CHAPTER I. 1

_LONGMANS’ CIVIL ENGINEERING SERIES_

RAILWAY CONSTRUCTION

LONGMANS’

CIVIL ENGINEERING SERIES

NOTES ON DOCKS AND DOCK CONSTRUCTION.

By C. COLSON, C.B., M.Inst.C.E., Deputy Civil Engineer-in-Chief,

Loan Works, Admiralty. With 365 Illustrations. Medium 8vo, 21_s._

_net._

CALCULATIONS IN HYDRAULIC ENGINEERING:

A Practical Text-Book for the Use of Students, Draughtsmen, and

Engineers.

By T. CLAXTON FIDLER, M.I.C.E., Professor of Engineering,

University College, Dundee.

Part I. Fluid Pressure and the Calculation of its Effects in

Engineering Structures. With numerous Illustrations and

Examples. Medium 8vo, 6_s._ 6_d._ _net._

Part II. Calculations in Hydro-Kinetics. With numerous

Illustrations and Examples. Medium 8vo, 7_s._ 6_d._ _net._

NOTES ON CONSTRUCTION IN MILD STEEL:

Arranged for the Use of Junior Draughtsmen in the Architectural

and Engineering Professions. With 425 Illustrations from Working

Drawings, Diagrams and Tables. By HENRY FIDLER, M.I.C.E. Medium

8vo, 16_s._ _net._

RAILWAY CONSTRUCTION.

By W. H. MILLS, M.I.C.E., Engineer-in-Chief, Great Northern

Railway of Ireland. With 516 Illustrations. Medium 8vo, 18_s._

_net._

PRINCIPLES AND PRACTICE OF HARBOUR CONSTRUCTION.

By WILLIAM SHIELD, F.R.S.E., M.Inst.C.E., and Executive Engineer,

National Harbour of Refuge, Peterhead, N.B. With 97 Illustrations.

Medium 8vo, 15_s._ _net._

CIVIL ENGINEERING AS APPLIED IN CONSTRUCTION.

By LEVESON FRANCIS VERNON-HARCOURT, M.A., M.Inst.C.E. With 368

Illustrations. Medium 8vo, 14_s._ _net._

SANITARY ENGINEERING WITH RESPECT TO WATER-SUPPLY AND SEWAGE DISPOSAL.

By LEVESON FRANCIS VERNON-HARCOURT, M.A., M.Inst.C.E. With 287

Illustrations. Medium 8vo, 14_s._ _net._

TIDAL RIVERS: their (1) Hydraulics, (2) Improvement, (3) Navigation.

By W. H. WHEELER, M.Inst.C.E. With 75 Illustrations. Medium 8vo,

16_s._ _net._

LONGMANS, GREEN, AND CO.

LONDON, NEW YORK, BOMBAY, AND CALCUTTA

[Illustration:

_Frontispiece._] KINSUA VIADUCT, ERIE RAILWAY, U.S.A. [_See p. 97._]

_LONGMANS’ CIVIL ENGINEERING SERIES_

RAILWAY CONSTRUCTION

BY

WILLIAM HEMINGWAY MILLS, M.INST.C.E.

PAST PRESIDENT OF THE INSTITUTION OF CIVIL ENGINEERS OF IRELAND, AND

ENGINEER-IN-CHIEF OF THE GREAT NORTHERN

RAILWAY OF IRELAND

[Illustration]

_WITH ILLUSTRATIONS_

FOURTH IMPRESSION

LONGMANS, GREEN, AND CO.

39 PATERNOSTER ROW, LONDON

NEW YORK, BOMBAY, AND CALCUTTA

1910

_All rights reserved_

PREFACE

The construction and maintenance of a railway calls for the

application of so many branches of engineering that several volumes

would be required to do ample justice to a subject so comprehensive

and ever-extending. To avoid attempting so wide a range, the object of

the following pages has been to describe briefly some of the

recognized leading features which regulate railway construction, and

to assist the explanation with sketches of works selected from actual

practice.

Where the number of existing good examples is legion, it is somewhat

difficult to make a choice for illustration, and the course adopted

has been to select such samples of structures as appear best to

elucidate in a simple manner the different types of work under

consideration.

In the drawings and diagrams many important minor details are

necessarily omitted, partly to avoid complexity, but principally to

leave more prominent the leading features of the particular piece of

work referred to in the description. Some of the sketches of the large

span bridges and large span roofs are only shown in outline; but, as

their principal dimensions are given, a general idea can be obtained

of their actual proportions.

No allusion is made to the requisite strengths of the various

structures described, nor to the necessary dimensions of the materials

used in their construction, as this would necessitate the introduction

of a vast amount of mathematical formulæ which does not come under the

province of the object in view, and which the engineer has already at

command from his training and works of reference.

Neither is any mention made as to the probable cost of the different

works of construction, as these must always vary to a very large

extent, according to the locality, facility of supply, and current

prices of materials.

Every railway scheme which is the outcome of public enterprise has its

commercial aspect and influence. The large sums to be invested in its

construction are expected to yield permanent and increasing returns,

and this desirable end can only be attained where there is thorough

efficiency in works and equipment, and a full compliance with those

national regulations which control matters connected with public

safety. The correct dealing with the technical requirements and

structural features of the undertaking must always precede all other

considerations, as the constituted authorities will exact a proper

fulfilment of all the statutory obligations, regardless of the

prospective remuneration to the promoters. A stroke of the pen may

change a train-service, or alter the rates and tariffs, but a

modification in the works of construction arising out of errors or

oversight, would entail a heavy expenditure and tedious delay. The

essential point of every railway undertaking must be its suitability

and completeness in every respect for the duty for which it is

intended.

Notes of what has been done are always valuable for consideration and

comparison, and that the following brief description and sketches may

be found useful for reference, is the earnest wish of the writer.

W. H. MILLS,

M.INST.C.E.

CONTENTS

CHAPTER I.

PAGE

Location of a line of railway--Government regulations--Questions

for consideration in connection with gauge, gradients, and

curves 1

CHAPTER II.

Works of construction: Earthworks, Culverts, Bridges,

Foundations, Screw piles, Cylinders, Caissons, Retaining

walls, and Tunnels 60

CHAPTER III.

Permanent way--Rails--Sleepers--Fastenings--and Permanent-way

laying 182

CHAPTER IV.

Stations: Station Buildings, Roofs, Lines, and Sidings 248

CHAPTER V.

Sorting-sidings--Turn-tables--Traversers--Water-Tanks and

Water-Columns 285

CHAPTER VI.

Comparative Weights of some Types of Modern Locomotives 304

CHAPTER VII.

Signals--Interlocking--Block Telegraph and Electric Train

Staff Instruments 313

CHAPTER VIII.

Railways of different ranks--Progressive improvements--Growing

tendency for increased speeds, with corresponding increase in

weight of permanent way and rolling-stock--Electricity as a

motive-power 348

INDEX 361

CHAPTER I. 1

Location of a line of railway--Government regulations--Questions

for consideration in connection with gauge, gradients, and

curves.

Location.--The locating of a line of railway, or the determination

of its exact route, is influenced by many circumstances. In a rich

country, with thickly populated districts and large industrial

enterprises, there are towns to be served, manufacturing centres to be

accommodated, and harbours to be brought into connection; while, at

the same time, there may be important estates which must be avoided

and private properties which must not be entered. Each point will

present its own individual claim for consideration when selecting the

route which promises the greatest amount of public convenience and

commercial success.

In new countries--in our colonies, and especially out in the far west

of Canada and the United States--railways have to be laid out in

almost uninhabited districts, where there is but little population or

commerce to serve, and where the principal object is to obtain the

best and most direct route through the vast territories, leaving

colonists and settlers to choose afterwards the most convenient sites

for towns and villages. Untrammelled by the network of public and

private roads and properties which are met with at home, it might

appear that the locating of such a line would be comparatively light;

but even in such countries, which at first sight seem to present

unlimited freedom for selecting a route, much can be done, and should

be done, by taking a course through those plains and districts which

possess the best natural resources for future agricultural,

manufacturing, or mineral development.

In addition to the motives of convenience and policy, the route of

every line of railway must be influenced by the natural features of

the country--the mountains, valleys, and rivers. These physical

obstacles are in some cases on such an enormous scale as to compel 2

long detours in the formation of a more suitable opening; and in

others, although the difficulties are not insurmountable, they may

involve works of great magnitude and expense.

In a comparatively rich country, with a prospect of large and

remunerative traffic, a succession of heavy works, bridges, and

tunnels may be admissible and expedient; but in new countries economy

of outlay has to be considered, and costly works avoided as much as

possible.

Every one of the heavy works on a line, whether lofty bridges, long

viaducts, or costly tunnels, not only enormously increase the original

expenditure of the undertaking, but also entail large annual outlay in

the necessary constant supervision and maintenance.

Each particular scheme will have to be discussed on its own individual

merits. The heavy, high-speed passenger traffic line will suggest

light gradients and easy curves, while on secondary lines and in

thinly populated districts it may be prudent, for the sake of economy,

to introduce sharper curves and heavier gradients. Even in the latter

case, and especially in new countries, it is well to keep in view the

future possibilities of the undertaking. The steeper the gradients,

the greater the cost and time in working the traffic, and if there is

every probability of early and large development, the prospective

increase may warrant an additional outlay in the original

construction.

Large, open plains and wide valleys of important rivers generally

afford ample latitude for the selection of a suitable route, and, by

taking advantage of the gradations of altitude, a favourable course

may be adopted without incurring excessive gradients. When traversing

moderately hilly districts, some low ridge or opening may be found,

which may form a pass from the one side to the other, and the line may

be laid out for a long distance to lead gradually up to the highest

point. But when a route has to be laid out over some of those lofty

mountain ranges which are met with abroad, the locating of a suitable

line, or of any line, becomes particularly intricate and difficult. A

comparatively low ridge may be found possessing features in favour of

the project, but the question will be how to reach that point. The

nearer the summit of these high mountains, the more precipitous the

sides; no one slope can be found sufficiently long and uniform to 3

permit a practical direct ascent, and the only way out of the

difficulty is to make a series of detours along the various spurs of

the mountains to gain length to overcome the height. Each detour has

to be the subject of most careful study. Forming part of a long series

of ascending gradients, it has to follow the winding of the

mountain-side, must be laid out to be always gaining in height, and

will comprise important works, many of them of considerable extent,

necessary for protection against the floods and atmospherical changes

of the locality.

In these higher altitudes nature is met with on the grandest and most

rugged scale. Deep gorges, wide ravines, and almost perpendicular

rocks form the pathway along which the line must be carried, and the

skill of the engineer is taxed to the utmost to select a course which

shall comprise a minimum of the works of magnitude. Mile after mile of

line must be laid out in almost inaccessible places, loose or broken

rocks must be avoided, a firm foundation must be obtained at all

points skirting high ledges, and ample provision must be made for

those mountain torrents which rise so suddenly, and are liable to

sweep away all before them.

Many grand examples of these detour lines are in existence in

different parts of the world, and the traveller passing over them can

realize the difficulties that had to be encountered, and the masterly

manner in which they have been overcome.

Before proceeding to carry out the works of any line of railway, it is

necessary to prepare a complete plan and section of the line, showing

the route to be followed and the position of the various curves,

gradients, and principal works. Within certain limits, the course of

the line may have to be slightly modified as the work proceeds, in

consequence of ground turning out unfavourable, river-crossings

treacherous, or of sites involving so many contingent alterations that

it is found better to avoid them altogether. The route should,

however, be so carefully studied out before completing the final plan

and section, as to leave only minor deviations of line and level to be

dealt with in the actual carrying out of the work.

The promoters of lines in the United Kingdom obtain valuable

assistance from the ordnance maps, which give full and reliable

information regarding the position of all roads, rivers, and

boundaries of counties, parishes, and townlands. In many parts abroad 4

local maps are scarce, and not always accurate, and engineers have to

depend principally on their own surveys, and rely upon the resident

local authorities for any particulars as to divisions of territory. On

some of our great colonial plains, and out in the far west of America,

a line may be laid out for miles without a single landmark to localize

it on a plan; but careful setting out, and the relative levels of the

ground and gradients, as shown on the section, will always indicate

the correct position of any portion of the work.

Both at home and abroad complete plans and sections of any proposed

railway must be deposited with the proper Government authorities, and

must be approved and sanctioned by them before permission can be

obtained to proceed with the works.

The regulations regarding the scale and general arrangement of these

plans and sections vary in different countries, and are subject to

modification from time to time.

Each country has its own special enactments relative to the method of

dealing with roads, rivers, streams, and public and private property

proposed to be interfered with in the construction of any line, and a

knowledge of these is absolutely necessary for the promoters of any

new scheme, inasmuch as some of the requirements may, in certain

instances, influence the precise route to be selected.

The English Government has passed several Acts of Parliament setting

forth the general conditions which must be complied with in the

construction of any railway in the United Kingdom. These conditions,

or standing orders, relate both to the acquirement of land and

property, the size and description of works for public or private

accommodation, and the inspection and official approval of the

undertaking when completed. These fixed regulations are alike valuable

to the promoters and to the public; the former are informed of the

principal points with which the scheme must conform, and the latter

know the limit of their legal demands.

No line of railway, or extension of any railway, will obtain

Parliamentary sanction unless it can be satisfactorily proved in the

outset, that its construction would be of public advantage. This point

is of paramount importance, and due weight must be given to it when

preparing to refute the evidence of opponents to the scheme.

[Illustration: Fig. 1.]

When conceding the right to make any railway, Parliament grants with 6

it the power to purchase lands or property compulsorily, or by

agreement, to change and divert roads and streams in the manner shown

on the deposited plans, and to construct all necessary bridges and

works in accordance with the standing orders, or such modifications of

them as may be approved by the Board of Trade.

The standing orders, or Government regulations, are very

comprehensive, and include much detailed information on all questions

likely to arise. The following brief summary of some of the principal

orders relating to deposited plans, and works of construction, will be

found useful for reference.

Extract from Government Standing Orders and Regulations.--All

plans and sections relative to proposed new railways must be lodged

with the constituted Government Authorities on or before November 30.

Every deposited plan must be drawn to a scale of not less than four

inches to a mile, and must describe the centre line, or situation of

the work (no alternative line being allowed), and must show all lands,

gardens, or buildings within the limits of deviation, each one being

numbered with a reference number, and where powers to make lateral

deviations are applied for, the limits of such deviation must be

marked on the plan.

Unless the whole of such plan be drawn to a scale of not less than 400

feet to an inch, an enlarged plan must be drawn to that scale of every

building and garden within the limits of deviation.

The Railway Clauses Act limits the extent of deviation to 100 yards on

each side of the centre line in the country, and 10 yards on each side

of the centre line in towns or villages.

The distances must be marked on the plan in miles and furlongs from

one of the termini.

The radius of every curve not exceeding one mile must be marked on the

plan in furlongs and chains.

In tunnels the centre line must be dotted, but no work must be shown

as tunnelling, in the making of which it is necessary to cut through,

or remove the surface soil. If it is intended to divert or alter any

public road, navigable river, canal, or railway, the course and extent

of such diversion, etc., shall be marked on the plan.

[Illustration: Fig. 2.]

When a railway is to form a junction with an existing railway, the 8

course of such existing railway must be shown on the plan for a

distance of 800 yards on each side of the proposed junction. In the

case of Bills for constructing subways, the plans and sections must

indicate the height and width of such subway, and the nature of the

approaches by which it is proposed to afford access to such subway.

The Book of Reference must contain the names of all owners, lessees,

and occupiers of all lands and houses of every parish within the

limits of deviation.

The numbers on the Book of Reference must correspond with the numbers

on the plan, and opposite to each number must be entered a brief

description of the property, whether field, garden, house, road,

railway, or river. It is intended that the plan and Book of Reference

together, shall afford ample information to enable all parties

interested to ascertain to what extent their property will be affected

by the proposed undertaking.

The section must be drawn to the same horizontal scale as the plan,

and to a vertical scale of not less than 100 feet to an inch, and must

show the level of the ground, the level of the proposed work, the

height of every embankment, the depth of every cutting, and a

horizontal datum line which shall be referred to some fixed point,

near one of the termini.

In every section of a railway, the line of railway marked thereon must

correspond with the upper surface of the rails.

Distances on the datum line must be marked in miles and furlongs to

correspond with those on the plan; a vertical measure from the datum

line to the line of the railway must be marked in feet and decimals at

the commencement and termination of the railway, and at each change of

gradient, and the rate of inclination between such vertical measures

must also be marked.

Wherever the line of railway crosses any public carriage road,

navigable river, canal, or railway, the height of the railway over, or

depth beneath the surface thereof, and the height and span of every

arch by which the railway will be carried over the same, must be

marked in figures.

[Illustration: Fig. 3.]

In the case of a public road level crossing, it must be described on

the section, and it must also be stated if such level will be

unaltered. If any alteration be intended in the level of any canal,

public road, or railway which will be crossed by the intended line of

railway, the same must be stated on the section and cross-sections to

a horizontal scale of not less than 330 feet to an inch, and a vertical 10

scale of not less than 40 feet to an inch must be added, which must

show the present surface of such road, canal, etc., and the intended

surface thereof when altered, and the greatest of the present and

intended rates of inclination marked in figures, such cross-sections

to extend 200 yards on each side of the centre line of railway.

Wherever the height of any embankment, or depth of any cutting, shall

exceed 5 feet, the extreme height over or depth beneath the surface of

the ground must be marked in figures upon the section.

All tunnels and viaducts must be shown on the section.

At a junction with an existing railway, the gradient of such existing

railway must be shown on the section on the same scale as the general

section for a distance of 800 yards on each side of the point of

junction.

Where the level of any turnpike or public road has to be altered in

making any railway, the gradient of any altered road need not be

better than the mean inclination of the existing road within a

distance of 250 yards of the point of crossing the railway; but where

the existing roads have easy gradients, then the gradients of the

altered roads, whether carried over, or under, or on the level with

the railway, must not be steeper than 1 in 30 for a turnpike road, 1

in 20 for a public carriage road, 1 in 16 for a private or occupation

road.

A good and sufficient fence, 4 feet high at least, shall be made on

each side of every bridge, and fences 3 feet high on the approaches.

The application to cross any public road on the level must be reported

upon by one of the officers of the Board of Trade, and special

permission for the work must be embodied in the Act.

Not more than 20 houses of the labouring classes may be purchased in

any city or parish in England, Scotland, and Wales, or more than 10

such houses in Ireland, until approval has been obtained to a scheme

for building such houses in lieu thereof as the authorities may deem

necessary.

Every bridge (unless specially authorized to be otherwise) must

conform with the following regulations:--

A bridge over a turnpike road must have a clear span of 35 feet on the

square between the abutments, with a headway, or height, of 16 feet

for a width of 12 feet, as shown on Fig. 12.

[Illustration: Fig. 4.]

A bridge over a public road must have a clear span of 25 feet on the 12

square between the abutments, with a headway of 15 feet for a width of

10 feet, as shown on Fig. 13.

A bridge over a private or occupation road must have a clear span of

12 feet on the square between the abutments, with a headway of 14 feet

for a width of 9 feet, as shown on Fig. 14.

Road bridges over the railway must have the same clear width between

the parapets, measured on the square, as the widths prescribed for

road bridges under the railway, or 35 feet for a turnpike road, 25

feet for a public road, and 12 feet for private or occupation road.

It is not compulsory, however, to construct the public road bridges

over or under the railway of a greater width than the average

available width of the existing roads within 50 yards of the point of

crossing the railway, but in no case must a bridge have a less width

than 20 feet. Should the narrow roads be widened at any future time,

the railway company will be under the obligation to widen the bridges

at their own expense to the extent of the statutory widths of 35 feet

for a turnpike road, and 25 feet for a public road.

Suitable accommodation works in the form of bridges, level crossings,

gates, or other works, must be provided for the owners, or occupiers

of lands, or properties intersected or affected by the construction of

the railway; or payments may be made by agreement instead of

accommodation works. All questions, or differences between the Railway

Company, and the owners or occupiers of property affected, will be

decided by the authorities duly appointed by the Government for the

purpose.

In constructing the railway, the Parliamentary plans and sections may

be deviated from to the following extent:--

The centre line may be deviated anywhere within the limits of

deviation (100 yards on each side of the centre line in country, and

10 yards each side in towns, or villages).

Curves may be sharpened up to half a mile radius, and further, if

authorized by the Board of Trade.

A tunnel may be made instead of a cutting, and a viaduct instead of an

embankment, if authorized by the Board of Trade.

The levels may be deviated from to the extent of 5 feet in the

country, and 2 feet in a town, or village, and various authorities

have power to consent to further deviations.

[Illustration: Fig. 5.]

Gradients may be diminished to any extent, gradients flatter than 1 in

100 may be made steeper to the extent of 10 feet in a mile, and 14

gradients steeper than 1 in 100 may be made steeper to the extent of 3

feet in a mile, or to such further extent as may be authorized by the

Board of Trade.

Suitable fences must be erected on each side of the line, to separate

the land taken for the use of the railway from the adjoining lands not

taken, and to protect such lands from trespass, or the cattle of the

owners, or occupiers thereof from straying on to the railway.

In addition to the Parliamentary plans, and sections, and Book of

Reference, an estimate of the cost of each separate line, or branch,

must be prepared as near to the following form as circumstances will

permit.

ESTIMATE OF THE PROPOSED (RAILWAY).

Line No._______

------------------------------------------+-----------------------------

Miles. F. Chs. | Whether single or double.

Length of Line: ____ ____ ____ | _______________________

-----------------------+--------------+---+------+-----------+----------

| Cubic yards. | Price per | £ _s. d._ | £ _s. d._

| | yard. | |

+--------------+-----------+-----------+---------

Earthworks:-- | | | |

Cuttings--Rock | | | |

Soft soil | | | |

Roads | | | |

+--------------+-----------+-----------+

Total | | | |

+--------------+-----------+-----------+

|

Embankments, including roads, ____ cubic yards |

Bridges, public roads--number |

Accommodation bridges and works |

Viaducts |

Culverts and drains |

Metallings of roads and level crossings |

Gatekeepers’ houses at level crossings |

Permanent way, including fencing:-- |

|

Miles. F. Chs. | Cost per mile. |

| £ _s._ _d._ |

____ ____ ____ at | ____ ____ ____ |

|

Permanent way for sidings, and cost of junctions |

Stations |

+---------

Contingencies ____ per cent. |

+---------

A. R. P. |

Land and buildings ____ ____ ____ |

+---------

Total £ |

+=========

Dated this _______ day of ______________________ 18____

Witness: __________________________

___________________________________

Engineer.

[Illustration: Fig. 6.]

The same details for each branch, and general summary of total cost. 16

Every Railway Bill must be read twice, both in the House of Commons

and in the House of Lords. A committee, duly appointed for each House,

must report upon it, and if the reports from such committees be

favourable, the Bill will be read a third time, and passed.

When it has passed both Houses, the Bill receives the Royal Assent,

and becomes law.

The minimum scale of four inches to a mile for the plans is so very

small that it is rarely, if ever, adopted. It would necessitate

enlarged plans of so many portions to show clearly the property or

buildings inside the limits of deviation, that in practice it is found

expedient to make the plans to a much larger scale.

Figs. 1 and 2 show a small portion of a Parliamentary plan and section

drawn to the minimum scale allowed, with an enlargement of a small

part to distinguish the houses clearly.

Figs. 3 and 4 show a part of the same plan and section drawn to a

scale of 400 feet to an inch, a scale which is very frequently

adopted, and is sufficiently large to distinguish the buildings and

small plots, except in closely populated districts. This scale also

gives ample room for reference numbers.

The Parliamentary plans and sections must be accurate in delineation,

levels, and description. All property within the prescribed limits of

deviation must be clearly shown, and the numbers and description on

the plans and book of reference must be concise and complete, to

enable the owners to ascertain to what extent they will be affected.

In every place where it is proposed to interfere with any public

highway, street, footpath, river or canal, the manner of such proposed

alteration must be shown and described on both plan and section. The

commencement and termination of every tunnel must be correctly

indicated, and the length given on both plan and section. An omission

of any of the above requirements might prove very detrimental to the

scheme, and possibly result in the Bill being thrown out of Parliament

for non-compliance with standing orders.

[Illustration: Fig. 7.]

In carrying out the works the constructors have power to deviate the

centre line either to the one side or the other, provided that such

deviation will permit of the boundary of the works, or property to be

acquired, to come within the limits of deviation or property 18

referenced, and they may also vary the levels of the line to the

extent prescribed in the standing orders.

Figs. 5 and 6 are parts of a Parliamentary plan and section showing

alteration of a public road with an overline bridge--also a diversion

of a small river to avoid two river bridges.

Figs. 7 and 8 are parts of a Parliamentary plan and section showing a

public road diverted and carried under the railway.

A stipulated time is fixed in the Bill for the purchase of the

property and construction of the line, and if this time be exceeded

before the completion of the works, it will be necessary to obtain

further Parliamentary powers for an extension of time.

Every new railway, or extension of railway, in the United Kingdom,

must be inspected, and certified, by one of the inspecting officers of

the Board of Trade, previous to Government sanction being granted for

its opening as a passenger line.

To facilitate these inspections, and as a guide both to their own

inspecting officers and the engineers in charge of the construction,

the Board of Trade have issued a list of the principal requirements in

connection with all new lines.

The following is a copy of the list so far as relates to works of

construction and signals:--

Requirements of the Board of Trade.--1. The requisite apparatus

for providing by means of the block telegraph system an adequate

interval of space between following trains, and, in the case of

junctions, between converging or crossing trains. In the case of

single lines worked by one engine under steam (or two or more coupled

together) carrying a staff, no such apparatus will be required.

2. Home-signals and distant-signals for each direction to be fixed at

stations and junctions, with extra signals for such dock, or bay

lines, as are used either for the arrival, or for the departure of

trains, and starting-signals for each direction, at all passenger

stations which are also block posts. On passenger lines all cross-over

roads and all connections for goods, or mineral lines, and sidings to

be protected by home and distant signals, and as a rule at all

important running junctions a separate distant-signal to be provided

in connection with each home-signal.

[Illustration: Fig. 8.]

_Signals may be dispensed with on single lines under the following

conditions_:--

(_a_) _At all stations and siding connections upon a line worked by 20

one engine only (or two engines coupled together), carrying a staff,

and when all points are locked by such staff._

(_b_) _At any intermediate siding connection upon a line worked under

the train staff and ticket system, or under the electric staff or tablet

system, where the points are locked by the staff or tablet._

(_c_) _At intermediate stations, which are not staff or tablet

stations, upon a line worked under the electric staff or tablet

system: Sidings, if any, being locked as in (b)._

3. The signals at junctions to be on separate posts, or on brackets;

and the signals at stations, when there is more than one arm on one

side of a post, to be made to apply--the first, or upper arm, to the

line on the left, the second arm to the line next in order from the

left, and so on; but in cases where the main, or more important line,

is not the one on the left, separate signal-posts to be provided, or

the arms to be on brackets. Distant-signals to be distinguished by

notches cut out of the ends of the arms, and to be controlled by home

or starting signals for the same direction when on the same post. A

distant-signal arm must not be placed above a home or starting signal

arm on the same post for trains going in the same direction.

In the case of sidings, a low short arm and a small signal light,

distinguishable from the arms or lights for the passenger lines, may

be employed, but in such cases disc signals are, as a rule,

preferable.

Every signal arm to be so weighted as to fly to and remain at danger

on the breaking at any point of the connection between the arm and the

lever working it.

4. On new lines worked independently, the front signal lights to be

green for “all right,” and red for “danger;” the back lights (visible

only when the signals are at “danger”) to be white.

_This requirement not to be obligatory in the case of new lines run

over by trains of other companies using a different system of

lights._

5. Facing points to be avoided as far as possible, but when they

cannot be dispensed with they must be placed as near as practicable to

the levers by which they are worked or bolted. The limit of distance

from levers working points to be 180 yards in the case of facing

points, and 300 yards in the case of trailing points on the main line,

or safety points of sidings.

[Illustration: Fig. 9.]

In order to ensure that the points are in their proper position before 22

the signals are lowered, and to prevent the signalman from shifting

them while a train is passing over them, all facing points must be

fitted with facing-point locks and locking-bars, and with means for

detecting any failure in the connections between the signal-cabin and

points. The length of the locking-bars to exceed the greatest

wheel-base between any two pairs of wheels of the vehicles in use on

the line, and the stock rails to be tied to gauge with iron or steel

ties. All points, whether facing or trailing, to be worked or bolted

by rods, and not by wires, and to be fitted with double

connecting-rods.

6. The levers by which points and signals are worked to be interlocked

and, as a rule, brought close together, into the position most

convenient for the person working them, in a signal-cabin or on a

properly constructed stage. The signal-cabin to be commodious, and to

be supplied with a clock, and with a separate block instrument for

signalling trains on each line of rails. The point-levers and

signal-levers to be so placed in the cabin that the signalman when

working them shall have the best possible view of the railway, and the

cabin itself to be so situated as to enable the signalman to see the

arms and the lights of the signals and the working of the points. The

back lights of the signal lamps to be made as small as possible,

having regard to efficiency, and when the front lights are visible to

the signalman in his cabin no back lights to be provided. The fixed

lights in the signal-cabin to be screened off, so as not to be

mistakable for the signals exhibited to control the running of trains.

If, from any unavoidable cause, the arm and light of any signal cannot

be seen by the signalman they must, as a rule, be repeated in the

cabin.

7. The interlocking to be so arranged that the signalman shall be

unable to lower a signal for the approach of a train until after he

has set the points in the proper position for it to pass; that it

shall not be possible for him to exhibit at the same moment any two

signals that can lead to a collision between two trains; and that,

after having lowered the signals to allow a train to pass, he shall

not be able to move any points connected with, or leading to, the line

on which the train is moving. Points also, if possible, to be so

interlocked as to avoid the risk of a collision.

[Illustration: Fig. 10.]

Home or starting signals next in advance of trading-points when 24

lowered, to lock such points in either position, unless such locking

will unduly interfere with the traffic.

A distant signal must not be capable of being lowered unless the home

and starting signals in advance of it have been lowered.

8. Sidings to be so arranged that shunting operations upon them shall

cause the least possible obstruction to the passenger lines.

Safety-points to be provided upon goods and mineral lines and sidings,

at their junctions with passenger lines, with the points closed

against the passenger lines and interlocked with the signals.

9. When a junction is situated near to a passenger station, the

platforms to be so arranged as to prevent, as far as possible, any

necessity for standing trains on the junction.

10. The junctions of all single lines to be, as a rule, formed as

double-line junctions.

11. The lines of railway leading to the passenger platforms to be

arranged so that the engines shall always be in front of the passenger

trains as they arrive at and depart from a station; and so that, in

the case of double lines, or of passing places on single lines, each

line shall have its own platform. At terminal stations a double line

of railway must not end as a single line.

12. Platforms to be continuous, and not less than 6 feet wide for

stations of small traffic, nor less than 12 feet wide for important

stations. The descents at the ends of the platforms to be by ramps,

and not by steps. Pillars for the support of roofs and other fixed

works not to be less than 6 feet from the edges of the platforms. The

height of the platforms above rail level to be 3 feet, save under

exceptional circumstances, and in no case less than 2 feet 6 inches.

The edges of the platforms to overhang not less than 12 inches. As

little space as possible to be left between the edges of the platforms

and those of the footboards on the carriages. Shelter to be provided

on every platform, and conveniences where necessary. Names of stations

to be shown on boards and on the platform lamps.

13. When stations are placed on, or near a viaduct, or bridge under

the railway, a parapet or fence on each side to be provided of

sufficient height to prevent passengers, who may by mistake leave the

carriages when not at the platform, from falling from the viaduct or

bridge in the dark.

[Illustration: Fig. 11.]

14. Footbridges or subways to be provided for passengers to cross the 26

railway at all exchange and other important stations. Staircases or

ramps leading to or from platforms to be at no point narrower than at

the top, and the available width to be in no case contracted by any

erection or fixed obstruction whatever below the top.

At all stations where crowding may be expected, the staircases or

ramps to be of ample width, and barriers for regulating the entrance

of the crowd at the top to be erected. If in such cases there are

gates at the bottom, a speaking-tube or other means of communication

between the top and bottom to be provided; and in all cases gates at

the bottom of a staircase or ramp to open outwards. For closing the

openings at the top, sliding bars or gates are considered best.

The steps of staircases to be never less than 11 inches in the tread,

nor more than 7 inches in the rise, and midway landings to be provided

where the height exceeds 10 feet.

Efficient handrails to be provided on both staircases and ramps, and

in subways where ramps are used the inclination not to exceed 1 in 8.

15. A clock to be provided at every station, in some conspicuous

position visible from the platforms.

16. No station to be constructed, and no siding to join a passenger

line, on a steeper gradient than 1 in 260, except where it is

unavoidable. When the line is double, and the gradient at a station or

siding-junction is necessarily steeper than 1 in 260, and when danger

is to be apprehended from vehicles running back, a catch-siding with

points weighted for the siding, or a throw-off switch, to be provided

to intercept runaway vehicles at a distance outside the home-signal

for the ascending line, greater than the length of the longest train

running upon the line.

Under similar circumstances, when the line is single, provision for

averting danger from runaway vehicles to be made--

(1) At a station in one of the following manners:--

(_a_) A second line to be laid down, a second platform to be

constructed, and a catch-siding or throw-off switch to be

provided on the ascending line inside the loop-points.

(_b_) A loop-line to be constructed lower down the incline than

the station platform with a similarly placed catch-siding or

throw-off switch.

(2) At a siding-junction in one of the following manners, except where 27

it is possible to work the traffic with the engine at the lower end

of a goods or mineral train, in which case an undertaking (see No.

35) to do so, given by the company, will be accepted as sufficient:--

(_a_) A similar loop to be constructed as in the case of a

station.

(_b_) Means to be provided for placing the whole train on sidings

clear of the main line before any shunting operations are

commenced.

17. Engine-turntables of sufficient diameter to enable the longest

engines and tenders in use on the line to be turned without being

uncoupled to be erected at terminal stations and at junctions and

other places at which the engines require to be turned, except in

cases of short lines not exceeding 15 miles in length, where the

stations are not at a greater distance than 3 miles apart, and the

railway company gives an undertaking (see No. 35) to stop all trains

at all stations. Care to be taken to keep all turntables at safe

distances from the adjacent lines of rails, so that engines, waggons,

or carriages, when being turned, may not foul other lines or endanger

the traffic upon them.

18. Cast-iron must not be used for railway under-bridges, except in

the form of arched-ribbed girders, where the material is in

compression.

In a cast-iron arched bridge, or in the cast-iron girders of an

over-bridge, the breaking weight of the girders not to be less than

three times the permanent load due to the weight of the

superstructure, added to six times the greatest moving load that can

be brought upon it.

In a wrought-iron or steel bridge, the greatest load which can be

brought upon it, added to the weight of the superstructure, not to

produce a greater strain per square inch on any part of the material

than five tons where wrought-iron is used, or six tons and a half

where steel is used.

The engineer responsible for any steel structure to forward to the

Board of Trade a certificate to the effect that the steel employed is

either cast-steel, or steel made by some process of fusion,

subsequently rolled or hammered, and of a quality possessing

considerable toughness and ductility, together with a statement of all

the tests to which it has been subjected.

19. In cases where bridges or viaducts are constructed wholly or 28

partially of timber, a sufficient factor of safety, depending on the

nature and quality of the timber, to be provided for.

_N.B.--The heaviest engines, boiler trucks, or travelling cranes in use

on railways afford a measure of the greatest moving loads to which a

bridge can be subjected. The above rules apply equally to the main

transverse girders and rail-bearers._

20. It is desirable that viaducts should, as far as possible, be

wholly constructed of brick or stone, and in such cases they must have

parapet walls on each side, not under 4 feet 6 inches in height above

the rail level, and not less than 18 inches thick.

Where it is not practicable to construct the viaducts of brick or

stone, and iron or steel girders are made use of, it is considered

best that in important viaducts the permanent way should be laid

between the main girders. In all cases substantial parapets, with a

height of not less than 4 feet 6 inches above rail-level must be

provided by an addition to the girders, unless the girders themselves

are sufficiently high. On important viaducts where the superstructure

is of iron, steel, or timber, substantial outside wheel-guards to be

fixed above the level of, and as close to the outer rails as possible,

but not so as to be liable to be struck by any part of an engine or

train running on the rails.

In the construction of the abutments or piers which support the

girders of high bridges and viaducts, cast-iron columns of small size

must not be used.

In all large structures a wind-pressure of 56 lbs. per square foot to

be assumed for the purpose of calculation, which will be based on the

rules laid down in the report, dated 30th May, 1881, of the committee

appointed by the Board of Trade to consider the question of

wind-pressure on railway structures.

21. The upper surfaces of the wooden platforms of bridges and viaducts

to be protected from fire.

22. All castings for use in railway structures to be, where

practicable, cast in a similar position to that which they are

intended to occupy when fixed.

23. The joints of rails to be secured by means of fish-plates, or by

some other equally secure fastening. On main lines, and lines where

heavy traffic may be worked at high speed, the chairs not to weigh

less than 40 lbs.; but on branch lines, or lines on which the traffic 29

is light, chairs weighing not less than 30 lbs. may be used.

24. When chairs are used to support the rails they must be secured to

the sleepers, at least partially, by iron spikes or bolts. With

flat-bottomed rails, when there are no chairs, or with bridge rails,

the fastenings at the joints, and at some intermediate places, to

consist of fang or other through-bolts; and such rails, on curves with

radii of 15 chains or less, to be tied to gauge by iron or steel ties

at suitable intervals.

25. In any curve where the radius is 10 chains or less, a check-rail

to be provided.

26. Diamond-crossings, as a rule, not to be flatter than 1 in 8.

27. No standing work (other than a passenger platform) to be nearer to

the side of the widest carriage in use on the line than 2 feet 4

inches, at any point between the level of 2 feet 6 inches above the

rails, and the level of the upper parts of the highest carriage doors.

This applies to all arches, abutments, piers, supports, girders,

tunnels, bridges, roofs, walls, posts, tanks, signals, fences, and

other works, and to all projections at the side of a railway

constructed to any gauge.

28. The intervals between adjacent lines of rails, where there are two

lines only, or between lines of rails and sidings, not to be less than

6 feet. Where additional running lines of rails are alongside the main

lines, an interval of not less than 9 feet 6 inches to be provided, if

possible, between such additional lines and the main lines.

29. At all level crossings of public roads, the gates to be so

constructed that they may be closed either across the railway, or

across the road at each side of the crossing, and a lodge, or, in the

case of a station, a gatekeeper’s box, to be provided, unless the

gates are worked from a signal cabin. The gates must not be capable of

being opened at the same time for the road and the railway, and must

be so hung as not to admit of being opened outwards towards the road.

Stops to be provided to keep the gates in position across the road or

railway. Wooden gates are considered preferable to iron gates, and

single gates on each side to double gates. Red discs, or targets, must

be fixed on the gates, with lamps for night use, and semaphore signals

in one or both directions interlocked with the gates, may be required.

At all level crossings of public roads or footpaths, a footbridge or a

subway may be required.

At occupation and field crossings, the gates must be kept hung so as 30

to open outwards from the line.

30. Sidings connected with the main lines near a public road level

crossing to be so placed that shunting may be carried on with as

little interference as possible with the level crossing; and, as a

rule, the points of the sidings to be not less than 100 yards from the

crossing.

31. At public road level crossings in or near populous places, the

lower portions of the gates to be either close barred, or covered with

wire netting.

32. Mile posts, half-mile, and quarter-mile posts, and gradient-boards

to be provided along the line.

33. Tunnels and long viaducts to be in all cases constructed with

refuges for the safety of platelayers. On under-bridges without

parapets, handrails to be provided. Viaducts of steel, iron, or timber

to be provided with manholes or other facilities for inspection.

34. Continuous brakes (in accordance with the Regulation of Railways

Act of 1889), complying with the following requirements, to be

provided on all trains carrying passengers, viz.--

(1) The brake must be instantaneous in action, and capable of

being applied by the engine-driver and guards.

(2) The brake must be self-applying in the event of any failure

in the continuity of its action.

(3) The brake must be capable of being applied to every vehicle

of the train, whether carrying passengers or not.

(4) The brake must be in regular use in daily working.

(5) The materials of the brake must be of a durable character,

and easily maintained and kept in order.

35. Any undertaking furnished by a railway company to be under the

seal, and signed by the chairman and secretary of the company.

Recommendations as to the Working of Railways.--1. There should

be a brake vehicle, with a guard in it, at or near the tail of every

passenger train; this vehicle should be provided with a raised roof

and extended sides, glazed to the front and back, and it should be the

duty of the guard to keep a constant look-out from it along his train.

2. All passenger carriages should be provided with continuous

footboards, extending the whole length of each carriage and as far as 31

the outer ends of the buffer castings. As passenger carriages pass

from one company’s line to another’s, it is essential for the public

safety that, although the widths of the carriages on the different

lines may differ from each other, the widths across the carriages from

the outside of the continuous footboard on one side, to the outside of

the continuous footboard on the opposite side, should be identical for

the carriages of all railway companies, so that the lines of rails may

be laid at the proper distance from the edges of the passenger

platforms.

3. There should be efficient means of communication between the guard,

or guards, of every passenger train and the engine-driver, and between

the passengers and the servants of the company in charge of the train.

4. The tyres of all wheels should be so secured as to prevent them

from flying open when they are fractured.

5. The engines employed with passenger trains should be of a steady

description, with not less than six wheels, with the centre of gravity

in front of the driving-wheels, and with the motions balanced. They

should, as a rule, be run chimney in front.

6. Records should be carefully kept of the work performed by the

wearing parts of the rolling stock, to afford practical information in

regard to them, and to prevent them from being retained in use longer

than is desirable.

7. In addition to the block-telegraph instruments, it is desirable

that there should be speaking-instruments, or telephones, for

communication between signalmen, and books for recording the running

of the trains.

8. When drovers or other persons are permitted to travel with goods or

cattle trains, suitable vehicles should be provided for their

accommodation.

9. It is considered that, in fixed signals, the front lights should

show--

Green, for all right;

Red, for danger;

and that back lights, visible only when the signals are at danger,

should show white.

10. Refuge sidings should be provided at all main-line stations where

slow trains are liable to be shunted for fast trains to pass them. If

at such stations it is impossible to provide refuge sidings, and slow 32

trains have to be shunted from one main line to the other to allow of

fast trains passing them, some simple arrangements should be supplied

in the signal cabins to help to remind the signalman of the shunted

train.

11. Efficient means should be adopted to prevent the accidental

opening of the doors of passenger trains.

* * * * *

To carry out the undertaking, the engineer has to prepare working

plans and sections to a somewhat larger scale than that adopted for

the Government or Parliamentary plans, and on which must be marked the

exact positions of the commencement of the curves, straight lines, and

gradients. The sites of all the over and under bridges must be shown,

and their angles of crossing noted. All road, river, or stream

diversions must be indicated, so that the work in connection with them

may be laid out on the ground. All culverts and drains must be marked,

and their size, depth, and direction described. Public road

level-crossings, and farm or occupation-road crossings, must be shown

in their proper positions.

The face-lines of the ends of all tunnels should be marked on the

working plan and section, and the position of any shafts, which may be

intended either for use in carrying on the work or for future

ventilation.

A considerable amount of investigation and negotiation will have to be

entered into before the locating of the above works can be finally

decided. The desire to meet the wishes and convenience of all parties

interested must of necessity be controlled by the physical

circumstances of each case; very little alteration can be made in the

level of the rails, although some variation may be made in their

position.

When fixing the depths of culverts and drains, attention must be paid

to any probable improvement in the drainage of the district, which

might at some future time necessitate the deepening of such of the

main culverts where the inverts had been laid too high.

Unless all these details are determined, and shown on the

working-plans before the works are commenced, there is the risk that

embankments may have to be opened out to admit of bridges and

culverts, and cuttings changed to permit of road diversions.

The entire centre-line of railway must be carefully staked out by 33

driving strong wooden pegs into the ground at the end of every chain

length, and along the course of these pegs the longitudinal section

must be taken. Three pegs, one on each side of the centre peg, are

generally placed at the commencement and termination of the curves.

When the longitudinal section has been plotted to scale, and the

course of the gradients and level portions worked out and drawn on,

then the heights of the ground level and formation level can be marked

at each chain, and from them the depths of the cutting and the heights

of the embankments can be ascertained and marked at each chain. In

addition to the longitudinal section, it will be necessary to take a

large number of transverse or cross sections at those pegs, or

intermediate points, where the ground is at all side-lying or

irregular. These cross-sections are necessary to determine the

side-widths, or distances to outer edge of slopes in cuttings or

embankments, and also to calculate the actual quantity of earthwork to

be executed. For convenience in taking out the quantities, these

cross-sections are generally plotted to a natural scale, that is to

say, to the same scale horizontal as vertical, as shown in the example

of cross-sections, Figs. 15 to 24. It is also necessary to obtain

information, by boring or otherwise, as to the material of which the

cuttings are composed, whether clay, gravel, or rock.

In laying out lines through fairly level plains and populous

districts, the absence of great natural obstacles will allow the

engineer to carefully consider how far it may be prudent to diverge to

the right or to the left, to accommodate towns and places which would

be excluded by a more direct through route. There will be ample range

for selection, and it will be rather the question of policy than

compulsion which will guide him in the route to be taken.

[Illustration: Fig. 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24]

When, however, the locating passes from the lower ground, away up

amongst the hills and mountain ranges, it becomes an intricate study

whether it will be possible to lay out any line at all which may

possess gradients and curves practicable for railway working. The

question of property, population, or convenience of access, is here no

longer the controlling influence, but in its stead there are the far

more formidable natural difficulties to be overcome in working out a

trackway to the inevitable summit level. The chief endeavour will be

to gain length, and so reduce as much as possible the steepness of the

gradients which at the best must necessarily be severe. In some of the 35

earlier mountain lines constructed abroad the system of _zigzags_ was

introduced, as shown in Fig. 25. These _zigzags_ were laid out on

ruling gradients, one above the other, on the sides of the mountain

slopes with pieces of level at the apices, A, B, and C, on which

the engine could be changed from one end of the train to the other.

Although feasible in principle, the system entailed considerable loss

of time in train-working, and was not unattended with risk.

The more modern and simple method of working out the same idea is to

connect the main zigzag lines by curves or _spirals_, thus rendering

the route continuous and unbroken. By this arrangement the heavy work

and delay in starting or stopping the train at the apices, A, B,

and C, as shown on Fig. 25, is avoided, and the train can proceed

continuously on its circuitous journey. Fig. 26 shows an instance of

the zigzags and spirals, as carried out on an important railway

abroad. To have made a direct line from D to E, the most difficult

part of the route, would have involved a gradient of 1 in 11; but by

constructing the spiral course, as shown, the length was more than

trebled, and the gradient reduced to 1 in 35.

Fig. 27 is another example of spiral zigzags in which advantage was

taken to cut a short tunnel through a high narrow neck of rock at

G, and then by skirting round the hill the line was taken over the

top of the tunnel and along the side of the mountain to the summit tunnel

at H. By this means the line from F to H was laid out to an

average gradient of 1 in 42.

Fig. 28 shows the Cumbres inclines on the Mexican Railway. The route

had to be located through one of the rugged passes of the great Chain

of the Andes, whose mountain-sides rise most abruptly from the lower

plains, to the great upper-land plateau, some eight thousand feet

above sea-level. The ground to be traversed was so steep and difficult

that, even with the best available detours and greatest length that

could be obtained, the result was an average continuous gradient of 1

in 25 for 12 miles.

[Illustration: Fig. 25, 26, 27, 28, 29]

Fig. 29 is a plan of part of the St. Gothard Railway, showing the

principal tunnel 9¼ miles long, and some of the adjoining spiral

tunnels. The long tunnel through the great Alpine barrier was the only

means of forming a railway connection between the two points at Airolo

and Goeschenen. Constructed in a straight line, with easy gradients, 37

falling towards the entrances, efficiency of drainage has been

secured, and excessive strain on motive-power avoided. The approaching

valleys on each side were in some places too irregular and broken to

admit of zigzag loops, and the spiral tunnels were adopted instead.

The enlarged plan of two of the spiral tunnels will explain the method

of working. An ascending train enters the first tunnel at A, and

after passing round almost an entire circle, on a rising gradient,

emerges at a much higher level at the point B. Proceeding onward,

the train enters the second tunnel at C, and after passing round a

similar circle, on a rising gradient, comes out at a still higher

point, D, and continues its course up the valley.

The last five sketches illustrate some of the methods which have been

adopted when constructing railways through some of the most difficult

mountain ranges. They show what has been done, and may serve as guides

in working out the location of a line in some hitherto unexplored

region.

Gauge.--The gauge of a railway, or its width from inside to inside

of rails, affects both its cost and efficiency. If the gauge be

exceptionally wide, then the expenditure on works and rolling-stock

will be proportionately heavy; and although theoretically the extra

wide gauge may possess greater capabilities for accommodation and

high-speed travelling, we may find in practice that the necessary

requirements may be provided on a much more moderate gauge. On the

other hand, if the gauge be exceptionally narrow, there will be

diminished convenience both for passengers and merchandise, and a

corresponding limit to the speed in transit.

In isolated districts, where passenger traffic is of secondary

importance, and where the principal merchandise will be heavy without

being bulky, such as mineral ores, slates, etc., a comparative narrow

gauge may possibly suit the purpose. For main trunk lines, however,

where a large, heavy, and fast passenger traffic will have to be

worked, and where goods of all kinds, many of them bulky without being

heavy, will have to be carried, an ample gauge must be selected to

ensure convenience and safety. A liberal gauge permits the use of

commodious rolling-stock without any great amount of lateral

overhanging weight outside the wheels; whereas with a narrow gauge

there is the tendency--if not the necessity--to use vehicles which have

too great a lateral overhang for proper stability, except at very 38

moderate speeds.

The following list shows the gauges adopted in various countries:--

ft. ins.

England, Scotland,

and Wales 4 8½

Ireland 5 3

United States 4 8½, with some lines 5 ft., 5 ft. 6 ins., and 6 ft.

Canada 4 8½ and 5 ft. 6 ins.

France 4 8½

Belgium 4 8½

Holland 4 8½

Germany 4 8½

Austria 4 8½

Switzerland 4 8½

Italy 4 8½

Turkey 4 8½

Hungary 4 8½

Denmark 4 8½

Norway 4 8½ and 3 ft. 6 ins.

Sweden 4 8½

Mexico 4 8½ and 3 ft.

Egypt 4 8½ and 3 ft. 6 ins.

Peru 4 8½

Nova Scotia 4 8½ and 5 ft. 6 ins.

New South Wales 4 8½

Brazil 4 8½, 5 ft. 3 ins., and 5 ft. 6 ins.

Uruguay Republic 4 8½

Russia 5 0

South Australia 5 3

New Zealand 3 6

British India 5 6 and 1 metre.

Ceylon 5 6

Spain 5 6

Portugal 5 6

Chili 5 6

Argentine Republic 5 6

Cape Colonies 3 6

Japan 3 6

After many years’ experience of actual working, the broad, 7 feet,

gauge of the Great Western Railway has been abandoned for the 4 feet

8½ inch gauge. Doubtless this decision was the result of most careful

deliberation, and was made upon convincing proof that the 4 feet 8½

inch gauge could fulfil all the advantages claimed for the wider

gauge, whilst at the same time it possessed the merit of less cost of

construction and working, and greater facilities for the exchange of

traffic with other lines having the standard gauge. The facility of

exchange, or through working of rolling-stock, is a leading element of

successful railway working, and it is difficult to estimate what would

be the amount of loss and delay if we had any great extent of break of

gauge on the main trunk lines of our own country.

Although some countries have selected gauges of 5 feet and 5 feet 39

6 inches, it is interesting to note that the largest number have

adopted the English standard gauge of 4 feet 8½ inches, and that the

miles of line laid to this gauge far outnumber all the others. The

fact that our own home lines, the principal Continental lines, and

nearly all that vast network of railways in the United States of

America, have been laid to the 4 feet 8½ inch gauge, testifies to the

general opinion of its utility and efficiency; and we know that

included in that list are the railways which carry the largest,

heaviest, and fastest train service in the world.

It would be interesting to trace back, and, if possible, ascertain

from whence the exact gauge of 4 feet 8½ inches was derived. No doubt,

in the early days of the pioneer iron highways in England, the

railways were made the same gauge as the tramroads which they

superseded. But why was 4 feet 8½ inches the gauge of the tramroads?

We may reasonably infer that the first four-wheeled waggons used on

the early tramroads were in reality the same waggons which had been

previously used on the common roads for the conveyance of coal and

minerals to the ports for shipment, and that the waggons were merely

transferred from the roughly paved or macadamised roads to the

tramroads. Flanged wheels were then unknown, and the introduction of

the tram-plates was at first simply designed to lessen the resistance

to haulage. The gauge, or width between the wheels, of these waggons

may have been the outcome of long experience as to the most suitable

width for convenience of load, stability during transit, or for space

occupied on the highway. The width may have been handed down from

generation to generation, going back to the time when wheeled vehicles

were first built in the country. Perhaps in the beginning the first

vehicles may have been imported from Italy, or Greece--countries which

in the earlier ages were the most advanced in matters of luxury and

convenience.

When in Pompeii, a few years ago, the writer measured the spaces

between a large number of the _wheel-ruts_ which are worn deep

into the paving-stones in many of the principal streets of that

wonderful unearthed city. These paving-stones, very irregular in

shape, and many of them 2 feet 6 inches long by 1 foot 6 inches wide,

are carefully fitted together, and form a compact massive pavement

from curbstone to curbstone. The wheel-tracks, which are in many

places worn into the stones to the depth of an inch or an inch and a 40

half, are always distinct, and there is no difficulty in defining the

corresponding track.

The result of a large number of measurements gave an average width of

about 4 feet 11 inches from centre to centre of the wheel-tracks, a

curious coincidence with the gauge of our own road vehicles at the

beginning of the railway era. Whether our selection of the railway

gauge of 4 feet 8½ inches has been the result of study, imitation, or

caprice, we certainly have the silent testimony of these old deep-worn

stones to prove that two thousand years ago the chariots of Pompeii

were of very similar gauge to our own of modern times.

Narrow-gauge railways, of gauges varying from 1 foot 10½ inches on the

Festiniog Railway, to 3 feet, 3 feet 3 inches (metre), and 3 feet 6

inches, have been made in several places both at home and abroad.

Generally speaking, they have been constructed as subsidiary or

auxiliary lines in thinly populated districts, with a view to afford

some railway accommodation where it was considered that lines of the

standard gauge would not pay. In some instances abroad long lines of

narrow gauge--3 feet and 3 feet 6 inches--have been constructed as

main trunk lines in newly opened out districts. Some of these have

since been altered to a wider gauge as the traffic developed, and

experience proved that the narrow width of the vehicles was unsuitable

for quick transit, or convenience in the accommodation of passengers

and goods.

The object in making a line to a narrow gauge is doubtless to save

cost in the original construction; but when a scheme for an altered

gauge is put forward, it will be well to consider what amount of

advantage or saving would be effected by deviating from the standard

gauge.

If there be almost a certainty that such proposed line will always

remain isolated from all other existing railways of the standard

gauge, then perhaps the selection of gauge may be one of minor

importance, and there remains but the question whether the description

of traffic, and the weights to be carried, can be worked to any

greater advantage, or more economically, by deviating from the

standard gauge.

If, however, there be a fair probability that such proposed line may

at some future time become part of an already established railway

system, it would appear to be more prudent to make the line to the

standard gauge, and effect economies by introducing steeper gradients, 41

sharper curves, and lighter permanent way, and keep down working

expenses by using lighter locomotives, worked at slower speeds.

High speeds are not expected on narrow gauge railways, and no

complaints are made about passenger trains whose highest running speed

does not exceed 20 miles per hour. By conceding the same indulgence to

light railways made to the standard gauge, great economies might be

introduced both in their construction and working. The similarity of

gauge would admit the transit of the carriages and waggons of other

standard gauge lines, and so avoid all cost and delay in transshipment.

The heavy engines could be kept for the main-line working, and light

engines for slow speeds would serve for the light standard-gauge

lines. As traffic developed, and the train service required heavier

and faster trains, the light rails could be removed, and replaced by

those of heavier section to correspond to the main line. The

similarity of gauge would permit uninterrupted transit of all vehicles

to a common centre for repairs, whereas the narrow gauge carriages and

waggons, being limited to running only on their own district, must

have separate workshops for their repair.

When considering the cost of construction and working of a

narrow-gauge railway as compared with one of the standard gauge, there

are certain items which are common to both, and in which the narrow

gauge could not be expected to obtain any advantage over the standard

gauge.

There would not be any saving in getting up the scheme in the first

instance;

Nor in the Parliamentary expenses;

Nor in the engineering or carrying out of the works;

Nor in the station accommodation, waiting-rooms, and offices;

Nor in the signals and interlocking arrangements;

Nor in the telegraph;

Nor in the working staff and train men;

Nor in the maintenance of the permanent way, as the same number of men

would be required for the inspection and packing of the road, perhaps

more.

Little or no saving could be expected in the bridges under the

railway, as these must be made to the prescribed widths and heights,

irrespective of the gauge of the railways.

Little, if any, saving could be made in river or stream bridges, as the 42

same amount of waterway would have to be provided in each case.

The same remark applies to culverts and drains.

There would, on the other hand, be a small saving in the quantity of

land to be acquired to the extent of a narrow strip or zone,

represented by the difference in width between the narrow and standard

gauges.

There would also be the same small proportionate saving in the

embankments and cuttings to the extent of the difference in gauge.

Also a saving in the overline bridges and road approaches in

consequence of less width and height of the opening through those

bridges.

And a saving in the rails, sleepers, and ballast of the permanent way,

to the extent consistent with efficiency. That some saving may be

effected in these is undoubted, but it is necessary to exercise

caution, and not rush to the opposite extreme by making the parts too

light. A rail should be made not only strong enough to carry well the

engines that have to pass over it, but it should also be heavy enough

to stand the wear of several years. Narrow-gauge engines must be heavy

in conformity with the loads they have to haul. The same amount of

power must be exerted to haul a hundred tons on a given gradient,

whether the gauge be narrow or broad. In some cases of narrow-gauge

railways the original rails, which weighed only 45 lbs. per yard, have

since been replaced with others weighing 60 and 65 lbs. per yard. The

light 45 lb. rails were evidently not found to be sufficiently heavy

to keep the road to proper line and level. The result of our everyday

practice seems to prove that there is not only an advantage, but an

economy, in adopting rails of a heavy section, and experience would

therefore indicate that even for a narrow-gauge railway it may not be

expedient to adopt rails weighing less than 65 lbs. per yard.

Gradients.--There are very few localities where the rails on any

line of railway can be laid perfectly level or horizontal for more

than comparatively short distances. By far the greater portion have to

be laid on inclined planes of varying rates of inclination to suit the

general formation of the district traversed, and the circumstances of

the line to be constructed.

The degree, or rate of inclination, of these inclined planes, or

gradients, may be expressed in various ways. A very general method is 43

to state the number of feet, metres, etc., which can be measured along

the gradient before an increased rise or fall of one foot or metre,

etc., is obtained. Thus a gradient of 1 in 200 signifies a rise or

fall of 1 foot in 200 feet, or 1 metre in 200 metres.

Sometimes the rate of inclination is expressed by stating the number

of feet of rise or fall in a mile. In this way a gradient would be

described as falling at the rate of 30 feet in a mile, rising at the

rate of 20 feet in a mile, etc. Twenty feet to a mile is equal to 1 in

264.

Another method is to give the percentage of rise or fall. In this way

the inclination would be expressed as a 1 per cent. gradient, 2 per

cent. gradient, ½ per cent. gradient, etc., which for comparison would

signify 1 in 100, 1 in 50, and 1 in 200 respectively.

The gradients of a railway most materially influence its facility and

cost of working, and every effort should be used to make them as easy

as possible consistent with the prospect of the line.

Steep gradients signify heavy locomotives, increased cost of

motive-power, reduced speed, and light loads.

The following tabulated memoranda show the approximate loads,

exclusive of engine and tender, which can be hauled on the level and

on certain inclines at various speeds by engines of the quoted

capacities and steam admissions. A medium-sized, ordinary type of

passenger and goods engine has been selected for each of the examples.

The working of the passenger engine and train is assumed to be under

favourable circumstances, with fine weather, fairly straight line,

first-class permanent way, modern rolling-stock with oil axle-boxes

and perfect lubrication, and all the conditions most suitable to

ensure the least resistance to the moving load. For the goods engine

and train a greater resistance per ton of load is assumed, as the

goods trucks are never so perfect or easy in the running as the

passenger carriages. A certain amount of side wind is taken into

consideration, and also an allowance for moderately sharp curves, the

object being to indicate what may be looked upon as fair, average,

workable loads.

The loads for engines of larger or smaller dimensions, or higher or

lower pressures, may be obtained by working out the proportion between 44

the tractive force put down in any of the columns of the tabulated

memoranda and the ascertained tractive force of any other engine under

the same conditions of cut-off and speed.

-----------------------+-------------------------+-------------------------

| PASSENGER ENGINE. | GOODS ENGINE.

| |

|Six wheels, driving |Six wheels, all coupled,

| and trailing wheels | 4 ft. 6 ins. diameter.

| coupled, 6 ft. 6 ins. | Cylinders,

| diameter. Cylinders, | 17 ft. × 24 ft.

| 17 ft. × 24 ft. | Locked-down pressure on

| Locked-down pressure on | safety-valves, 140 lbs.

| safety-valves, 140 lbs. | per square inch. Assumed

| per square inch. Assumed| pressure at cylinders,

| pressure at cylinders, | 120 lbs. per square inch.

| 120 lbs. per square |

| inch. |

| |

|Weight of engine 39 tons.|Weight of engine 34 tons.

| ” tender 24 ” | ” tender 24 ”

| -- | --

| 63 ” | 58 ”

-----------------------+-----+-----+------+------+-----+-----+------+------

Assumed cut-off | ¼ | ⅓ | ½ | ¾ | ¼ | ⅓ | ½ | ¾

” mean effective | | | | | | | |

pressure, lbs.| 45 | 56 | 76 | 100 | 45 | 56 | 76 | 100

” tractive force,| | | | | | | |

lbs. | 4000| 4979| 6758 | 8892 | 5780| 7192| 9760 | 12844

Speed in miles per hour| 60 | 40 | 30 | 15 | 40 | 30 | 20 | 15

| | | | | | | |

|Tons.|Tons.|Tons. |Tons. |Tons.|Tons.|Tons. |Tons.

| | | | | | | |

Level | 97 | 230 | 447 | 892 | 213 | 358 | 623 | 907

1 in 1000 | 84 | 196 | 373 | 707 | 187 | 310 | 532 | 768

” 800 | 81 | 188 | 358 | 671 | 181 | 299 | 512 | 739

” 600 | 76 | 177 | 335 | 618 | 172 | 285 | 482 | 695

” 400 | 68 | 157 | 296 | 533 | 157 | 257 | 432 | 621

” 300 | 60 | 141 | 263 | 467 | 143 | 233 | 390 | 560

” 250 | 55 | 129 | 241 | 424 | 133 | 216 | 361 | 519

” 200 | 47 | 114 | 213 | 372 | 120 | 195 | 324 | 467

” 150 | 37 | 93 | 177 | 304 | 101 | 165 | 276 | 397

” 100 | 21 | 63 | 126 | 217 | 74 | 123 | 208 | 302

” 90 | -- | 56 | 114 | 197 | -- | 113 | 191 | 279

” 80 | -- | 48 | 101 | 175 | -- | 101 | 172 | 253

” 75 | -- | 43 | 94 | 164 | -- | 95 | 163 | 240

” 70 | -- | 39 | 86 | 152 | -- | 88 | 153 | 226

” 60 | -- | 28 | 70 | 128 | -- | 74 | 131 | 196

” 50 | -- | -- | 53 | 101 | -- | -- | 107 | 163

” 40 | -- | -- | -- | 73 | -- | -- | -- | 127

” 25 | -- | -- | -- | 27 | -- | -- | -- | 67

-----------------------+-----+-----+------+------+-----+-----+------+------

NOTE.--The column loads in tons are exclusive of the weight of

engine and tender.

From the above memoranda it will be seen how greatly the gradients 45

affect the loads. For an important main trunk line, with a heavy and

frequent train-service of passengers and goods, the introduction of

steep gradients would not only reduce the speed of the train-working,

but would probably involve the necessity of assistant engines over

those parts of the line; and it may be prudent, where possible, to

incur heavier earthworks, or considerable detours, or tunnels, to

obtain more favourable gradients. For such a line the additional cost,

and the extra distance caused by a detour of a mile or more, will be

of far less importance than the interruption in the train service

arising from a serious reduction in speed or taking on assistant

engines. On many railways abroad there are very interesting examples

of long detours of several miles, carefully studied out to obtain

greater length and easier gradients, resulting in the construction of

lines over which the traffic can be worked without necessitating

auxiliary engine-power. On the other hand, there are situations where

steep gradients cannot be avoided, where certain altitudes must be

reached, and where there is no alternative but to face the inevitable.

On secondary lines, and short branch lines, where the traffic is not

expected to be heavy, and where speed is not so important, it may be

policy to economize outlay and introduce steeper

gradients than on the main line.

Half a mile of a rather steep gradient is not felt so much when it is

situate midway between two stations, because the attained speed of the

train assists the engine over the short distance to the summit; but

when it occurs as a rising gradient out of a station, it forms a great

check to the working, particularly in bad or wet weather, when there

is the risk of the engine slipping, and the entire train sliding back

into the station.

Long steep gradients not only necessitate increased motive-power for

the ascending trains, but also require increased brake-power, and

precautionary measures for the descending trains. Where passenger

trains are fitted with continuous brakes, the risk of losing control

is minimized; but with goods trains composed of waggons, having only

the ordinary independent side-lever brake, it will be found absolutely

necessary in many cases to have additional heavy brake-vans for

descending the inclines, and these special vans, unfortunately, will

form so much extra non-paying weight to be hauled up on the ascending

trains. Of course, it is quite possible--and, indeed, in many places 46

it is customary--to pin down some of the side-lever brakes before

commencing the descent, but once pinned down the brakes cannot be

eased or taken off until the entire train is brought to a stand.

Every goods waggon should be fitted with a brake, and it would be of

immense value if that brake could in all cases be applied and

controlled when the train is in motion.

The American type of long goods waggon, with a four-wheel bogie-truck

at each end, is fitted with a brake very similar to those adopted on

the ordinary horse tram-cars. On the top of the waggon a horizontal

iron hand-wheel, about 18 inches in diameter, is fixed on to a strong

vertical iron rod, which works in brackets, and extends down below the

underside of waggon framing. One end of a short length of chain is

secured to the foot of the vertical rod, and the other end is

connected by light iron rods to the series of levers which pull on the

brake-blocks. By rotating the horizontal hand-wheel the chain is

coiled round the lower end of the vertical rod, the brake-levers are

pulled over, and brake-pressure applied to the wheels of the waggon.

The brakesman is supplied with a convenient seat and footboard, and on

the floor-level of the latter there is a pawl and ratchet attached to

the vertical rod, which permits the brakes to be applied to the extent

required. The pawl retains the brakes in position until the brakesman

with his foot pushes the pawl out of the notch of the rachet and

releases the brake gearing, which is at once pulled off quite clear by

strong bow-strings attached to the framework of the bogies.

This type of hand-brake is, perhaps, the simplest that can be made.

The brakesman has merely to put it on, the pawl and ratchet keep it

on, and the bow springs take it off when no longer required. Each one

of these long, loaded goods waggons becomes a very serviceable

brake-van, and for ascending and descending steep inclines all that is

necessary is to take on a few additional brakesmen to manage the

brakes of as many suitable waggons. These incline brakesmen, after

going down, can return to the summit by the next ascending train,

their small weight being a mere nothing as compared with that of

special or extra brake-vans.

On some European lines it is the custom to sprag some of the goods

waggon wheels when going down exceptionally steep inclines, as well as 47

applying the brakes on the ordinary and extra brake-vans. The sprag is

a piece of wood, circular in section, about 2 feet 6 inches long, and

5 to 6 inches thick in the middle, tapering off to about 2 inches

thick at the ends. When the waggon-wheel is just beginning to move,

the sprag is inserted between the spokes, and being caught against the

waggon framework, the wheel is held fast, and being unable to revolve,

remains fixed, and acts like a skid upon the rails. The skidding of

the wheels upon the rails wears flat places on the wheel tyres, and it

is needless to mention that the practice is only resorted to in very

extreme cases. Although a very primitive means for checking the speed

of a descending train, or for maintaining vehicles stationary on an

incline, there have been many instances where lives have been saved

and accidents prevented by the prompt use of a few sprags. Solid or

close wheels cannot be spragged, only wheels which have spokes or

openings, and for this reason alone it would be very desirable that in

every passenger and goods train there should be some spoke or open

wheels which could be spragged as a last resource, in the event of a

sudden emergency of brakes failing or train becoming divided on an

incline.

On ascending gradients there is always the risk of a coupling

breaking, and the train becoming divided. If the detached portion left

behind be provided with ample brake-power, hand-brakes, or otherwise,

no harm may take place beyond a little delay; but if the brake-power

be insufficient or defective, and if all the wheels are solid wheels

incapable of admitting a few timely sprags, then the vehicles cannot

be held, but must slide back, and running unchecked would soon attain

such a velocity as would cause them either to leave the rails or dash

into another train standing at the last station. Many lamentable

accidents have taken place arising from portions of trains breaking

away and running back, and the sad experience of those casualties

should call forth every effort to avert a recurrence in the future. It

may not always be possible to detect a hidden flaw in a coupling, or a

defect in the brake-gearing until the actual failure occurs; but it is

quite possible to guard against disastrous results from such failure,

by providing means to hold the vehicles, and prevent them sliding

back.

For some years the writer had the entire charge of an important

railway abroad on which the gradients were very exceptional, and where 48

it was absolutely necessary that he should organize the most complete

precautions to prevent the possibility of trains, or portions of

trains, running back down inclines. Starting from sea-level, the line,

which was laid to the 4 feet 8½ inch gauge, rose to a summit of over

8000 feet, and on the mountain division there were many long gradients

of 1 in 40, 1 in 33, and in one place a continuous gradient of 1 in 25

for 12 miles. The specially powerful engines reserved for these heavy

inclines were each supplied with an ordinary hand-brake, a

steam-brake, and a Westinghouse continuous brake. The passenger

carriages, which were of considerable length, and carried on a

four-wheeled bogie-truck at each end, were all fitted up with the

Westinghouse brake, and in addition each carriage had its own

hand-wheel brake with the pawl and ratchet gearing. All the goods

waggons, which were of the American type, were fitted with hand-wheel

brakes similar to those on the carriages. Special gangs of trained

brakesmen took charge of the trains on these inclines, a brakesman to

every carriage or waggon, and were always in readiness in case of the

breakage of a coupling, or the failure in the Westinghouse brake or

brakes on engine. The immunity from accidents justified the combined

precautions adopted, and proved the possibility of working such severe

gradients with perfect safety.

The long-continued application of the brakes on heavy inclines

naturally leads to the question as to the description of wheel to be

adopted for the work. Not only are the wheels subjected to very severe

torsional strains, but the temperature at the circumference is raised

very high in consequence of the friction. Perhaps, theoretically, the

safest wheel would be one made out of a solid piece of metal, similar

to the chilled cast-iron wheels of the United States, or the steel

disc wheels used on some lines in Europe, in either of which holes can

be left for sprags. Wheels of this description can withstand very

heavy wear and tear, they are not affected by increased temperature,

and they certainly have the minimum of parts to work loose. Of the

built-up wheels, the strong forged-iron-spoke wheel with steel tyres

shows excellent results, and always gives due warning of loosening by

indications at the tyre rivets. The suddenness with which the solid

wooden centre wheels sometimes break up and fall to pieces does not

commend them for a service where there must be a long-sustained

application of the brakes. The increased temperature which expands the 49

tyre, contracts the wood, and must loosen and weaken the entire wheel.

On all steep gradients the road-bed should be of the most substantial

character, and the permanent way of a strong description, and

maintained in perfect order, as the engines for working the traffic

must necessarily be of a heavy type. The rails will be severely tested

by the pounding and slipping of the engines on the ascending journey,

and by the action of the brakes on the descending journey.

In the early days of the railway system, rope-haulage was adopted on

some of the main lines for working the trains on steep inclines near

the principal terminal stations. A powerful stationary engine, located

at the highest point, was employed to work an endless rope which

passed round large drums at the top and bottom of the incline, and was

supported on sheaves or pulleys fixed between the rails. The

connection between the carriages and endless rope was effected by

means of a short piece of rope called the _messenger_, which was

coiled round the main rope in such a manner as to be readily detached

when the train reached the summit. There are many persons who will

remember the time when the passenger trains were hauled by an endless

rope up the 1 in 66 incline from Euston to Camden Town, a distance of

about a mile and a half, and up the 1 in 48 incline from Lime Street,

Liverpool, to Edge Hill, a distance of about a mile and a quarter, and

several others. The rapid strides made in locomotive construction, and

the increased pressure used in the boilers, enabled much more powerful

engines to be built, until one by one the rope-haulage machinery has

disappeared from nearly all the inclines where for years it had been

considered indispensable. Rope-haulage on inclines is now very rarely

met with, except at collieries and ironworks, where occasionally the

rope may be seen so arranged that the loaded waggons descending pull

up the empty waggons on the opposite or parallel line.

Curves.--The degree of curvature of a railway curve is generally

expressed by giving the radius in feet, chains, metres, or other

national standard measure.

When laying out a line of railway, the natural features of the country

will necessitate the introduction of curves, and the question for

consideration will be whether they are to be made of small or large

radius. In some cases sharp curves are inevitable, except by incurring 50

enormous works which would not appear to offer any corresponding

prospective recompense. In others the curves may be made of easy

radius, at a comparative moderate extra outlay, if the character of

the line and description of traffic to be accommodated will warrant

the expenditure. For main through lines, with heavy, high-speed

traffic, it is advisable to have the curves of large radius, so as to

avoid the necessity of reducing speed when passing round them.

Although a high-class fast train may be allowed to run round an 80

chain (5280 feet) curve at almost unrestricted speed, safety demands

that there should be a reduction of speed on curves of 40 or 30 chains

radius, and a very much greater reduction for curves of 20 chains

radius and under. A sharp curve will in some places form a greater

check to fast trains than a length of moderately steep gradient on a

straight line. In the former the trains running in either direction

must slow down for some distance before reaching the curve, round

which they should pass at greatly reduced speed, and then some

distance must be run before they can attain their full speed again. On

the other hand, with a rising gradient, on a fairly straight line, the

acquired momentum of the train will materially assist in ascending the

incline, and although the speed may be slackened as the train

advances, there may not be any very great diminution in the running

before the gradient is passed, and average level line reached again. A

reduced rate of running must be maintained round curves of small

radius, for, however substantial the works and permanent way, and

however well devised and constructed the rolling-stock, there is an

element of danger ever present when passing round sharp curves at

anything more than moderate speed. In the great rush for fast through

trains this point is very apt to be overlooked, and too little time

allowed for the running. Even with the fastest trains on any line

there are some portions of the route which must be traversed with

greater caution and less speed than others, either on account of sharp

curves or of gradients; and if those who are entrusted with the

preparations of the time tables do not possess the technical

information necessary to deal properly with the question of relative

speeds, there is the strong probability that the programme prepared

may be one both difficult and dangerous to fulfil. The spirit of

rivalry is a strong incentive to fast running, but prudence and common

sense should indicate that record speeds should only be attempted on 51

the straight or favourable portions of the line. There is,

unfortunately, the growing tendency to run faster and faster round the

curved portion of our lines, heedless of the close approach to the

limit of safety, and unless this excessive speed be controlled in

time, the result must be disaster on a very large scale.

A sharp curve leading into or out of a terminal station or main-line

stopping-station does not so much affect the train running as a sharp

curve at an intermediate point between stations where the train may be

expected to run at its maximum speed. Wherever it is possible it is

very desirable to avoid sharp curves on inclines, because there are

times when descending trains may acquire a considerable velocity, and

wheels tightly gripped by the brakes have not the same facility for

following the curves as when they are running free.

In rugged and mountainous districts sharp curves are almost

unavoidable, except by introducing a series of tunnels; but in these

districts both the gradients and curves are alike exceptional, the

speed is necessarily slow, and special precautions are taken for the

ascending and descending trains.

[Illustration: Fig. 30, 31, 32, 33, 34, 35, 36, 37, 38]

When setting out reverse curves on a main line a piece of straight

line should always be laid in between the termination of the one curve

and the beginning of the other, to allow of a proper adjustment of the

rails to suit the super-elevation adopted on each of the adjoining

curves. In station yards and sidings this is not so absolutely

necessary, the sorting of the carriages and waggons and the

marshalling of the trains being carried on at a low speed, which does

not necessitate any super-elevation of the rails on the curves. The

speed of the train regulates the amount of super-elevation to be given

on any particular curve, and to ensure smooth and safe running this

amount must be maintained uniform all round the curve. On curves of

small radius, guard, or check, rails are frequently placed alongside

the inner rail, as in Figs. 30 to 33, to check the tendency of the

engine to leave the rails and run in a straight line. For the

bull-head road a special chair is used, which holds both the

running-rail and the check-rail, as shown on the sketch, the rails

being kept the proper distance apart by the web portion in the centre,

which forms part of the casting. For the flange railroad, check-rails

are sometimes made of strong angle irons placed against the flange of

the running-rail, and bolted to the transverse sleepers. This method 53

is not nearly so strong or efficient as the arrangement shown on Fig.

33, with a cast-iron distance-block about six inches long, placed

between the running-rail and check-rail, and all tied together with a

strong through bolt. A bolt-hole is punched in the edge of the flange

of check-rail, and a crab bolt and clip holds the two rails on the

sleeper. The cast-iron distance-blocks are placed just outside the

sleeper, so as not to interfere with the holding-down bolt. Doubtless

these guard rails do good service, but if the leading wheels of the

engine have sharp or worn flanges there is the possibility that the

wheel, pressing against the high rail, may mount the rail, and throw

the train off the line. A more secure method is to place the guard

outside the high rail, as in Figs. 34 to 38. This can be done by securing

a strong continuous longitudinal timber to the cross-sleepers--or to

the cross-girders in the case of a girder bridge--with its outer or

striking edge protected with a fairly heavy angle iron. The top of

this outside guard above the rail level may be three inches or more,

according to the height of any hanging spring, or portion of brake

apparatus belonging to the rolling-stock. The distance between the

striking-face of the guard and the inside of head of rail should be

about 5 inches, or such width that before the flange of the wheel can

mount on the top of the rail, the face of the wheel-tyre will be

brought into contact with the striking-face of the outside guard, and

thus effectually prevent the wheel leaving the rail. The sketches show

some of the types applicable to the chair road, and to the flange

railroad. In Figs. 34, 35, and 37, the outside brackets are of heavy

angle iron cut off in lengths to correspond to the width of the

sleeper. In Fig. 36 the cast-iron chair is lengthened, and has an end

bracket to support the guard timber. In Fig. 37 a hard wood bolster is

fastened on the top of each sleeper, and on this is placed the

continuous guard timber. This method of increased security is

frequently adopted on girder bridges and long iron viaducts which are

on the straight, and in such cases it is usual to place the guards

outside each of the rails forming the track.

The introduction of bogie engines and bogie carriages has conduced

largely to the safe working of the train-service over the curved

portions of many of our home railways, as well as to the economy in

the wear and tear of permanent way and rolling-stock. The action of

long rigid wheel-base vehicles passing round sharp curves is 54

detrimental to all the parts brought into contact. Not only is there

the constant tendency to mount the rails, and spread the gauge, but

the tiny shreds of steel scattered all along close to the

rail--particles ground off the rails, or off the wheel-tyres, or

both--testify to useless wear, unnecessary friction, and great waste

of motive-power.

The gradual increase of accommodation and conveniences in the carriage

stock of European railways led to the gradual increase in the length

of the vehicles. The six-wheeled carriage superseded the four-wheeled

carriage, on account of its increased steadiness when running, but the

introduction of long sleeping-cars, dining-cars, and corridor cars

necessitated some better wheel arrangement than the ordinary six-wheel

type could supply. The six wheels had been spread as far apart as was

admissible for carrying weight and passing round curves, and something

had to be done to meet the demand for still longer carriages. Many of

the six-wheeled carriages at present running on our own home lines

have a fixed wheel-base as long as 22 feet, and with this length the

horn-plates must undergo a very considerable strain when adapting

themselves for the passage round curves of small radius. On a curve of

15 chains radius (990 feet) a chord of 22 feet will have a versed sine

or offset of 0·73 of an inch, and on a curve of 10 chains radius (660

feet) an offset of 1·10 of an inch. Fortunately, curves of the above

small radius are not very numerous on our main lines; but wherever

they do occur, the conflict between the long fixed wheel-base

rolling-stock and the permanent way must be very severe to both.

Several descriptions of eight-wheeled carriages have been tried on our

home lines; but the system which is now most in favour is the ordinary

bogie truck, which has been in use for so many years on all American

railways. A bogie truck is really a short carriage frame complete in

itself, with its wheels, springs, and brake appliances, and is

attached to the under side of the carriage body by a central pivot,

round which the truck can swivel or rotate sufficiently to adapt

itself to the curved portions of the line. With a bogie truck at each

end of a long carriage, the vehicle will pass as easily round curves

as on the straight line, side pressure, or grinding against the rails,

is obviated, and friction is reduced to a minimum. The bogie truck may

consist of four wheels or six wheels, according to the length and

weight of the carriage to be supported.

[Illustration: Fig. 39, 40, 41, 42]

Figs. 39, 40, and 41 show sketch elevation, plan, and transverse 56

section of one pattern of four-wheel bogie truck largely adopted in

American carriage stock, and although there are other types varying in

detail, the general principle remains the same in all. The diagram

sketch (Fig. 42) represents the two bogie trucks slightly swivelled to

adapt themselves to the curve round which the carriage is supposed to

be passing.

For carriage or waggon stock with an independent bogie truck at each

end, the central pivot and swivelling motion supply all the freedom

that is requisite; but for locomotives it is necessary to provide for

lateral as well as for swivelling movement. The driving and trailing

wheels--and sometimes one or two other pairs of wheels--work rigidly

in the frames, and as the normal position of the centre of the bogie

truck must be in the centre line of the engine for the straight line,

it is evident that some appliance must be introduced to allow the

truck to move laterally when the engine has to traverse the curves.

Figs. 43, 44, and 45 give sketch elevation, plan, and transverse

section of a swing-link bogie truck as applied to an ordinary American

locomotive. Its recommendations are its simplicity, its efficiency,

and its accessibility for inspection and lubrication. The swing-links,

which provide for the lateral movement, are direct acting, and do not

require any side springs of steel or indiarubber. All the principal

parts of the bogie are visible and not mysteriously cased in with

plate-iron boxwork.

In the sketches several minor details are purposely omitted and only

sufficient particulars shown to explain the method of working. The

under side of the upper centre plate which carries the cylinder

castings and smoke-box end of boiler is cup-shaped, and fits into an

annular groove or channel in the lower centre plate, which is

suspended from the framework of the truck by the four swinging links.

Practically the entire carrying and swivelling work of the bogie truck

is effected by the annular-groove casting moving round the cup-shaped

casting, and the centre pin is merely passed down through each to

guard against the risk of the one lifting out of the other from sudden

shock or derailment.

[Illustration: Fig. 43, 44, 45, 46]

The lateral movement of the truck is obtained by means of the four

swing-links. When the engine is on the straight road the centre line

of the bogie is on the centre line of the engine, and the links hang

in the positions shown on the sketch, inclined towards the centre; but 58

upon entering a curve they come into play, and allow the truck to move

out sideways to the right or left, according to the direction of the

curve, the one pair of links assuming a flatter angle, while the other

pair approach nearer to the vertical, the extent of side movement

depending on the amount of the curvature. When the engine enters the

straight line again, the bogie truck resumes its central position.

The Bissell truck consists of one pair of wheels connected to a

triangular framework, as shown in Fig. 46. The axle-boxes are attached

to the side of the triangle which lies parallel to the axle, the other

two sides terminate in a circular ring which works round a centre pin

fixed to the engine. These two sides are practically the radii of a

given circle, and permit a large amount of lateral movement, which can

be controlled by placing suitable stop-pieces to limit the side play

to the extent desired.

Radial axle-boxes have been tried on the engines of some railways. In

the best types the opposite boxes are braced together by a diaphragm,

or plate-iron framework, to ensure that both boxes work together. The

curved faces of the horn-blocks, in which the radial axle-boxes slide,

are struck from a centre taken at some point to the rear of the normal

centre line of the axle, and stops are placed at proper distances to

control the extent of lateral movement. Although the advocates of

radial axle-boxes may urge some points in their favour, there are few

engineers, if any, amongst those who have had practical experience of

both systems, who would for a moment claim for the radial axle-box

anything but a modicum of the many advantages obtained by the

four-wheeled bogie truck.

As one of the principal functions of a four-wheeled bogie truck for an

engine is to act as a path-finder, or guide, to the other wheels which

constitute the fixed or rigid wheel-base portion of the machine, it

follows, therefore, that the full benefit of the bogie truck can only

be obtained when it is placed at the leading, or front, end of the

engine. In this position the bogie, with its swivelling arrangement

and smaller weights, is the first to pass over the rails, and in doing

so shapes the course and prepares the way for the easy running of the

heavier wheel weights which have to follow. When the bogie truck is

placed at the rear end of the engine, its action is restricted to

affording lateral movement only, and the driving and coupled wheels

have to force or pound themselves round the curves in a jerky,

irregular manner, as compared to their smooth running when following 59

the leading or guiding influence of a bogie truck in front.

The wheel-base of a four-wheeled bogie truck for an engine should

always be greater than the gauge of the line over which the bogie has

to travel On the 4 feet 8½ inch gauge some of the best results have

been obtained with bogies having wheel-bases varying from 6 feet to 7

feet. Where the wheel-centres have been less than 6 feet, the running

has been found to be much less steady than with the wider spacing; and

where the wheel-base is not more than the gauge, there is a tendency

for the bogie to catch, or lock, when passing round sharp curves.