CHAPTER XII.

TUNNELS, ANCIENT AND MODERN.

It is hardly necessary to say that the great rival to the Mont Cenis

or Summit Railway is the railway that is to be laid through the

tunnel, which, in the official documents of both France and Italy

is denominated “The Great Tunnel of the Alps.” But before we enter

upon the description of this tunnel, an account of subterraneous

construction from the earliest period we have been able to trace

tunnels, may not be uninteresting.

Tunnelling through hills and mountains is not exactly “as old as the

hills,” but the practice, nevertheless, is of great antiquity.[123]

Yet, the oldest tunnel of which we have record was neither through

hill nor mountain, but was carried beneath the course of the River

Euphrates. This happened no less than 4,812 years ago, for it was at

that time that Semiramis was appointed by her dying husband, Ninus,

King of Assyria, Regent and guardian to their only child, the infant

Ninias. The royal widow, according to Diodorus the Sicilian, the most

trustworthy historian of antiquity, who has written of the peoples

that existed earliest after the world’s creation, commenced her reign

2,944 years before the birth of Christ, and immediately afterwards, the

building of Babylon was begun, by two millions of men, who had been

collected, by regal command, from all parts of the empire. The mighty

city was erected on the two sides of the Euphrates, on each bank of

which was raised a palace of colossal proportions. These the Queen

Regent connected together by “a passage under the river,[124] in the

nature of a vault, from one palace to another, whose arches were built

of firm and strong brick, and plastered all over on both sides with

bitumen, four cubits thick. The walls of this vault were twenty bricks

in thickness, and twelve feet high, and the breadth was fifteen feet.

This piece of work was finished in 220 days, and the river flowing

over the vault. Semiramis could thus go from one palace to the other

without passing over the river. She made likewise two brazen gates at

either end of the vault, which continued to the time of the Persian

empire.” The passage was made, not by the process of tunnelling as we

now understand it, but by first making enormous works for diverting

the course of the Euphrates; then restoring it to its ancient channel

as soon as the vaulted passage had been completed. The investigations

of Mr. A. H. Layard, M.P., from 1846 to 1851, show that the process of

making underground connections was fully understood from the earliest

period of Assyrian history.

The ancient Egyptians were undoubtedly masters of the art of

tunnelling. In a very interesting letter received from our much valued

friend George Groves, Esq., the secretary of the Palestine Exploration

Fund, enclosing the recent reports of Lieutenant Warren, R.E., the

writer says, “you will see by Warren’s papers that there is no lack of

tunnels at Jerusalem; in fact, the whole of the rock upon which the

city is built, appears to be honeycombed with them, but of what exact

age they are, it is impossible for us as yet to tell.”

The further reports of Lieutenant Warren cannot fail to be looked for

and read with an all-absorbing interest by every lover of biblical

literature and history. Already his researches and discoveries show

that he is a man with whom his countrymen may well be satisfied. True

type of the Englishman, he is earnest, indefatigable, and enduring;

incapable of fatigue, he never knows what it is to be beaten. His

ordinary work extends not only throughout the day with a temperature

varying from 100 to 107, but also far on towards midnight. But at that

period of the 24 hours, the Lieutenant says, “the temperature is much

cooler.” That is, the thermometer falls to about 80! Recently when

having “an attack of incipient fever and not being able to shake it

quite off,” he with his faithful assistant and humble companion in

all his labours and anxieties, Sergeant Birtles, “who was also very

unwell,” went for a three days’ ride through Faghur, &c. “We returned

on Saturday quite recovered!” Twelve or thirteen hours a day in the

saddle for three successive days, is rather a rough remedy for the cure

of fever.

We limit ourselves to two extracts from the reports; the first relates

to a discovery made as recently as the 1st of September last, which may

be truly described as one of very great importance.

“I have made what I consider to be a very important discovery,

viz., an ancient aqueduct, south-east of the south-east corner of

the Cœnaculum, and fifty feet above the present aqueduct—I have no

doubt the original aqueduct from Solomon’s Pools to the Haram Area.

We dug out the earth from a cut stone shaft two feet square, and at

sixteen feet was a channel running from the west to the north-east,

precisely similar in construction to the passages under the Triple

Gate. It varies very much in size. Sometimes we could crawl on hands

and knees; then we had to creep sideways; again we lay on our backs

and wriggled along; but still it was always large enough for a man

of ordinary dimensions. In parts built of masonry, in parts cut out

of solid rock, it is generally of a semi-cylindrical shape; but in

many parts it has the peculiar shoulders which I have only seen

under the Triple Gateway, but which I told you in my last letter had

been noticed by Mr. Eaton in the channel leading towards Tekoah. To

north-east we traced the channel for 250 feet, until we were stopped

by a shaft which was filled with earth; to the west we traced it for

200 feet, till it was stopped in the same manner. In part of this

passage we could stand upright, it being ten or twelve feet high, with

the remains of two sets of stones for covering, as shown in M. Piazzi

Smyth’s work on the Great Pyramid; the stones at the sides being of

great size—12 feet by 6. This channel cannot be so late as the Romans.

It is evidently of most ancient construction. It is built in little

spaces, as if the work had been commenced at two or three points,

and had not been directed properly. The plaster is still in good

preservation. I shall have the passage cleared out, if possible, as

far as the city walls. I presume it goes into the Haram, at a slightly

higher level than the present aqueduct. If so, by following it we may

arrive at some very interesting conclusions as to the original method

of supplying the Temple with water.

“This channel must have been of great consequence in olden times, both

from the distance it is driven under ground, and from the well-cut

shafts which lead to it. I think the question is to be hazarded

whether the supply of Jerusalem was not obtained by this aqueduct,

which is quite concealed from an enemy.”

At the date of the last report the tunnel had been traced about 300

feet to the north-east, where it appears to fall into the present

aqueduct.

Our second and concluding extract will show the difficulties and

dangers attending upon the labours of Lieutenant Warren and his party,

as well as the necessity which exists for funds coming in liberally to

meet the very heavy expenses of these marvellous explorations.

“PROGRESS OF WORKS TO 11TH OCTOBER, 1867.—_Shaft near S.W. angle South

Wall of Haram Area._—Depth excavated, to Thursday, the 10th October,

76 feet.

“On Friday, having arrived at a depth of 79 feet, the men were

breaking up a stone at the bottom of the shaft. Suddenly the ground

gave way, down went the stone and the hammer, the men barely saving

themselves. They at once rushed up and told the sergeant they had

found the bottomless pit. I went down to the spot and examined it,

and, in order that you may have an idea of the extent of our work, I

will give you a description of our descent.

“The shaft mouth is on the south side of the Haram Wall, near the

south-west angle, among the prickly pears; beside it, to the east,

lying against the Haram Wall, is a large mass of rubbish that has been

brought up; while over the mouth itself is a triangular gin with iron

wheel attached, with guy for running up the excavated soil. Looking

down the shaft, one sees that it is lined for the first 20 feet with

frames 4 feet 6 inches in the clear; farther down, the Haram Wall

and soil cut through is seen, and a man standing at what appears to

be the bottom. An order is given to this man, who repeats it, and

then, faintly, is heard a sepulchral voice answering as it were from

another world. Reaching down to the man who is visible is a 34 feet

rope ladder, and, on descending by it, one finds he is standing on

a ledge which the ladder does not touch by 4 feet. This ledge is

the top of a wall running north and south and abutting on the Haram

Wall; its east face just cuts the centre of the shaft, which has to

be canted off about 2 feet towards the east, just where some large,

loose stones jut out in the most disagreeable manner. Here five more

frames have been fixed to keep these stones steady. On peering down

from this ledge, one sees the Haram Wall with its projecting courses

until they are lost in the darkness below, observing, also, at the

same time, that two sides of the shaft are cut through the soil and

are self-supporting. Now to descend this second drop the ladder is

again required; accordingly, having told the man at bottom to get

under cover, it is lowered to the ledge, from whence it is found that

it does not reach to the bottom by several feet. It is, therefore,

lowered the required distance, and one has to reach it by climbing

down hand over hand for about 12 feet. On passing along, one notes the

marvellous joints of the Haram Wall stones, and also, probably, gets a

few blows on skull and knuckles from falling pebbles. Just on reaching

the bottom, one recollects there is still a pit of unknown depth to

be explored, and cautiously straddles across it. Then can be seen

that one course in the Haram Wall, near the bottom, is quite smooth

all over, the stone being finely dressed, all other courses being

only well dressed round the drafts; one also sees two stout boards

lying against the Haram Wall, under which the men retire whenever an

accidental shower of stones renders their position dangerous. One is

now at a depth of 79 feet from the surface, and from here we commence

the exploring of the “bottomless pit.” After dropping a rope down, we

found that it was only six feet deep, though it looked black enough

for anything. Climbing down, we found ourselves in a passage running

south from the Haram Area, 4 feet high by 2 feet wide, and we explored

this passage. It is of rough rubble masonry, with flat stones at

top similar to the aqueduct from Triple Gate, but not so carefully

constructed. The floor and sides are very muddy, as if water gathers

there during the rainy season.

“It at once struck me that it was one of the overflow aqueducts

from the Temple of Solomon, and that there might be a water conduit

underneath. We scrambled along for a long way on our feet, our skulls

and spines coming in unhappy contact with the passage roof. After

about 200 feet we found that the mud reached higher up, and we had to

crawl by means of elbows and toes. Gradually the passage got more and

more filled up, and our bodies could barely squeeze through, and there

did not appear sufficient air to support us for any length of time; so

that, having advanced 400 feet, we commenced a difficult retrograde

movement, having to get back half way before we could turn our heads

round. On arriving at the mouth of the passage underneath the shaft,

we spent some time in examining the sides, but there is no appearance

of its having come under the Haram Wall. It seems to start suddenly,

and I can only suppose it to have been the examining passage over an

aqueduct coming from the Temple, and I am having the floor taken up to

settle the question. This passage is on a level with the foundations

of the Haram Wall, which are rough-hewn stones—perhaps rock; I cannot

tell yet. The bottom is the enormous distance of 85 feet below the

surface of the ground, and, as far as I can see as yet, the wall at

the south-west angle must be buried for 95 feet under ground, so that

it must at one time have risen to the height of 180 feet above the

Tyropœon Gully. I consider it very unsafe sinking these shafts without

sheathing them; but I have been obliged to do so for want of wood.

In this shaft in particular there is about 60 feet unsheathed, and a

loose stone from any part might stave a man’s head in before he is

aware of it. I think it running needlessly into danger; and I hope

that, with what you are sending from England, and what I am getting

from Malta and Alexandria, I shall soon have enough to go on with in

a business-like manner. The amount of wood wanted is very great. This

shaft, when sheeted, would require 100 boards 18 feet long, and 9

inches by 1 inch. We are also very much in want of English dockyard

rope and rope ladders; all the work here consisting of driving shafts

of great depths, it is necessary to have many ladders. We have

only two, and are often in great difficulties about it. It is all

very well climbing hand over hand thirty-five feet up a rope, when

hanging in the air; but when it is in an unsheathed shaft, with the

dangling bringing down the loose stones on the head, it is unsafe. The

anxiety of mind caused lately, by having to keep the workmen going

without adequate means for their protection, is more than I can put

up willingly with any longer. _We must have plenty of money for the

excavations, or stop them altogether._”

The oldest tunnel, of which we can find any record or mention in

Europe, is that constructed in connection with a great aqueduct built

about 540 years B.C. in Boetia, to draw off the waters of the lake

Copais, now called lake Topolias, to the sea then called the gulf of

Opuntius, and now the Channel of Talanti. The tunnel, nearly a mile in

length, became impeded and choked up, and, about 220 years afterwards,

was ordered to be restored by Alexander the Great, who had previously

“fleshed his maiden sword” in its neighbourhood at one of the few great

and decisive battles of the world—that of Chœroncia. It was fought and

won by Philip of Macedon, 338 years before the birth of Christ.

As to how the rock was penetrated in the absence of the modern

appliance of gunpowder, we are now as ignorant as we are of the

mechanical means by which the great pyramids of Egypt and other

gigantic works there, were constructed; and we are in the like state

as regards a tunnel in the Island of Samos, which we learn on the

authority of Strabo was 4,200 Greek feet long—equal to 4,230 modern

English feet—that is more than three-quarters of a mile. The height of

the mountain through which it was driven was 900 Greek (907 English

feet), and its purpose was to supply with water the principal city of

the island, the inhabitants of which, 2,600 years ago, were among the

most active and enterprising merchants and shipowners of the world.

Ancient Samos, now called by the Turks _Susam Adasi_, is the nearest

to the coast of Turkey in Asia of the numerous islands which dot the

Eastern Archipelago.

Albano is the first halting station of the day express train from

Rome to Naples; close to it is the Alba lake seven miles round, at an

elevation of 700 feet above the level of the sea. 2,000 years ago the

Romans constructed a duct to carry off its superfluous water into the

Tiber; part of the duct is through a tunnel, which, in consequence of

modern repairs, is still in a state of perfect preservation. It is a

little more than a mile long, and its dimensions are 6 feet high and 4

feet wide; it was completed in a year.

But the grandest tunnel of ancient Italy is the underground canal

constructed by the orders of the Emperor Claudius to draw off the

waters of the lake then called Fucinus, now Celano, into the River

Siris. This stupendous work, three miles long, and nowhere less than

twenty feet high, required the labour of 30,000 men for eleven years to

accomplish. It has several shafts as in modern tunnels; it is now in a

sound state, having been solidly repaired only a few years ago.

In the second volume of _La Vie de Cæsar_, by the Emperor Napoleon

III., pages 412, _et seq._, (English edition) will be found the account

of the siege of Uxellodum (_Puy d’Issolu_, near Vayrac), the capture

of which by Julius Cæsar, U.C., 703, put him in complete possession

of Gaul. The town, surrounded on all sides by steep rocks, was, even

without being defended, difficult of access to armed men. It was

also well provisioned, but, as its water supply was derived from an

abundant spring which arose at the foot of the wall of the town, 300

feet from the channel of the River Tourmente, “Cæsar resolved,” says

his Imperial historian, “to drain this spring, and for this purpose

he did not hesitate to attempt a laborious undertaking. Opposite to

the point where the spring rose, he ordered covered galleries to be

pushed forward against the mountain, and, under protection of them, a

terrace to be raised. Although these works were attended with great

danger and fatigue, they were vigorously persevered in. At the same

time, a subterranean excavation on a lower plane than the fountain,

and running from the galleries, was made. This work, carried on, free

from all danger, was executed without being perceived by the Gauls;

the terrace attained a height of sixty feet, and was surmounted by a

tower of ten stories, which, without equalling the elevation of the

wall of the town, a result it was impossible to attain, still commanded

the fountain. Its approaches, battered by engines from the top of

the tower, became inaccessible; in consequence of this, many men and

animals in the place died of thirst. Nevertheless, the Gauls did not

yield. At last, the subterranean gallery having reached the veins of

the spring, they were taken and turned aside. The besieged seeing

the fountain all at once dried up, believed, in their despair, that

it was an intervention of the gods: they submitted to necessity, and

surrendered.” Researches made for the purposes of the _Vie de Cæsar_,

by M. J. B. Cessac, assisted subsequently by the Permanent Commission

of the Department du Lot, have brought this tunnel fully into view. It

was carried through the marl; and the proof that the Roman soldiers

had not boring tools suited for penetrating rock is afforded by the

fact that, when they came upon it, they deviated in the expectation

that they would come upon the tufas which, formed by the waters, would

necessarily lead towards the spring. The Roman soldiers were right in

their expectations.

The galleries and tunnel, as well as the siege-works, are illustrated

by two plates, No. 31 and 32 of the Appendix. The tunnel was about 550

yards long. During M. Cessac’s investigation the timber which supported

part of it still existed.

The earliest mention that we have of tunnelling in connection with

the Alps dates back more than 400 years. Anne,[125] Duchess of Savoy,

conceived the grand project of piercing the Col di Tenda, then, and

for nearly two centuries and a-half afterwards, the best and easiest

pass available between France and north-western Italy, with a tunnel

at about one-third of its height from the summit. It appears, beyond

doubt, that the works were begun, but at the death of Anne they were

abandoned; after a lapse of three centuries they were resumed in 1782

by order of Victor Amadeus III., King of Savoy. The excavation of the

mountain was continued, although not vigorously, until 1794, when it

was abandoned, in consequence of the invasion of Savoy by the French.

The total length of the tunnel would have been about 3,000 yards, and

by means of it a precipitous sugar-loaf ascent of 1,300 feet to the top

of the pass would have been avoided. At the present time the idea of

the tunnel is revived, it being proposed to construct to it a railway

on the Fell system,[126] from Cuneo at the foot of the pass, which

place is now connected with Turin and the whole system of Italian

railways by a line fifty-four miles long. The Cuneo district is one

of the most productive of the fertile plains that fringe the southern

slopes of the Alps, and extend for a width of from fifty to sixty miles

beyond them.

We did not begin either to make canals or to tunnel in Great Britain

until a little more than a century ago. Now we have 2,200 miles of

inland navigation, of which 213 are in Scotland and 297 in Ireland.

Brindley, the engineer of the Duke of Bridgewater, commenced the

Harecastle Tunnel on the Trent and Mersey Canal in 1765, but it took

him eleven years to finish it. It was not until 1776 that the first

boat was able to go through it. The tunnel is 2,880 yards long, 12

feet wide and 9 feet high. Although Brindley was much troubled with

quicksands, the work was completed for the marvellously small sum of

£3. 10s. 8d. a yard forward. Some years afterwards, in consequence of

the immense increase of the business of the canal, Telford constructed

another Harecastle Canal alongside the first, the dimensions of which

are—length, 2,936 yards; width, 14 feet; height, 16 feet.

The longest canal tunnel—indeed, the longest tunnel, whether railway or

canal—in England is the Marsden, on the Huddersfield Canal, 5,450 yards

(3 miles and 170 yards), thus exceeding the longest railway tunnel

by 154 yards. The lengths in yards of some of the principal canal

tunnels of England are as follows:—Sapperton (Thames and Severn),

4,180; Lapal (Dudley), 3,776; Blisworth (Grand Junction), 3,080; Tipton

Green, 2,926; Oxenhall, 2,192; Foulbridge (Leeds and Liverpool), 1,640;

Asperton (Hereford and Gloucester), 1,320; Fenny Compton (Oxford),

1,188. From this list we exclude the Old Thames and Medway Canal

Tunnel, near Rochester, because the South-Eastern Railway Company, when

it purchased the canal, converted the tunnel into one suitable for a

railway; its length is 3,740 yards.

The most recently constructed canal tunnel in England is the Netherton

Tunnel, on a branch of the Birmingham Canal, having only been completed

in 1858. It is 3,036 yards long, 27 feet wide, and 24 feet 4 inches

high in the clear. Seventeen shafts altogether were sunk during its

construction, of which ten were closed on being used for traffic. The

greatest depth of any of the shafts is 344 feet 6 inches, the least

65 feet 9 inches. The time occupied for completing this tunnel was

only two years. For full and minute description of this tunnel see

proceedings of the “Institution of Civil Engineers,” Vol. XIX.

The village of Highgate, situated on one of the two northern hills in

the immediate vicinity of London, was to have had a tunnel 301 feet

long, 24 feet wide, and 13 feet high, for the purpose of avoiding the

steep and dangerous hill on the great road which led, and still leads

from London, towards the North. An Act of Incorporation was obtained,

and the undertaking was prosecuted for a time with great energy; but

unfortunately, after 130 yards of the work had been accomplished, the

whole fell in on the 13th of April, 1812. The accident created an

intense sensation, and it was the subject of a drama: “The Highgate

Tunnel, or the Secret Arch,” which for a time was a source of

attraction at one of the minor theatres at the East end of London. The

disaster put an end to the desire for a tunnel, and the present road

was constructed through a deep cutting, by means of which much of the

steepness of the hill was done away with. Hornsey Lane crosses this

cutting, on a noble bridge, which is called the Highgate Arch.

The late Mr. Robert Stephenson, M.P., in his address to the Institution

of Civil Engineers, on his election as President in January 1856,

stated, that “tunnels for railways had traversed hills and penetrated

mountains to the extent of nearly 70 miles,” the miles of railways

opened in the United Kingdom at that time being 8,054.

Mr. J. M. Fraser, in a paper which he read at the Institution of Civil

Engineers, on the 24th of March, 1863, considered, that “it would not

be inaccurate to assume 80 miles as representing the length of tunnels

now daily traversed by railway trains in the United Kingdom.” At that

period there were 11,547 miles of railway in operation. As there were

13,882 miles opened for traffic on the 31st of December, 1866 (of which

about one-third is single line), we may consider that w e have about

90 miles of line “in tunnel” at the present date, and in these are

included the Metropolitan (Underground) Railway and the tunnels[127]

on the New Midland Line between Bedford and London, opened for goods

traffic in August 1867. We knew as a fact that, during the early

construction of railways in England, our engineers resorted to tunnels

to avoid gradients and curves (especially the former) that would almost

be considered favourable at the present day. As experience increased

and the power of the locomotive was developed, so did the amount of

tunnel work diminish. Hence it is that if the three estimates just

stated be correct, the proportion of tunnel to railway on the 1st of

January, 1856, was one mile to every 115; on 1st of January, 1863,

one to every 144 miles; on 1st of January, 1867, one to every 154.

Had Ireland been excluded from the reckoning,—as she might well be,

seeing that there are only three there of the aggregate length of 2,980

yards (exactly 100 yards less than a mile and three-quarters) on the

1,948 miles of railway that are now open for traffic in that part of

the United Kingdom,—the proportion of tunnel to railway in England,

Scotland, and Wales would have been one mile of the former for every

132½ of the latter. The number of tunnels in Ireland is, however, it

is alleged, about to be added to, as, since a very serious accident at

“Bray Head,” on the Dublin, Wicklow and Wexford Railway, a feeling of

uneasiness prevails in the public mind as regards the safety of the

line at this point. It is, therefore, contemplated to run four tunnels

through the mountain at its side nearest to the sea, at an estimated

cost of about £23,000. Bray Head, it may be mentioned, forms the

southern boundary of the Bay of Dublin, the Hill of Howth being its

boundary to the north.

The longest railway tunnel in England[128] is the Woodhead or Summit

Tunnel of the Manchester, Sheffield and Lincolnshire Railway. Its

length is 5,296 yards, or 3 miles and 16 yards, with a gradient of

1 in 200, or 26⅖ feet to the mile, the rise being in the direction

from Dunford to Woodhead. The ordinary passenger trains require ten

minutes from Dunford to Woodhead, but trains travelling from Woodhead

to Dunford take a minute less. Therefore, with the gradient favourable,

the speed is only at the rate of 20 miles an hour; against the

gradient, 18. It is a single line tunnel.

The Stanedge Tunnel on the Huddersfield Branch of the London and

North-Western Railway is exactly 3 miles long, and it is also a single

line tunnel; the gradient is nearly a level. The time for passenger

trains through it is six minutes, or at the rate of 30 miles an hour;

the time for goods trains is nine minutes, or at the rate of 20 miles

an hour. The deepest portion of the tunnel is 600 feet below the upper

surface of the mountain.

On the 3rd September, 1867, we came through the Shepherd’s Well Tunnel

of the London, Chatham and Dover Railway, 2,376 yards long, against

the gradient, which is 1 in 100, or 53 feet in the mile for two-thirds

of its length, and the remainder nearly level, in two minutes fifteen

seconds; on the same day we came through the tunnel in the opposite

direction, when the time occupied was one minute forty-two seconds:

on the other hand, Mr. Allport, the General Manager of the Midland

Railway, to whom we gladly acknowledge ourselves indebted for much

valuable information most obligingly afforded, says that the passenger

trains are timed to run _in each direction_ through the Dove’s Hole

Tunnel 2,420 feet long at the same rate of speed, and actually do run

at that speed—nearly 46 miles an hour,—yet the gradient is 1 in 90, or

58⅔ feet per mile. The same for goods trains, their speed is 23 miles

an hour in each direction, and Mr. Allport assures us they maintain it

in both directions.

The following are the lengths of some of the principal railway tunnels

in Great Britain and of the two longest in Ireland:—

Name. Company. Yards.

Medway South-Eastern 3,740

Sevenoaks ” 3,600

Box Great Western 3,227

Littleborough Lancashire and Yorkshire 2,869

Sapperton Great Western 2,800

Pohhill South Eastern 2,750

Kilsby London and North-Western 2,423

Dove’s Hole Midland 2,420

Shepherd’s Well Chatham and Dover 2,376

Wapping (L’pool) London and North-Western 2,250

Lime Street ” ” 2,230

Clayton London and Brighton 2,200

Sydenham Chatham and Dover 2,190

Abbot’s Cliff South-Eastern 2,000

Watford London and North-Western 1,793

Merstham South-Eastern 1,780

Clay Cross Midland 1,780

Sapperton(A) ” 1,760

Corah Wood Newry and Armagh 1,510

White Ball Bristol and Exeter 1,470

Belsize Midland 1,460

Grenfield Midland 1,400

North-Eastern 1,364

Thackley Midland 1,360

Honiton London and South-Western 1,350

Bletchingly South-Eastern 1,324

Lydgate Lancashire and Yorkshire 1,322

Wichwar Midland 1,320

Shanklin Isle of Wight 1,320

Shakspeare South-Eastern 1,320

Almonsbury Bristol and South Wales 1,320

Kilbarry Great Southern and Western 1,290

Primrose Hill London and North-Western 1,250

Glasgow Edinburgh and Glasgow 1,250

Potter’s Bar Great Northern 1,210

Balcombe London and Brighton 1,122

Brislington (No. 1) Great Western 2,200

Brislington (No. 2) ” 1,100

Brislington (No. 3) ” 330

North Welwyn Great Northern 1,046

Penscliff ” 968

Guildford London and South-Western 965

Saltwood South-Eastern 954

Bangor Chester and Holyhead 910

Chislehurst South Eastern 900

Elstree Midland 900

Gillingham Chatham and Dover 895

Stoke Great Northern 880

Milford Midland 836

Calandar Edinburgh and Glasgow 830

Whitstable South-Eastern 822

Haddon Midland 800

Oakley ” 800

Bishopton Glasgow and South-Western 760

Coates Park Midland 740

Buckhorn Weston Salisbury and Yeovil 739

Belmont Chester and Holyhead 737

Penmaen Bach Chester and Holyhead 721

Tottenham Great Northern 714

Leeds North-Eastern 700

Copenhagen Great Northern 694

Dover Chatham and Dover 682

Manton Midland 660

Ampthill ” 640

Chivet ” 620

Martello South-Eastern 616

Barnet Great Norther 605

Chelsfield South Eastern 600

(A) Followed by an open cutting of 100 yards; then a tunnel of 440

yards. The gradient in these tunnels is 1 in 70. For full details

respecting them, see Paper read by Mr. Charles Nixon at the Institution

of Civil Engineers. _Proceedings_, volume for 1842.

Some of our tunnels have been extremely costly, the Kilsby, for

instance, £125 per yard forward, total £302,000. The face of the

Primrose Hill Tunnel at its London end cost £7,000, thereby adding to

its total cost at the rate of £5. 15s. a yard. Up to 1857, the average

cost of all tunnels was £102 per yard, or for 70 miles £12,320,000.

Tunnels have certainly been constructed more cheaply since then.[129]

Mr. J. G. Fraser assumes them to have cost at the average rate of

£45 per lineal yard, but this must be considerably below the mark,

notwithstanding that many of the more recently constructed tunnels have

only been for “single line.” The dimensions of these tunnels on the 4

feet 8½-inch gauge, are usually as follows:—12 feet wide at rail level,

17 feet from rail level to soffit, whilst for a double line of the same

gauge tunnels are usually about 25 feet wide at rail level, and about

22 feet from rail level to soffit. On the exceptional Great Western

gauge, they would be respectively about a fourth higher and a third

wider.

We must only touch the Thames Tunnel at a tangent. Its length is 1,200

feet with two arches each 13 feet 9 inches at the springing of the

arch; 16 feet 4 inches high from the invert. It cost £1,000 a yard, or

for 400 yards £400,000, two and a-half times as much per yard forward

as the most expensive estimate for the Mont Cenis Tunnel, more than

three times as much as its cost per yard forward up to the present

time. In addition, the approaches of the Thames Tunnel (for foot

passengers only) cost £54,714, total £454,714. It is now about to be

utilised as a railway tunnel, having been purchased by the East London

Railway Company for the purpose of bringing together the lines at the

north-eastern and south-eastern ends of London.

As a rule, the tunnel mileage (except in one country only, Spain) is

much less in proportion to total mileage on the various continental

railways than it is in England. This is especially the case in almost

all the more recently constructed lines, but more particularly so in

Germany. Here, the ingenuity of the engineer has been exercised to

avoid tunnels wherever possible, and not to seek them. We might cite

many instances in proof, but limit ourselves to one, which must be

familiar to many—the line along the left bank of the Elbe, between

Dresden and the Austrian frontier at Bodenbach, through the beautiful

Saxon Switzerland. There are, however, tunnels in Germany, the longest

of which is that which has already been mentioned, the summit Tunnel of

the Sœmmering Pass, 1,565 yards, just 195 yards less than an English

mile.

There are long tunnels in France, both canal[130] and railway, and as

regards the first-named class, our readers will hardly be prepared

to learn that there has existed for forty-five years in France, an

underground passage at Cunhardy called a tunnel, which is in length

only 314 yards less than the Great Tunnel of the Alps; yet such is

the fact,—the Norieu underground passage which forms a portion of the

_Canal de St. Quentin_, is 13,128 yards long, or 7½ miles all but 72

yards. Its maximum depth below the surface is 86 yards. It is only 4

feet 11 inches wide and is without towing path. It was opened in 1822

at a cost of only £2. 12s. per yard. Seven years were occupied in its

construction. But the most important canal tunnel in France, in respect

of its width and elevation, is that of Rigueval, which is also on the

_Canal de St. Quentin_. It is 6,237 yards long, 26 feet 2 inches wide,

of which 5 feet 3 inches are for the towing path along which horse

traction is used. The Tunnel of Manvages, 5,320 yards long, is on the

_Canal du Marn au Rhin_. Of the two other long canal tunnels (both on

the _Canal de Bourgogne_), that of Sousey is 3,873 yards long, 7 feet 3

wide. It has not a towing path. That of Pouilly is 3,630 yards long and

20 feet 2 inches wide, including a towing path of the width of 5 feet

3 inches. The cost of the Sousey was £9. 4s. a yard; of Pouilly £80 a

yard.

The longest railway tunnel in France is that of La Nerthe on the Paris,

Lyons and Mediterranean Railway, between Avignon and Marseilles. It is

4,638 metres (5,101 yards). It cost £90. 10s. per metre. Its shafts

vary in depth from 65 to 623 feet.[131] There are twenty-four of these

shafts, which are not over the centre of the tunnel, but about 30 feet

on one side. They communicate with it by lateral galleries 10 feet

wide, and as high as the tunnel itself. The shafts are all circular,

about 10 feet wide, and have all been left open. The gradient from

one end to the centre is 1 in 500—10½ feet in the mile. It then falls

to the other entrance at the rate of 1 in 1,000. The tunnel of Blaisy

on the same line, near Dijon, is 4,100 metres (4,510 yards). It cost

£77 per metre. It had twenty shafts during construction, of which ten

are now closed. Nine of the shafts are from 515 to 643 feet below the

surface. They are not over the tunnel, but about 32 feet on one side,

and connected to it by lateral galleries. The Credo Tunnel on the

Geneva Branch of the same line 3,949 metres (4,344 yards), £65. 12s.

per metre. There are several other long railway tunnels in France. That

of Rilly near Rheims, is 3,500 metres long. There were nine shafts

during construction, of which four were closed when the railway was

opened. Although lined with masonry throughout, the thickness being 20

inches in compact chalk, and 32 inches in that which was seamy, the

cost was only £28. 15s. per yard. Hommarting Tunnel (_Chemin de Fer de

l’Est_), is 2,780 metres long, Pissy Poville, 2,400 metres; Tarare is

a very long one but we are not sure of its exact extent. The Tunnel of

Arschwiller, on the _Chemin de Fer de l’Est_, is 2,678 metres, and is

close to the tunnel of the canal from the Marne to the Rhine, named on

the previous page the Tunnel of Manvages. In fact, where they enter the

mountain they are at the same level, and a double arched entrance—the

intervening pier being only 22 feet thick, and the arches precisely

similar—receives them both. The canal tunnel was completed before that

for the railway, which latter diverges from the line of the former at

the rate of 26 feet in 1,000, so that at the end of the railway tunnel

it is 60 feet from that of the canal. The canal then makes a bend and

presently crosses _over_ the railway tunnel, as it has a descending

gradient of 1 in 200, and at what may be called its diverged entrance,

it is 44 feet below the level of the canal. The railway tunnel took

nearly eight years to construct at a cost of £38. 10s. per metre

forward.

There is also a large number of tunnels from 500 to 1,500 metres long.

The price per metre forward varies nearly as much as in England, its

maximum being £95, that of Batignolles, near Paris, on the _Chemin de

Fer de l’Ouest_, a short one, only 333 metres (366 yards); minimum

£30, that of Terre Noire 1,641 metres, on the Paris, Lyons and

Mediterranean.

The longest railway tunnel in Belgium is that of Braine le Compte,

641 metres (705 yards). It cost £46 a metre. There are altogether

eighteen tunnels along the 15½ miles of picturesque line of railway

between Liege and Verviers; they are all short, none exceeding 400

metres in length; their cost was exactly £50 a metre forward. There is

only one long tunnel in Switzerland, that of Hauenstein near Olten,

on the railway between Basle and Berne, its length is 2,731 yards,

and, notwithstanding the numerous difficulties which attended its

construction, its cost was only £80 per yard. It might be expected

that in an undulating country like Switzerland there would be a great

many tunnels on its railways; such, however, is not the case, the

larger proportion of the railways are constructed in the comparatively

level valleys, and when engineers come upon rough ground, as a rule,

they prefer stiff gradients to very expensive works. This, however is

not always the case; witness the passage of the Jura from Pontarlieu

towards Neufchatel; here there is the combination of expensive works

with a steep ascending and then a steep falling gradient. These might

have been greatly alleviated, if not altogether avoided, by a tunnel of

comparatively short length; the engineer, it is said, wished to erect

for himself, in this work, a monument _perennius ære_. He has succeeded.

The longest tunnel upon a railway in Italy, now open for traffic, is

on the Giovi incline, near Genoa, 3,225 yards, or five yards over two

miles. The longest of the two on the Brachia pass of the Apennines,

between Pistoja and Poretta, is (as already stated) 3,300 yards; the

length of the next longest, on the same pass, is 2,860 yards. A tunnel

longer by a few yards than that on the Giovi incline, is in process of

construction on the branch which is to connect Naples by a direct line

with the Adriatic. The tunnel Maggioni, between Florence and Rome, is

1,170 metres (1,287 yards) long.

The natural undulatory, in many places almost mountainous, character of

Spain, has rendered necessary the construction of numerous tunnels on

Spanish Railways. The following is an abridgment of much interesting

information on this subject, published by the Spanish Government last

summer, and translated into French a few weeks ago.

On the line from Madrid to Saragossa, the length of which is 213 miles,

there are twenty-six tunnels; the most important of them is Horna,

1,010 metres. The total length of these twenty-six tunnels is 4,791

metres, or 3⅝ miles. On the Manzanares to Cordova Line, the length of

which is 243½ kilometres, there are thirteen tunnels, the longest of

which is 1,025 metres; their total length 3,092 metres. The Albaceta

to Carthagena Line, is 154 miles long; the chief tunnel is that of

Almadenes, along the gorge of the same name, its length is 1,056

metres. There are four short tunnels on this line, all in the vicinity

of the gorge; their combined length is only 393 metres, making, with

the tunnel of Almadenes, 1,449 metres.

The Northern of Spain—Madrid to Irun—is 399 miles long. Although it

is not the longest, it is probably the most important railway in

Spain, traversing nearly throughout its entire extent, a difficult,

and, at places, an extremely hilly country, and finally terminating

at the Pyrenees, where it meets the Bayonne and Irun Railway. Thus,

on the section from L’Escurial to Avila, 44 miles long, there are

sixteen tunnels, the total length of which is 4,408 metres, all of

which are associated with numerous extremely difficult works of art

in their immediate vicinity, some of the viaducts varying from 95 to

135 feet in height, with other proportional dimensions. It is in this

section that the Guaddarama Mountains are traversed, and, until the

locomotive crossed the Mont Cenis the summit of this railway was the

highest in Europe, 4,505 feet above sea level. On the section between

Otzaurte and Beasain, 33 miles long, there are twenty-three tunnels,

the total length of which is 10,351 metres. Some of the works of art

on this section are magnificent in their character and construction.

The tunnels on the other sections of the line are not so numerous;

nevertheless, they are altogether fifty-eight in number, with an

aggregate length of 22,160 metres, exactly 14 miles.

Turning from the most difficult Spanish railway in point of

construction, to the easiest for the greater part of its extent, the

Seville, Xeres and Cadiz Line, the length of which is 103 miles, we

find that there are no tunnels upon it, although on the section between

Xeres and Cadiz there are several extremely difficult works of art.

The Alar del Rey to Santander Railway is 87 miles long. It has

twenty-one short tunnels upon it, the total length of which is 4,808

metres.

The length of the Palencia and Astorya Line is 110 miles. It runs

from Palencia to Gigon, on the Bay of Biscay. This railway is only in

course of construction. There are several tunnels upon it, of which the

particulars have not yet been published.

The Saragossa and Barcelona Line is 230 miles in length. In the section

between Cervara and Tarrassa, 59 miles long, there are sixteen tunnels.

As their aggregate length is only 3,591 metres, it will be observed

that they are all very short ones. The other portions of the line are

of comparatively easy construction.

The Ciudad Real to Badajoz Railway, 213 miles long, is a line

presenting scarcely any difficulties of construction, and it has no

tunnel upon it from one end to the other.

The principal difficulty connected with the Tudela and Bilbao Line is

that at its terminus at Bilbao, it is barely above the level of the

sea; but it has to ascend 2,060 feet in 29½ miles. There are no heavier

works in all Spain than those upon this section. For more than half

a mile the principal branch of the Ebro has been deviated, and the

railway has been constructed upon the old bed of the river.

On the Barcelona to Santa Coloma Railway there are seven tunnels, very

short in length; the longest is 443 metres long.

The Tarragona to Barcelona Line is 64 miles long; though passing

through a level country for the greater part of its extent, it has one

section—that between Villa-franca and Marterello, in which the rise

is 540 feet in 15 miles. There are five tunnels upon this length, all

short ones; but they were very difficult as regards construction, and

they are very troublesome in maintenance.

The Lerida Reus and Tarragona Line is 63 miles. It has only one tunnel

upon it, that of Terres, 700 metres long.

The Cordova to Malaga Railway, 121 miles, is extremely easy in point of

construction, except for 6¼ miles at the passage of the Guitanas, where

there are no less than twelve tunnels and six great bridges. In one of

the tunnels a singular circumstance was discovered during construction.

The miners suddenly came upon a _crevasse_ or split in the mountain

which extended from its lofty and precipitous summit to a great depth

beneath the part bored through. The space is traversed by a bridge, the

only one in the records of tunnels that we remember to have met with.

There is one very long canal tunnel in Spain—the Canal of Urgel—between

the Ebro and one of its affluents, the Segro. This canal is 90 miles

long and the tunnel is of the length of 5,230 metres.

The grandest canal in Spain for water supply is the “Canal of Isabel

II.” It furnishes the supply for Madrid. It is built after the system

of the ancient Romans—that is, aqueducts constructed in masonry arched

over. Its total length is 45 miles. It has besides, thirty-one tunnels,

partly cut straight through rocks which the canal traverses, and partly

side-cut tunnels (one is five-eighths of a mile long) for obtaining

water. At the present time, when the question of supplying London and

other important cities with water is much agitated, it may be well to

mention that by means of this canal 200,000 cubic metres of water, or

600 litres (a litre is about a quart) per inhabitant are brought to

Madrid daily. Of these 600 litres 100 per head is for domestic use,

and 500 for irrigating the districts adjoining Madrid. The quality

of the water is said to be excellent; indeed it is alleged that if

the air which it contains were abstracted it might be considered as

distilled water. The pressure of the water in the conduits is almost

without exception sufficient to raise it to the upper stories of the

highest houses in Madrid. In some quarters of the city it could rise 75

yards above them. There are two road tunnels in Spain, one on the road

between Grenada and Motril, 300 metres long, and one on the Pyrennean

road between Barbastro and Benasquez, the length of which is 90 metres.

Spain, for a country with a population under 16,000,000, cannot be said

to be badly off for means of communication. The total length of roads

in the kingdom on the 1st of January, 1867, was 4,137,640 miles of the

first class, 3,265,700 of the second, and 1,908,112 of the third. About

2,800,000 are in course of construction. It is intended eventually to

extend the road system of Spain to a total of about 22,500,000 miles.

As already mentioned, the total length of Spanish railways on the 1st

of January, 1867, was 3,182 miles.

There are few tunnels of any length in the United States. The

Cincinnati Tunnel is 3,337 yards long; the Kingwood 1,366. The

Alleghany mountains are perforated by one, the property of the

Pennsylvania Railroad Company, which is 1,204 yards long, 24 feet wide,

and 22 feet high. There are four through the Blue Ridge Mountains,

Virginia, the longest of which is 1,955 yards, the next 1,418 yards,

with an uniform gradient of 1 in 70. The Long Duck Tunnel, New Jersey,

is 1,437 yards in length. But the Hoosac Tunnel, Massachusetts, will,

when completed, be the longest railway tunnel in existence—except the

tunnel of the Alps—8,166 yards; it was commenced in 1855, but it has

only been vigorously proceeded with since 1864; its total estimated

cost is to be £1,100,000, of which about £420,000 have been expended

upon the 2,350 yards already constructed; its width is 26 feet, height

24 feet; the rock through which it is pierced is mica slate mixed with

a little quartz.[132]

General Haupt, of the United States Army, the engineer-in-chief of

this tunnel, is said, by the _Times_, to have invented one of the

most compact, effective, and economical drilling machines, applicable

for boring tunnels, driving adits of mines, and indeed for every

description of work in which the hardest kinds of rocks have to be

pierced. It is stated that it can drive holes in granite, or even

quartz, at the rate of nearly four inches in a minute, and that as

soon as about twenty-eight inches have been drilled, the blasts take

place, when the machine can, in consequence of its great lightness and

portability, be immediately carried over the _debris_ caused by the

explosion, and be at work upon the new face of the tunnel in the course

of a few minutes.

We extract the “latest novelty” in tunnels from a New Zealand newspaper

received in England August 1867,—

“A TUNNEL THROUGH AN EXTINCT VOLCANO.—The Moorhouse Tunnel, opening up

the fertile plains of the Canterbury settlement, is 2,838 yards long,

and cost £195,000. It affords, we believe, the first instance where

a complete section of an extinct volcano has been opened out. The

elaborate drawings prepared by Dr. Haas for exhibition in Paris, will

draw the attention of geologists to the fact, and doubtless afford

the greatest satisfaction to the scientific world. The rock in the

tunnel may be described as a series of lava streams and beds of tufa,

intersected by vertical dykes of phonolite. The lava streams consist

generally of scoria, overlaying a coarse pink trachyte, which passes

gradually through shades of grey, purple, and blue into a black finely

grained dolorite intensely hard and tough; the lightest and softest

rock being at the top, and the densest and blackest at the bottom.

Regarded from an engineering point of view, the work is considered

eminently successful.”

The New Zealanders are naturally very much elated at the completion

of this, to them, great and important work, of which the _New Zealand

Examiner_, a monthly journal published in London, and devoted

exclusively to the interests of the New Zealand settlements, thus

speaks in its August number:—

[Illustration: METROPOLITAN RAILWAY.]

“That perseverance which has commanded success for England in so many

fields has achieved another triumph in New Zealand. For six years

has a quiet, but none the less remarkable, work been going on in the

range of hills that divides Christchurch from Lyttelton. Possessed of

a splendid harbour, the Province of Canterbury has had to suffer ever

since its foundation from the difficulty of communication between its

capital and port. At first sight the range of hills appear impassable,

and are sufficient to frighten new arrivals. For the first years of

the settlement’s existence there was nothing in the shape of a road

until the track over the hills was widened into a bridle path. All

goods destined for Christchurch had to be sent round in boats up the

river. Then came the cutting of a cart road winding round the hills,

and eventually reaching Heathcote (which may be properly called the

Christchurch side of the range). The latter road was opened in 1859,

and ever since the traffic on it has continued increasing. In 1856 an

attempt was made to introduce steam navigation on the river, for the

quicker and cheaper conveyance of goods, this unfortunately terminated

disastrously in the wreck of the steamship Alma. The course of the

river having been staked out in 1858, the Planet commenced running,

and from that time the number of coasting steamers has steadily

increased, while the sailing vessels from being confined to craft of

15 to 20 tons have risen to 100 tons. Still the great desideratum of

a _direct_ and _rapid_ communication remained, and various schemes

were propounded, but none carried into effect till May 1861, when

the Provincial Government accepted a tender from Messrs. Holmes &

Co., to complete a line of railway from Lyttelton to Christchurch (a

distance of six miles) in five years, for £240,500. In this contract

the tunnel, 2,838 yards long (the cost of which was estimated at

£195,000), was included. The first sod of the line was cut on the 17th

July, 1861, and for six long years, night and day, has the process of

boring through the mountain gone on. During that time the contractors

have met with all sorts of difficulties, not the least of which have

been the attractions offered to their men by the successive outbreaks

of the Otago and Canterbury diggings, but, lending their whole

energies to the task, the works have not been stopped for a single

day. The completion of this work must be productive of the highest

benefits to Canterbury.

It will thus be seen that this tunnel cost at the rate of £69 per

yard forward, and it required six years to complete it at a cost

both of money and time very onerous to a young settlement. With Mr.

Fell’s system the tunnel would have been altogether avoided, and it is

probable that the line would have been completed in about two years, at

a price not exceeding £60,000, instead of the £240,500 it has cost the

colony to construct it.

The total length of London’s greatest tunnel, the Metropolitan Railway,

from Bishop’s Road to Moorgate Street, is 23,616 feet, or 4½ miles,

less 144 feet. Starting from Bishop’s Road, the measurements are as

follows:—For 3,024 feet, or 96 feet less than five-eighths of a mile,

there is tunnel, then an open space of 675 feet around the Edgware

Road station. From there to King’s Cross, 2 miles and 496 feet, is

tunnel; but in this distance there are three most effective means of

ventilation: the first is at Baker Street Station, 2,640 feet, or

exactly half a mile from the Edgware Road Station. The second is at

Portland Road Station, 2,978 feet, or 338 feet more than half a mile,

from Baker Street. Portland Road Station is the most open of all the

four intermediate stations. The third is at Gower Street Station, 1,920

feet, or 60 feet more than three-eighths of a mile. From Gower Street

to King’s Cross Station is the longest interval between two stations,

3,900 feet, or 60 feet less than three-quarters of a mile. The distance

between the King’s Cross and the Farringdon Street Stations is 5,192

feet, or 88 feet less than a mile. In this distance there are two

tunnels—if one of them may be so called, for it is only 220 feet long;

the other is 2,170 feet, or 190 feet more than three-eighths of a mile.

In the remaining 3,836 feet, or 124 feet less than three-quarters of a

mile, there are two little tunnels, one 523 and one 91 feet. During the

hours the sun is above the horizon, complete light is never absent in

the 91 feet tunnel—the train is no sooner in it than it is out again;

and in the longer one there is for a moment or so “a dim religious

light,” and then it is actual daylight. The amount of this, however,

must depend upon the season of the year at which the passenger goes

through it. In certain dark days of November it is hard to say which is

the darker of the two—the tunnel or the daylight.

The foregoing measurements will be readily understood by reference to

the diagram herewith appended. It is a section of the Metropolitan

Railway from end to end.

As regards its ventilation we shall speak presently.

[Illustration: SECTION OF THE METROPOLITAN RAILWAY. LONDON.

_Horizontal Scale_ 2000 ft—1 _inch_ _Engineer, John Fewler, Esq._

_Vertical Scale_ 40 ft—1 _inch_ _General Manager, Myles Fenton, Esq._

]

There are two railways in connection with the Metropolitan Railway,

which are also to be carried underneath portions of London. The

Metropolitan District Railway, when finished, will form the southern

side of the inner railway circle that is to encompass London. It

connects at Kensington, with the “Metropolitan Extension Railway”

(a continuation from Paddington of the Metropolitan Railway). This

extension is to run through Brompton to Pimlico, where it will be in

closest proximity to the Victoria Stations of the London, Chatham and

Dover, and of the London, Brighton and South Coast Companies; from

there to Westminster Bridge, whence it is carried along, and, in fact,

forms part of, the Thames Embankment, to Blackfriars Bridge. Here it

is again in close contact, although at a different level, with the

line of the London, Chatham and Dover Company, near its Ludgate Hill

station. Proceeding eastward, it is carried as far as Trinity Square,

Tower Hill, where it is to meet the eastern “Metropolitan Extension” of

the Metropolitan Railway. These two sections finished, the whole inner

Metropolitan circle will be completed. The distance from Kensington to

Trinity Square is 33,150 lineal feet, or 6 miles and 1,470 feet, of

which a little more than a third—that is, 10,974 feet—or 2 miles and

414 feet, are open cuttings or glass-covered stations, and a little

less than two-thirds, or 4 miles and 1,056 feet, are in tunnel. The

open cuttings and the tunnels are constantly alternating; the three

longest of the latter are 665 feet; one is close to Gloucester Road

Station, Brompton; one is at Tothill Street, Westminster; and the third

is in the Thames Embankment. The gradients are favourable, there being

only 2,352 feet (or less than half a mile) of 1 in 100, or 52 feet in

the mile. These are all situated between Blackfriars Bridge and Trinity

Square, Tower Hill. In addition to the foregoing main line of the

Metropolitan District Line, there is to be a railway from Kensington

High Street to join the West London Railway—the line that connects the

London and North-Western and the Great Western railway systems north of

the Thames with the Clapham Junction Station on the south. From Clapham

Junction there is unbroken connection with all parts of the London and

South-Western, and the London, Brighton and South Coast Railways.

The length of the Kensington and West London Extension of the

Metropolitan District Extension is to be 7,470 feet, or 450 feet less

than a mile and a half, of which 5,565 are to be entirely open, 525

station roof and 1,380 covered way.

The St. John’s Wood Railway, which starts from the Baker Street Station

of the Metropolitan Railway, is in tunnel throughout, and is a series

of stiff gradients, culminating with the stiffest of all at its St.

John’s Wood end. The line is 2¾ miles long, and its total rise in

this length will be 255 feet, but the elevations are very unequally

distributed. Starting from Baker Street Station, it proceeds for a

short distance on a level, and then it rises 1 in 90 and 1 in 44 to

the Regent’s Canal. From the canal the line descends slightly, and

then at three quarters of a mile from Baker Street will commence an

ascent of 1 in 60, or at the rate of 88 feet in the mile, for 660

yards. Then follows an incline of the same length of 1 in 150 (35

feet in the mile), then for 440 yards nearly level, except, just for

a few yards, 1 in 80. At one mile and 1,320 yards from Baker Street

commences a gradient of 1 in 27, or 196 feet in the mile for a length

of 1,320 yards. Half way up the gradient will be a station, but the

steepness of the gradient will be diminished for about 200 feet to 1

in 250, or 21 feet in the mile. Mr. John Fowler, the President of the

Institution of Civil Engineers, is engineer of the Metropolitan, the

Metropolitan District, and the St. John’s Wood Railway Companies. The

construction of an extension of this last-named line to Hampstead has

been authorised.

The longest tunnel in Europe _over_ land and over water is the

Britannia Tubular Bridge built across the Menai Straits, parallel to

and some mile and a-quarter from Telford’s beautiful Suspension Bridge

opened for road traffic in 1829. It is 1,834 feet 9 inches long, and

in fact consists of two independent wrought iron tubes, each placed

alongside of the other. There are four spans, two of 460 feet each,

and two of 230—that is, the tubes rest upon two abutments and three

towers of masonry—at an elevation of 100 feet above high water mark.

The tower called the Britannia Tower is built upon a solid rock that

projects above high water nearly in the centre of the Channel. The

summit of this tower is 130 feet higher than the level of the railway

in the tubes. The total weight of iron in the tubes is 9,360 tons, each

tube of 460 feet weighs 1,587 tons, each of 230 feet weighs 753 tons,

but these weights of iron are greatly in excess of what would be put

in tubular bridges of like spans at the present time; and for a length

but little exceeding a third of a mile, one tube, and not two, would be

considered more than sufficient for all traffic, in both directions,

that could be conveyed through it. The tubular bridge across the

Conway River, forty-five miles from Chester, consists of two tubes

placed alongside each other, each is 400 feet long and 1,180 tons. The

combined cost of the two bridges, Britannia and Conway, is always set

down at a million sterling. Now-a-days they would be constructed for

about half that amount.

But Canada, or rather the Grand Trunk Railway of Canada, can put

forward the boast that it possesses the longest over-land-and-water

tunnel in the world. The Victoria Railway Bridge is constructed across

the River St. Lawrence just above the ancient city of Montreal. The

entire length of this stupendous structure is 3,470 yards, or exactly

50 yards less than 2 miles. The tube is approached on each side by a

solid abutment, that on the north side being 266 yards long, on the

south 400 yards. Deducting these measurements from the total length of

the bridge, the tunnel or tubular portion of it is 2,804 yards long,

or 164 yards more than a mile and a-half. In addition to the abutments

there are 24 piers of masonry which it is impossible to exceed in

grandly massive strength and solidity. The current of the St. Lawrence

runs where the bridge is constructed at a rate never less than six

miles an hour, and in some parts of the stream its rate is ten. The

real giant force, however, which the piers have to resist is the ice

at its breaking up some time between the last ten days of each April

and the first six or seven of each May. The late Mr. Robert Stephenson

the engineer of this bridge, as well as those at the Menai Straits and

at Conway, estimated the ice pressure on some of the central piers of

the Victoria Bridge at six thousand tons each. It is therefore not to

be wondered that there is no stone opposed to the current at each of

these piers which weighs less than ten tons, and that all should be

clamped together by massive bars of iron drilled into each block, and

held fast for ever by molten lead poured into each interstice. The

total amount of masonry in the bridge is 3,000,000 cubic feet, or about

22,000 tons. There are 25 tubes or spans of which 24 are 130 feet long

each, and the centre, which is 60 feet above the surface of the water,

is 242 feet long. The total amount of iron in the structure is 10,400

tons. The contractors for the bridge were Messrs. Peto & Betts, their

resident engineer was Mr. James Hodges, and to him the chief merit in

connection with the construction is due. Its cost was £1,350,000. It

was opened for traffic at the period of the Prince of Wales’ visit to

Canada and the United States in 1860.

So far as regards tunnels actually constructed. We now come to speak

of tunnels suggested. These may he divided into two classes—tunnels

under rivers and tunnels under the ocean. Of the former, the first

to he mentioned is that proposed to he constructed under the Mersey,

to connect its Cheshire and Lancashire sides together. The scheme is

propounded by Mr. John Hawkshaw, the eminent engineer, in a letter

which he addressed to the Mersey Dock and Harbour Board, on the 31st

of August last. Mr. Hawkshaw having stated that it is evident a bridge

or viaduct over the river would interfere with the navigation, whilst

the sand-stone rock which underlies its bed affords facilities for the

construction of a tunnel, proceeds to show that the river should be

crossed between New Brighton and Bootle, that being the best point for

connecting together the dock lines of railway on each side of the river

Mersey.

The cost is set forth as follows:—

Total length of lines 9¼ miles; length of tunneling, 4,800 lineal

yards: estimated cost £785,000.

The lowness of the estimate is owing to it not being necessary to

pass through valuable property, or important commercial buildings of

any kind. Nevertheless Mr. Hawkshaw feels that the usual allowance

for contingencies should be increased from 10 to 20 per cent. on the

outlay. Still it brings the total amount considerably under a million.

Mr. Hawkshaw does not ask the Mersey Docks and Harbour Board to be at

the total cost of these works, however important it is that the two

several portions of the board’s establishment should be closely united

in the manner which this tunnel accomplishes, but that it should only

contribute a portion of the outlay—an outlay which he considers will

not be more than a third of what will be required for accomplishing

any other of the schemes that have been proposed for carrying a tunnel

under the Mersey.

In 1864 the Dublin Trunk Connecting Railway obtained an Act for the

construction of a railway in the immediate vicinity of Dublin. Part of

the plan sanctioned by Parliament is a tunnel under the Liffey, less

than half a mile from its mouth. The depth of the tunnel-top under

the bed of the river will be 20 feet. The stratum of limestone rock

is curiously placed where the tunnel is to be pierced. The bottom of

it will rest upon the rock, but the tunnel itself will be constructed

through the superjacent clay. It will be lined with brick in cement.

Its length under the river is to be 324 yards, and the approaches to

it, which are to be constructed in the manner known as “cut and cover,”

are to be 430 yards each. The gradients on both sides will be 1 in 70,

or 75½ feet in the mile. The cost is estimated by Mr. John Burke, the

engineer for its construction, at £200 per yard forward.

A proposal has recently been made to construct a tunnel under the

Humber from Barton to Hessle, close to Hull. A bridge over the river

has often been spoken of; but its estimated cost, £700,000, render its

construction hopeless. It is considered that the tunnel, which would

be about 2,000 yards long, could be constructed for £150 a yard, and,

with an allowance of £50,000 for approaches, the total cost would

not exceed £350,000. It is not probable, however, that the railway

companies concentrating on both sides of the river would find it to

their interests, at all events at present, to carry this project into

execution. The company that would most benefit by it would be the

Manchester, Sheffield and Lincolnshire.

Mr. Peter W. Barlow, civil engineer, has recently obtained permission

from the City Commissioners of Sewers to construct a subway beneath

the Thames, which is to be carried from Lower Thames Street to the

opposite shore of the river. The dimensions of the subway are to be

sufficient to allow a loaded omnibus to pass through it. If constructed

economically, there is no reason why it should not answer commercially.

We perceive by recent accounts from America that it was originally

intended to connect the railways concentrating on both banks of the

Mississippi at St. Louis, by a tunnel under the bed of the river; but

this plan has been abandoned, and instead of it a “sub-aqueous iron

tubular bridge” is to be laid on the bed of the river, which is about

half a mile wide in this vicinity.

The difficulties connected with crossing the upper Indus at Attock, a

thousand miles from its mouth, and 940 feet above sea level, have long

been felt. Colonel Robertson, of the Madras Staff Corps, therefore,

proposed a scheme for going under instead of over it. In his report on

the subject submitted to Government in 1859, he stated that, as the

geological formation at Attock, is a compact slate rock, it is easily

worked; and under the bed of the river it is apparently not broken by

any great fissures which might possibly endanger the tunnel. Colonel

Robertson fixed the upper level of the excavation for the tunnel at

60 feet under low water cold weather mark, or, at the water’s deepest

point, 20 feet below the bed of the river; the lining of the tunnel to

be 2 feet thick, and as its height is 20 feet, the foundation level

would be 82 feet below the low water level. To guard against all risk

of inundation through floods, which raise the level of the river from

50 to 92 feet (it was at the latter height in 1841), the two entrances

of the tunnel are to be 100 feet above low water level. The width of

the river at the point selected is 1,215 feet. This portion of the

tunnel is to be nearly on the level; but the gradient of the approaches

to it on each side, each 3,720 long, is to be 1 in 40, or at the rate

of 132 feet in the mile; the total length of actual tunnel to be 7,215

feet, as some portion of each approach is to be in open cutting. There

are ten shafts, each 600 feet apart, except at the actual river, where

they are 1,580 feet apart. In 1860 the works were commenced, and a

drift gallery had been nearly carried through, when all operations were

suspended; but it is intended that they be resumed in prospect of the

railway between Lahore and Pesshawer being constructed. The revived

estimate makes the cost of the tunnel £105,000, if the gradient on each

side be 1 in 20; but if it be flattened to 1 in 30, the estimate is

£143,300.[133]

The greatest tunnels that we know of connected with mining

(irrespective of galleries for working in mines) are the great drainage

galleries at the mines of Clausthal, in the Hartz, 11,377 yards, or

6½ miles long, and in many parts 900 feet below the surface of the

superjacent mountain. The second is the _Great Adit_, which drains

several of the important mines in the parish of Gwennap, Cornwall. It

is from 30 to 60 feet below the surface, and is 30 miles long. There is

an adit level of 10,000 yards to the celebrated silver-mines of Norway.

There are two modes by which it is proposed to carry a subway between

France and England,[134] the first is by means of iron tubes laid on

the bed of the ocean, the other is by actual tunnel. At the present

time no less than three competitors present themselves for the honour

of constructing the former, and there is only one whose scheme is

before the public for the latter. The three advocates for the tubular

system are Mr. James Chalmers, Mr. B. Hilmer, and M. Thome de Gammond,

of Paris. Each has his mode of laying down and connecting the tubes

together, but the great and distinguishing feature of the plan of M.

De Gammon, is that he proposes to construct a great oceanic station,

which is to be a kind of half-way halting house between the two shores.

Here also is to be a harbour and three ship’s basins, so that any one

returning from a long voyage and being in a hurry to get either to

London or to Paris, or to any other place—it signifies not where—in

England or the Continent, might land and at once proceed upon the

_terra firma_ portion of his journey. In the centre of the harbour

there is to be a huge shaft 330 yards in diameter, which would serve

the double purpose of ventilating the tunnel, and of providing means

of ingress and egress between the _Islet de Varne_ station and the

upper and outer world. All these great advantages—tunnel, shaft, and

railway—are to obtained at the cost, as estimated by M. De Gammond, of

£7,200,000!

[Illustration: SECTION OF

CHANNEL RAILWAY TUNNEL

AS PROPOSED BY M^R. GEO. REMINGTON C.E.

From “Engineering” #/ ]

The advocates for the tubes insist that theirs is the right system,

in consequence of its having been publicly stated that Mr. Hawkshaw

has satisfied himself by many borings that the bottom of the English

channel between Dover and Cape Grinez, has too many and too deep

“faults” to permit of tunnelling. Mr. George Remington, C.E., however,

considers he gets over the difficulty by avoiding the line originally

selected for the Anglo-French tunnel. He therefore proposes Dungenness

as his English starting point. The depths of the tunnel is, says Mr.

Remington, to be from 90 to 130 feet below the bed of the channel,

and there are to be three main shafts, the first at the point of

Dungenness, the second on the shoal in mid-channel, where there are

only eleven feet at low water spring tide, and the third at Cape

Grinez. These shafts are to be 100 feet diameter, and being carried

up considerably above the sea are to act as lighthouses. It would be

inconsistent with the character of this work to enter into an account

of the technical details which Mr. Remington proposes to adopt. We

shall, therefore, limit ourselves to saying that in addition to the

three intended permanent shafts, it is likewise proposed to put down

ten temporary shafts, the cost of each of which is not to exceed

£20,000. With these thirteen shafts, says the editor of _Engineering_,

“the tunnel may be carried on in twenty-six sections, and the distance

from shore to shore being twenty-six miles, gives only one mile for

each section, or two miles for a shaft, and assuming an advance of only

one yard a day for each headway, the whole distance may be accomplished

in about five and a-half years,” exclusive of the couple of years

required for sinking the shafts.

The following is Mr. Remington’s estimate:—

56,320 yards run of tunnelling of £100 £5,632,000

Three main shafts, at £50,000 150,000

Ten temporary shafts, at £19,800 198,000

Six miles of approaches, at £20,000 120,000

36 miles of permanent way, at £4,500 162,000

Stations 100,000

———————————

£6,362,000

Contingencies 636,200

———————————

Total £6,998,200

Is it practicable? An excellent authority, although, no doubt, a little

of the “go-a-head” class, says, “Yes,” and informs the world that

there is judicious “provision for gas lighting, water pipes, electric

telegraph and proper drainage, and indeed all that can be desired to

make the passage through the tunnel as safe and comfortable as transit

on the Metropolitan Railway.” On the other hand, there is the opinion

of Mr. Hawkshaw, whose borings we have just referred to. Have they

been extended as far to the westward as the diagonal line, or course,

proposed by Mr. Remington, and do the “faults” extend to a depth of

from 80 to 130 feet below the bed of the ocean? At all events, thinking

it would interest our readers, we have had engraved the section of

the tunnel from the drawing of it, which was recently published in

_Engineering_, and it is herewith inserted.

There is no incident or occurrence in life, no matter how solemn or

serious it may be, that cannot, in some way or another, contribute

to travestie and amusement. We shall therefore, conclude our notice

of “Tunnels suggested,” with the following piece of pleasantry

extracted from a recent number of the _Scientific American_—“A gigantic

engineering project is now the sensation out West—a tunnel under the

Atlantic for a railway! The plans are already supposed to be drawn up,

complete in detail. Even to lighting the cars with the magnesium and

electric lights. The undertaking is to employ one hundred thousand

men for thirty years, and when completed it will take the trains

but five days to do the journey from Newfoundland to Ireland, _viâ_

the telegraph route. The amount of capital required is estimated at

two billions five hundred million dollars.” Well may the Editor of

_Engineering_ lift up his hands and exclaim, GOOD GRACIOUS!

[Illustration: THE MONT CENIS TUNNEL RAILWAY

LONGITUDINAL SECTION]

[Illustration: SECTION OF THE

MONT CENIS RAILWAY

JAMES BRUNLEES ESQ^R. ENGINEER.]