CHAPTER VIII. 348

Railways of different ranks--Progressive improvements--Growing

tendency for increased speeds, with corresponding increase in

weight of permanent way and rolling-stock--Electricity as a

motive-power.

Looking at railways in their present stage of development, they appear

to be divided into three ranks, each one distinct from the other as

regards its importance, capability, and prospects.

In the first rank are the great trunk lines, which, at home or abroad,

pass through thickly populated districts, rich in manufactures,

minerals, or shipping industries, with their enormous movement of

materials and people, and consequently requiring the most ample works,

equipment, and appliances for security.

In the second rank may be classed those railways which run through

ranges of country where the population is moderate, or where the

manufacturing industries are few in number and of minor importance.

Although of the utmost value to the community of the long series of

small towns and agricultural districts through which they pass, and

forming the only great commercial highway, or connecting link, with

some distant seaport, or leading business centre, the traffic returns

upon such lines are too small to permit of the introduction of the

more complete appliances and luxuries to be met with on the richer

railways. In newly opened-out countries, and in distant colonies, such

lines have often to struggle on for years against financial returns so

small as to barely enable them to maintain a condition of efficiency;

but where there are natural advantages in soil and climate, combined

with a judicious development of all the available resources, the

result will be the raising of the standard of the railway itself, and

the enrichment of the entire district through which it passes. When

laying out lines of this description, it may be necessary to curtail

as much as possible the expenditure on works and equipment, but there

should be no hesitation in obtaining liberal quantities of land for

future enlargement of stations, or for constructing additional 349

stations on promising sites. The value of the land may be small in the

outset, but will be enhanced enormously as the benefits of the

undertaking become appreciated.

In the third rank may be grouped those branch lines which, starting

from a main passenger or goods line, are laid down to some outlying

town, seaport, or mining centre, which, although small, is considered

of sufficient importance to be brought into railway communication. In

general, these lines are laid to the same gauge as the line with which

they connect, and the transfer of merchandise waggons is readily

effected at the point of junction. Others, from motives of economy,

have been laid down to a narrow gauge, involving the transhipment of

all goods and cattle at the station where the break of gauge takes

place. Most of these branch lines are laid out through the open

country, like an ordinary standard railway, but with a minimum of

works and appliances. Others are laid down partly on level public

roads, and partly through the fields, and are in consequence subject

to a statutory low rate of speed when travelling over those portions

on the public roads.

In many cases the construction of second and third rank railways, both

at home and abroad, has been largely assisted by state or provincial

aid. Such assistance must always be valuable to poor or undeveloped

districts, but judgment should be exercised so as not to encourage the

introduction of any scheme which would interfere or become competitive

with any existing undertaking constructed by public enterprise. So

long as capitalists invest their money more from commercial motives

than from feelings of philanthropy, it would, to say the least, be

unjust and impolitic for any country to adopt a course of competition

by national funds, and so check the flow of public money into public

undertakings. Ordinary public commercial competition may be business,

as each party can value and compare their own prospects; but the

competition of a scheme enjoying national aid and free money grants is

very apt to become one-sided.

There is every indication that even what may be termed a fourth-rank

type of railway is destined to play a very important part in the

industrial enterprises of many countries, and that in the form of

little lines, made to any convenient gauge, and laid either along

public roads or open country, or both, the produce from isolated

manufactories, forests, quarries, and large farms will be conveyed to 350

the nearest railway stations with greater facility and at much less

expense than by carting along the public highway. Such little lines

are available in places where the most sanguine promoter would

hesitate to suggest an ordinary railway, and may be found to supply

what is felt to be the missing link in the economical transport of a

long list of materials of everyday use. As they would be almost

exclusively intended for merchandise purposes, the statutory

requirements would be on the most moderate scale, and as they would be

generally constructed at the cost of the parties who had to operate

them, the outlay would be restricted to the actual works necessary for

convenience and efficiency. Similar little lines have been in use for

many years in the busy yards of large ironworks, shipbuilders, and

many other localities, where weighty masses of materials have to be

moved from place to place in the course of manufacture, and it would

be merely carrying out the same idea to a more extended range. The

principal inducement for their introduction is the great advantage,

both in convenience and cost, that is obtained by hauling a ton of

materials over a pair of rails as compared with carting the same

weight along an ordinary road; and as the fact becomes more and more

proved by experience, these little fourth-rank lines will become more

general. Numbers of them are in use at the present time, and some of

them, even of only 2-feet gauge, are doing good service, the little

trucks conveying manufactured goods to the nearest railway station and

returning loaded with coals and other materials. By making suitable

arrangements for passing places and junctions, the system could be

carried out to considerable distances in thinly populated districts,

and be made available by means of local sidings, to several places

along the route. With a narrow-gauge type there would, of course,

always be the time and expense of transhipment to or from the ordinary

railway trucks in the same way as with the road carts, but the time

and expense may be lessened by so constructing the little narrow-gauge

trucks that the bodies may be readily lifted off the frames and

wheels, and be placed like packing-cases in the railway waggons.

It is natural to look to the railways of the first rank for the latest

advances in construction, appliances, and equipment, and it is

generally there they are found. Great trunk lines, crowded with

traffic of all kinds, have not only the opportunity and means, but all

the strong inducements to try or adopt any arrangement which promises 351

greater facilities for dealing with the ever-increasing demands made

on their carrying powers.

Passenger and goods traffic are so dissimilar in their requirements

that when both of them are steadily increasing it becomes difficult,

if not impossible, to work the two classes over an ordinary double

line. In some cases much assistance has been obtained by shortening

the lengths of the working sections and introducing intermediate

electric telegraph block stations between the ordinary stations. Long

refuge-sidings have also been introduced at many of the signal-cabins

or stations, into which goods trains can be shunted out of the way to

allow fast passenger trains to pass through without stopping. Up to a

certain extent this arrangement works fairly well, but where there is

a very frequent service of fast and slow passenger trains, combined

with a heavy and constant service of goods and mineral trains, the two

lines of way are practically incapable of accommodating such a number

of mixed trains without causing serious detentions. The goods trains

must shunt out of the way some time before a passenger train is due,

and this frequent shunting into sidings results in hours of delay in

the transit of the goods and cattle traffic; and when one of such

trains is allowed to proceed again on its way up to another station,

dove-tailed as it may be between two fast passenger trains, there is

always the tendency to run at a much higher rate of speed than is

prudent for the class of rolling-stock of which the goods train is

composed. To overcome this difficulty some railways have introduced

additional UP and DOWN lines on the busiest part of their system,

making four lines of way in all, two of these being reserved for the

fast passenger and through trains, and the other two for slow trains,

goods, and mineral trains. This arrangement of the four lines has

afforded great relief to the traffic of all kinds, and has enabled the

service to be worked with much greater facility and punctuality. The

goods trains being restricted to their own separate lines, can proceed

regularly in their order, at their uniform working speed, without

having to resort to the spasmodic fast running too often expected from

them when passing over some parts of an ordinary double line.

Doubtless this four-line system, or rather the principle of laying

down two additional lines of way, will go on extending, and will be

accelerated in its accomplishment by the growing demand for still

higher speed of our fast passenger trains, and still longer distances

to be traversed without stopping. High-speed long-distance through 352

trains can only perform their journeys with punctuality, when the

route is kept clear of all other trains or obstructions which might

interfere with their free running. Any check or stoppage in their

course would cause loss of time and prestige.

It is to be regretted that in so many of the cases where two

additional lines of way have been laid down, more space was not left

between the sets of rails for the fast traffic and those for the slow.

In many instances the dividing space is not more than 7 or 8 feet. It

would have been better and safer if it could have been made 20 feet.

An ordinary goods train is made up of several kinds of trucks, some

empty, some loaded, many of them unequally loaded, all of them subject

to heavy work and rough handling, and more likely to give trouble than

the higher class vehicle, the passenger carriage. The breaking down or

derailment of one or two goods trucks on a line of rails close

alongside the fast passenger rails, would in all probability so foul

and obstruct the passenger line as to cause a very serious accident to

an express train which could not be stopped in time. The greater width

would not only provide more clearance in case of breakdowns, but would

afford increased safety to the platelayers and other workmen engaged

on the line. The permanent-way men have to be very watchful to keep

out of danger on an ordinary busy double line, but they must be very

much more on the alert where there are four lines of way close

together side by side.

In the neighbourhood of large cities and important manufacturing

centres, railways have created a distinct traffic for themselves by

providing means for a large portion of the population to reside in

convenient suburbs. Local trains running at suitable business hours

have induced people of all classes to select homes a few miles away

from town, and the gradual growth of this suburban traffic has

produced its own advantages and requirements. At the large terminal

stations platform after platform has been added to accommodate the

increased number of trains which arrive in the busy parts of the

morning or depart in the evening. Every facility has to be provided to

permit of the expeditious ingress and egress of the large crowds

forming the respective trains--ample platforms, over-line

foot-bridges, subways, convenient booking-offices, waiting-rooms, and

left-luggage rooms.

The enormous train service on some of these first-rank lines demands 353

the highest efficiency in the signalling and interlocking

arrangements, and the use of any devices which will ensure increased

facility and safety in the working of the traffic. With a crowd of

trains passing a signal-cabin in both directions, and often over four

lines of way, it is quite possible for a signalman to make a mistake

which cannot be rectified in time to prevent an accident. To obtain

increased security many railways have adopted the lock and block

system previously described, or some adaptation of the same principle,

and this method of working will go on extending as the traffic

increases. These additional appliances entail additional care and

inspection, for although automatical machinery may be exempt from the

human frailty of preoccupation of mind or forgetfulness, it is

somewhat delicate in its organization, and requires constant

supervision to maintain its efficiency.

On many of the large lines, much has been done to give improved

carriage accommodation. Carriages have been made longer, easier on the

road, loftier, better furnished, and better lighted; but there is

still a very great deficiency in those conveniences so essentially

necessary, especially on trains running long distances without

stopping. Drawing-room cars and dining-room cars are no doubt

attractive, and may contribute considerably to the popularity of

certain routes; but it is questionable whether many of the lines at

home and abroad which have adopted such luxuries, have not in doing so

commenced at the wrong end, and whether it would not have been more to

the public satisfaction to have begun by first providing those

conveniences which are found in every carriage on every line in the

United States. It is satisfactory to find that there is a steadily

growing tendency to so construct passenger carriages that their

occupants may, by passages or corridors, communicate with all parts of

the same carriage or with the adjoining carriages; and there is every

reason to assume that the carriage of the future, either by

legislation or consent, will combine both the items of conveniences

and intercommunication, and will confer not only greater comfort to

the passengers, but also increased protection against those outrages

which, unfortunately, too frequently occur under the system of

isolated compartments.

It will be instructive to watch the results of the passenger receipts 354

on those lines where only first and third-class carriages are used.

The elimination of the second class may at first sight appear an

innovation; but if there is not any pecuniary loss sustained, there

must be a gain in the reduction of unoccupied seats to be hauled. It

is customary to provide in every train a liberal number of spare seats

of each class to meet contingencies; and the omission of one class may

mean the saving of two or three carriages--a very important item in

locomotive power.

On important through lines high-speed running has become a leading

feature, and compels a very efficient standard of perfection in works

and rolling-stock to effect its attainment. There is no indication of

remaining contented with what has been already accomplished; on the

contrary, the spirit of restlessness is always urging to do something

more. The travelling public speak as calmly now of a speed of seventy

miles an hour as they did of thirty-five a few years ago; they

thoroughly recognize the value of railways, and they merely desire to

travel still faster. The incentives of emulation and competition are

ever present to encourage further and further reduction of the running

time, and the railway that offers a special fast through service for

some of its passenger and mail trains, reasonably expects its

popularity and patronage to be in the ascendant. Much has been done in

permanent way and equipment to make the present high speeds possible,

but more will be required if the speeds are to go on increasing. The

passenger carriages for such work must be very substantial, and

naturally heavy. The locomotives to haul a long train must have

increased power and weight, and will necessitate stronger rails to

carry the greater rolling loads. With the present system of

motive-power, the heaviest item is the locomotive, and its weight must

always determine and regulate the character of the works and permanent

way. Rails weighing 90 pounds per yard are becoming common, and there

is clear indication that before very long sections weighing from 100

to 120 pounds, or more, per yard will be brought into use on many

lines. There will be no difficulty in making a permanent way strong

enough for rolling loads very far in excess of anything in the present

practice; but it will be costly, and the extra expense per mile,

extended over a few hundred miles, will represent a sum so large as to

raise the question in many cases whether the probable advantages and

additional remuneration to be obtained will warrant the outlay.

To some extent the increased speed may be attained by dividing the 355

present long trains into two shorter trains, with a fair interval of

time between them. There are many splendid locomotives now running,

which on a fairly level line can reach a speed of considerably over

seventy miles an hour with a short train, but would be quite incapable

of doing so with a long train. At the same time it is possible that if

passengers increase in the same proportion as the inducements

provided, the short train might not be sufficient for the numbers

presented, and there would be no other alternative but to resort to

still greater rolling loads and stronger hauling power.

Perhaps electricity, which has already achieved so many marvels, is

destined to take a still more prominent part as a motive-power in the

working of ordinary railways, and may help out of the difficulty by

inaugurating still higher speeds without the necessity of incurring

stronger works or heavier permanent way. In addition to its success in

the telegraph, in the telephone, and in its brilliant light,

electricity is every day coming more and more to the front as a

motive-power. At present many tramways and short lines, some of them

in tunnel, some above ground, and many of them with very steep

gradients, are successfully worked by electricity; but these, being of

modern construction, were specially designed and equipped for that

method of working, and none of them as yet resort to high speeds. Such

rapid strides have, however, been already made in the progress of this

system of haulage, as to promise that both increased power and speed

will be forthcoming when the demand for them is made manifest. Various

modes of application are being tried: overhead wires, underground

wires, conductors on the level with the rails, storage batteries or

accumulators, and self-contained electric motors, each and all of them

being carefully tested to ascertain the comparative cost and

efficiency. Much will depend upon the localities and advantages to be

obtained for the respective generating stations. In places where a

large, constant, and unutilized water supply is available, a great

saving may be effected in the most expensive item of electric working,

but in the greater number of cases steam-power will have to be adopted

for driving the generating machinery. The main question will be

whether electricity in its most approved form of application can haul

a ton of paying load for one mile at a less average cost, and at as

great or greater speed than the ordinary locomotive. Until there is 356

very clear evidence that electricity is cheaper, there will not be any

great inducement for its general use as a motive-power on ordinary

railways.

Experiments have been made on some existing railways to ascertain how

far this new motive-power can be made serviceable under special

circumstances. In one case, a powerful electric motor-car has been

introduced for working frequent and heavy trains through a long

tunnel, where the atmosphere with ordinary steam locomotives became

foul almost to suffocation, and the result has shown that the traffic

can be hauled efficiently by electricity, and the air in the tunnel

maintained pure and clear. In this instance, the question of cost was

of secondary importance, the primary object being to avoid the

asphyxiating gases emitted from the ordinary locomotives.

In other cases, specially designed electric motor-cars have been

constructed with a view to obtain a higher speed for passenger trains

than is at present attained with the locomotives, and the trials made

have proved that these cars could reach a high speed, but so far only

with limited loads. Experiments are still going on with larger and

improved machines, from which it is expected to obtain both high speed

and much increased hauling power.

It is more than probable that amongst the earliest practical

applications of electric motive-power on existing railways will be its

introduction as an auxiliary on the steep gradients of some of the

mountain railways abroad. In many of these regions there are millions

of gallons of water running to waste down the ravines, a portion of

which could be utilized in working powerful generating plant, to drive

strong electric motor-cars for assisting the ordinary locomotives up

the steep inclines. In such localities, with free water-power, the

cost of the electricity would be at a minimum, while the cost of the

ordinary locomotive would be at a maximum.

In whatever form the electric motor-car may be designed, we are

brought face to face with the old axiom, that there must be a certain

amount of weight to obtain a certain amount of adhesion; but there

will be one important point in favour of the motor-car, that whereas

in the ordinary locomotive the weight for traction can only be

distributed over a few working wheels, the electric arrangement may

distribute it over a much greater number, and so diminish the

insistent weight of each wheel upon the rails. There would also be the 357

saving of the dead weight of the tender, the fuel, water, and other

minor accessories, as well as the advantage that the active power

would be applied in a rotary form instead of reciprocating.

There are important interests at stake in the perfecting of this new

system of haulage, and day by day new developments are being made to

add to its efficiency and reduce its cost. Existing railways will,

however, naturally require some very convincing proof of the all-round

superiority of electricity before adopting that power generally

in place of their present locomotives. The latter, with their

corresponding workshops and appliances, represent so large an amount

of invested capital, as to demand most thorough trials and

investigation of the new power before they are superseded;

nevertheless, if further experience proves that electrical power is

better and cheaper than the ordinary steam locomotives, then the

change will undoubtedly be made.

Under whatever system of haulage the acceleration of trains be

obtained, the increased speed will call for increased precautions in

the selection and proving of the materials to be used in such service.

Rails must be made more uniform in quality, and must be free from the

imputation of fracture under regular wear. Notwithstanding the great

improvements made in the preparation of the steel, and in the rolling,

there are still far too many steel rails which break under traffic to

allow rail-makers to rest satisfied with their work. Something is

still wanting in the manufacture to effectually remove this

disposition to fracture. The safe rail, the rail of the future, must

be one that may bend and may wear, but will never break under ordinary

use in the road. Axles must be stronger and tougher, as they will have

to bear greater torsional strains than are now imposed upon them; and

the wheels, of whatever type they are made, must be incapable of

collapsing or falling to pieces upon the sudden and severe application

of the brake-blocks. A train, rushing along at a speed of 70 or 80

miles an hour, may on an emergency have to be brought to a stand in

the shortest distance possible, and the failure of either axles or

wheels in the endeavour to avert one form of accident would inevitably

initiate another.

To permit of unchecked high-speed running, many sharp curves will have

to be flattened, bridges will have to be built at busy level

crossings; and points, crossings, and junctions on the main lines will 358

have to be reduced to the smallest possible number.

It would be difficult to form an opinion as to how far passenger

traffic will go on expanding, but if it continues to increase at the

same rate as at present, some railways may find it expedient, and even

absolutely necessary, to construct new lines altogether separate and

apart from the existing routes, and for the sole use of their fast

through traffic. As roadside or intermediate traffic would not form

any part of the scheme, such lines could be laid out so as to keep

away from the populous districts, where property would be costly, and

pass instead through those parts of the open country where the most

direct course and easiest gradients could be obtained. Stations would

only be required at the very large and important places, and at long

distances from each other. Lines of this description, reserved for

through traffic only, taken alone, might not pay, but taken in

conjunction with the existing lines, of which they would form a part,

they might prove to be the best solution of the problem of dealing

with a crowded train service, the remunerative earnings of which,

placed together, might yield a rich return over the entire system. A

project for a separate through line might at first appear a little

startling, but we have well-known precedents in the vast expenditure

already incurred in the constructing of enormous viaducts and

connecting lines to avoid long detours on certain through routes. The

widening out of an ordinary double line into a four-line road was at

first considered as a rather venturesome departure; and it must always

be costly because, in addition to the earthworks and permanent way,

there is the doubling of all the over and under bridges and waterways,

besides the great and expensive alterations at stations. Practically

it is almost like making a second railway, and yet the constant

extension of the principle is an admission that the working results

have proved satisfactory, in spite of the large outlay. A little later

the question will force itself more prominently into notice, whether

the four-line track or the separate fast through traffic lines, will

best answer the purpose. The former possesses certain advantages, but

the latter would give more freedom for high-speed running.

Engineers have brought railways to their present stage of perfection,

and the public will expect them to devise and carry out still further

improvements as the march of development moves onward. It is a simple 359

matter to arrange the traffic on a railway when all the works and

appliances are appropriate for the service to be performed; but the

advances which are made follow one another so rapidly as to

necessitate constant study and organization to effect the structural

alterations and additions requisite to maintain an up-to-date standard

of efficiency. The traffic manager on a railway receives his

instructions from the directors or controllers of the company as to

the working out of the train service, rates, charges, and other items

of his department, but the engineer has to stand alone, and his

technical knowledge and professional skill must enable him not only to

design and construct works suitable in character, extent, and strength

to the duty for which they are intended, but also to decide when

structures are no longer capable of properly sustaining the increasing

loads brought upon them, and must be taken down and replaced with

others of a stronger description. For this reason the engineer must

carefully consider every circumstance and local feature which may

influence the design to be prepared; he must thoroughly investigate

the nature of the ground for foundations, as the description when

ascertained will frequently determine the class of work to be erected,

whether in viaducts, bridges, or buildings; and in his selection of

materials and calculations for strength, he must allow ample margin to

meet further increased weights, as well as for natural deterioration.

He should, indeed, go a little further, and as his perceptive ability

and training will always enable him the more readily to foreshadow the

direction in which improvements or changes are tending, he should

study out and be prepared with his schemes to meet the new departures

as the requirements gradually arise.

Strength and efficiency are the leading points which must be always

kept in view, and the engineer must never forget that he is solely

responsible for the safety of the line and works, and of the public

passing over the same.

INDEX 361

A

Accommodation works, 12

Air-lock, 119

Air-pump, 120

Allowances for sinkage on embankments, 70

Alteration of gradients, 12

---- of roads, 6, 10

American hand-brake, 46

Analysis of steel rails, 193

Approach roads to stations, 249

Arch culverts, 76

Automatical gate-alarm, 336

B

Ballast, 225

Bascule bridge, 85

Battering-rule, 72

Bearing-weights of various materials, 129

Beater, 239

Bench marks, 66

Bissell truck, 58

Block crossing, cast steel, 235

---- telegraph signalling, 18, 338

Board of Trade requirements, 18

Bog-cutting, 65

Bogie carriage, 54

---- engine, 56, 306

Booking-hall, 249, 260

Book of reference, 8

Borings for foundations, 129

---- for tunnel work, 164

Borrowed earthwork, 61

Bottom-pitching, 225

Bracket signals, 20, 322

Brake-power on gradients, 45

Brakes for goods waggons, 46

Brick-well foundations, 123

Bridges, 79

---- over public roads, 10

Broken stone ballast, 225

Buffer-stops, 282

Bull-head rail, 191

C

Cab-rank, 251

Caisson foundations, 121

Cant of rail, 230

Carriage accommodation, 353

---- bogie, 54

---- dock, 282

---- traverser, 292

Cast-iron column piers, 97

---- in bridges, 27

---- saddles, 224

---- sleepers, 214

---- tram-plates, 184

---- tube tunnels, 179

---- water-tanks, 299

Catch-siding, 26

Centre line of railway, 32

Chairs, 206

Channelling ballast, 231

Check-rails on sharp curves, 29, 51

Cinder ballast, 227

Circular running-shed, 289

Clay puddle, 127

Clocks at stations, 26

Coal-drops, 282

Coffer-dams, 127

Comparison of bull-head and flange rails, 199

Compound rails, 190

Concrete foundations, 114

Continuous brakes, 30

Cost of permanent way, 241, 242 362

Covered-way tunnels, 178

Crab bolts, 223

Cranes, 280, 294

Creosoted sleepers, 211

Cross-over road, 233

Crossings made of rails, 237

Cross-sections, 33

Culverts and drains, 74

Curve alterations, 12

Curves, 49

Cutting rails on curves, 229

Cylinder foundations, 116

D

Datum line, 8

Deck or floor of girder bridges, 133

Deposited plans, 4, 6

Depths of cuttings, 10

Derrick crane, 299

Detached lock, 332

Detonator or fog signals, 334

Detours on mountain-sides, 3

Deviation, limits of, 6

---- of centre line, 12

---- of levels, 12

Diagram sketches of bridges, 149

Diamond crossing, 237

Disc or ground signals, 322

---- wheels, 48

Distant signal, 18, 314, 322

Diversion of roads, etc., 6

Dobbin-cart, 67

Dock platforms, 251

Double-line junction, 231

---- slip points, 233

Dry stone backing, 162

E

Earthworks, 60

Edge rails, 185

Electric motive-power, 355

---- repeater, 22, 334

---- train-staff instrument, 344

Embankment on bog, 71

Engine bogie, 53, 56, 304

---- triangle, 290

Engine turntables, 27, 289

Enlargements on parliamentary plans, 16

Entrances to tunnels, 176

Estimate, 14

Expansion of rails, 228

Extract from Government Standing Orders and Regulations, 6

F

Facing-bolt lock, 315

---- points, 20

---- ---- distance, 20

---- point locks, 22

Fang clips, 224

Fastenings, 218

Fences enclosing line, 14, 73

---- on bridges, 10

---- on road approaches, 10

Fish bolts, 203, 220

---- plates, 188, 203

---- plate liners, 206

Flag signals, 313

Flag-top culverts, 76

Flange rail, 191

Floor or deck of girder bridges, 133

Floors for goods-sheds, 280

Flying junction, 231

Fog or detonator signals, 334

Footbridges, 26, 147, 149

Footings of foundations, 111

Foundations, 111

Four-line system, 351

G

Gantry crane, 294

Gate-alarm, 336

Gates for level crossings, 74

Gauge of railways, 37, 38

Girder bridges, 110

Glazed roofs over platforms, 272

Goliath crane, 297

Goods-sheds, 273

Government grants to railways, 349

---- Standing Orders, 4, 6

Gradient alterations, 12

Gradients, 42

---- influencing loads, 43

---- in tunnels, 166

Gravel ballast, 225

---- foundations, 113

Guard-rails, 51

Guide-piles, 127

H 363

Half-round sleepers, 211

Hand-brakes on trucks, 46

Headings in tunnels, 169

Headway and span of public-road bridges, 10

Height of platforms, 24

Heights of embankments, 10

High-level viaduct, 81, 83

High-speed running, 354

Home signals, 18, 314

Houses of labouring classes, 10

I

Inclination of ramps, 26

Inside keys for chairs, 207

Inspection of new line, 18

---- of tunnel work, 176

Interlocking of signals, 22, 314, 330

Iron-tube tunnels, 179

Island-platform station, 258

J

Jack-arches of brickwork, 145

---- of concrete, 139

Jib crane, 296

Jim Crow, 239

Junction signals, 20, 323

---- with existing line, 6

K

Keys for chairs, 207

Kinsua Viaduct, 97

L

Lavatories and conveniences, 260

Laying permanent way, 225

Level crossings, 10

Life of steel rails, 193

Lift-bridge, 87

Light railways standard gauge, 41

Limits of deviation, 6, 16

Loa Viaduct, 102

Loads of locomotive engines, 44

Location of railway, 1

Lock and block signals, 342, 353

Longitudinal sleepers, 210

Low viaduct arching, 129

Low-level viaduct, 81, 83

M

Made ground, 111

Marking steel rails, 195

Mechanical drills, 172

---- gates, 335

Mile-posts, 30

N

Names of stations, 24

Narrow-gauge railways, 40

Natural features of country, 1

---- ground, 111

Navigable rivers, 81

O

Occupation bridges, 110

Ordinary crossing, 235

Ordnance maps, 3

Outside guard-rails, 53

---- keys for chairs, 207

Over-line arch bridges, 103

P

Parapets on viaducts, 28

Parliamentary estimate, 14

---- plan and section, 6, 8

Pedestal water-tanks, 302

Piers of cast iron, 97

---- of masonry, 95

---- of timber, 102

---- of wrought-iron and steel, 97

Pile foundations, 114

Plate-iron troughing, 143

Platform roofs, 264

Platforms (requirements of), 24

Plenum system of sinking, 119

Pneumatic process of sinking, 129

Points, or switches, 235

Portage viaduct, 102

Power to purchase land, 6

Preservation of timber, 211

Private-road bridges, 110

Provincial grants to railways, 349

Public-road bridges, 10, 103

---- level crossing, 8

R 364

Radial axle-boxes, 58

Rails, 182

Railway bills, 16

---- Clauses Act, 6

---- fences, 14

---- slope, 61, 66, 72

Railways of different ranks, 348

Ramps to platforms, 24

Recommendations as to working of railways, 30

Rectangular running-sheds, 289

Reduced speed on curves, 50

Refuge sidings, 31, 351

Relative costs of narrow-gauge and light railways, 41

Renewal of under-line bridges, 151

Repeater signal, 22, 334

Requirements of Board of Trade, 18

Retaining walls, 159

Reverse curves, 51

Roadside station, 253

Rock foundations, 113

Rocking-bar, 316

Roof-principals, 264

Roofs over roadside platforms, 272

Rope-haulage, 49

Route of railway, 1

Royal assent, 16

Runaway points, 233

S

Safety-points, 24, 319

Sandy foundations, 113

Scales for Parliamentary plans, 6, 16

Scissors cross-over, 233

Screw piles, 114

Semaphore signals, 313

Semi-circular running-sheds, 289

Separate lines for through traffic, 358

Service roads, 69

Shafts in tunnels, 167

Sheeting-piles, 127

Side-cutting, 61

Side recesses in tunnels, 176

Sidings, 24

Signal-cabins, 328

Signal-detector, 315, 318

Signals, 313

---- at junctions, 20, 323

Signals (requirements of), 20

Six-wheeled carriage, 54

Sleepers, 209

Slip-points, 233

Slope of cutting, 61

---- of embankment, 66

Slotted signals, 326

Snake-heads, 184

Soft deep bog, 70

Soiling earthwork, 66

Sorting-sidings, 285

Span and headway of P. R. bridges, 10

Spans of large railway bridges, 158

Spikes, 222

Spirals, 35

Spoil-bank, 60

Sprags, 46

Square crossing, 233

Standing orders, 4, 6

Starting-signal, 18, 314

Station buildings, 260

---- roofs, 264

Stations, 248

---- near viaducts, 24

---- on gradients, 26

Steel and wrought-iron sleepers, 217

---- rails, 190

Steps for side-lying ground, 70

---- of staircases, 26

Stone sleepers, 210

Strain on steel, 27

---- on wrought-iron, 27

Suburban traffic, 352

Subways, 26

Super-elevation of rail, 230

Supervision of tunnel-work, 176

Swing-bridges, 83, 87

Switches or points, 235

Syphon culverts, 79

T

Tamping-bar, 239

Terminal station, 253

Tests for steel rails, 194

Three-throw switches, 233

Thrust-girders for retaining walls, 161

Tie-bars, 224

Timber bridges, 95

Timbering of tunnels, 170

Timber-pile foundations, 114

Time for construction, 18

Tip head, 67 365

Tip-waggon, 69

Tools for permanent way, 239

---- for tunnel-work, 172

Trailing-points, 20

Train-staff on single line, 342

Train-tickets, 343

Tramplates of cast-iron, 184

Tramway rails, 199

Trap-points, 319

Travelling-crane, 296

Traversing bridge, 85

Trimming slopes, 72

Trough girders, 135

Tunnel faces, or entrance, 176

---- headings, 169

---- sections, 176

---- shafts, 167

Tunnels, 6, 10, 162

---- composed of cast-iron segments, 179

---- drainage of, 166

---- through cities, 178

---- under rivers, 181

Turn-out, 233

Turntables, 287

U

Under-line arch bridges, 103, 129

V

Vacuum system of sinking, 119

Verandah on platform, 261

Viaduct parapets, 28

Viaducts of timber, 95

---- over rivers, 83

Viaducts over valleys, 91

---- to be shown on section, 10

W

Waggon turn-table, 292

Waiting-rooms, 251

Warehouse crane, 294

Water-column, 302

Water-jet piles, 116

Water-tables, 227

Water-tanks, 299

Wear of fish-plates, 205

Wear of steel rails, 193

Weeping-holes, 161, 174

Weights of locomotive engines, 304

Well foundations, 123

Wheel-base of engine bogie, 59

Wheel-guards on viaducts, 28

Widths of public-road bridges, 10

Winding engines, 185

Wind-pressure, 28

Wooden-centre wheels, 48

Wooden culverts, 76

---- screws, 223

---- tramway, 182

---- water-tanks, 301

Working plans and sections, 32

Wrought-iron column piers, 97

---- and steel sleepers, 217

---- piles, 116

---- rails, 186

---- water-tanks, 301

Z

Zigzags, 35

PRINTED BY WILLIAM CLOWES AND SONS, LIMITED, LONDON AND BECCLES.

ENGINEERING, STRENGTH OF MATERIALS, ETC.

THE STRENGTH OF MATERIALS AND STRUCTURES: the Strength of Materials as

depending on their Quality and as ascertained by Testing Apparatus. By

Sir J. ANDERSON, C.E., LL.D., F.R.S.E. With 66 Illustrations. Crown

8vo, 3_s._ 6_d._

RAILWAY APPLIANCES: a Description of Details of Railway Construction

subsequent to the completion of the Earthworks and Structures. By Sir

JOHN WOLFE BARRY, K.C.B., F.R.S. With 218 Illustrations. Crown 8vo,

4_s._ 6_d._

MECHANICS APPLIED TO ENGINEERING. By JOHN GOODMAN, Wh.Sch., M.I.C.E.,

M.I.M.E., Professor of Engineering in the University of Leeds. With

714 Illustrations and numerous Examples. Crown 8vo, 9_s._ net.

RAILWAY APPLIANCES AND OPERATIONS. For the Use of Railway Employés. By

EDWARD S. HADLEY, the Great Western Railway’s Divisional

Superintendent’s Office, Newport, Monmouth. [_In the press._

ENGINEER’S VALUING ASSISTANT: being a Practical Treatise on the

Valuation of Colleries and Other Mines, etc. By H. D. HOSKOLD. With

an Introductory Note by PETER GRAY. 8vo, 7_s._ 6_d._ net.

PRACTICAL HYDRAULIC (WATER SUPPLY AND DRAINAGE) TABLES AND DIAGRAMS.

By C. E. HOUSDEN. With 6 Plates and 7 Diagrams in the Text. Crown

8vo, 3_s._ 6_d._

PRACTICAL EARTHWORK TABLES. By C. E. HOUSDEN. With 9 Plates. Crown

8vo, 2_s._ 6_d._

A POCKET-BOOK FOR MECHANICAL ENGINEERS. By DAVID ALLAN LOW (Whitworth

Scholar), M.I.Mech.E., Professor of Engineering, East London Technical

College. With over 1,000 specially prepared Illustrations. Fcp. 8vo,

gilt edges, rounded corners. 7_s._ 6_d._

MECHANICS FOR ENGINEERS: a Text-book of Intermediate Standard. With

200 Diagrams and numerous Examples. By ARTHUR MORLEY, M.Sc.,

Professor of Mechanical Engineering in University College, Nottingham.

Crown 8vo, 4_s._ net.

STRENGTH OF MATERIALS. By ARTHUR MORLEY, M.Sc., Professor of

Mechanical Engineering in University College, Nottingham. With 248

Diagrams and numerous Examples. 8vo, 7_s._ 6_d._ net.

LIGHT RAILWAY CONSTRUCTION. By RICHARD MARION PARKINSON, Assoc.

M.Inst.C.E. With 85 Diagrams. 8vo, 10_s._ 6_d._ net.

GRAPHICS; or, the Art of Calculation by Drawing Lines, applied

especially to Mechanical Engineering. By ROBERT H. SMITH, formerly

Professor of Engineering, Mason College, Birmingham. Part I. With

separate Atlas of 29 Plates containing 97 Diagrams. 8vo, 15_s._

<!--385.png-->

THE THEORY OF STRESSES IN GIRDERS AND SIMILAR STRUCTURES; with

Practical Observations on the Strength and other Properties of

Materials. By BINDON B. STONEY, LL.D., F.R.S., M.I.C.E. With 5

Plates and 143 Illustrations in the Text. Royal 8vo, 36_s._

THE TESTING OF MATERIALS OF CONSTRUCTION. A Textbook for the

Engineering Laboratory and a Collection of the Results of Experiment.

By W. CAWTHORNE UNWIN, F.R.S., B.Sc. With 5 Plates and 188

Illustrations and Diagrams. 8vo, 16_s._ net.

ENGINEERING CONSTRUCTION IN IRON, STEEL, AND TIMBER. By WILLIAM

HENRY WARREN. With 13 Folding Plates and 375 Diagrams. Medium

8vo, 16_s._ net.

THE SEA COAST: Destruction, Littoral Drift, Protection. By W. H.

WHEELER, M.Inst. C.E. With 38 Illustrations and Diagram. Medium 8vo,

10_s._ 6_d._ net.

A PRACTICAL MANUAL OF TIDES AND WAVES. By W. H. WHEELER, M.Inst.

C.E. With 19 Illustrations. 8vo, 7_s._ 6_d._ net.

MACHINE DRAWING AND DESIGN.

AN INTRODUCTION TO MACHINE DRAWING AND DESIGN. By DAVID ALLAN LOW,

M.I.Mech.E. With 153 Illustrations and Diagrams. Crown 8vo, 2_s._

6_d._

A POCKET-BOOK FOR MECHANICAL ENGINEERS. By DAVID ALLAN LOW,

M.I.Mech.E. Fcp. 8vo, 7_s._ 6_d._

THE DIAGRAM MEASURER. An Instrument for Measuring the Areas of

Irregular Figures, and specially useful for determining the Mean

Effective Pressure from Indicator Diagrams from Steam, Gas and other

Engines. By DAVID ALLAN LOW, M.I.Mech.E. With full instructions, 1_s._

A MANUAL OF MACHINE DRAWING AND DESIGN. By DAVID ALLAN LOW and ALFRED

WILLIAM BEVIS. With over 700 Illustrations. 8vo, 7_s._ 6_d._

MACHINE DESIGN, CONSTRUCTION AND DRAWING: a Textbook for the Use of

Young Engineers. By HENRY J. SPOONER, C.E., M.I.Mech.E., F.G.S., etc.,

Director and Professor in the Polytechnic School of Engineering. With

86 Tables and numerous Exercises. Illustrated by over 1,400 Drawings

and Figures. 8vo, 10_s._ 6_d._ net.

MACHINE DRAWING AND DESIGN FOR BEGINNERS: an Introductory Work for the

Use of Technical Students. By HENRY J. SPOONER, C.E., M.I.Mech.E.,

F.G.S., etc., Director and Professor in the Polytechnic School of

Engineering. Crown 4to, price 3_s._ 6_d._

THE ELEMENTS OF MACHINE DESIGN. PART I. General Principles; Strength

of Materials; Rivets, Bolts, and other Fastenings; Journals and

Shafting; Couplings; Pedestals; Transmission of Power by Gearing,

Belting, Ropes, and Chains. By W. CAWTHORNE UNWIN, LL.D., F.R.S.,

B.Sc., M.I.C.E., Hon. Mem. Inst. Mech. E., Hon. Mem. Am. Soc. Mech.

E., Foreign Hon. Mem. Am. Academy of Arts and Sciences. With 387

Figures. 8vo, 7_s._ 6_d._ net.

PART II. Chiefly on Engine Details. With 259 Diagrams, etc. Crown 8vo,

6_s._

LONGMANS, GREEN, & CO.

LONDON, NEW YORK, BOMBAY, AND CALCUTTA.

Transcriber’s Note:

Unprinted punctuation was added, where appropriate. The illustrations

identified as numbered figures are all full-page without captions. When

illustrations interrupt the text of a paragraph, they were moved to

precede that paragraph. For ease of use of the index, page numbers are

displayed in the right margin for only pages that contain text.

Words and phrases in italics are surrounded by underscores, _like

this_. Superscripted letters and numbers are preceded by a carat, e.g.

C^o. Use of hyphens was made consistent. Obsolete and alternative

spellings were left unchanged. Spelling corrections are noted below:

‘transhipment’ to ‘transshipment’ ... delay in transshipment... pg 41

‘steepier’ to ‘steeper’ ... introduce steeper gradients ... pg 45

‘guage’ to ‘gauge’ ... 8½ inch gauge,... pg 48

‘guage’ to ‘gauge’ ... on 3-foot narrow-gauge railways ... pg 193

‘breaks’ to ‘brakes’ ... the working of the brakes.... pg 193

‘petition’ to ‘partition’ ... plate partition across ... pg 301

‘close’ to ‘closed’ ... is kept closed by the pressure ... pg 302

End of Project Gutenberg's Railway Construction, by William Hemmingway Mills

Railway Construction · 第 10 / 10 章