PART X

SMELTING WORKS AND REFINERIES

THE NEW SMELTER AT EL PASO, TEXAS

(April 19, 1902)

In July, 1901, the El Paso, Texas, plant of the Consolidated Kansas

City Smelting and Refining Company[52] was almost completely destroyed

by fire. The power plant, blast-furnace building and blast furnaces

were entirely destroyed, and portions of the other buildings were badly

damaged. The flames were hardly extinguished before steps were taken to

construct a new, modern and enlarged plant on the ruins of the old one,

and on April 15, 1902, nine months after the destruction of the former

plant, the new furnaces were blown in. In rebuilding it was decided to

locate the new power-house at some distance from the other buildings.

The furnaces have all been enlarged, each of the new lead furnaces (of

which there are seven) having about 200 tons daily capacity. These and

the three large copper furnaces have been located in a new position

in order to secure a larger building territory. The entire plant is

modern and up to date in every particular. One of the interesting

features is the substitution of crude oil as fuel in the boiler and

roasting departments. It is intended to use Beaumont petroleum for

the generation of power and the roasting of the ores instead of wood,

coal or coke, and it is expected that a considerable economy will be

effected by this means.

_Power Plant._—The power plant is complete in all respects. It is a

duplicate plant in every sense of the word, so that it will never be

necessary to shut the works down on account of the failure of any one

piece of machinery. There are seven boilers, having a total of 1250

h.p. The four blowers are unusually large, having a capacity of 30,000

cu. ft. of free air per minute. They are direct-connected to three

tandem compound condensing Corliss engines. No belts are used in this

plant, except for driving a small blower of 10,000 cu. ft. capacity,

which will act as a regulator. A large central electric plant has been

installed in the power-house, consisting of two direct-connected,

direct-current generators, mounted on the shafts of two cross-compound

condensing Nordberg-Corliss engines. The current from these generators

is transmitted through the plant, operating sampling works, briquetting

machinery, pumps, hoists, motors, cars, etc., displacing all the

small steam engines and steam pumps used in the old plant. The power

plant is provided with two systems for condensing; one being a large

Wheeler surface condenser, the other a Worthington central-elevated jet

condenser, the idea being to use the surface condenser during a short

period of the year when the water is so bad that it cannot be used in

the boilers. During the remainder of the year the jet condenser is in

service and the surface condenser can be cleaned. The condensed steam

from the surface condenser, with the necessary additional water, goes

back directly to the boilers when the surface condenser is in use. The

power-house is absolutely fireproof throughout, being of steel and

brick with iron and cement floors. It is provided with a traveling

crane, and no expense has been spared to make this, as all other

parts of the plant, complete in every respect. The main conductors

from the generators pass out through a tunnel into a brick and steel

lightning-arrester house, from which point the various distributing

lines go to different parts of the plant.

_Blast Furnaces._—There are seven large lead furnaces, each having a

capacity of 200 to 250 tons of charge per day, and three large copper

furnaces, each having a capacity of 250 to 300 tons per day. All of

the furnaces are enclosed in one steel fireproof building, the lead

furnaces being at one end and the copper furnaces at the other. Each

of the furnaces has its independent flue system and stack. An entirely

new system of feeding these furnaces has been devised, consisting of

a 6 ton charge car operated by means of a street railroad motor and

controller with third-rail system. The charge cars collect their charge

at the ore beds, lime-rock and coke storage, and are run on to 15 ton

hydraulic elevators. They are then elevated 38 ft. to the top of the

furnaces, traveling over them to the charging doors, through which the

loads are dumped directly into the furnaces. This system permits of two

men handling about 1000 tons per day. The same system and cars are used

for charging the copper furnaces, except that, as these furnaces are

much lower than the lead furnaces, the charge is dropped into a large

hopper, from which it is fed to the copper furnaces by a man on the

copper furnace feed-floor level.

NEW PLANT OF THE AMERICAN SMELTING AND REFINING COMPANY AT MURRAY, UTAH

BY WALTER RENTON INGALLS

(June 28, 1902)

Murray is a few miles south of Salt Lake City, with which it is

connected by a trolley line. The new works are situated within a few

hundred yards of the terminus of the latter and in close juxtaposition

to the old Germania plant, which is the only one of the Salt Lake

lead-smelting works in operation at present. The new plant is of

special interest inasmuch as it is the latest construction for

silver-lead smelting in the United States, and may be considered as

embodying the best experience in that industry, the designers having

had access to the results attained at almost all of the previous

installations. It will be perceived, however, that there has been no

radical departure in the methods, and the novelties are rather in

details than in the general scheme.

The new works are built on level ground; there has been no attempt to

seek or utilize a sloping or a terraced surface, save immediately in

front of the blast furnaces, where there is a drop of several feet

from the furnace-house floor to the slag-yard level, affording room

for the large matte settling-boxes to stand under the slag spouts.

A lower terrace beyond the slag yard furnishes convenient dumping

ground. Otherwise the elevations required in the works are secured by

mechanical lifts, the ore, fluxes and coal being brought in almost

entirely by means of inclines and trestles.

The plant consists essentially of two parts, the roasting department

and the smelting department. The former comprises a crushing mill

and two furnace-houses, one equipped with Brückner furnaces and the

other with hand-raked reverberatories. The reverberatories are of

the standard design, but are noteworthy for the excellence of their

construction. Similar praise may be, indeed, extended to almost all

the other parts of the works, in which obviously no expense has been

spared on false grounds of economy. The roasting furnaces stand in a

long steel house; they are set at right angles to the longer axis of

the building, in the usual manner. At their feed end they communicate

with a large dust-settling flue, which leads to the main chimney of

the works. The ore is brought in on a tramway over the furnaces and is

charged into the furnaces through hoppers. The furnaces have roasting

hearths only. The fire-boxes are arranged with step-grates and closed

ash-pits, being fed through hoppers at the end of the furnace. The

coal is dumped close at hand from the railway cars, which are switched

in on a trestle parallel with the side of the building, which side is

not closed in. This, together with a large opening in the roof for

the whole length of the building, affords good light and ventilation.

The floor of the house is concrete. The roasted ore is dropped into

cars, which run on a sunken tramway passing under the furnaces. At the

end of this tramway there is an incline up which the cars are drawn

and afterward dumped into brick bins. From the latter it is spouted

into standard-gage railway cars, by which it is taken to the smelting

department. The roasted ore from the Brückner furnaces is handled in a

similar manner. The delivery of the coal and ore to the Brückners and

the general installation of the latter are analogous to the methods

employed in connection with the reverberatories.

The central feature of the smelting department is the blast-furnace

house, which comprises eight furnaces, each 48 by 160 in. at the

tuyeres. In their general design they are similar to those at the

Arkansas Valley works at Leadville. There are 10 tuyeres per side, a

tuyere passing through the middle of each jacket, the latter being

of cast iron and 16 in. in width; their length is 6 ft., which is

rather extraordinary. The furnaces are very high and are arranged for

mechanical charging, a rectangular brick down-take leading to the dust

chamber, which extends behind the furnace-house. The furnace-house is

erected entirely of steel, the upper floor being iron plates laid on

steel I-beams, while the upper terrace of the lower floor is also laid

with iron plates. As previously remarked, the lower floor drops down a

step in front of the furnaces, but there is an extension on each side

of every furnace, which affords the necessary access to the tap-hole.

The hight of the latter above the lower terrace leaves room for the

large matte settling-boxes, and the matte tapped from the latter runs

into pots on the ground level, dispensing with the inconvenient pits

that are to be seen at some of the older works. The construction of

the blast furnaces, which were built by the Denver Engineering Works

Company, is admirable in all respects. The eight furnaces stand in a

row, about 30 ft. apart, center to center. The main air and water pipes

are strung along behind the furnaces. The slag from the matte-settling

boxes overflows into single-bowl Nesmith pots, which are to be handled

by means of small locomotives. The foul slag is returned by means of a

continuous pan-conveyor to a brick-lined, cylindrical steel tank behind

the furnace-house, whence it is drawn off through chutes, as required

for recharging.

The charges are made up on the ground level, immediately behind the

furnace-house. The ore and flux are brought in on trestles, whence the

ore is unloaded into beds and the flux into elevated bins. These are

all in the open, there being only two small sheds where the charges are

made up and dumped into the cars which go to the furnaces. There are

two inclines to the latter. At the top of the inclines the cars are

landed on a transferring carriage by which they can be moved to any

furnace of the series.

The dust-flue extending behind the furnace-house is arranged to

discharge into cars on a tramway in the cut below the ground level.

This flue, which is of brick, connects with the main flues leading to

the chimney. The main flues are built of concrete, laid on a steel

frame in the usual manner, and are very large. For a certain distance

they are installed in triplicate; then they make a turn approximately

at right angles and two flues continue to the chimney. At the proper

points there are large dampers of steel plate, pivoted vertically, for

the purpose of cutting out such section of flue as it may be desired to

clean. Each flue has openings, ordinarily closed by steel doors, which

give access to the interior. The flues are simple tunnels, without

drift-walls or any other interruption than the arched passages which

extend transversely through them at certain places. The chimney is of

brick, circular in section, 20 ft. in diameter and 225 ft. high. This

is the only chimney of the works save those of the boiler-house.

The boiler-house is equipped with eight internally fired corrugated

fire-box boilers. They are arranged in two rows, face to face.

Between the rows there is an overhead coal bin, from which the coal is

drawn directly to the hoppers of the American stokers, with which the

boilers are provided. Adjoining the boiler-house is the engine-house;

the latter is a brick building, very commodious, light and airy. It

contains two cross-compound, horizontal Allis-Chalmers (Dickson)

blowing engines for the blast furnaces, and two direct-connected

electrical generating sets for the development of the power required

in various parts of the works. A traveling crane, built by the Whiting

Foundry Equipment Company, spans the engine-house. In close proximity

to the engine-house there is a well-equipped machine shop. Other

important buildings are the sampling mill and the flue-dust briquetting

mill.

A noteworthy feature of the new plant is the concrete paving, laid on a

bed of broken slag, which is used liberally about the ore-yard and in

other places where tramming is to be done. The roasting-furnace houses

are floored with the same material, which not only gives an admirably

smooth surface, but also is durable. The whole plant is well laid out

with service tramways and standard-gage spur tracks; the intention has

been, obviously, to save manual labor as much as possible.

THE MURRAY SMELTER, UTAH[53]

BY O. PUFAHL

(May 26, 1906)

This plant has been in operation since June, 1902. It gives employment

to 800 men. The monthly production consists of about 4000 tons of

work-lead and 700 tons of lead-copper matte (12 per cent. lead, 45 per

cent. copper). The work-lead is sent to the refinery at Omaha; the

matte to Pueblo, Colo. Most of the ores come from Utah; but in addition

some richer lead ores are obtained from Idaho, and some gold-bearing

ores from Nevada.

For sampling the Vezin apparatus is used, cutting out one-fifth in

each of three passes, crushing intervening, the sample from the third

machine being 1/625 of the original ore; after further comminution of

sample in a coffee-mill grinder, it is cut down further by hand, using

a riffle. The final sample is bucked down to pass an 80-mesh sieve, but

gold ores are put through a 120-mesh.

The steps in the smelting process are as follows: Roasting the poorer

ores in reverberatory furnaces and in Brückner cylinders. Smelting

raw and roasted ores, mixed, in water-jacketed blast furnaces,

for work-lead and lead-copper matte, the latter containing 15 per

cent. lead and 10 to 12 per cent. copper. Roasting the ground

matte, containing 22 per cent. of sulphur, down to ¾ per cent. in

reverberatory furnaces. Smelting the roasted matte together with acid

flux in the blast furnace for a matte with 45 per cent. copper and 12

per cent. lead.

Only the pyritic ores are roasted in Brückner furnaces, the lead ores

and matte being roasted in reverberatory furnaces. Each of the 20

Brückner furnaces, which constitute one battery, roasts 8 to 12 tons

of ore in 24 hours down to 5½ to 6 per cent. sulphur, with a coal

consumption of two tons. The charge weighs 24 tons. The furnaces make

one turn in 40 minutes. To increase the draft and the output, steam

at 40 lb. pressure is blown in through a pipe; this has, however,

resulted in increasing the quantity of flue dust to 10 to 15 per cent.

of the ore charged. Ten furnaces are attended by one workman with one

assistant, working in eight-hour shifts. For firing and withdrawing the

charge five men are required.

The gases from the Brückners and reverberatory furnaces pass into a

dust-flue 14 × 14 ft. in section and 600 ft. long, built of brickwork,

with concrete vault; in the stack (225 ft. high, 20 ft. diameter) they

unite with the shaft-furnace gases, the temperature of which is only 60

deg.

There are 12 reverberatory furnaces with hearths 60 ft. long and 16

ft. broad. They roast 14 tons of ore (or 13 tons of matte) in 24 hours

down to 3½ to 4 per cent. sulphur, consuming 32 to 34 per cent. of coal

figured on the weight of the charge. There are 12 working doors on each

side. The small coal (from Rock Springs, Wyoming), which is burnt on

flat grates, contains 5 per cent. ash and 3 to 5 per cent. moisture.

The roasted product is dumped through an opening in the hearth,

ordinarily kept closed with an iron plate, into cars which are raised

by electricity on a self-acting inclined plane. Their content is then

tipped over into a chute and cooled by sprinkling with water. From here

the roasted matte is conveyed to the blast furnace in 30-ton cars. The

roasted ore is tipped into the ore-bins.

There are eight blast furnaces, 48 × 160 in. at the tuyeres, of which

there are 10 on each of the long sides. The hight from the tuyeres to

the gas outlet is 20 ft., thence to the throat 6 ft.; the distance

of the tuyeres from the floor is 4 ft. The base is water-cooled. The

water-jackets of the furnace are 6 ft. high. The tuyeres (4 in.)

are provided with the Eilers automatic arrangement for preventing

the furnace gases entering the blast pipes. The blast pressure is

34 oz. The furnaces are furnished with the Arents lead wells; the

crucible holds about 30 tons of lead. The slag and the matte run into

a brick-lined forehearth (8 × 3 ft., 4 ft. deep), from which the slag

flows into pots holding 30 cu. ft., while the matte is tapped off into

flat round pans mounted on wheels.

The charge is conveyed to the feed-floor by electricity. The furnace

charge is 8000 lb. and 12 per cent. coke, with 30 per cent, (figured on

the weight of the charge) of “shells” (slag). Occasionally as much as

230 tons of the (moist) charge, exclusive of coke and slag, has been

handled by one furnace in 24 hours. During one month (September, 1904)

40,000 tons of charge were worked up, corresponding to a daily average

of 166 tons per furnace.

The lead in the charge runs from 13 to 14 per cent. on an average. The

limestone, which is added as flux, is quarried not far from the works.

The coke used is in part a very ordinary quality from Utah; in part a

better quality from the East, with 9 to 10 per cent. ash. The matte

amounts to 10 per cent. The slag contains 0.6 to 0.7 per cent. lead and

0.1 to 0.15 per cent. copper. The slag has approximately the following

composition: 36 per cent. silica, 23 per cent. iron (corresponding to

29.57 per cent. FeO), 23 per cent. lime, 3.8 per cent. zinc and 4 per

cent. alumina.

The work-lead is transferred while liquid from the furnaces to kettles

of 30 tons capacity, in which it is skimmed, and thence cast in molds

through a Steitz siphon. First, however, a 5.5 lb. sample is taken

out by means of a special ladle, and is cast into a plate. From this

samples of 0.5 a.t. are punched out at four points for the assay of the

precious metals.

For the purpose of precipitating the flue dust, the blast-furnace gases

are passed into brickwork chambers in which a plentiful deposition of

the heavier particles takes place. From here the gases go through an L

pipe of sheet iron, 18 ft. in diameter, to the Monier flues, which have

a cross-section of 256 sq. ft. and a total length of 2000 ft. A small

part of the flues is also built of brick. The gases unite with the hot

roaster gases just before entering the 225 ft. chimney. In the portion

of the blast-furnace dust first precipitated the silver runs 22 oz. per

ton, while that recovered nearer the stack contains only 8 oz. The flue

dust is briquetted with a small proportion of lime, and, after drying,

is returned to the blast furnaces.

THE PUEBLO LEAD SMELTERS[54]

BY O. PUFAHL

(May 12, 1906)

At the Pueblo plant, ores containing over 10 per cent. lead are not

roasted, but are added raw to the charge. For such material as requires

roasting there are in use five Brückner furnaces. The charge is 24 tons

for 48 to 60 hours; the furnaces make one revolution per minute and

roast the ore down to 6 per cent. sulphur. There are also two O’Harra

furnaces, each roasting 25 tons daily, and 10 reverberatory furnaces 75

ft. in length, each roasting 15 tons of ore daily down to 4 per cent.

sulphur.

The charge for smelting is prepared from roasted ore, together with

Idaho lead ore, Cripple Creek gold ore, briquetted flue dust, slag

and limestone. There are seven water-jacketed furnaces, which smelt,

each, 150 tons of charge per day. The furnaces have 18 tuyeres, blast

pressure 34 oz., cross-section at the tuyeres 48 × 148 in. They are

charged mechanically by a car of 4 tons’ capacity.

The output of lead is 11 to 15 tons per furnace. The matte, which

is produced in small quantity, contains 8 to 12 per cent. lead and

the same percentage of copper. It is crushed by rolls, roasted in

reverberatory furnaces, and smelted with ores rich in silica. The matte

resulting at this stage, running 45 to 50 per cent. in copper, is

shipped to be further worked up for blister copper.

The work-lead is purified by remelting in iron kettles, the cupriferous

dross being pressed dry in a Howard press, and sent to the blast

furnaces. The work-lead is sent to the refineries at Omaha, Neb., or

Perth Amboy, N. J.

To collect the flue dust the waste gases are passed through long brick

flues. The chimneys are 150 to 200 ft. high, and 15 ft. in diameter.

They stand 75 ft. above the ground level of the blast furnaces. The

comparatively small proportion of flue dust produced (0.9 per cent. of

the charge) is briquetted, together with fine ore and 5 per cent. of

a thick paste of lime. For this purpose a White press is used, which

makes six briquets at a time, and handles 10 tons per hour.

According to a tabulation of the results of five months’ running, the

proportion of flue dust at several works of the American Smelting and

Refining Company is as follows:

Globe Plant, Denver 0.5% of the charge.

Pueblo Plant, Pueblo 0.9% ” ” ”

Eilers’ Plant, Pueblo 0.5% ” ” ”

East Helena Plant, Helena 0.3% ” ” ”

Arkansas Valley Plant, Leadville 0.2% ” ” ”

Murray Plant, Murray, Utah 1.2% ” ” ”

The fuel used is of very moderate quality. The coke (from beehive

ovens) carries up to 17 per cent. ash, the coal 10 to 18 per cent. The

monthly production is 2300 tons of work-lead and 150 tons of copper

matte (45 to 50 per cent. copper).

At the Eilers plant all sulphide ores, except the rich Idaho ore, are

roasted down to 5 to 7 per cent. S in 15 reverberatory furnaces, 60 to

70 ft. in length, each furnace roasting 15 tons per 24 hours, in six

charges.

The flue dust is briquetted together with fine Cripple Creek ore,

pyrites cinder from Argentine, Kan., Creede ores rich in silica and

10 per cent. lime. The residue from the zinc smeltery (U. S. Zinc

Company), which is brought to this plant (600 tons a month containing

nearly 10 per cent. lead), is taken direct to the blast furnaces.

Of the latter there are six, each with 18 tuyeres, which handle per

24 hours 160 to 180 tons of charge, containing on an average 10 per

cent. of lead in the ore, with 10 per cent. of coke, figured on the

charge. The average monthly production of a furnace is about 360 tons

of work-lead, which is purified at the Pueblo plant. The furnaces

are charged by hand. Of the slag, 30 per cent., as shells, etc., is

returned to the charge. The monthly production of work-lead is 2000

tons, carrying 150 oz. of silver and 2 to 6 oz. of gold per ton.

The matte amounts to about 8.3 per cent., and contains 12 per cent.

copper. It is concentrated up to 45 per cent. Cu, which is shipped (150

tons a month) for smelting to blister copper.

THE PERTH AMBOY PLANT OF THE AMERICAN SMELTING AND REFINING COMPANY[55]

BY O. PUFAHL

(January 27, 1906)

These works were erected in 1895 by the Guggenheim Smelting Company.

They are situated on Raritan Bay, opposite the southern point of Staten

Island, in a position offering excellent facilities for transportation

by land and by water. The materials worked up are base lead bullion

and crude copper, containing silver and gold, chiefly drawn from the

company’s smelteries in the United States and Mexico. Silver ore is

received from South America. The ores and base metals from Mexico and

South America are brought to Perth Amboy by the company’s steamships

(American Smelters Steamship Company).

_Ore Smelting._—The silver ore from South America (containing antimony

and much silver, together with galena, iron and copper pyrites) is

crushed by rolls and is roasted down from 26 per cent. to 3 per cent.

S in 11 reverberatory furnaces, 70 ft. long and 15 ft. wide (inside

dimensions). It is then mixed with rich galena from Idaho, pyrites

cinder, litharge, copper skimmings, and residues from the desilverizing

process, together with limestone, and is smelted for work-lead and

lead-copper matte in three water-jacketed furnaces, using 12 per cent.

coke, figured on the ore in the charge. Of these furnaces one has 12

tuyeres; it measures 42 × 96 in. in cross-section at the tuyeres, and

6 ft. 3 in. by 8 ft. at the charging level. The hight of charge is 16

ft. The other two furnaces have 16 tuyeres each, their cross-section at

the tuyeres being 44 in. by 128 in., at the charging level 6 ft. 6 in.

by 12 ft., and hight of charge 16 ft. The furnaces are operated at a

blast pressure of 35 oz. per square inch. The temperature of the gases

at the throat is 140 deg. F. (60 deg. C.) measured with a Columbia

recording thermometer, which works very well. These furnaces reduce,

respectively, 100 to 120 and 130 to 140 tons of charge per 24 hours;

they are also used for concentrating roasted matte.

_Copper Refining._—The crude copper is melted in two furnaces of 125

tons aggregate daily capacity, and is molded into anodes by Walker

casting machines. Twenty-six anodes are lifted out of the cooling

vessel at a time, and are taken to the electrolytic plant.

The electrolytic plant comprises two systems, each of 408 vats. The

current is furnished by two dynamos, each giving 4700 amperes at 105

volts. The cathodes remain in the bath for 14 days. The weight of the

residual anodes is 15 per cent.

The anode mud is swilled down into reservoirs in the cellar as at

Chrome (De Lamar Copper Refining Company), is cleaned, dried and

refined in a similar manner.

For melting the cathodes there are two reverberatory furnaces of

capacity for 75 tons per 24 hours. The wire-bars and ingots are cast

with a Walker machine. About 3200 tons of refined copper are produced

per month.

_Copper Sulphate Manufacture._—The lyes withdrawn from the electrolytic

process are worked up into copper sulphate, shot copper being added.

This latter is prepared in a reverberatory furnace from matte obtained

as a by-product in working up the lead. About 200 tons of copper

sulphate are thus produced per month; the process used is the same as

at the Oker works. Lower Harz, Germany. The crystals are rinsed, dried

and packed in strong wooden barrels.

_Lead Refining._—The working up of the Mexican raw lead is carried

out under the supervision of the customs officers. The lead, which is

imported duty free, must be exported again. From each bar a sample is

cut from above and below by means of a punch entering half way into the

bar. For refining the lead there are four reverberatory furnaces of 60

tons capacity, with hearths 17 ft. 9 in. by 12 ft. 6 in., a mean depth

of 14 in., and a grate area of 2 ft. 6 in. by 6 ft.; in addition to

these there is a furnace of 80 tons capacity with a hearth 19 ft. 7½

in. by 9 ft. 6 in., a mean depth of 18 in., and grate area of 3 ft. by

6 ft.

For desilverizing the softened lead there are five kettles, each of

60 tons capacity, 10 ft. 3 in. diameter and 39 in. depth. The zinc

is stirred in with a Howard mechanical stirrer and the zinc scum is

pressed dry in a Howard press, which gives a very dry scum. The latter

is then, while still warm, readily hammered into pieces for the retorts.

The desilverized lead is refined in five reverberatory furnaces, of

which four take a charge of 50 tons each, and one of 65 tons. The

production of desilverized lead is 5000 to 5500 tons a month.

The distillation of the zinc crusts is carried out in 18 oil-fired

Faber du Faur tilting furnaces. Each retort receives a charge of

1200 lb. of broken-up crust and a little charcoal. The distillation

lasts 6 to 7 hours. Fifty gallons of petroleum residues are consumed

per charge. The oil is blown into the furnace with a compressed

air atomizer. After withdrawing the condenser, which runs on a

traveling support, the argentiferous lead is poured directly from

the tilted retort into an English cupel furnace. Seven such furnaces

(magnesia-lined, with movable test) are in use, of which each works

up 4.5 to 5 tons of retort metal in 24 hours. The furnaces are

water-jacketed. The blast is introduced by the aid of a jet of steam.

Three tons of coal are used per 24 hours.

_Gold and Silver Parting._—The doré bars are cast into anodes for

electrolytic parting by the Moebius process. The plant consists of 144

cells in 24 divisions. The mean composition of the electrolytic bath is

said to be as follows: 10 per cent. free nitric acid, 17 grams silver,

and 35 to 40 grams copper per liter. The current is furnished by a 62

k.w. dynamo. One cell consumes 260 amp. at 1.75 volts. One k.w. gives

a yield of 1600 oz. fine silver per 24 hours. The daily production

of silver is almost 100,000 oz., and is exceeded at no other works.

About $3,000,000 worth of metal is always on hand in the different

departments.

THE NATIONAL PLANT OF THE AMERICAN SMELTING AND REFINING COMPANY[56]

BY O. PUFAHL

(April 14, 1906)

This plant, at South Chicago, Ill., refines base lead bullion. It

comprises four reverberatory furnaces, of which one takes a charge of

100 tons, one 80 tons, and the other two 30 tons each; one of the small

furnaces is being torn down, and a 120 ton furnace is to be built in

its place. The furnaces are fired with coal from Southern Illinois,

which contains 11 per cent. of ash.

In softening the bullion, the time for each charge is 10 hours. The

first portion tapped consists of dross rich in copper, which is

followed by antimonial skimmings and litharge.

The copper dross is melted up in a small reverberatory furnace,

together with galena from Wisconsin (containing 80 per cent. lead),

for work-lead and lead-copper matte, the latter containing about 35

per cent. of copper; this matte is enriched to 55 per cent. copper

by the addition of roasted matte, and is finally worked up for crude

copper (95 per cent.) in a reverberatory furnace. All the copper so

produced is used in the parting process for precipitating the silver.

The antimonial skimmings are smelted in a reverberatory furnace,

together with coke cinder, for lead and a slag rich in antimony, which

is reduced to hard lead (27 per cent. antimony, 0.5 per cent. copper,

0.5 per cent. arsenic) in a small blast furnace, 14 ft. high, which has

8 tuyeres.

The softened lead is tapped off into cast-iron desilverizing pots,

which usually outlive 200 charges; in isolated cases as many as

300. For desilverizing, zinc from Pueblo, Colo., is added in two

instalments, being mixed in by means of a Howard stirrer. After the

first addition there remains in the lead 7 oz. of silver per ton;

after the second only 0.2 oz. The first scum is pressed in a Howard

press and distilled; the second is ladled off and is added to the next

charge. The Howard stirrer is driven by a small steam engine suspended

over the kettle; the Howard press by compressed air.

For distilling zinc scum, 12 Faber du Faur tilting retorts, heated with

petroleum residue, are used. The argentiferous lead (with 9.6 per cent.

silver) is transferred from the retort to a pan lined with refractory

brick, which is wheeled to the cupelling hearth and raised by means of

compressed-air cylinders, so as to empty its molten contents through a

short gutter upon the cupelling hearth. The cupelling hearths are of

the water-cooled English type, and are heated by coal with under-grate

blast. The cast-iron test rings, with reinforcing ribs, are made in two

pieces, slightly arched and water-cooled; they are rectangular, with

rounded corners, and are mounted on wheels. The material of the hearth

is marl.

Argentiferous lead is added as the operation proceeds, and finally the

doré bullion is poured from the tilted test into thick bars (1100 oz.)

for parting.

The desilverized lead is refined in charges of 28 tons (4 to 5 hours)

and 80 to 90 tons (8 to 10 hours), introducing steam through four to

eight half-inch iron pipes. The first skimmings contain a considerable

proportion of antimony and are therefore added to the charge when

reducing the antimonial slags in the blast furnace. The litharge is

worked up in a reverberatory furnace for lead of second quality. The

refined lead is tapped off into a kettle, from which it is cast into

bars through a siphon.

The parting of the doré bullion is carried out in tanks of gray cast

iron, in which the solution is effected with sulphuric acid of 60 deg.

B. The acid of 40 deg. B. condensed from the vapors is brought up to

strength in leaden pans. In a second larger tank, which is slightly

warmed, a little gold deposits from the acid solution of sulphates.

The solution is then transferred (by the aid of compressed air) to the

large precipitating tank, and diluted with water. It is here heated

with steam, and the silver is rapidly precipitated by copper plates

(125 plates 18 × 8 × 1 in.) suspended in the solution from iron hooks

covered with hard lead. After the precipitation, the vitriol lye is

siphoned off, the silver is washed in a vat provided with a false

bottom, is removed with a wooden shovel, and is pressed into cakes 10 ×

10 × 6 in.

The refining is finished on a cupelling hearth fired with petroleum

residue, adding saltpeter, and removing the slag by means of powdered

brick. After drawing the last portion of slag the silver (0.999 fine)

is kept fused under a layer of wood-charcoal for 20 minutes, and is

then cast into iron molds, previously blackened with a petroleum flame.

The bars weigh about 1100 oz.

The gold is boiled with several fresh portions of acid, is washed and

dried, and finally melted up with a little soda in a graphite crucible.

It is 0.995 fine.

The lye from the silver precipitation, after clearing, is evaporated

down to 40 deg. B. in leaden pans by means of steam coils, and is

transferred to crystallizing vats. The first product is dissolved

in water, the solution is brought up to 40 deg. B. strength, and is

allowed to crystallize. The purer crystals so obtained are crushed, and

are washed and dried in centrifugal apparatus; they are then sifted and

packed in wooden casks in two grades according to the size of grain.

The very fine material goes back into the vats. From the first strongly

acid mother liquor, acid of 60 deg. B. is prepared by concentrating in

leaden pans, and this is used for the parting operation.

THE EAST HELENA PLANT OF THE AMERICAN SMELTING AND REFINING COMPANY[57]

BY O. PUFAHL

(April 28, 1906)

The monthly production of these works is about 1500 tons of base

bullion (containing 150 oz. Ag and 4 to 6 oz. Au per ton), and 200 tons

of 45 per cent. copper matte. The base bullion is shipped to South

Chicago, the matte to Pueblo.

The ore-roasting is done in two batteries of eight reverberatory

furnaces and 16 Brückner furnaces, the resulting product containing on

an average 20 per cent. lead and 3 per cent. sulphur. The charge for

the blast furnaces consists of roasted ore, rich galena, argentiferous

red hematite, briquetted flue dust, slag (shells) from the furnace

itself, lead skimmings, scrap iron and limestone.

Four tons of the charge are dumped over a roller into a low car, which

is then drawn up an inclined plane to the charging gallery by an

electric motor and is then dumped into the furnace.

The two rectangular blast furnaces (Eilers’ type) have eight tuyeres on

each of their longer sides and cast-iron water-jackets of 6 ft. hight.

The blast is delivered at a pressure of 40 oz. The lead is drawn off

through a siphon tap into a cooling kettle. The furnace has a large

forehearth for separating the matte and the slag. The slag is received

by a two-pot Nesmith truck, having an aggregate capacity of 14 cu. ft.

These trucks are hauled to the dump by an electric locomotive. The

shells are returned to the furnace with the charge.

The matte (with about 6 per cent. Cu and the same percentage of lead)

is tapped off into iron molds and after cooling is crushed to 0.25-in.

size, to be roasted in the reverberatory furnaces and smelted up

together with roasted ore for a 15 per cent. matte. The latter is

crushed, roasted and separately smelted together with silicious ore

for 45 per cent. matte, which is then sent to Pueblo to be worked up

into blister copper. The small quantity of speiss which is formed is

broken up and returned to the blast furnaces with the charge. The slag

contains 0.5 to 0.8 per cent. lead and 0.5 oz. silver per ton.

THE GLOBE PLANT OF THE AMERICAN SMELTING AND REFINING COMPANY[58]

BY O. PUFAHL

(May 5, 1905)

This plant produces 1800 tons of base bullion per month and 200 tons

of lead-copper matte containing 45 to 52 per cent. of copper. The ores

smelted are mostly from Colorado, but include also galena from the Cœur

d’Alene and other supplies. The limestone is quarried 14 miles from

Denver; coke and coal are brought from Trinidad, Colo.

All sulphides, except the slimes, concentrates and the rich Idaho ores,

are roasted. For roasting there are:

(1) Fifteen reverberatory furnaces, five of which measure 60 × 14 ft.,

and the other ten 80 × 16 ft. externally. In 24 hours these roast six

charges of 4400 lb. (average) of moist ore (2.15 tons of dry ore) from

28 to 30 per cent. down to 3 to 4 per cent. sulphur. Each furnace is

attended by three men working in 12-hour shifts; the stoker earns

$2.75; the roasters, $2.30.

(2) Two Brown-O’Harra furnaces, 90 ft. long, with two hearths, and a

small sintering furnace attached. They have three grates on each long

side, and each roasts 26 tons of ore in 24 hours down to ¾ per cent.

sulphur.

(3) Twelve Brückner furnaces, each taking 24 tons’ charge, with

under-grate blast, the air being fed into the cylinders by a steam jet.

According to the zinc content of the ores the roasting operation lasts

70 to 90 hours, the furnace making one revolution per hour. The roasted

product from the Brückner furnaces is pressed into briquets, together

with fine ore, flue dust and lime.

The smelting is carried out in seven blast furnaces, with 16 tuyeres,

blast at 2-lb. pressure, hight of furnace 18 ft. 6 in., section at

the tuyeres 42 × 144 in. The charge is 120 to 150 tons exclusive of

slag and coke. The slag and the matte are tapped off together into

double-bowl Nesmith cars, which are hauled, by an electric locomotive,

to a reverberatory furnace (hearth 20 × 12 ft.) in which they are kept

liquid, for several hours, in charges of 14 to 15 tons, in order to

effect complete separation. A little work-lead is obtained in this

operation, while the matte is tapped off into cast-iron pans of one

ton capacity, and the slag, 0.5 to 0.6 per cent. lead, 0.6 to 0.7 oz.

silver, is removed in 5-ton pots to the dump.

The matte is broken up, crushed to 0.25 in. size, roasted in the

reverberatory furnaces, smelted for a 45 to 52 per cent. copper matte,

which is shipped to be further worked up into blister copper. The crude

matte contains 10 to 12 per cent. copper, 12 to 15 per cent. lead, 40

oz. silver and 0.05 oz. gold.

From the siphon taps of the blast furnaces the work-lead is transferred

to a cast-iron kettle of 33 tons’ capacity. Here the copper dross

is removed, the metal is mixed by introducing steam for 10 minutes,

sampled, and the lead is cast into bars through siphons. It contains

about 2 per cent. antimony, 200 oz. silver and 8 oz. gold. This product

is refined at Omaha.

The blast-furnace gases pass through a flue 1200 ft. long, and enter

the bag-house, in which they are filtered through 4000 cotton bags 30

ft. long and 18 in. in diameter. These bags are shaken every 6 hours.

The material which falls to the floor is burnt where it lies, sintered

and returned to the blast furnaces.

In the engine house there are four Connersville blowers, two of which

are No. 8 and two of No. 7 size. Each blast furnace requires 45,000 cu.

ft. of air a minute.

The works give employment to 450 men, whose wages (for 10-to 12-hour

shifts) are $2 to $3.

LEAD SMELTING IN SPAIN

BY HJALMAR ERIKSSON

(November 14, 1903)

A few notes, gathered during a couple of years while I was employed

at one of the large lead works in the southeastern part of Spain, are

of interest, not as showing good work, but for comparing the results

obtained in modern practice with those obtained by what is probably the

most primitive kind of smelting to be found today. The plant about to

be described may serve as a general type for that country. As far as I

know, the exceptions are a large plant at Mazarron, fully up to date

and equipped with the most modern improvements in every line; a smaller

plant at Almeria, also in good shape, and the reverberatory smelting of

the carbonates at Linares. It should be kept in mind, however, that the

conditions are peculiar, iron and machinery being very expensive and

manual labor very cheap.

[Illustration: FIG. 41.—Spanish Lead Blast Furnace.]

About 4 ft. above the tuyeres the furnace is built of uncalcined brick

made of a black graphitic clay found in the mines near by; the upper

part is of common red brick. The entire cost of one furnace does not

reach $100. The flue leads to a main gallery 3.5 by 7 ft., which goes

down to the ground, and extends several times around a hill, the

chimney being placed on the top of the hill, considerably above the

furnace level. The gallery is about 10,000 ft. long, and is laid down

in the earth, with the arched roof just emerging. It is all built of

rough stone, the inside being plastered with gypsum. The furnace has

three tuyeres of 3 in. diameter. The blast pressure is generally 4 to

6 in. of water. Neither feeding floor nor elevators are used, only a

couple of scaffolds, the charge being lifted up gradually by hand in

small convenient buckets made of sea-grass. When charging the furnace,

coke is piled up in the center, and the mixture of ore, fluxes and slag

is charged around the walls. The slag and matte are left to run out

together on an inclined sand-bed. The matte, flowing more quickly, goes

further and leaves the slag behind, but the separation thus obtained

is, of course, very unsatisfactory. The charge mixture is weighed and

made for each furnace every morning. When it is all put through, the

furnace is run down very low, without any protecting cover on the top;

several iron bars are driven through the furnace at the slag-tap level,

for holding up the charge; the lead is all tapped out; a big hole is

made in the crucible for the purpose of cleaning it out; all accretions

are loosened with a bar; the hole is closed with mud of the graphitic

clay; bars are removed, when the crucible is filled with coke from the

center and the charging is continued. In this way a furnace can be kept

running for any length of time, but at a great loss of heat, and with a

great increase of flue dust.

The current practice, in many parts of Spain, is to run the same number

of ore-smelting and of matte-smelting furnaces. All the slag and the

raw matte, produced by the ore-smelting furnaces, is re-smelted in the

matte furnaces, together with some dry silver ores. No lead at all is

produced in the matte furnaces, only a matte containing up to 150 oz.

silver per ton and 25 to 35 per cent. of the lead charged on them. This

rich matte is calcined in kilns, and smelted together with the ore

charge.

The ores we smelted were galena ranging from 5 to 83 per cent. lead

and about 250 oz. silver per ton of lead; dry silver ores containing

up to 120 oz. silver per ton, and enough of the Linares carbonates for

keeping the silver below 120 oz. per ton in the lead. The gangue of the

galena was mainly iron carbonate. Most of that ore was hand picked and

of nut size. Machine concentrates with more than 30 per cent. lead or

containing much pyrite were calcined; everything else was smelted raw.

The flux exclusively used, before I came, was carbonate of iron, which,

by the way, was considered a “cure-for-all.” The slag analyses showed:

CaO, below 4 per cent.

FeO, above 45 per cent.

SiO₂, about 30 per cent.

BaO, 5 to 10 per cent.

Al₂O₃, 5 to 10 per cent.

Pb, by fire assay, 0.75 to 2.5 per cent.

Ag, by fire assay, 2 to 3 oz. per ton.

The specific gravity of the slag was about 5, or practically the same

as that of the matte. The output of metallic lead was about 70 per

cent.; of silver, 84 per cent. The working hight of the furnaces—tuyere

level to top of charge—was at that time only 7 ft., and I was told that

it had been still lower before.

To the working hight of the furnaces was added 2 ft., simply by putting

up the charging doors that much. A very good limestone was found just

outside the fence around the plant. Enough limestone was substituted

for the iron carbonate, to keep the lime up to 12 per cent. in the

slag, reducing the FeO to below 35 per cent. and the specific gravity

to below four.

The result of these alterations was an increase in the output of

metallic lead, from 76 to 85 per cent.; of silver from 84 to 90 per

cent.; a comparatively good separation of slag and matte, and a slag

running about 0.5 to 0.75 per cent. Pb and 1.5 oz. Ag per ton.

Owing to the great extent of the gallery, and the consequent good

condensation of the flue dust, the total loss of lead and silver was

much smaller than would be expected; in no case being found above 4 per

cent.

The composition of the charge was 55 per cent. ore and roasted matte,

13 per cent. fluxes, and 32 per cent. slag. Coke used was 11 per cent.

on charge, or 20 per cent. on ore smelted. Each furnace put through 10

to 15 tons of charge, or 7 tons of ore, in 24 hours. Eight men and two

boys were required for each furnace, including slag handling and making

up of the charge. The cost of smelting was 17 pesetas per ton of ore,

which at the usual premium (£1 = 34 pesetas = $4.85) equals $2.43. This

cost is divided as follows:

Coke $1.47

Fluxes 0.04

Labor 0.65

Coal for power 0.10

General expenses 0.17

————-

Total $2.43

This $2.43 per ton includes all expenses of whatever kind. The iron

carbonate flux contained lead and silver, which was not paid for. The

fluxes are credited for the actual value of this lead and silver.

Without making this discount, the cost of flux would amount to 26c. per

ton, making the entire smelting cost come to $2.65. As an explanation

of the low cost of labor, it may be noted that the wages were, for

the furnace-man, 2.25 pesetas, or 32c. a day; for the helpers, 1.75

pesetas, or 25c. a day.

The basis for purchasing the galena ore may here be given, reduced to

American money; lead and silver are paid for according to the latest

quotations for refined metals given by the _Revista Minera_, published

at Cartagena. (The quotations are the actual value in Cartagena of the

London quotations.)

The following discounts are made: 5 per cent. for both silver and

lead; $6.40 per ton on ore containing 7 per cent. Pb and below; this

rises gradually to a discount of $7.75 per ton of ore containing 30 per

cent. Pb and above.

The transportation is paid by the purchaser and amounts to about $1.20

per ton of ore.

The dry silver ores were cheaper than this and the lead carbonates much

more expensive.

LEAD SMELTING AT MONTEPONI, SARDINIA[59]

BY ERMINIO FERRARIS

(October 28, 1905)

In dressing mixed lead and zinc carbonate ores by the old method of

gradual crushing with rolls, middling products were obtained, which

could be further separated only with much loss. Inasmuch as the losses

in the metallurgical treatment of such mixed ore were reckoned to be

less than in ore dressing, these between-products at Monteponi were

saved for a number of years, until there should be enough raw material

to warrant the erection of a small lead and zinc smeltery.

In 1894 the lead smeltery in Monteponi was put in operation; in 1899

the zinc smeltery was started. At about the same time the reserves of

lead ore were exhausted, and the lead plant then began to treat all the

Monteponi ores and a part of those from neighboring mines.

As will be seen from the plan (Fig. 42), the smelting works cluster

in terraces around the mine shaft, covering an area of about 3000 sq.

m. (0.75 acre); the ore stocks and the pottery of the zinc works are

located in separate buildings.

During the first years of working, the slag had purposely been kept

very rich in zinc, in the hope of utilizing it later for the production

of zinc oxide. It had an average zinc content of 16.80 per cent., or 21

per cent. of zinc oxide, with about 32 per cent. SiO₂, 25 per cent.

FeO, and 14 per cent. lime. According to the recent experiments, this

slag can very well be used for oxide manufacture, in connection with

calamine rich in iron. The slag made at the present time has only 15

per cent. ZnO; 25 per cent. SiO₂; 16 per cent. CaO; 3 per cent. MgO;

33 per cent. FeO; 2.5 per cent. Al₂O₃, and 2 per cent. BaO, and

small quantities of alkalies, sulphur and lead (1 to 1.5 per cent).

The following classes of ore are produced at Monteponi:

1. Lead carbonates, with a little zinc oxide; these ores are screened

down to 10 mm. The portion held back by the screen is sent straight

to the shaft furnaces; the portion passing through is either roasted

together with lead sulphides, or is sintered by itself, according to

circumstances.

2. Dry lead ores, mostly quartz, with 10 to 15 per cent. lead, which

are mixed for smelting with the lead carbonates.

[Illustration: FIG. 42.—General Plan of Works.]

3. Lead sulphides, which are crushed fine and roasted dead. Quartz

sand is added in the roasting, in order to decompose the lead sulphate

and produce a readily fusible silicate; as quartz flux, fine sand from

the dunes on the coast is used. This is a product of decomposition of

trachyte, and contains 88 per cent. of silica, together with alkalies

and alumina. The roast is effected in two hand-raked reverberatory

furnaces, 18 m. long, which turn out 12,000 kg. of roasted ore in

24 hours, consuming 1800 kg. of English cannel coal, or 2400 kg.

of Sardinian lignite. There is also a third reverberatory furnace,

provided with a fusion chamber, which is used for roasting matte and

for liquating various secondary products.

The charge for the shaft furnace, as a rule, consists of 50 per cent.

ore (crude and roasted), 20 per cent. fluxes and 30 per cent. slag

of suitable origin. The fluxes used are limestone from the mine,

containing 98 per cent. CaCO₃, and limonite from the calamine

deposits. This iron ore contains 48 per cent. Fe, not more than 4 per

cent. Zn, a little lead and traces of copper and silver.

A shaft furnace will work up a charge of 60 tons, equal to 30 tons of

ore, in 24 hours, with a coke consumption of 12 per cent. of the weight

of the charge and a blast pressure of 50 mm. of mercury. There are

three furnaces, of which two are used alternately for smelting lead

ores, while one smaller furnace serves for smelting down products, such

as hard lead, copper matte and copper bottoms.

[Illustration: FIG. 43.—Elevation of works on line A B C D E F of Fig.

42.]

Figs. 43 to 46 show one of the furnaces. It will be seen at once that

its construction is similar to that of the standard American furnaces.

Pilz furnaces were tried in the first few years, but were finally

abandoned, as they could not be kept running for any satisfactory

length of time with slags rich in zinc. Diluting the slag, on the other

hand, would have led to an increased coke consumption, and would have

rendered the slag itself worthless. The furnace, however, differs in

several respects from its American prototype; the following are some of

the chief characteristics peculiar to it:

[Illustration: Section E F. Section G H.

FIG. 44.—Shaft Furnace for Lead Smelting.]

The chimney above the feed-floor covers one-third of the furnace

shaft, and is turned down in the form of a siphon, to connect with

the flue-dust chamber. The lateral faces, which are left open, serve

as charging apertures; the central one of these, provided with a

counterbalanced sheet-iron door, is used for charging from cars. The

square openings at the ends, which are covered with cast-iron plates,

are used for barring down the furnace shaft and may also be used for

charging. By this arrangement, together with the two hoppers placed

laterally on the chimney, it is possible to distribute the charge in

any desired manner over the whole cross-section of the furnace. This

arrangement greatly facilitates the removal of any accretions in the

furnace shaft, as the centrally placed chimney catches all the smoke,

while the charge-holes render the furnace accessible on all sides.

In case of large accretions being formed, the whole furnace can be

emptied, cleaned and restarted in 24 to 36 hours.

The smelting cone is enclosed by cast-steel plates 50 cm. high, instead

of having a water-jacket. These are cooled as desired by turning a

jet of water on them. The plates are connected to the furnace shaft

by a bosh wall 25 cm. thick, which is surrounded with a boiler-plate

jacket. These jacket plates also are cooled from the outside by sprays

of water. With this arrangement the consumption of water is less than

with water-jackets, as a part of the water is vaporized, and the danger

of leakage of the jackets is avoided. The cast-steel plates are made

in two patterns; there are two similar side-plates, each with four

slits for the tuyeres, and two end-plates, provided with a circular

breast of 30 cm. aperture, for tapping the slag. The breast is cooled

by water flowing down, and is closed in front by a plate of sheet

iron, in which is the tap-hole for running off the slag. When cleaning

out, this sheet-iron plate is removed and the breast is opened, thus

providing easy access to the hearth. The four cast-steel plates are

anchored together with bolts at their outer ribs, and rest on two long,

gutter-shaped pieces of sheet iron, which carry off all the water which

flows down, and keep it away from the brickwork of the hearth.

[Illustration: Section J L. Section C D.

FIG. 45.—Shaft Furnace.]

The hearth, cased with boiler plate and rails, has at the side a

cast-iron pipe of 10 cm. diameter for drawing off the lead to the

outside kettle; this pipe has a slight downward inclination, to prevent

the slag flowing out; every 20 minutes lead is tapped, and the end of

the pipe is then plugged up with clay.

The furnace shaft is supported upon a hollow mantel, which serves at

the same time as blast-pipe. The blast-pipe has eight lateral tees,

which are connected by canvas hose with the eight tuyeres. The mouth

of the tuyeres has the form of a horizontal slit, whereby the air is

distributed more evenly over the entire zone of fusion.

[Illustration: FIG. 46.—Shaft Furnace for Lead Smelting. (Section A B.)]

The precipitation of flue dust is effected in a brick condensing

chamber, placed near the beginning of the main flue. The main flue

terminates on the hill (see Fig. 43) in a chimney, the top of which

is 160 m. above the ground level of the works, affording excellent

draft. The condensing chamber (Figs. 49 to 51) consists of a vaulted

room, 3.40 m. wide and 6.60 m. long, which is divided into twelve

compartments by one longitudinal and five baffle walls. The gases

change direction seven times, and pass over the longitudinal wall

six times, being struck six times by fine sprays of water. The six

atomizers for this purpose consume 1.5 liter of water per minute, of

which four-fifths is vaporized, while one-fifth flows off to the lower

water basin. By this means 10 to 15 per cent. of the total flue dust

is precipitated in the condensing chamber itself, and is removed from

time to time as mud through the lower openings, which are water-sealed.

The remainder of the volatilized water precipitates the flue dust

almost completely on the way to the stack, so that only a short column

of steam is visible at the mouth of the stack. The flue to the stack

passes for the most part underground through abandoned adits and

galleries, thus providing a variety of changes in cross-section and

in direction, and assisting materially the action of the condensing

chamber.

[Illustration: FIG. 47.—Section of Lead Refinery.]

[Illustration: FIG. 48.—Softening Furnace.]

As the charge of the shaft furnaces is poor in sulphur, no real matte

is produced, but only work lead and lead ashes (Bleischaum), which

contains 90 per cent. of lead, 1.6 per cent. sulphur, 0.4 per cent.

zinc, 0.85 per cent. Cu, 0.99 per cent. Fe, and 0.22 per cent. Sb. By

liquation and a reducing smelt in a reverberatory furnace, most of the

lead is obtained, along with a lead-copper matte, which is smelted for

copper matte and antimonial lead in the blast furnace.

[Illustration: FIG. 49.—Fume Condenser. (Section A B.)]

The copper matte, containing 18 per cent. Cu, 25 per cent. Fe, 30 per

cent. Pb and 18.4 per cent. S, is roasted dead in a reverberatory

furnace, is sintered, and melted to copper-bottoms in a small shaft

furnace. These copper-bottoms, which contain 60 per cent. copper and

25 per cent. lead, are subjected to liquation, and finally refined to

blister copper.

The zinc-desilvering plant, Fig. 47, consists of a reverberatory

softening furnace, two desilvering kettles of 14 tons capacity, a pan

for liquating the zinc crust, and a small kettle for receiving the lead

from the liquation process.

This pan has the advantage over the ordinary liquating kettle, that the

lead which drips off is immediately removed, before it can dissolve the

alloy; the silver content of the liquated lead is scarcely 0.05 per

cent., while the dry alloy contains 5 to 8 per cent.

[Illustration: FIG. 50.—Fume Condenser. (Section E F G H.)]

[Illustration: FIG. 51.—Fume Condenser. (Section C D.)]

The removal of the zinc is effected in a second reverberatory furnace.

Formerly the steam-method was used, but the rapid wear of the kettles,

and the excessive formation of oxides called for a change in the

process. The zinc-silver alloy is distilled in a crucible of 200 kg.

capacity, and is cupeled in an English cupel furnace. The details of

the reverberatory furnace are shown in Fig. 48.

The composition of the final products is shown by the following

analyses; Lead: Zn, 0.0021 per cent.; Fe, 0.0047 per cent.; Cu, 0.0005

per cent.; Sb, 0.0030 per cent.; Bi, 0.0007 per cent.; Ag, 0.0010 per

cent.; Pb, 99.998 per cent.; Silver, Ag, 99.720 per cent.; Cu, 0.121

per cent.; Fe, 0.005 per cent.; Pb, 0.018 per cent.; Au, 0.003 per

cent.

INDEX

Alloy, retorting the, in lead refining, 267

Alumina, experience with, 259

American Smelting and Refining Co., 4, 6, 26, 93, 113, 252, 295

at Murray, Utah, 287

Atmosphere, effect of on concrete, 242

Bag-house, cost of attending, 246

standard, 246

Bag-houses for saving fume, 244

Bartlett, Eyre O., 244

Bayston, W. B., 199

Bennett, James C., 66

Betts, Anson G., 270, 274

Between products, working up of, 39

Biernbaum, A., 41, 148, 160

Blast furnace of circular form, 253

Spanish lead, 307

Blast, volume and pressure of in lead smelting, 76

Blower, rotary, deficiency of, 251

Blowers for lead and copper smelting, 256

now more powerful for lead smelting use, 252

Blowers, rotary, method of testing volumetric efficiency of, 254

_vs._ blowing engines, 254

_vs._ blowing engines for lead smelting, 251

Blowing engines, when to use, 259

Bonne Terre lead deposits, 18

orebody, Missouri, 13, 14

Borchers, W., 114, 116, 127

Bormettes method, combination processes in, 222

Bradford, Mr., 55

Bretherton, S. E., 251, 258

Broken Hill Proprietary Block, 14, 59

Broken Hill practice, 51

Proprietary Co., 52, 113, 124, 145, 175, 178, 206

Bricking plant for flue dust and fine ores, 66-70

Briquetting costs, 62

methods of avoiding, 63, 64

process, operations, in 59

Bullion, analyses of in lead refining, 281

refined lead and slimes, analyses of, 282

Canadian Smelting Works, 275

Carlton Iron Co., 63

Carmichael, A. D. 56, 199

Carmichael-Bradford process, 175-185

brief estimate of, 209

claims of in patent, 199

recommendations of, 124

process, points concerning, 131

Cement walls, how to build, 241

Channing, J. Parke, 254

Charge-car in smelting, true function of, 94

feeding of in lead smelting, 77

mechanical character of in lead smelting, 78

Charges, effect of large in lead smelting, 77

Cherokee Lanyon Smelter Co., 104

Chimney bases, 237

Chisholm, Boyd & White Co., 64

Clark, Donald, 114, 144, 175

Cœur d’Alene mines, 5, 6, 7

Concrete flues and stacks, advantages and disadvantages of, 242

in metallurgical construction, 234

Connersville Blower Co., 252

Consolidated Kansas City Smelting and Refining Co., 285

Coke, percentage necessary to use in smelting, 259

Croll, H. V., 253

Cupellation in lead refining, 269

De Lamar Copper Refining Co., 297

Desilverization in lead refining, 265

Desloge practice contrasted with others, 46

Doeltz, F. O., 139

Dross, analyses of in lead refining, 279

Dupuis & Sons, 63

Dust chamber, arched form, 231

beehive form of, 232

design, 229

rectangular form, 230

concrete, 235-237

Dwight, Arthur S., 73, 81

spreader and curtain in furnaces, 91

East Helena and Pueblo smelting systems compared, 93

plant of the American Smelting and Refining Co., 302

system of smelting, 88-94

Edwards, Henry W., 234, 240, 242

Einstein silver mine, 14

Engine, blowing, proper field of, 257

blowing, and rotary blowers, 258

Eriksson, Hjalmar, 306

Federal Lead Co., 38

Mining and Smelting Co., 7

Feeders, cup and cone, for round furnaces, 81

Ferraris, Erminio, 311

Flat River mines, 18

Flue gases and moisture, effect of on concrete, 242

Flues, concrete, 234, 240, 242

Foundations for dynamos, 236

Fremantle Smelting Works, 145

Fume-smelting, cost of, 33

in the hearth, 32

Furnace operations at Desloge, Mo., 45

Furnaces at Desloge, Mo., 43

reverberatory, at Desloge, Mo., 42

Galena, experiments in roasting, 129

lime-roasting of, 14

new methods of desulphurizing, 116

roasting of by Savelsberg process, 122, 123

Gas, furnace, effect of on cement, 240

Gelatine, use of in electrolytic lead refining, 275

Germot, A., 224

process, 224

Globe plant of the American Smelting and Refining Co., 304

Smelting and Refining Co., 244

Greenway, T. J., 59

Guillemain, C., 133

Harvard, Francis T., 242

Hearth, covered-in, 36

Heat, effect of on cement, 242

Heberlein, Ferdinand, 113, 167, 199

Hixon, Hiram W., 256, 258

Harwood, E. J., 51

Hourwich, Dr. Isaac A., 27

Huntington-Heberlein process, 113, 144-147

consideration and estimate of, 203-209

credit due to, 126

process as distinguished from others, 118

economic results of, 155-159

Huntington-Heberlein explained by the inventors, 167-173

process at Friedrichshütte, 148

process, from the hygienic standpoint, 160

ideas of in patent specifications, 117

process, introduction of at Tarnowitz, Prussia, 41

and Savelsberg processes, essential difference between, 192

process, some disadvantages of, 165, 166

Huppertz, L., 121

Hutchings, W. Maynard, 108, 126, 170

Huntington, Thomas, 113, 167, 199

Iles, Malvern W., 96, 252

Ingalls, W. R., 3, 16, 27, 42, 177, 186, 193, 215, 224, 244, 287

Iron, behavior of in silver-lead smelting, 75

Jackson Revel mine, 14

Johnson, E. M., 104

R. D. O., 18

Jones, Richard, 244

Samuel T., 244

Laur, F., 224

Lead, analyses of refined, 281

bullion, electrolytic refining of base, 270

bullion, Parkes process of desilverizing and refining, 263

bullion, softening of, 263

concentrate Joplin district, valuation of, 25

and copper smelting, the Bormettes method of, 215-223

deposits, southeastern Missouri, 18

Joplin district, 8

marketing, 3

-ore roasting, consideration of new processes, 135-138

Lead ore, average prices for, 27

ore, cost of smelting, 32

-ore roasting, theoretical aspects of, 133

ores, Galena, Kan., 24

ores, method of valuing, 26

ores, southwestern Missouri, 24

Park City, Utah, 8

-poisoning in old and new processes, 162-165

refining, electrolytic, 274

soft, Missouri, 25

smelting at Desloge, Mo., 42

smelting at Monteponi, Sardinia, 311

smelting and refining, cost of, 96

smelting in the Scotch hearth, 31

smelting in Spain, 306

smelting at Tarnowitz, Prussia, 41

source of in Missouri, 13

in southeastern Missouri, 7, 10, 17

sulphide and calcium sulphate, metallurgical behavior of, 139-143

total production United States, 5

yield from Scotch hearths, 39

Leadville, Colo., mines, 8

Lewis, G. T., 244

Lime-roasting of galena, 126

Lotti, Alfredo, 215

Messiter, Edwin H., 229, 240

Middleton, K. W. M., 31

Mine La Motte, 14

Minerals, briquetting of, 63

Mining methods in Missouri, 19-23

Missouri Smelting Co., 197

Mould, H. S., Co., 64

Murray smelter, Utah, 291

National plant of the American Smelting and Refining Co., 299

New Jersey Zinc Co., 246

Nutting, Mr., 256

Ore and Fuel Co., 63

different behavior of coarse and fine in lead smelting, 79

treatment in detail by the Huntington-Heberlein process, 150-155

Parkes process, cost of refining by, 99

Percy, Dr., 244

Perth Amboy plant of the American Smelting and Refining Co., 296

Petraeus, C. V., 24

Pfort curtain for furnaces, 82

Picher Lead Co., 197

Piddington, F. L., 263

Potter, Prof. W. B., 15

Pueblo lead smelter, 294

Smelting and Refining Co., 84

Pufahl, O., 38, 291, 294, 296, 299, 302, 304

Pyritic smelting without fuel practically impossible, 256

Raht, August, 251, 254

Refining, monthly cost of per ton of bullion treated, 100

Roasters, hand, and mechanical furnaces, average monthly cost of, 98

Roberts-Austen, W. C., 139

Salts, effect of crystallization of contained on concrete, 243

Santa Fe Gold and Copper Mining Co., 255

Savelsberg, Adolf, 122

Savelsberg process, 186-192

process, claims of in patent, 201

process contrasted with Huntington-Heberlein, 209

process, difference between and Huntington-Heberlein, 197

Savelsberg process the simplest, 132

Scotch-hearth method, permanency of, 195

Scotch hearths, 34

Schneider, A. F., 81

Seattle Smelting and Refining Works, 273

Silver-lead blast furnaces, mechanical feeding of, 81

blast furnace, proper conditions, 73

smelting, details of practice, 73

smelting, modern, 73

Slag-smelting costs, 34

Slime analysis at Broken Hill, 51

Slimes, analyses of in lead refining, 281

desulphurization of by heap roasting, 51

treatment of at Broken Hill, 53-55

Smelter, new, at El Paso, Texas, 285

Smelters’ pay, 32

Smelting, average cost of per ton, 98

Smelting Co. of Australia, 263

costs, 48

detailed costs of, 101, 102

of galena ore, 38

preparation of fine material for, 59

Solution, washing from slime, 277

Sticht, Mr., 256

St. Joseph Lead Co., 16

St. Louis Smelting and Refining Co., 81

Sulphide Corporation, 145

Sulphur dioxide, effect of on cement, 240

Sulphuric acid, making of at Broken Hill, 174

Tasmanian Smelting Co., 145

Tennessee Copper Co., 255

Terhune, R. H., furnace gratings, 84

Thacher, Arthur, 14

Ulke, Titus, 270

United Smelting and Refining Co., 88

States Zinc Co., 295

Vezin, H. A., 252

Walls, retaining, 237

Walter, E. W., 260

Waring, W. Geo., 24

Welch, Max J., 229

Wetherill, Samuel, 244

Wheeler, H. A., 10

Zinc, amount required in lead refining, 265, 266

crusts, treatment of in lead refining, 267

oxide in slags, 108

retort residues, analysis of materials smelted and

bullion produced, 106

retort residues, smelting, 104

FOOTNOTES:

[1] During 1905, antimonial lead commanded a premium of about 1c. per

lb. above desilverized, owing to the high price for antimony.

[2] The figures for 1903 and 1904 have been added in the revision of

this article for this book. The production of lead in the United States

in 1903 was 276,694 tons; in 1904, it was 302,204 tons.

[3] Ounces of silver to the ton of lead.

[4] These figures are doubtful; they are probably too high. (See table

on p. 5).

[5] The production of zinc ore in this district has now been commenced.

[6] The manuscript of this article was dated Oct. 5, 1905.

[7] Translated from _Zeit. f. Berg.-Hütten-und Salinenwesen_, LIII

(1905, p. 450).

[8] This paper is published in pp. 148-166 of this book.

[9] Abstract from _Transactions_ of the Australasian Institute of

Mining Engineers, Vol. IX, Part 1.

[10] In the course of subsequent discussion Mr. Horwood stated that the

losses in roasting were 12½ per cent. in lead and probably about 5 per

cent. in silver. As compared to roasting in Ropp furnaces the loss in

lead was 5 to 6 per cent. greater, but the difference of loss in silver

was, he thought, not appreciable. Mr. Hibbard said that the Central

mine had obtained satisfactory results with masonry kilns.—EDITOR.

[11] Abstract of portion of a paper presented at the Mexican meeting

of the American Institute of Mining Engineers, under the title “The

Mechanical Feeding of Silver-Lead Blast Furnaces.” _Transactions_, Vol.

XXXII, pp. 353-395.

[12] Abstract of a paper (“The Mechanical Feeding of Silver-Lead Blast

Furnaces”) presented at the Mexican meeting of the American Institute

of Mining Engineers and published in the _Transactions_, Vol. XXXII.

For the first portion of this paper see the preceding article.

[13] Abstract of a paper in _Western Chemist and Metallurgist_, I, VII,

Aug., 1905.

[14] Much better work is being done at present, smelting the Western

zinc ores, and the residue contains about one-third of the above

figure, or 7.5 per cent. of zinc oxide. The high per cent. of ZnO left

in residue was mainly due to poor roasting.

[15] There was also considerable coke used of an inferior grade, made

from Kansas coal.

[16] Part of the ZnO in roasted matte came from being roasted in the

same furnace the zinc ore had been roasted in.

[17] There was less residue on the charges during this month, which

accounts for the larger tonnage with a lower blast.

[18] Translation of a paper read before the Naturwissenschaftlicher

Verein at Aachen, and published in _Metallurgie_, 1905, II, i, 1-6.

[19] 35 to 40 cm. = 13.78 to 15.75 in. = 8 to 9.12 oz. per sq. in.

[20] _Engineering and Mining Journal_, 1904, LXXVIII, p. 630; article

by Donald Clark; reprinted in this work, p. 144.

[21] Owner of the patents.—EDITOR.

[22] Abstract of a paper in _Metallurgie_, II, 18, Sept. 22, 1905, p.

433.

[23] This method is described further on in this book.

[24] Translated from _Metallurgie_, Vol. II, No. 19.

[25] British patent, No. 17,580, Jan. 30, 1902, “Improved process for

desulphurizing sulphide ores.”

[26] W. C. Roberts-Austen, “An Introduction to the Study of

Metallurgy,” London, 1902.

[27] A. Lodin, _Comptes rendus_, 1895, CXX, 1164-1167; _Berg. u.

Hüttenm. Ztg._, 1903, p. 63.

[28] _Comptes rendus_, loc. cit.

[29] Translated from the _Zeitschrift für das Berg.-Hütten-und

Salinenwesen im. preuss. Staate_, 1905, LIII, ii, pp. 219-230.

[30] Translated from the _Zeitschrift für das Berg.-Hütten-und

Salinenwesen im. preuss. Staate_, 1905, LIII, ii, pp. 219-230.

[31] The manufacture of sulphuric acid from these gases has now been

undertaken in Silesia on a working scale.—EDITOR.

[32] A paper presented before the American Institute of Mining

Engineers, July, 1906.

[33] _Engineering and Mining Journal_, Sept. 2, 1905.

[34] This term is inexact, because the hearths employed in the United

States are not strictly “Scotch hearths,” but they are commonly known

as such, wherefore my use of the term.

[35] Percentages of lead in Missouri practice are based on the wet

assay; among the silver-lead smelters of the West the fire assay is

still generally employed.

[36] This improvement did not originate at either Alton or

Collinsville. It had previously been in use at the works of the

Missouri Smelting Company at Cheltenham, St. Louis, but the idea

originated from the practice of the Picher Lead Company, of Joplin, Mo.

[37] This refers especially to the Savelsberg process.

[38] A. D. Carmichael, U. S. patent No. 705,904, July 29, 1902.

[39] _Metallurgie_, 1905, II, i, 1-6; _Engineering and Mining Journal_,

Sept. 2, 1905.

[40] _Metallurgie_, 1905, II, 19; _Engineering and Mining Journal_,

Jan. 27, 1906.

[41] _Metallurgie_, 1905, Sept. 22, 1905; _Engineering and Mining

Journal_, March 10, 1906.

[42] _Engineering and Mining Journal_, Oct. 21, 1905.

[43] Translated by W. R. Ingalls.

[44] As originally published the title of this article was

“Lead-Smelting without Fuel.” In this connection reference may well be

made to Hannay’s experiments and theories, _Transactions_ Institution

of Mining and Metallurgy, II, 188, and Huntington’s discussion,

_ibid._, p. 217.

[45] Excerpt from a paper, “Concrete in Mining and Metallurgical

Engineering,” _Transactions_ American Institute of Mining Engineers,

XXXV (1905), p. 60.

[46] A Discussion of the Paper by Henry W. Edwards, on “Concrete in

Mining and Metallurgical Engineering,” _Transactions_ of the American

Institute of Mining Engineers, XXXV.

[47] _Engineering News_, Nov 30, 1899, and U. S. Patent No. 665,250,

Jan. 1 1901.

[48] A discussion of the paper of Henry W. Edwards, on “Concrete in

Mining and Metallurgical Engineering,” _Transactions_ of the American

Institute of Mining Engineers, XXXV.

[49] Abstract from the _Journal_ of the Chemical, Metallurgical and

Mining Society of South Africa, May, 1903.

[50] Abstract of a paper in _Transactions_ American Institute of Mining

Engineers, XXXIV (1904), p. 175.

[51] Silver not given. This was the case, also, with the gold in the

bullion. The slimes contained 0.131 per cent. of gold, or 39.1 oz. per

ton.

[52] A constituent company of the American Smelting and Refining

Company.

[53] Translated from _Zeit. f. Berg.-Hütten.-und Salinenwesen im

preuss. Staate_, 1905, LIII, p. 433.

[54] Abstract from a paper in _Zeit. f. Berg.-Hütten-und Salinenwesen

im preuss. Staate_, 1905, LIII, p. 439.

[55] Translated from _Zeit. f. Berg.-Hütten.-und Salinenwesen im

preuss. Staate_, 1905, LIII, 490.

[56] Abstract from a paper in _Zeit. f. Berg.-Hütten-und Salinenwesen

im preuss. Staate_, 1905, p. 400.

[57] Abstract from a paper in _Zeit. f. Berg.-Hütten.-und Salinenwesen

im preuss. Staate_, 1905, p. 400.

[58] Abstract from an article in _Zeit. f. Berg.-Hütten.-und

Salinenwesen im preuss. Staate_, 1905, LIII, p. 444.

[59] Translated from _Oest. Zeit. f. Berg.-und Hüttenwesen_, 1905, p.

455.