Caissons constructed of plates of wrought-iron or steel are much used

for the foundations of large piers in deep water. Practically they may

be considered as cylinders on a large scale, with the difference that

whereas cylinders are generally continued up to the under side of the

girders of the superstructure, caissons are only carried up to a short

distance above the water-level. A caisson forms a strong water-tight

iron cofferdam, from which the water can be excluded, and a masonry or 122

brickwork pier constructed inside. It may be made all in one piece to

correspond to the form of the pier, or in separate pieces to form one

whole, each being sunk independent of the other, and connected

together afterwards. Being built up of plates cut to the proper size

and shape, it is a very simple matter to rivet on additional tiers of

plates as the caisson is lowered deeper and deeper into the bed of the

river. The lower length is made with a cutting edge to penetrate the

ground; the exterior is made without any projection larger than the

rivet heads, and the interior is strengthened with T-irons or double

L-irons at the joints, and strong cross-bracing to resist the

pressure of the water. About 7 or 8 feet above the cutting edge a

strongly framed iron floor is riveted to the vertical sides, and

strengthened by plate-iron under-brackets placed at short distances.

The excavators work in the space below the floor, and the excavated

material is passed up through openings formed in the floor at

convenient points to suit the working. The methods of lowering a

caisson are the same as for lowering a cylinder. If the pneumatic

system has to be adopted, then two or more air-tight tubes of liberal

dimensions (say 5 to 8 feet diameter), according to the size of the

caisson, must be attached to the floor, and on the top of each of

these tubes air-locks must be secured for the removal of men and

materials. The masonry or brickwork of the pier is built upon the iron

floor, and a portion of this building work is usually carried on

during the sinking of the caisson to obtain weight to assist in the

lowering. When down to the proper depth, the space below the floor is

properly cleared of _débris_ and water, and then carefully filled in

with cement concrete.

Some caissons are made with vertical sides throughout their entire

height; others have an outward taper for 15 or 20 feet on the lower

end. The former are not only simpler in construction, but are more

easily kept in a vertical position during the sinking. Caissons are

usually put together in some convenient place near the edge of the

water, and then conveyed on pontoons to the sites of the piers. Great

care is required in lowering them into position in the bed of the

river, and guide-piles, guy-chains, and other appliances are

frequently necessary to keep them vertical during the sinking.

The form, dimensions, thickness of plates, cross-bracing, and general

arrangement will depend upon the size and depth of the pier to be 123

constructed. Caissons for heavy work on difficult or treacherous

ground require great care, not only in their construction, but also in

placing them in exact position, and in sinking them correctly to their

proper depth. A tilted caisson is a most difficult subject to handle,

and entails heavy expenditure to restore it to a true vertical

position. By making careful borings, the engineer can ascertain very

closely the depth to which the caisson will have to be lowered to

obtain a good firm foundation. With this information the caisson can

be so constructed that the upper portion, termed the temporary

caisson, commencing a few feet above the bed of the river, can be

detached, and removed at the completion of the work from the lower or

permanent portion sunk below the ground line.

Fig. 118 gives sketches of a wrought-iron plate-caisson applied to a

deep-water river pier, and lowered to its full depth by the pneumatic

process; dotted lines show the air-tubes through which the excavated

material is hoisted and emptied into barges alongside.

Many large and important pier foundations have been constructed on the

system of brick cylinders or wells, particularly in India, where the

foundations for large river viaducts have to be carried down to great

depths through thick deposits of soft material. These wells are built

upon V-shaped curbs to facilitate the penetration when sinking. Fig.

119 is a section of a well with a wrought-iron curb, and Fig. 120 is a

similar well with a wooden curb. The wrought-iron curb is made in

segments for convenience of transport, the pieces forming the complete

ring being bolted or riveted together at the site of the foundations.

The wooden curb is composed of several thick layers of hard wood

planking cut to the proper shape, and laid with broken joints, the

whole being bound together with suitable bolts and spikes. In some

cases the lower or cutting edge of the wooden curb is strengthened or

protected by a sheathing of wrought-iron plates.

[Illustration: Fig. 118]

[Illustration: Fig. 119, 120, 121, 122, 123]

Well foundations are usually put in when the rivers are at their

lowest, and reduced to a few small channels in the great width of

dried-up river bed. This condition enables the greater portion of the

curbs to be conveniently and accurately placed in position on dry

ground, or on ground which, although soft and muddy, is not covered

with water. Should the site of one of the wells occur in one of the

small channels, the stream can be diverted to one side, and a small 126

artificial island made to receive the curb above water-level. When a

curb is fairly fixed in position, the work of building the brick well

can be commenced. With the wrought-iron curb the triangular cavity

between the vertical plate and sloping plate must be filled with

concrete to form a level base for the first course of brickwork. The

wooden curb being composed of horizontal layers of timber, is ready to

receive the brickwork without further preparation. To strengthen and

keep the brickwork firmly tied together, strong wrought-iron vertical

tie-rods, 1¼ or 1½ inch in diameter, are generally built into the

work--as shown in the sketches--at distances about four feet apart.

The lower end of the bottom tier of tie-rods is secured to the curb,

and the upper end passed through a strong wrought-iron plate-ring,

which is continuous all round the brickwork. A long deep nut is

screwed down over the top or screwed end of tie-rod until the

plate-ring is down tight on the brickwork. The tightening nuts are

made sufficiently deep to receive the lower ends of a second series of

vertical tie-rods, which in like manner pass through another

wrought-iron plate-ring on the next section of brick well, and the

same arrangement is continued for the full height of the well. The

lengths of the tie-rods will depend upon the lengths of the section of

brickwork to be built at a time, and may vary from 10 to 15 feet.

As the work of building proceeds the curb and brick well will sink

gradually into the ground, and down to a certain depth, varying

according to the material of the river bed, the weight of the brick

well itself will effect the penetration and lowering. Beyond this

depth the lowering must be done by scooping or dredging the material

from the inside of the well, and placing heavy weights of old railway

iron or other convenient masses on the top. When one section or length

of well has been sunk down, then another set of tie-rods are inserted

into the deep nuts, and another section of brickwork commenced. The

operation of lowering is rather tedious, as all the weights have to be

hoisted up on to the top of the length in hand, and piled so as to

leave space for lifting out the material dredged from the interior;

and then, when the length has been lowered, all the weights must be

removed before the brickwork can be resumed on another length. Where

the river bed consists of soft material, the excavation inside the

well can generally be effected by suitable dredges or scoops worked 127

from the surface or top of brickwork. Should trees or other

obstructive masses be met with embedded in the strata, it will be

necessary to employ divers to remove them piecemeal out of the way of

the curb.

When the brick well has been lowered down to the full depth, and is

thoroughly bedded in a stratum of strong material, the test weights

should be left on for some time to ascertain if there is any further

sinking. After all the weights have been removed the bottom of the

well can be dredged out clean, and the interior filled in with

concrete to such height as may be considered necessary.

Brick wells must be watched carefully to ensure that they sink down in

a perfectly vertical position. Any inclination away from the

perpendicular must be corrected at once by means of guys and struts,

the same as in sinking iron cylinders. The principal difficulty will

be with the first 20 or 25 feet.

The diameter of the well will depend upon the weight it has to carry,

and its height from river bed to under side of girders. The wells may

be either circular or polygonal in section, and built singly or in

pairs, as shown in sketches (Fig. 121).

Many piers and abutments of bridges in shallow or moderately deep

water are built by means of coffer-dams of timber and clay puddle. The

coffer-dam forms a water-tight wall round the site of the foundation,

from which the water is pumped out, and the excavation carried down to

the depth required. In very shallow water it is sometimes sufficient

to drive only a single row of piles, and form a bank of good clay

puddle on the outside, as shown in Fig. 122. In deep water it is

necessary to drive a double row of piles, 3 or 4 or more feet apart,

and fill in the space between with clay puddle, as shown in Fig. 123.

The piles for coffer-dam work should be carefully selected, of good

timber straight, and correctly sawn on the contact faces. Guide-piles

are first driven in proper line and position round the intended

foundation. To these strong horizontal double waling pieces are

securely bolted, one on each side of the guide-pile, one pair near the

top, and the other pair as low down as can be placed. The sheeting

piles, which are lowered down between the horizontal waling or guiding

pieces, are driven as close to one another as possible, being assisted

in doing so by the sheet-pile shoe, shown on Fig. 124, which is made

not with a point like an ordinary pile shoe (Fig. 125), but with a 128

cutting edge slightly inclined, so that in driving the tendency of the

pile is to drift towards the pile previously driven. Sometimes the

outer row of piles consists of whole balks, and the inner row of half

balks; the size of the piles must, however, be regulated by the depth

and current of the water. When both rows of piles have been completed,

the space between should be dredged out, and then filled with

carefully prepared clay puddle. To enable the puddle to adapt itself

thoroughly to the wooden sides, it is desirable to remove the inside

walings after all the piles are driven, as any internal projections

interfere with the proper punning and settling of the puddle. The

swelling of the puddled clay has a tendency to force apart the two

rows of piles, and to counteract this as much as possible, iron

tie-rods should be passed through from side to side every few feet,

and screwed up against large washers placed on the outside of the

outer walings. Strong struts or cross-bracing of timber must be placed

from side to side inside the coffer-dam to resist the pressure of the

water in the river. This cross-bracing can be removed gradually as the

work of building progresses upwards, and be replaced with short struts

wedged in against the sides of the finished courses.

In cases where the ground is soft, and when it is not considered

prudent to excavate the foundations deeper for fear of disturbing the

stability of the coffer-dam piles, rows of large, square bearing-piles

may be driven in the floor of the foundation, as shown in Fig. 111.

The tops of these bearing-piles must all be sawn off to the same

level, and a platform of strong double planking securely fixed to the

piles to receive the foundation course of concrete, masonry, or

brickwork. The spaces around the tops of the piles and the under side

of the timber platform should be filled in with good cement concrete.

The interior of the coffer-dam is kept dry by constant pumping, either

by hand pumps or steam pumps, according to the volume of water finding

its way into the foundations. When the finished pier or abutment has

been carried up above the river water-level, the coffer-dam is no

longer required, and may be removed. Sometimes, to save the timber,

the piles are drawn by means of strong tackle fitted up for the

purpose; but in doing this there is considerable risk of disturbance

to the foundations, and it is better to leave the piles in the ground

and employ divers to cut off the tops a little above the bed of the 129

river.

In preparing the design for a large foundation it is absolutely

necessary to first ascertain by careful borings the description of

material upon which that foundation must be placed, so as to

proportion the area of bearing surface to the weight to be sustained.

Some materials will naturally carry more weight than others, and

although the engineer cannot always select the material he would

prefer, he can, however, control the superficial area of the

foundations. Much valuable information has been obtained both from

experiments and from comparisons of actual practice, and the following

memoranda may be useful for reference, as indicating the pressures per

superficial foot which may be safely put on various materials:--

Moderately stiff clay 2½ tons.

Chalk 4 ”

Solid blue clay 5 ”

Compact gravel and close sand 6 ”

Solid rock 12 ”

Doubtless the above weights have been exceeded in many cases, but it

is better to be on the safe side, and leave a good margin for

stability.

Large subaqueous foundations for heavy piers and abutments are costly

and tedious, and especially so when the pneumatic process has to be

adopted. Special appliances and well-trained, experienced workmen are

requisite, and if all the men and materials have to pass through the

air-locks, the progress of the work must necessarily be slow. When the

foundations have been completed up to the level of the water, the

construction can be pushed on more rapidly, as the work of

scaffolding, hoisting, and building, can all be carried on in the open

air.

Amongst the very many types of arch-work and girder-work adopted for

railway purposes, the following examples from actual practice may be

useful for reference:--

[Illustration: Fig. 126, 127]

Fig. 126 represents small 24-foot span, low viaduct arching suitable

for a line passing through towns or villages, where ground is valuable

and the area to be covered must be kept as small as possible. The

arches may be utilized for stables, stores, or roads of communication

between the lands and properties intersected by the railway. The

segmental form gives a better headway underneath than the

semicircular, besides containing less material in the arching proper,

and requiring a smaller amount of centering. Every precaution should 131

be taken to prevent water percolating through any portion of the

arching, or haunching, and a thick layer of good asphalte should be

placed over the entire upper surface, and carried well up the lower

portion of the parapet walls, as shown on the sketch. The cast-iron

pipes with rose heads form a very efficient means of taking away the

rain-water which filters through the ballast and filling. The pipes

should be carried down in chases, or recesses, built in the fronts of

the piers, to protect them as much as possible from injury in the

yards below. Rose heads, pierced with holes, and surrounded with small

stones hand-laid, serve well to conduct the water into the pipes.

Where the arching is of considerable length, recesses or refuges for

the platelayers may be obtained by substituting a short length of

cast-iron-plate parapet, instead of the stone or brick parapet, over

some of the piers, as indicated in the sketch.

Fig. 127 shows a similar description of arching for spans of 30 feet.

The above two examples represent plain substantial work, but if

circumstances warrant more external finish, this can readily be added

without interfering with the general arrangement. In a similar manner,

if considered preferable, the arches may be made semicircular or

elliptical.

In the sketches shown of the arched over-line and under-line bridges,

the arching and coping of parapets are in brick, and the remainder of

the work in stone. In very many cases brick will be found cheaper and

more expeditious for arching than stone, unless the quarries turn out

stone in blocks which can be conveniently trimmed for arching. All

bricks used for arch-work should be hard and well burnt, and special

care should be taken in the selection of those to form the under-side

course, which will be exposed to the atmosphere. For moderate spans

arches have been successfully constructed of concrete. For this

description of work the materials should be carefully gauged and mixed

together, and the finished work should be allowed to stand some time

on the centres to allow the concrete to become thoroughly set.

[Illustration: Fig. 131]

In Fig. 102, the cutting being deep, almost up to the level of the

public road, the foundations of the wing walls are built in steps,

resulting in a minimum of masonry below the finished ground line.

Where the cutting is shallow, and the public road has to be brought up

to the bridge on an embanked approach, the greater portion of the wing 133

walls will have to be built up from the solid or original ground, and

there will be a large amount of masonry below the finished ground

line, as indicated in Fig. 128.

In some cases of over-line bridges it is necessary to curve the wing

walls to correspond to the road which turns off to the right or left

after crossing the railway, as shown in Fig. 129; or the wing walls

may have to form two separate curves where the road branches off in

two directions after leaving the bridge, as shown in Fig. 130.

Fig. 131 shows plan, elevation, and cross-section of an under-line

arch bridge, considerably on the skew, carrying a railway over a

river. The wing walls are curved, and very similar in type to some of

those in preceding examples. The river bed and ground alongside being

of solid rock, good foundations were obtained at a very moderate cost.

On many railways constructed in the beginning as single lines only,

the over-line bridges have been built for double line. The additional

cost in the outset has been small, compared with the great expenditure

which would be incurred afterwards in reconstructing the bridges to

suit a double line.

The general arrangement of abutments and wing walls shown in the

foregoing examples will apply to similar classes of bridges where

girder-work is adopted instead of arching.

There are many ways of forming the floor or deck of a girder bridge

intended to carry a railway over a road or stream. In some cases it

will be imperative to have a thoroughly water-tight floor to prevent

rain-water percolating through to the roadway below; while in others,

such as bridges over streams, and secondary roads, this special

provision will not be necessary, and a lighter and more economical

floorway can be adopted. A strong wrought-iron or steel-plate

flooring, with its corresponding filling and ballasting, means not

only so much additional cost in the flooring proper, but also so much

additional dead weight to be carried by the main girders.

[Illustration: Fig. 132, 133, 134, 135, 136, 141]

Fig. 132 is a sketch of rolled joist-iron I-girders and timber floor

frequently adopted for small farm roads and cattle creeps of 10 or 12

feet span. A beam of timber is fitted in between the two rolled

joist-irons, and the three pieces securely fastened together with

strong iron bolts placed about 3 feet apart. These small compound

girders rest on bearing-plates of wrought or cast iron, and are held 135

together and to gauge by tie-rods, as shown. The rails are spiked or

bolted down on to the timber beams, and the flooring formed of strong

planking.

Fig. 133 shows an arrangement of plate girders for a 16-foot opening

over a stream. The girders are placed immediately under the rails, and

are tied together by plate-iron cross-bracing the same depth as the

main girders. The flooring consists of 4-inch planking laid with

¾-inch spaces, on which are laid longitudinal rail-bearers 14 inches

wide by 7 inches thick.

Fig. 134 is a sketch of a somewhat similar arrangement for a

lattice-girder bridge, 45 feet span, carrying a single line of railway

over a river. The main girders are tied together by lattice-work

cross-bracing. The floorway consists of 5-inch planking, laid with

¾-inch spaces, on which is placed the 14 feet by 7 feet longitudinal

rail-bearers. Plate-iron outside brackets are riveted to the main

girders to carry the ends of the planking and light tube-iron parapet.

Fig. 135 illustrates an example of trough girders, constructed to

carry a double-line railway over a country road 25 feet wide, where

the space from under side of girder to rail-level is small. The

girders are constructed in pairs, with short, shallow cross-girders at

3 feet 6 inch centres, riveted in between them to carry longitudinal

timbers on which the rails are laid. Bottom plates, 5/8 inch thick,

unite the two girders for the length of their bearing on the

abutments, and a similar plate, 9 inches wide, unites them at the

centre; the remainder of the span is left open to prevent the lodgment

of rain-water. Three strong tie-rods are placed to keep the girders to

gauge. Curved wrought-iron ballast-plates are used between the

running-rails, and plank flooring forms the rest of the covering.

[Illustration: Fig. 137]

Fig. 136 is a sketch of a plate-girder bridge over a country road 28

feet wide, with the load carried on the lower flange of girder. Three

main girders carry the double line of railway, the centre one having

double the strength of each of the outside girders. On the top of the

cross-girders, strong angle irons are riveted to serve as guides and

supports for the longitudinal timbers which carry the rails. Every

third cross-girder has raised ends to give increased lateral stability

to the main girders. A close cast-iron plate parapet forms a screen to

the roadway. Wrought-iron ballast-plates are used between the

running-rails, and the remainder of the flooring is of timber.

Fig. 137 gives the particulars of one 60-foot span of a viaduct 137

carrying a double line of railway over tidal water. The main girders

are placed one under each line of rails, and all the four are strongly

tied together by lattice-work bracing the full depth of the girders.

The outside footpaths for the platelayers are carried on strong

brackets, riveted to the main girders. Longitudinal timbers, coped

with angle iron, are placed as outside guards, alongside each rail,

for the full length of the viaduct. Wrought-iron ballast-plates are

placed between the running-rails. The remainder of the footways

consist of timber planking, laid with half-inch spaces, and covered

with a layer of small pebbles as a protection against fire.

Fig. 138 shows a very similar arrangement in a viaduct carrying a

single line of railway across a river. The two main lattice

girders--66 feet span--are placed at 9-foot centres, to obtain greater

stability. The cross-girders are extended to carry the outside

footpaths and handrailing. Outside guards are placed alongside each

rail as in the preceding example. Wrought-iron ballast-plates are

fixed all along between the running-rails, and timber planking used

for the rest of the floorway.

Fig. 139 gives cross-section of a lattice-girder bridge, 82 feet span,

carrying a single line of railway over a river, with the load carried

on the lower flange. The cross-girders are placed at 4 feet 3 inch

centres. Wrought-iron ballast-plates compose the floorway between the

rails, and timber planking covers the rest of the bridge. Plate

diaphragms, or stiffeners, of the form shown at A, A, A, A,

are riveted to the main girders at five places in their length.

Fig. 140 shows cross-section of a lattice-girder bridge of 200 feet

span, carrying a single line of railway over a river, the load being

placed on the lower flange. The floorway consists of plate-iron

cross-girders, spaced at 4-foot centres, on which are placed the

longitudinal rail-bearers and planking, the latter being covered with

a layer of clean pebbles for the width between the running-rails. As

the depth of the main girders was sufficient to admit of overhead

bracing, strong plate-iron diaphragms, of the form shown on the

sketch, were riveted to the main girders at every 50 feet. These

diaphragms thoroughly brace the two girders together, and effectually

prevent any tendency to side-canting, at the same time imparting an

effective appearance to the bridge.

[Illustration: Fig. 138, 139, 143]

Fig. 141 shows cross-section of a plate-girder bridge, of 36 feet 139

span, carrying six lines of way across a street. Strong plated

cross-girder bracing, at 4 feet 8¼ inch centres, is riveted to the

main girders, and the top is covered with old Barlow rails, 12 inches

wide, and weighing 90 lbs. per lineal yard. A layer of asphalte, about

1½ inches thick, is carefully laid all over the upper surface of these

rails to make a thoroughly water-tight floor. Clean gravel is placed

on the top, on which are laid the sleepers and rails of the permanent

way. Rain-water passes through the gravel into the hollows of the

Barlow rails, and finds its way into suitable drains provided at each

abutment. This arrangement not only prevents the falling of drip-water

into the street below, but permits of the alterations of the lines of

way, or putting in of cross-over roads on the surface above. The

outside main girders are made deeper, and are surmounted by close

cast-iron parapets.

Fig. 142 gives the particulars of a three-span plate-girder bridge,

constructed to carry a double line of railway over two other railways

and a canal, the load being placed on the lower flange. Two main

girders are used for each line of way. Strong plated cross-girders are

placed at 5 feet 3 inch centres, and on the top of these is laid a

flooring of old Barlow rails, terminating at the sides with sloping

wing-plates riveted to the cross-girders and main girders, the entire

surface being covered with an inch and a half layer of asphalte. Good

gravel ballast is placed on the top, on which are laid the sleepers

and rails. One central main girder of sufficient strength would have

been as efficient as the two central girders, but there was a

practical difficulty which prevented its adoption. The new girder-work

was built to replace an old structure of peculiar arrangement, and to

keep the traffic going on one line there was no alternative but to

make each line of way complete in itself.

[Illustration: Fig. 140, 144]

Fig. 143 illustrates an example of jack arches in concrete built

between strong plate-girders. The span of the girders was only 16

feet, but the opening or roadway was of considerable length, and

passed under a portion of a busy station yard. The girders are placed

at 6-foot centres, and tied together in pairs by 1¼-inch tie-rods,

three to the span, spaces of 6 inches in plan being allowed between

each set of the rods. The concrete was curved up to the top plate of

the girder, as shown, and the entire surface covered with a thick

layer of asphalte, on which were placed the ballast and permanent way. 141

Brickwork might have been used for the jack-arching, but concrete was

considered more convenient.

Fig. 144 shows the cross-section of a truss-girder bridge of 123 feet

span, carrying a double line of railway over a wide thoroughfare, the

load being placed on the lower flange. There are two main girders,

each 12 feet 6 inches deep in the centre, and 8 feet deep at the ends.

Plate cross-girders are placed at 4 feet 6 inch centres, on which is

riveted longitudinal plate-iron troughing, extending across the bridge

and terminating at the sides with wing-plates, as shown. The entire

floor is covered with a thick layer of asphalte previous to filling in

with ballast to receive the permanent way. Plate stiffeners are

adopted in this bridge very similar to those in Fig. 139.

Fig. 145 gives plan, elevation, and cross-section of a plate-girder

bridge of 95 feet span, carrying a double line of railway over a very

busy street. There are two curved-top main girders, each 10 feet 9

inches deep in the centre, and 6 feet 7½ inches deep at the ends. The

arrangement of cross-girders, longitudinal plate-iron troughing, and

permanent way, is very similar to that in the preceding example, but

the side wing-plates are carried up higher, and are riveted up to the

web-plate of main girder, forming continuous stiffeners from end to

end of the main girders. A light, ornamental, close cast-iron parapet

is bolted on to the top of the curved, or upper, boom of the main

girder, the top line of the parapet being carried out parallel to the

bottom boom of girder. This bridge crosses the street very obliquely,

and, although cast-iron columns were allowed at the edge of the

footpaths, the main spans are unavoidably large. When designing the

above bridge, the writer had to adopt a girder that would form a

screen, to provide a deck, or floor-way, which would be not only

water-tight, but also deaden as much as possible the sound or

vibration of passing trains, and at the same time give some ornamental

appearance to the girders and parapets. This bridge carries a constant

service of heavy trains; it is perfectly dry underneath, and is

remarkably free from noise or vibration.

[Illustration: Fig. 142]

Fig. 146 shows cross-section of a plate-girder bridge of 40 feet span,

carrying a double-line railway over a street, in a situation where the

depth from top of rails to under side of girders had to be made as

small as possible. Three main girders were used, the centre one being 143

double the strength of each of the outside girders. Instead of

ordinary cross-girders, transverse plate-iron troughing was adopted,

very similar in section to the longitudinal iron troughing in Fig.

145, but stronger. The troughing rested on the angle iron of bottom

flange of main girder, and was riveted to the vertical web-plates of

main girders, shallow additional vertical plates being inserted

alongside web-plates to prevent any drip-water or moisture coming in

contact with the main web-plates. The entire surface of the troughing

was well covered with asphalte before filling the hollows with gravel

ballast. An ordinary transverse wooden sleeper was placed in each

hollow, and on these sleepers the rails were secured as shown. In this

case--as in others of transverse troughing--the rain-water had to be

conveyed away from the hollow of each trough by a separate outlet into

longitudinal gutters shown at A, B, and continued on to the

abutments.

Transverse troughing is always more troublesome than longitudinal

troughing, as both ends of each trough must be effectually closed to

prevent the drainage water leaking out on to the web-plates, or angles

of the main girders. With longitudinal troughing the water is readily

carried away from each hollow, to cross drains constructed at the

piers, or abutments.

Fig. 147 shows cross-section of a truss-girder bridge, 120 feet span,

carrying a single line of railway over a river. The cross-girders are

placed at 10-foot centres to correspond to the vertical members of the

main truss-girder. Longitudinal plate-iron rail-girders are riveted in

between the cross-girders, and the entire floor is covered with curved

wrought-iron ballast plates, as shown. The rails are carried on

longitudinal timbers, which are bolted on to the rail-girders. Angle

iron brackets, riveted on the top of the cross-girders, keep the rail

timbers in position and gauge.

[Illustration: Fig. 145]

In each of the above examples, where longitudinal rail timbers are

adopted, flange rails are shown, as many engineers prefer to have a

continuous bearing for the rails on bridges, in case of rail fracture.

There is nothing, however, to prevent the chair road being laid on

longitudinal timbers, and for this purpose the writer has used chairs

of the ordinary pattern, specially cast with side lugs to grip the

timber, as shown in Fig. 148. Chairs of this form have a very firm 145

hold on the longitudinal timber, and the side lugs check any tendency

of the splitting or opening of the wood when putting in the spikes or

screw bolts.

Fig. 149 shows cross-section of a plate-girder over-line bridge, 32

feet span, carrying a private road, 12 feet wide, over a double-line

railway. The road traffic being small, the floorway was constructed of

creosoted planking carried on rolled I-iron cross-girders placed at 3

feet 8 inch centres, and riveted to the main girders. The horse-tread

track was provided with a second layer of planking, laid transversely,

to take up the wear, cross battens, 4 inches by 2 inches, being placed

at 12-inch centres, and sand spread between to give good foothold. A

light lattice-work parapet was bolted on to the top of the main

girders.

Fig. 150 gives cross-section of a plate-girder over-line bridge, 30

feet span, carrying a private road, 20 feet wide, over a double-line

railway. The main girders are tied together by lattice-work bracing,

spaced at 7-foot centres. Curved wrought-iron plates are laid across

from girder to girder, and butt against a narrow horizontal plate,

which forms part of the upper boom. The curved plates are riveted on

to the top of girder, and form a continuous iron floor, or deck, from

side to side of the bridge. Upon this iron floor is laid an ordinary

asphalte roadway. The outside girders are made deeper, and carry an

ornamental cast-iron parapet. In some bridges of a similar

construction, the roadway is formed of creosoted wooden block paving,

on a foundation of asphalte.

[Illustration: BRIDGE CARRYING THE D. W. AND W. RAILWAY (LOOP LINE)

OVER AMIENS STREET, DUBLIN. [_To face p. 144._]

[Illustration: Fig. 146, 147, 158, 159, 148]

Fig. 151 shows cross-section of a plate-girder over-line bridge, 28

feet span, carrying a public road, 35 feet wide, over a double-line

railway. The main girders, 2 feet 4 inches deep, are placed at 5 feet

2 inch centres, and are tied together by plate-iron cross-bracing 2

feet deep. Jack-arches of brickwork, 9 inches thick, are built in

between the main girders, the haunching being filled in with concrete.

The entire surface is covered over and made watertight with asphalte,

on which is laid the metalling of the roadway. The outside girders are

made considerably deeper, and have strong cast-iron-plate parapets

bolted on to the top booms. There is no doubt that jack-arching of

brickwork or concrete makes a very strong and permanent floorway, but

its dead weight is very great, and its adoption is not to be recommended 147

where iron or steel plate troughing can be obtained at a moderate

price.

Fig. 152 gives cross-section of plate-girder over-line bridge, 41 feet

6 inch span, carrying a public road, 25 feet wide, over three lines of

way. Two main girders are used, of sufficient depth to form parapets

or screens for the finished roadway. Plate cross-girders, placed at 6

feet 6 inch centres, are riveted to the web-plate and lower angle

irons of main girders; and on these is placed a flooring of plate-iron

longitudinal troughing to carry the metalled roadway.

Fig. 153 gives the particulars of a plate-girder over-line bridge,

carrying an important public road, 35 feet wide, over several main

lines and sidings. The carriage-way is carried by two girders placed

at 25-foot centres, and on the lower boom of these are riveted

lattice-work cross-girders to receive the plate-iron longitudinal

troughing and roadway. The footpath girders are set at a higher level,

and the load placed on the lower flange. The curved side brackets

merely act as bracing between the carriage-way girders and footpath

girders. A cast-iron-plate parapet is bolted on to the top of each of

the footpath girders, making a close screen, 6 feet high, above the

footpath. Lattice-work cross-girders were adopted for the convenience

of supporting small water mains and gas mains below the road-level.

The roadway is formed of ordinary metalling, and the footpaths of

asphalte pavement; the kerbing is of granite, and the side

water-tables of crushed granite concrete.

[Illustration: Fig. 149, 150, 151, 152]

Fig. 154 is a cross-section of a small uncovered lattice-girder

footbridge 41 feet span, and 5 feet wide, suitable for small roadside

stations. The top and bottom flange consist each of two angle irons,

those in the bottom flange being placed table side upwards, so as to

bring the entire section of both angle irons fairly into play, and

also to provide a better bearing for the channel-iron cross-girders

which carry the planking of the footway. When planking is carried on

the inside of light angle iron, as in Fig. 155, a severe strain is

produced at the point A; this is entirely obviated by placing the

bottom angle irons table side upwards, as in Fig. 156. Three of the

channel-iron cross-girders are extended outwards, and to the ends of

these are riveted tee-iron stiffeners to steady the main girders. In

some cases stamped, or ribbed, wrought-iron plates are used for a

footway, but, although more durable, they do not give such a secure or 149

agreeable foothold as timber. The ascent or descent of the bridge may

consist either of steps and landings, or of ramps, according to

circumstances or expediency. Sometimes these bridges are made with

curved tops, terminating in steps when nearing the steps, or ramps. It

is very questionable whether such an arrangement is a good one or a

safe one. There is always a feeling of insecurity when walking over a

sloping surface broken up by steps, and experience points out that it

is better to continue the footway level right across to the place

where the passenger must change his direction to go down the stairs or

ramp.

Fig. 157 gives cross-section of a covered lattice-girder footbridge,

62 feet 6 inches span, and 10 feet wide, suitable for an important

station. The upper boom of girder consists of two angle irons and top

plate, and the bottom boom of two channel irons. The cross-girders are

rolled joist-irons resting on the top tables of the channel irons.

Four of the cross-girders are extended outwards, and carry plate-iron

outside vertical brackets to stiffen the main girders. Three-inch

longitudinal planking is laid down from end to end of the bridge, and

on this is laid 1¼-inch transverse flooring, in narrow widths, to form

the walking deck. The footbridge is lighted from the sides by

continuous glazed sashes fixed in strong wooden framework, as shown.

The roof is covered with canvas bedded in white lead, and painted in

the same way as an ordinary carriage roof.

The above examples of under-line and over-line bridges are given more

with a view of illustrating some of the many different descriptions of

flooring, rather than to point out or suggest the type of main girder

to carry the load. The description and size of the main girders can be

varied to suit the span of the bridge, the requirements of the

traffic, and the opinion of the designer. For spans up to 50 feet it

will generally be found that web-plate girders are both simpler and

cheaper than lattice or truss girders; at the same time, there are

occasions where plate girders can be advantageously adopted for very

much larger spans, as, for instance, in the example given in Fig. 145,

where the deep plate girders form a most efficient screen.

[Illustration: Fig. 153]

Figs. 160 to 194 give diagram sketches of a few out of the many forms

of open, or truss, girders which have been adopted for large spans.

There are many types from which to make a selection, each one

possessing its own special features and advocates. In working out the 151

details of any, or all of them, there are some points which should

always be kept in mind when deciding the distribution of material in

the main booms. Rain-water, or moisture of any kind, is the great

enemy of wrought-iron or steel work, and therefore the plates, angles,

tees, or channel sections, should be so arranged as to afford the

least possible facility for the collection or lodgment of water. With

open, level booms, as in Figs. 137, 139, 140, 144, and 145, the

rain-water cannot collect, but runs off at the sides, and the plates

are quickly dried by the sun and wind. With trough booms, as in Fig.

158, the collected rain-water can only get away through holes drilled

for the purpose in the bottom plates. These holes are liable to become

choked up, but even when open they rarely carry off all the

accumulated water; some of it remains to corrode the plates, and is

only dried up by evaporation. The inside of trough booms should be

constantly inspected, and the exposed plates more frequently painted

than the rest of the girder. In a similar manner, in small double-web

lattice girders, with the lattice-bars inserted between two angle

irons, as in Fig. 159, the rain-water finds its way into the spaces at

A, A, in spite of the most careful packing or filling with cement

or asphalte. Numbers of small girders of this latter type have had to

be taken out after a comparative short life, in consequence of the

great corrosion and wearing away of the lower ends of the lattice-bars

and angle irons into which they were inserted.

It is most essential, also, that all portions of the girder-work

should be conveniently accessible for inspection and painting.

Complicated connections, and parts which are difficult to examine, are

liable to be overlooked, or, at the best, only painted in a very

imperfect manner. Neglected corners soon create deterioration, the

paint scales off, corrosion commences, and the working section is

gradually reduced. A discovered weakness in some of the important

parts points to an early condemnation of the entire structure. The

difficulty of access to the interior of box or tubular girders,

especially those of small or moderate dimensions, is a great objection

to that type of girder. Experience has pointed out that open girders,

free and exposed to the light and air, can be so much more effectually

inspected and painted.

[Illustration: Fig. 154, 155, 156, 157]

[Illustration: Fig. 160, 161, 162, 163, 164, 165, 166, 167, 168]

[Illustration: Fig. 169, 170, 171, 172, 173, 174, 175, 176]

[Illustration: Fig. 177, 178, 179, 180, 181, 182, 183]

[Illustration: Fig. 184, 185, 186, 187, 188, 189, 190, 191]

[Illustration: Fig. 192, 193, 194]

Perhaps one of the most anxious tasks which falls to the lot of an

engineer is the renewal of under-line bridges and viaducts on a

working line. On a new line in course of construction the entire site 158

of the work is at the disposal of the erectors, and the building of a

bridge or viaduct can be carried on with a freedom which cannot be

obtained on an open line. On a working railway, the train service must

be kept going, irrespective of renewals, and very often the best that

can be done is to reduce the double line to single line working at the

site of the operations. It is not always expedient or possible to make

a temporary bridge and diverted line for traffic purposes, as the

expenditure to be incurred might be too great to warrant the outlay,

or there may be local difficulties to effectually prevent the

introduction of a provisional structure. The taking down of one half

of the old structure may necessitate the removal of stays and bracing

affecting the stability of the half remaining to carry the traffic,

and thus render temporary shoring and bracing necessary. The erection

of the new work in such a limited space has to be watched with great

care; all cranes, lifting appliances, and scaffolding must be kept

clear of vehicles moving over the running-line, and very frequently it

is found prudent to cease erecting operations during the passage of a

train.

In very many cases of renewals, the description and arrangement of the

old structure will materially influence or control the design for the

new one, and the details of the latter must be schemed out so as to

disturb as little as possible the stability of the old work remaining

as the working road.

The following list gives the lengths of the main spans of some railway

bridges, and may be found useful for reference:--

LENGTHS OF MAIN SPANS OF SOME LARGE RAILWAY BRIDGES.

-----------------------------------+-------+----------------

Name. | Span. | Description.

-----------------------------------+-------+----------------

| feet. |

Forth Bridge | 1,710 | Cantilever.

Niagara | 821 | Suspension.

Sukkur | 820 | Cantilever.

Poughkeepsie, U.S.A. | 548 | Cantilever.

Douro | 525 | Arch.

St. Louis | 520 | Arch.

Cincinnati | 515 | Linville truss.

Haarlem | 510 | Arch.

Kuilemburg | 492 | Lattice bow.

St. John’s River | 477 | Cantilever.

Niagara | 470 | Cantilever.

Britannia | 460 | Tube.159

Ohio River, Pennsylvania | 442 | Pratt through truss. 159

Saltash | 434 | Tube and girder.

Hawkesberry Viaduct | 410 | Compound truss.

Conway | 400 | Tube.

Vistula | 397 | Lattice.

Spey River, Garmouth, N.B. | 350 | Bowstring.

St. Laurence | 330 | Tube.

Hamburg | 316 | Double bow.

Cologne | 313 | Lattice.

Runcorn | 305 | Lattice.

Sunderland | 300 | Bowstring.

Rondout Bridge, Buffalo | 264 | Pratt through truss.

Newark Dyke (New) | 259 | Lattice bow.

Tay Bridge (New) | 245 | Lattice bow.

Ohio River, Louisville | 245 | Fink truss.

Beaver Bridge, Pennsylvania | 230 | Pratt deck truss.

Craigellachie Bridge | 200 | Lattice.

Rohrbach Bridge, St. Gothard River | 197 | Wrought-iron arch.

Windsor Bridge | 187 | Bowstring.

Victoria Bridge over Thames | 175 | Wrought-iron arch.

Shannon River Bridge | 165 | Bowstring.

Carron Bridge over Spey | 150 | Cast-iron arch.

Preston Viaduct | 102 | Cast-iron arch.

Trent River Bridge | 100 | Cast-iron arch.

-----------------------------------+-------+----------------------

Retaining Walls.--Instances frequently occur during the construction

of a railway where it is advisable, if not absolutely necessary, to

substitute retaining walls in preference to forming the slopes of

cuttings and embankments.

The excavation of a cutting may be greatly reduced in quantity by

introducing low retaining walls, as in Fig. 195, and the saving in the

material to be removed will be all the more important in those cases

where cutting is in excess of embankment.

The amount of filling for an embankment and the land on which it has

to be formed may both be considerably diminished by building a low

retaining wall, say 6 or 7 feet high, at the foot of the slope, as

shown in Fig. 196. Such a retaining wall makes a most efficient fence

and well defined boundary of property.

[Illustration: Fig. 195, 196, 197, 198, 199, 200, 201]

The policy of adopting low retaining walls in cases like the above 161

will depend mainly upon the cost of building materials as compared

with the cost of earthwork and land.

Where land is very valuable, and where residential property, streets,

or roads must be interfered with as little as possible, the retaining

walls may have to be carried up to the level of the original surface

of the ground, as in Fig. 197, which is shown as for a cutting 25 feet

deep. The walls may be built of masonry, brickwork, or concrete, or a

combination of them, and the dimensions or thickness will depend upon

the description of material to be supported. Weeping holes, or small

pipe drains, should be formed in the walls, a little above formation

level, to take away any water which may collect at the back.

Where the cutting is through soft, wet, treacherous clay, liable to

slip or expand, it may be necessary to insert arched thrust girders

extending from side to side, as in Fig. 198, so that the outward

pressure against the one wall may counteract against the outward

pressure of the other. The thrust girders should be placed at from 10

to 15 feet centres, and be well braced together in plan to enable them

the better to resist any tendency of bulging out of the walls.

A similar arrangement of high retaining wall may be introduced in

embankment to lessen the encroachment on streets or public roads, as

shown in Fig. 199.

In making a railway through thickly populated towns, it is generally

preferable to construct the line on arches rather than on earthwork

filling between two high retaining walls. The numerous openings are

available for future streets, or means of communication from one side

to the other, and the arches themselves can be profitably utilized for

stables, stores, offices, and workshops.

Fig. 200 shows a narrow rocky pass with deep rapid river on the one

hand and high cliffs on the other, the only available ledge being

already occupied by a public highway. By building a retaining wall, as

indicated on the sketch, and excavating a little out of the cliff,

space may be obtained for a line of railway; or the arrangement may

have to be reversed, and the retaining wall for the railway built

along the margin of the river, as in Fig. 201.

In both the cases, Figs. 200 and 201, not only must there be a number

of weeping holes left in the lower part of the wall, but there must be

sufficient well-built drains and culverts under the filling and through 162

the wall to carry away all ordinary or flood water coming down from

the cliffs and hills above. Where a retaining wall is built along the

margin of a river, the lower portion, which will be in contact with

the water when the river is full, should be constructed of selected

large heavy stones to withstand the scouring action of the water, and

any brushwood or floating timber which may be brought down by flood

water.

Where retaining walls are built to support wet clay, or in embanked

places on wet side-lying ground, the efficiency of the work will be

much increased by constructing a layer, two or three feet in

thickness, of dry, flat, bedded stones carefully hand-laid, from the

foundation to the top of the wall, as shown in Fig. 199.

These dry stones form a continuous vertical drain to take away water

from any part of the earthwork down to the outlets left in the lower

portion of the wall.

The building of retaining walls entirely of dry stone is very

questionable economy, and entails a constant expenditure in

maintenance and renewal. The working out of one stone loosens the

surrounding portion of the wall, and if not at once repaired, a length

of the wall will fall down, bringing with it a large quantity of the

earthwork.

If readily obtained, large heavy stones should be selected for the

coping of retaining walls, so as to minimize as much as possible the

chance of their disturbance or displacement. Where lighter stones have

to be used, or bricks laid on edge, they should be bedded and pointed

in cement.

In many places it is necessary to form wide and massive foundations of

concrete on which to build the retaining wall; and in some cases of

soft, treacherous ground, timber piling may be necessary.

Tunnels.--It would be difficult to assign a date to the first

examples of subterranean works constructed for utilitarian purposes.

Nature had furnished so many grand specimens of caves, grottoes, and

underground passages formed in the solid rock, that man soon grasped

the principle, and essayed to carry out similar works on his own

account. The early attempts would probably be limited to forming

places of shelter, storage or security. Advantage would be taken of

those rocks which from their locality, accessibility, and compactness

of material, promised favourable results. The appliances being few and

primitive, the work of construction would be laborious and slow. So 163

long, however, as the workers restricted their operations to the solid

rock, they had merely to contend against the hardness of the material,

as the opening or passage-way, once made, required no further support

or attention; but as the wave of progress swept onward, man was

compelled to deviate from the lines originally followed by nature, and

had to form his subterranean pathway through softer material, where

the workings required substantial support. The search for minerals of

various kinds led to the driving of long headings or galleries

underground, and as these had frequently to penetrate through strata

of a soft and yielding character, strong timber framework had to be

introduced to afford stability to the works, and safety to the

workers. For ordinary mining operations, strong rough timber supports

may meet all requirements, and may last until the heading is worked

out and abandoned; but for subterranean passages or tunnels which are

intended to form permanent means of communication, the strongest and

most durable materials must be used to protect the interior as far as

possible from deterioration or decay. Heavy timbering might be

sufficient for mere temporary purposes, but substantial masonry or

brickwork side walls and arching became necessary for permanent work

in those portions where the tunnel required artificial support.

The first tunnels of any importance were most probably those

constructed for canal purposes. Many of them were of considerable

magnitude, and in some instances were from two to three miles in

length. They were substantially lined with masonry or brickwork at all

places where the tunnel passed through soft material or loose rock,

and from the solid nature of the work, and the many years they have

been in existence, they thoroughly testify to the ability of the

constructors.

The introduction of railways involved the making of a large number of

tunnels, perhaps more so in the beginning, when it was thought that

the use of the locomotive would be confined to very moderate

gradients, and when engineers hesitated to adopt the steeper inclines

and sharper curves which form the practice of modern times. Another

element of consideration also consisted in the fact that the first

railways were designed to connect the most populous and busiest

districts, where the prospects of heavy traffic would appear to

warrant a large outlay for works of construction. As the system spread

and railways extended further away from the important centres, the 164

probabilities of traffic would become less promising, and efforts

would be made to keep down cost of construction, and avoid tunnel work

as much as possible.

It is not easy to define where cutting should end and tunnelling

begin. There is no practical difficulty in making a cutting 50, 60, or

70 feet deep, with slopes to suit the material excavated, and the

estimated cost per yard forward may even compare favourably with the

cost of average tunnel-work. But there are other questions which must

be kept in view--the time required to form the cutting, the space to

be obtained on which to deposit the enormous quantity of excavated

material, and the probable difficulty in obtaining the large area of

land necessary for the cutting.

Before deciding the actual position of a tunnel, both as to line and

level, it is necessary to obtain the most reliable information

possible regarding the strata through which it has to pass. In

addition to the geological indications on the surface and in the

locality, borings should be made, and trial holes or shafts sunk along

the proposed centre line of the work, and from these an approximately

accurate longitudinal section can be laid down on paper, showing the

respective layers of material to be cut through, and the angle at

which they lie. With these particulars before him, the engineer may,

in some cases, consider it more prudent to change the position of the

tunnel in preference to incurring specially difficult or tedious work

in dealing with some recognized unfavourable material. Occasionally

the route may be slightly varied and better material obtained, but

very frequently there is little to be gained except by a wide

deviation from the original line.

Solid rock, except for the slow progress, is perhaps the most

favourable material for tunnelling, as the timbering, side walling,

and arching can be almost, if not entirely, dispensed with.

Loose rock, although more readily removed, necessitates strong

timbering to prevent large masses breaking away and falling into the

tunnel.

Some clays are very compact and tenacious, and will stand well with

moderate timbering, but even these should not be left long before

following up with the side walls and arching.

Many clays give much trouble by expanding, or swelling out, when the

excavation penetrates the layer, and although extra strong timbering 165

may be used, and be placed closer together, the logs and planks are

frequently bulged out and broken by the action of the clay. Specially

strong supports are required for this description of clay, and extra

thickness of material in the permanent work of side walls and arching.

Solid unbroken beds of chalk are not difficult to cut through: the

material is easy to work, and the excavation will stand with ordinary

timbering; but where the chalk is broken and intersected with deep

pockets of gravel and sand, the operations are very much impeded. The

loose material, once set free by cutting through the confining barrier

of chalk, will quickly fall into and fill up the excavation if not

held back by strong timbering. Side walls and arching are generally

necessary for tunnels through chalk.

Soft wet clay, quicksands, or other strata having springs of water

percolating through them, are serious obstacles in the way of

expeditious tunnelling. No sooner is one cube yard of this soft

material removed than another slides down, or is washed down, to take

its place. When once the excavation taps the water-bearing strata,

large volumes of water will find their way into the workings, and must

be conveyed away to the mouth of the tunnel, or pumped up through the

nearest shaft. The timbering of the sides and roof through this

description of working is very tedious, and attended also with a

considerable amount of risk. The absence of really solid ground on

which to place or shore up the supports, taxes the skill of the

excavators, and very often, when a short length has been made

apparently secure, it will come down with a run, compelling all hands

to beat a hasty retreat. The permanent lining through such treacherous

material should follow the excavation very closely, and special care

should be exercised in building the walls, arching and invert.

In the excavation through stratified rocks it is necessary to note

carefully the lie of the strata, whether horizontal, vertical, or

shelving, as with each one the excavators are exposed to risks,

against which every precaution should be taken. A large horizontal

slab of solid-looking rock will suddenly break and fall down without

any warning. A heavy mass from a vertical layer, perhaps unkeyed, or

loosened, by an adjacent blasting operation, drops down when least

expected; and pieces from the high side of the shelving layers detach

themselves and slide into the working in a most unaccountable manner.

No attempt should be made to carry a tunnel through material which has 166

been disturbed or at all affected by any natural slip or cleavage, as

although the strata may be hard and compact in themselves, they have

really no solid or fixed foundation. The sliding away, once initiated,

is certain to continue, and, accelerated by the tunnelling operations,

will most likely, sooner or later, crush in the tunnel and sweep away

every vestige of the work. Amongst the great mountain ranges these

natural disturbances are by no means rare, and it will be wiser to

keep away from their locality, even at the expense of a longer tunnel.

Unfortunately, instances are on record of tunnels made, or in course

of construction, through hillsides which had already commenced to

slide away from the more solid rock, and the ultimate results were a

further sliding away and total destruction of the work.

The lower slopes and outlying portions of high mountains are the most

exposed to these natural slips, and they should be most carefully

studied before commencing any tunnelling operations through them.

To facilitate drainage, it is essential that a railway tunnel should

be laid down with a gradient or gradients falling in the direction of

one or both ends of the tunnel. In nearly all tunnels a considerable

amount of water finds its way in through the weeping-holes left for

that purpose in the side walls, and must be carried away in suitable

drains. If the quantity of water be small, ordinary water-tables, one

on each side, may be sufficient; but for large volumes of water it

will be necessary to build substantial side-drains, or an ample

culvert below the level of the rails.

The gradients in a tunnel should be moderate, and not by any means

excessive, or likely to tax the hauling powers of the locomotives.

When an engine is working nearly to the utmost of its power on a steep

tunnel incline, and the speed has become very slow, the exhaust

vapours or gases from the funnel strike the arching with great force,

and are deflected down on to the footplate in such dense volumes as to

almost suffocate the driver and fireman. The writer will never forget

two or three trying experiences in foreign tunnels, when he and the

engine-staff were compelled to leave the footplate and climb forward

to the front of the funnel, leaving the engine to work its way alone.

Except for very short tunnels it is wiser to have easy inclines, and

to restrict the steep gradients to the open line, where the very slow 167

travelling, or even the coming to a stand from “slipping,” may not

produce unpleasant or alarming consequences.

In tunnels of any length it is usual, where possible, to construct

shafts extending from the surface of the ground overhead down to the

tunnel below. These shafts serve the double purpose of enabling the

excavation to be carried on at an increased number of faces, and act

as permanent ventilators after completion. In some cases the shafts

are sunk exactly over the centre line of the tunnel, in others a few

yards away from the centre line. The latter arrangement, if not quite

so convenient for hoisting material while carrying on the excavations,

has certainly the great after advantage that anything falling or

maliciously thrown down the shaft cannot strike a passing train. The

short side-gallery, or space between the tunnel and the shaft,

provides a good refuge for workmen employed in repairs, and a

convenient site for storing a few materials advisable to keep on hand.

Occasionally favourable opportunities present themselves for making

horizontal shafts. For a portion of its length the tunnel may be

located at no very great distance from the precipitous sides of some

deep mountain ravine, or run near to the cliffs on the sea-coast, and

advantage can be taken to drive a lateral heading or gallery through

which the material from the tunnel excavation may be conveyed and

thrown out into the gorge or seashore below.

In many cases the surface of the ground rises so abruptly from the

faces of the tunnel and ascends to so great a height, that shafts of

any kind are entirely out of the question, and the whole of the work

must be carried on from the two ends. The rate of progress is

consequently much slower, and the ventilation more difficult. In a

shaftless tunnel of considerable length, and with a frequent train

service, the question of providing suitable appliances for promoting

artificial ventilation is of the utmost importance.

When the centre line of the tunnel has been accurately set out on the

ground, and the levels of the different parts of the work decided, the

construction of the shafts and the driving of the headings can be

commenced. Working shafts intended to serve for permanent ventilation

are generally made nine or ten feet or more in diameter, and are

usually lined with substantial brickwork or masonry. When the well-like 168

excavation has been carried down a few yards, or as far as it can be

taken without the risk of the earth falling in upon the sinkers, a

strong curb of hard wood or iron of the same diameter as the finished

shaft is laid down perfectly level and to exact position, and on this

curb the ring or lining of brickwork or masonry is built up to the

level of the ground. The first length finished, the excavation

downwards is resumed, and the interior lining continued, either by

allowing the first length to slide down as the material below is

gradually removed, and building further lining on the top, or by

excavating and propping up the curbing with strong timbers below. When

working to the latter method, stout wooden props of convenient length,

stepped on to sole-pieces, are adjusted to the under side of the

wooden curb above, the material is then removed for the thickness of

the brickwork or masonry, and another curb accurately set to level and

position; on this is built a length of lining up to the first curb.

This work of under-building or under-pinning must be carried out with

great care and in segments; no props must be removed until the curb

immediately above is well supported by the new lining, and the inside

of the lining must be watched and tested to prevent any tilting. All

spaces at the back of the work must be filled in and well packed with

hard dry material. As the shaft is continued downwards the mode of

working may have to be varied; different descriptions of material may

be encountered, and blasting, shoring, and pumping may each in turn be

necessary.

When down to the full depth, the lower length of the shaft will have

to be securely supported by strong timbers, until it can be properly

built into and incorporated with the arching of the tunnel or side

gallery.

The completion of the shaft enables the workings to be commenced on

each side, the excavated material can be hoisted to the surface, and

building material lowered down. When the tunnel works are finally

finished, the lining of the shaft should be carried up until it is 15

or 20 feet above the level of the surface of the ground, and a

dome-shaped iron grating placed on the top as a protection against

stones or other articles which malicious persons might attempt to

throw down the shaft.

Some shafts are only intended for the temporary purpose of lifting the

excavations from below, or lowering building materials down, and when 169

the work is completed they are filled in again and closed. These

service shafts are generally made square in section, and are merely

lined with wood. Strong vertical timbers are placed at the four

corners, to which horizontal double cross-pieces are bolted, thick

planking being placed vertically at the back of these cross-pieces to

support the sides of the excavation.

The _heading_ of a tunnel is a narrow passage or gallery cut

through from end to end of the works in the direction of the centre

line. Where there are shafts, the cutting of the heading can be pushed

on from several points, and be completed much more rapidly than when

the working is restricted to the two ends. Headings are usually made

just sufficiently large for the miners to work, say about 5 feet 6

inches high by about 3 feet wide, the object being rather to expedite

the driving of the driftway than to remove large masses of material.

They must be set out with great accuracy, and be constantly checked as

the driving is in progress. When completed from end to end, the centre

line can be checked throughout, and the course actually taken compared

with the course intended. If there has been much variation in the

narrow pioneer pathway, either in line or level, the amount of the

divergence must be rectified when ranging the final centre line for

the full-size excavation.

Tunnels cannot always be delayed until the heading is cut through for

the entire length. In many cases the heading, the full-size

excavation, and the permanent lining have all to be carried on at the

same time, but as the work of the heading is smaller in extent, that

portion of the operations can usually be kept well in advance of the

others. The critical moment arrives when the headings from opposite

directions meet, as any deviation or want of coincidence must be

adjusted in the portion of the tunnel still remaining to be opened out

to full size. Some tunnels of moderate length have been constructed

without any heading at all, the excavation being taken out to the full

dimensions from the commencement.

The heading of a tunnel assists not only in the correct alignment of

the work, but furnishes at the same time an accurate knowledge of the

strata passed through. It is also of service for ventilation,

communication, and drainage.

In some cases the heading is driven at the bottom of the tunnel

section, as in Fig. 211, and in others at the top, as in Figs. 202 and 170

204. Many of the earlier tunnels were constructed on the former

system, while of late years the latter method has been very largely

adopted. The bottom heading may perhaps in some instances be more

efficacious for drainage, but it is very liable to be frequently

choked up when taking out the excavation to the full size, and the

lower surface is much cut up by the movement and conveyance of

materials. Another disadvantage arises from the necessity of removing

such a large amount of the cutting approaching the tunnel entrance

before a beginning can be made to the bottom heading. The top heading

has the advantage that it requires less removal of open cutting

previous to its commencement, and, being high up in position, there is

less chance of its being stopped up by falling material, the finished

excavations being carried out on the sides and below the heading.

Where the headings are cut through solid rock, stiff shale, or compact

chalk, little or no supports are necessary, but where they pass

through clay or loose material, timbering will be required for sides,

roof, and floor. Rough round poles, about 6 inches in diameter, are

generally used for verticals, and are firmly secured to transverse

sole-pieces, and on the top of these verticals strong transverse

top-sills are fastened by means of rough tenons or checks. Strong

boards are inserted at the back of this framework to keep the earth

from falling into the working. The distance apart of the verticals

will depend upon the description of material excavated; in very soft

places they will have to be placed very close together, but where

fairly sound and tenacious they may be placed at about 3-foot centres.

The excavated material must be conveyed away to the entrance of the

heading in small hand-trucks running on planks or light rails.

The widening out of the excavation to the full size will be a

repetition on a large scale of the work carried out in the heading,

with the difference that, the exposed surfaces being of so much

greater extent, extra care and precautions must be taken with the

framework and shoring of the timbering.

[Illustration: Fig. 202, 203]

The form and arrangement of the timbering, as well as the number,

sizes, and positions of the pieces, must be determined by the material

of the excavation and the contour line of the finished arching or

lining. The framework, which would be sufficient to support ordinary

soft material, must be largely augmented both in quantity and scantling 172

to meet the requirements for wet treacherous clay.

Figs. 202 and 203 give end view and longitudinal section of timber

framework frequently adopted for average tunnel work. The positions of

the different pieces will explain themselves and the duty they have to

perform. The main struts, or raking pieces, which have to sustain

great pressure, may be shored against the finished lengths of masonry

or brickwork. The timbering of the sides can be removed as the lining

proceeds, but in many cases the round logs and boards near the crown

cannot be withdrawn, and have to be left in the work, the space

between the top of the arching and under side of the boards being

firmly packed with brickwork, masonry, or dry rubble stonework.

As the tunnel lining is generally carried forward in short lengths,

following up the main excavations, the centering for the arching

should be of such description that it can be readily transferred or

moved forward as the work proceeds. The form of the centering, and the

spacing of its upright supports, must admit of sufficient width for

one or more lines of rails for the waggons required to remove the

excavated _débris_ and convey the building materials used in the

lining.

Picks, bars, and shovels are the tools used in the excavation of the

softer material and loose disintegrated rock, but for the hard rock,

blasting will be necessary. The tunnel opening being comparatively

small, only moderate blasting charges can be used with safety, and

these must be placed so as to break up the rock-bed in a suitable

manner for working, and without shaking or damaging the already

completed excavation. Ordinary hand-drills, or _jumpers_, may be used

for forming the charge holes, a number of them being at work at the

same time, and the charges fired very closely one after the other. As

the blasting operations necessitate the retiring of the miners to a

considerable distance, out of the way of flying fragments, and the

remaining away until the foul air has been dispelled, it is advisable

to fire off several charges about the same time, and thus minimize as

much as possible the stoppage to the drilling and clearing away the

loosened material.

[Illustration: Fig. 204, 205, 206, 207, 208, 209, 210, 211]

Mechanical drills, worked by compressed air or other motive-power, are

now very extensively used where the rock is solid and continuous. They

are much more expeditious than the hand drills, but they are costly in 174

their installation, and also in their working and maintenance.

In some tunnels, where the material has been firm and dry, the upper

portion of the excavation has been first removed, and the masonry and

brickwork lining built in position down to about the springing of the

arch, the remainder of the excavation being afterwards taken out, and

the side walls built by means of shoring and underpinning.

In other tunnels the complete section has been excavated and timbered,

and the work of building commenced from the foundation of the side

walls. A strong continuous invert from side wall to side wall is

necessary where passing through soft swelling clay or loose strata

intersected with small streams of water. Where the material is very

solid and dry, it is not necessary to introduce inverts, but the

foundations of the side walls should be laid at such a depth below

rail-level as not to be affected by drain-water running through the

tunnel.

The side walls and arching may be either of masonry or brickwork, but

should be of the best description, especially for the facework. For

brick arching only the best hard-burnt bricks should be used, and the

inner or exposed ring should consist of selected hard fire-bricks to

withstand the heat and gases escaping from the funnels of the

locomotives. The thickness of the side walls and arching will depend

upon the description of material to be supported. In some places a

comparative thin lining may be sufficient, while in others extra

thickness must be given to resist the great pressure exerted by

expanding clay and loose wet strata.

Weeping-holes, or small drain-pipes, placed low down must be left in

the side walls every three or four yards, or closer in very wet

places, to allow the water collected at the back of the walls to

escape into the side drains of tunnel. In building the arch portion

every effort should be made to have close solid work without any open

joints or spaces through which the water may run, and the crown of the

arch and a few feet down on each side should be coated with cement or

asphalte to lead all water away from the top to the sides. Water

dripping from the under side of the arch on to the line is a great

destructor of the permanent way materials, especially the fastenings;

and bolts, nuts, fish-plates, and spikes placed in a wet dripping

tunnel will not last half the time they would out in the open line,

where they would have the sun and wind to dry them.

[Illustration: Fig. 212, 213, 214, 215, 216, 217, 218, 219]

Small arched recesses or niches should be formed in the side walls at 176

convenient distances to serve as refuges for platelayers or others

working in the tunnels.

It is most essential that the space between the masonry and brickwork

lining and the facework of the excavation should be carefully filled

in and hard packed, so as to prevent the possibility of pieces of rock

or other material falling on to the top of the arch. The neglect of

this precaution may lead to a casualty years after the tunnel has been

completed.

It would be impossible to over-rate the importance of a constant

faithful supervision of the building of the lining, especially the

arching. The work has to be carried on by workmen in cramped

positions, with imperfect light, and surrounded by all kinds of

obstacles and inconveniences, and unless a detailed inspection be

rigidly maintained, a carelessness in the selection of the materials,

and a laxity in the workmanship, will be the inevitable result.

Figs. 204 to 219 are sections of tunnels which have been constructed

for double and single line railways. The sections give the normal form

and dimensions adopted in each case, although there may have been many

portions of the work where unfavourable or treacherous material

necessitated an increase in the thickness of the side walls, or of the

arching, or of both. The types vary in accordance with the opinions of

the designers as to the most suitable section for the purpose, and

range from the comparatively thin lining and vertical side walls shown

on Fig. 207, to the almost circular form and very thick lining shown

on Fig. 216. The latter is the section which experience has proved to

be the best to sustain the enormous all-round pressure exerted by

certain descriptions of swelling clay.

Careful judgment will be required to decide which parts of a rock

tunnel may be left unlined. The apparently solid-looking portions are

oftentimes deceptive, and numbers of instances are on record of large

pieces of rock falling down in tunnels which for many years had been

considered as thoroughly secure. Where there is any doubt it is better

and safer to put in a lining, even if only to the extent of an arching

springing from side walls of solid rock, as shown on Fig. 206. A

moderate additional expenditure at the time of construction may

prevent a serious catastrophe afterwards.

[Illustration: Fig. 220, 221, 222, 223]

The faces or entrances to tunnels may be constructed with curved wing 178

walls, as in Fig. 220, or with straight wing walls, as in Figs. 221,

222, and 223. Where the approach cutting is in rock, the latter form

is generally adopted.

It would be misleading to put down any average price for tunnel-work.

So much depends upon the locality, the description of material to be

excavated, the cost of masonry or brickwork, and the cost of labour.

Added to these come the unforeseen troubles of slips and water-laden

strata, creating difficulties which baffle the miners for a time, and

add enormously to the expenditure. Some tunnels for double line have

been constructed in good ground, and under favourable circumstances as

to building materials and labour, for as low as £32 per lineal yard;

while others, carried out under adverse conditions, have cost as much

as £150 per lineal yard. A medium somewhere between the two should

represent the cost of tunnel-work through ground which does not

present any special difficulty. At the same time it must be borne in

mind that simple tunnelling which can be done in one locality for £50

or £60 per lineal yard, would be increased 20, 30, or 40 per cent. in

another, where building material for the lining is scarce and

expensive.

Tunnel-work abroad will generally cost more than the same work at

home. The native labourers may perhaps be procured at low rates, but

the skilled workmen must be brought from a distance, and will obtain

high wages.

Another form of tunnel-work, generally termed the covered-way system,

is frequently adopted in towns and places where land and space are

very valuable. This method consists in the excavating and removing of

earthwork to admit of the building of the side walls and arching of a

suitable tunnel-way, and then filling in over the top to a depth of

three or four feet, or up to the level of the original surface of the

ground. This work may be carried out by either removing the entire

width of the earthwork before the commencement of any building

operations, or by first forming two deep, well-shored trenches, in

which to build the side walls up to about arch-springing. In bad

ground the latter arrangement has the advantage, as the shoring and

strutting to hold up the sliding material is limited to the widths of

the two narrow trenches, and the centre block of earthwork is left

untouched as a support to the strutting. When the side walls have been

built sufficiently high the upper portion of the centre block of

earthwork can be removed to allow of the erection of centering and 179

building of the arching, and afterwards the remaining portion of

earthwork can be removed at convenience. In this manner a tunnel-way

may be constructed under streets, gardens, and even under buildings.

Being nearly all done in the open, the work is more under control than

in an ordinary tunnel, but it is usually very costly. Temporary or

diverted roads must be arranged; the excavated material must generally

all be removed by carts, sometimes to long distances; and provision

must be made for diverting the network of sewers, gas, and water pipes

which are intercepted along the route.

Fig. 224 is a sketch of covered-way with brick arching. Fig. 225

illustrates another type where cast-iron girders and jack-arches of

brickwork were introduced on account of the small headway. In soft

yielding clay it is necessary to construct strong inverts, as

indicated in the sketches. Recesses for the platelayers should be

provided every ten or fifteen yards.

The above systems of covered-way were largely adopted in the

construction of the underground portions of the Metropolitan Railway

and District Railways in and around London.

[Illustration: Fig. 224, 225, 226]

In addition to the ordinary type of tunnel formed by first excavating

the material and then lining the opening with brickwork or masonry,

tunnels of moderate size have been constructed of cast-iron tubes,

similar in section to Fig. 226. The tubes were cast in short segments,

bolted together inside, the outer circumference, or surface in contact

with the earth or clay, being left free from projections of any kind.

By making the segments with bolt-holes exact to template, they were

readily fitted together in the work, and a thin layer of suitable

packing material placed between the bolting-flanges sufficed to render

the tubes water-tight. The tunnelling was carried on by means of a

short length of slightly larger tube, or cap, made of plate-iron or

steel, which fitted over the leading end of the main tube. The front

end of this cap was made very strong, and provided with doors through

which the miners could work. A series of hydraulic presses attached to

the cap were brought to bear on the bolting-flange of the last

completed ring, and as the excavated matter was removed by the miners

from the front the cap was forced forward by the hydraulic presses,

and another ring of cast-iron segments inserted. On the City and South

London Railway, constructed on the above system, the small annular

space formed round the cast-iron tube by the operation of the sliding 181

cap was filled in with cement grouting by means of an ingenious

machine designed for the purpose.

Large tunnels under rivers or tidal estuaries must each be dealt with

according to the particular circumstances of depth below stream-bed,

material to be cut through, length of tunnel, and gradient. The chief

obstacle to be contended against in so much of the river tunnel-work

is the large volume of water which pours into the workings through

fissures in rock or seams of gravel and sand, necessitating the

constant use of most powerful pumps. In ordinary land tunnels the

gradients are generally laid out to fall towards one or both

entrances, and any water finding its way into the excavations may be

led away to the entrances by drains or pipes. On the other hand, in a

river tunnel the gradients generally fall away from the entrances down

towards the centre of the river, and all water coming in must be

pumped out and raised up to at least the level of the river. In places

where the water comes streaming in from many points, any failure or

stoppage of the pumps would place the lives of the miners, and the

security of the work itself, in great jeopardy. Iron shields, or

protection chambers for the miners advancing the excavation, have been

used with great success in carrying on work through loose wet strata

which appeared to defy all other means of progress. Solid rock, chalk,

or compact clay, may present no difficulty so far as they go, but a

continued dip in the gradient, or a line of fault, may suddenly change

the entire course of operations, and require the immediate use of the

most powerful pumping machinery and protective appliances. The special

features of each case will demand special precautions, and the

judgment and inventive powers of the engineer will be severely tested

in coping with the difficulties with which he is surrounded.