studies provide a detailed view of the activities at Bailey’s

Dam and testify to the magnitude of Bailey’s engineering feat.

Historical documents indicate that Bailey first built his dam just above

the lower, downstream rapids. There, the river was around 758 feet wide,

and a 10-mile-per-hour current rushed over the shoals. By constructing

the dam at that particular location, he hoped the water would rise

enough behind the dam to allow the gunboats to float over the upper

rapids. Then, with the built-up water pressure, the dam could be broken

through at the proper time and the gunboats could rush over the lower

rapids, carried by the force of the released water.

[Illustration: Sketch of crib dam which accompanied Colonel Bailey’s

report (U.S. War Department 1891-1895:Plate 53-3).

CRIB OF STONE.

Iron Bars 14 × 22 Ft. Iron Bars]

Following Bailey’s practical nature, the dam was built with any locally

available material readily at hand. To do so, he used different methods

of construction for each riverbank. On the west (Alexandria) bank, he

built the dam of large wooden boxes called cribs. Bailey constructed a

number of cribs which were placed side by side from the bank out into

the river.

Archaeologists investigated these structures during a low water period

by carefully digging two small excavation units around partially exposed

crib remains. These units were 4 feet wide and 8 feet long. As the

archaeologists removed the surrounding mud and dirt and exposed the

cribs, they painstakingly recorded the position of each timber and beam.

Afterward they studied their photographs and notes, comparing their

findings with the historical records.

Historical accounts indicate that lumber from Alexandria mills, homes,

and barns was quickly stripped for use in building the cribs. Bricks,

stone, and even machinery were used to fill and anchor the cribs.

Additionally, historical illustrations show that iron bars were placed

vertically in the four corners of each crib, to provide a supporting

framework.

The evidence from modern archaeological excavations generally supports

the historical accounts with some interesting variations. Both lines of

evidence testify to the ingenuity of Lieutenant Colonel Bailey. The

excavations revealed that the crib framework was constructed of hand

hewn 4-by-10-inch timbers, which is strong evidence that the lumber was

from nearby buildings. The ends of these timbers were notched so that

they fit tightly together at the corners of the cribs. The corners were

supported by smaller vertical wood posts. However, in the cribs

excavated by the archaeologists, there was no evidence of the iron

support bars. Furthermore, there was no evidence of machinery parts in

the cribs. Instead, they found that the cribs were filled mostly with

sand and mud and only capped with a layer of loose brick and stone. A

metal fragment of a large sugar kettle was also found among this brick

and stone. A sugar kettle was just the kind of loose but heavy object

that could be quickly transported to the cribs for anchoring material.

On the east (Pineville) bank, there were no town buildings to strip for

lumber but there was, quite conveniently, a forest. With abundant trees

available, Bailey constructed a “self-loading” tree dam. According to

historical diagrams, trees were stacked lengthwise with the flow of the

stream. The upstream treetops were anchored to the river bottom with

stones. The downstream trunks were raised higher than the upstream tops

by alternating layers of other logs running perpendicular to, or across,

the stream. This technique presented a dam face of logs angled upward

with the stream flow. As the river was held back by the log face, the

water pressure actually made the dam stronger or “self-loading.”

[Illustration: Sketch of tree dam which accompanied Colonel Bailey’s

report (U.S. War Department 1891-1895:Plate 53-3).]

The archaeological investigation of the tree dam was completed in a

manner similar to the excavations at the crib structures. But here a

trench excavation unit was dug. This trench was 22 feet long and 5 feet

wide, and it was positioned parallel to the flow of the river. During

these investigations, the river began to rise, and when the excavation

unit was finally abandoned, the archaeologists were working about 2 feet

below the water level. The field crew was successful in reaching that

depth only with the aid of a water pump. Archaeologists had hoped to

excavate a slice of the dam completely down to its base, but attempts to

excavate deeper were halted when the pump could not keep out the

incoming water.

[Illustration: Archaeologist David Kelley drawing map of logs

uncovered during the tree dam excavation.]

The tree dam excavations revealed that both pine and hardwood logs were

used and that the tree bark was left intact. The tree limbs had been cut

off, but by observing the knots on the tree trunks, archaeologists were

able to note the direction in which the trees were positioned. They

found that many of the trees were positioned with their tops downstream,

exactly opposite of that shown in historical illustrations. Also, all of

the upstream ends of the trees had been trimmed of their branches, and

their tips had been pointed with an axe. Spaces between the logs were

filled with sand and mud, and the entire structure was covered with

brick and stone. Interestingly, the archaeologists also found a hewn,

octagonal, wood column among the logs. The upstream end of the column

had been rough cut, seemingly to fit into that particular spot in the

tree dam. The column was most likely a mast from a riverboat.

[Illustration: Portion of the tree dam exposed during the low water

in August 1984.]

Together, the crib and tree dam sections did not cross the entire

758-foot riverbed. A 150-foot gap existed between the two dams. To close

this gap, four coal barges were used. While the remains of these barges

were not found in the archaeological excavations, historical photographs

provide a fairly detailed picture of their appearance. These

24-by-170-foot barges were sunk in the gap, lying lengthwise with the

current, and more stones, brick, and iron rails were used to anchor

them. Braces and ropes, anchored to the riverbanks, were also needed to

secure the barges against the rising water pressure.

Bailey directed that the second barge from the Alexandria side be only

partially filled with anchoring materials. This was the barge that he

hoped either to ram or blast out of the way, creating a flood that the

gunboats would ride like kayaks. As it turned out, Bailey’s idea worked,

but not exactly as he would have liked.

[Illustration: Building the Red River Dam. Courtesy of the Library

of Congress.]

Bailey's Dam · 第 14 / 28 题