PART II

ROAST-REACTION SMELTING

SCOTCH HEARTHS AND REVERBERATORY FURNACES

LEAD SMELTING IN THE SCOTCH HEARTH

BY KENNETH W. M. MIDDLETON

(July 6, 1905)

In view of the fact that the Scotch hearth in its improved form is now

coming to the front again to some extent in lead smelting, it may prove

interesting to give a brief account of its present use in the north of

England.

Admitting that, where preliminary roasting is necessary, the best

results can be obtained with the water-jacketed blast furnace (this

being more especially the case where labor is an expensive item), we

have still as an alternative the method of smelting raw in the Scotch

hearth. At one works, which I recently visited, all the ore was smelted

raw; at another, all the ore received a preliminary roast, and it is

instructive to compare the results obtained in the two cases. The

following data refer to a fairly “free-smelting” galena assaying nearly

80 per cent. of lead.

When smelting raw ore in the hearth, fully 7½ long tons can be treated

in 24 hours, the amount of lead produced direct from the furnace in the

first fire being 8400 to 9000 lb.; this is equivalent to 56 to 60 per

cent. of lead, the remaining 24 to 20 per cent. going into the fume and

the slag.

When smelting ore which has received a preliminary roast of two hours,

12,000 lb. of lead is produced direct from the hearth, this being

equivalent to 65 per cent. of the ore. When the ore is roasted, the

output of the hearth is practically the same for all ores of equal

richness; but when smelting raw, if the galena is finely divided, the

output may fall much below that given herewith; while, on the other

hand, under the most favorable conditions it may rise to 12,000 lb. in

24 hours, or even more.

I had an opportunity of seeing a parcel of galena carrying 84 per cent.

of lead (but broken down very fine) smelted raw. The ore was kept damp

and the blast fairly low; but, in spite of that, a quantity of the ore

was blown into the flue, and only 5100 lb. of lead was produced from

the hearth in 24 hours.

Galena carrying only 65 per cent. of lead does not give nearly as

satisfactory results when smelted raw in the hearth; barely six tons of

ore can be smelted in 24 hours, and only 4500 to 5400 lb. of lead can

be produced directly. This is equivalent to, say, 43 per cent. of the

ore in the first fire; the remaining 22 per cent. goes into the slag or

to the flue as fume. Moreover, the 65 per cent. ore requires 1500 lb.

of coal in 24 hours, while the 80 per cent. galena uses only 1000 lb.

Turning now for a moment to the costs of smelting raw and of smelting

after a preliminary roast, we find that (in the case of the two works

we have been considering) the results are all in favor of smelting raw,

so far as a galena carrying nearly 80 per cent. is concerned.

The cost of smelting, per ton of lead produced, is given herewith:

ORE SMELTED RAW

Smelters’ wages $2.04

“ coal (425 lb.) 0.38

——-

Total $2.42

A very small quantity of lime is also used in this case for some ores,

but its cost would never amount to more than 4c. per ton of lead

produced.

ORE RECEIVING A PRELIMINARY ROAST

Roasters’ wages $0.61

“ coal (425 lb.) 0.65

Smelters’ wages 1.08

“ coal (75 lb.) 0.11

Peat and lime 0.08

——-

Total $2.53

It should be noted also that the smelters at the works where the ore

was not roasted receive higher pay. In the eight-hour shift they

produce about 1½ tons of lead; and as there are two of them to a

furnace, they make $3.06 between them, or $1.53 each. The two men

smelting roasted ore produce about two tons in an eight-hour shift, and

therefore each receives $1.08 per shift.

Coming now to fume-smelting in the hearth, we can again compare the

results obtained in smelting raw and after roasting. It is well to

bear in mind, also, that, while only 6½ per cent. of the lead goes in

the fume when smelting roasted ores in the hearth, a considerably

larger proportion is thus lost when smelting raw ores. When fume is

smelted raw, it is best dealt with when containing about 40 per cent.

of moisture. One man attends to the hearth (instead of two as when

smelting ore), and in 24 hours 3000 lb. of lead is produced, the amount

of coal used being 2100 lb. No lime is required.

When smelting roasted fume, two men attend to the hearth and the output

is 6000 lb. in 24 hours, the amount of coal used being 1800 lb. In this

latter case fluorspar happens to be available (practically free of

cost), and a little of it is used with advantage in fume-smelting, as

well as a small quantity of lime.

The cost of fume-smelting per ton of lead produced is given herewith:

FUME SMELTED RAW

Smelters’ wages $2.88

“ coal (1400 lb.) 2.13

——-—-

Total $5.01

FUME RECEIVING A PRELIMINARY ROAST

Roasters’ wages $2.08

“ coal (1450 lb.) 2.18

Smelters’ wages 2.04

“ coal (600 lb.) 0.92

Peat and lime 0.08

———--

Total $7.30

In this case, as in that of ore, the smelter of the raw fume gets

better pay; he has $1.44 per eight-hour shift, while the smelter of the

roasted ore has only $1.02 per eight-hour shift.

Fume takes four hours to roast, as compared to the two hours taken by

ore.

From these facts regarding Scotch-hearth smelting, it would seem that

with galena carrying, say, over 70 per cent. lead (but more especially

with ore up to 80 per cent. in lead, and, moreover, fairly free from

impurities detrimental to “free” smelting), very satisfactory results

can be obtained by smelting raw. Against this, however, it must be said

that at the works where the ore is roasted attempts at smelting raw

have been made several times without sufficient success to justify the

adoption of this method, although the ores smelted average 75 per cent.

lead and seem quite suitable for the purpose.

Probably this may be accounted for by the fact that the method of

running the furnace when raw ore is being smelted is rather different

from that adopted when dealing with roasted ore. Moreover, at the works

under notice the furnaces are not of the most modern construction; and,

as the old custom of dropping a peat in front of the blast every time

the fire is made up still survives, it is necessary to shut off the

blast while this is being done, and the fire is then apt to get rather

slack.

The gray slag produced in the hearth is smelted in a small blast

furnace, a little poor fume, and sometimes a small quantity of

fluorspar, being added to facilitate the process. Some figures

regarding slag-smelting may be of interest. The slag-smelters produce

9000 lb. of lead in 24 hours. The cost of slag-smelting per ton of lead

produced is as follows:

Smelters’ wages $1.60

Coke (1500 lb.) 3.42

Peat 0.06

———--

Total $5.08

Recent analyses of Weardale (Durham county) lead smelted in the Scotch

hearth, and slag-lead smelted in the blast furnace, are given herewith:

─────────┬───────────────────┬────────────────────┬──────────────────

│ FUME-LEAD FROM │ SILVER-LEAD FROM │ SLAG-LEAD FROM

│ HEARTH │ HEARTH │ BLAST FURNACE

─────────┼───────────────────┼────────────────────┼──────────────────

Lead │ 99.957 │ 99.957 │ 99.013

Silver │ 0.0035 │ 0.0200 │ 0.0142

│ (1oz. 2dwt. 21gr. │ (6oz. 10dwt. 16gr. │(4oz. 12dwt. 18gr.

│ per Long Ton) │ per Long Ton) │ per Long Ton)

Tin │ nil │ nil │ nil

Antimony │ nil │ nil │ 0.874

Copper │ nil │ nil │ 0.024

Iron │ 0.019 │ 0.019 │ 0.023

Zinc │ nil │ nil │ nil

│ ──────── │ ──────── │ ────────

│ 99.9795 │ 99.9960 │ 99.9482

─────────┴───────────────────┴────────────────────┴──────────────────

The ordinary form of the Scotch hearth is probably too well known

to need much description. The dimensions which have been found most

suitable are as follows: Front to back, 21 in.; width, 27 in.; depth

of hearth, 8 to 12 in. Formerly the distance from front to back was 24

in., but this was found too much for the blast and for the men.

The cast-iron hearth which holds the molten lead is set in brickwork;

if 8 in. deep and capable of holding about ¾ ton of lead, it is quite

large enough. The workstone or inclined plate in front of the hearth

is cast in one piece with it, and has a raised holder on either side

at the lower edge, and a gutter to convey the overflowing lead to the

melting-pot. The latter is best made with a partition and an opening

at the bottom through which clean lead can run, so that it can be

ladled into molds without the necessity for skimming the dross off

the surface. It is well also to have a small fireplace below the

melting-pot.

On each side of the hearth, and resting on it, is a heavy cast-iron

block, 9 in. thick, 15 in. high, 27 to 28 in. long. To save metal,

these are now cast hollow and air is caused to pass through them. On

the back of the hearth stands another cast-iron block known as the

“pipestone,” through which the blast comes into the furnace. In the

older forms of pipestone the blast comes in through a simple round or

oval pipe, a common size being 3 or 4 in. wide by 2½ in. high, and the

pipestone is not water-cooled. With this construction the hearth will

not run satisfactorily unless the pipestone is set with the greatest

care, so as to have the tuyere exactly in the center, and as there

is no water-cooling the metal quickly burns away when fume is being

smelted. Moreover, the blast is apt to be stopped by slag adhering to

the end of the pipe. As already mentioned, a peat is dropped in front

of the blast every time the fire is made up, with the object of keeping

a clear passage open for the blast. This old custom has, however,

several serious disadvantages; first, it prevents the blast being kept

on continuously; and, second, it makes it necessary to have the hearth

open at the top so that the smelter-man can go in by the side of it. In

this case the ore is fed from the side by the smelter-man, who works

under the large hood placed above the furnace to carry away the fume.

Even when he is engaged in shoveling back the fire from the front and

is not underneath the hood, it is impossible to prevent some fume from

blowing out; and there is much more liability to lead-poisoning than

when the hearth is closed at the top by the chimney and the smelter-men

work from the front. The best arrangement is to have the hearth

entirely closed in by the chimney, except for the opening at the front,

and to have a small auxiliary flue above the workstone leading direct

to the open air to catch any fume that may blow out past the shutter in

front of the hearth.

In an improved form of pipestone, a pipe connected to the blast-main

fits into the semicircular opening at the back and is driven tight

against a ridge in the flat side of the opening. Going through the

pipestone, the arch becomes gradually flatter, and the blast emerges

into the hearth, about 2 in. above the level of the molten lead,

through an oblong slit 12 in. long by 1 in. wide, with a ledge

projecting 1½ in. immediately above it. The back and front are similar,

so that when one side gets damaged the pipestone can be turned back to

front.

Water is conveyed in a 2½ in. iron pipe to the pipestone, and after

passing through it is led away from the other end to a water-box, which

stands beside the hearth and into which the red-hot lumps of slag are

thrown to safeguard the smelters from the noxious fumes.

On the top of the pipestone rests an upper backstone, also of cast

iron; it extends somewhat higher than the blocks at the sides. All this

metal above the level of the lead is necessary because the partially

fused lumps which stick to it have to be knocked off with a long bar,

so that if fire-bricks were used in place of cast iron they would soon

be broken up and destroyed.

With a covered-in hearth, when the ore is charged from the front,

the following is the method adopted in smelting raw ore: The charge

floats on the molten lead in the hearth, and at short intervals the

two smelters running the furnace ease it up with long bars, which they

insert underneath in the lead. Any pieces of slag adhering to the sides

and pipestone are broken off. After easing up the fire, the lumps of

partially reduced ore, mixed with cinders and slag, are shoveled on

to the back of the fire; the slag is drawn out upon the workstone

(any pieces of ore adhering to it being broken off and returned to

the hearth), and it is then quenched in a water-box placed alongside

the workstone. One or two shovelfuls of coal, broken fairly small

and generally kept damp, are thrown on the fire, together with the

necessary amount of ore, which is also kept damp if in a fine state

of division. It is part of the duty of the two smelters to ladle out

the lead from the melting-pot into the molds. In smelting ore a fairly

strong, steady blast is required, and it is made to blow right through

so as to keep the front of the fire bright. A little lime is thrown on

the front of the fire when the slag gets too greasy.

When smelting raw fume one man attends to the furnace. It does not

have to be made up nearly as frequently, the work being easier for

one man than smelting ore is for two. The unreduced clinkers and slag

are dealt with exactly as in smelting ore; and coal is also, in this

case, thrown on the back of the fire, but the blast does not blow

right through to the front. On the contrary, the front of the fire is

kept tamped up with fume, which should be of the coherency of a thick

mud. The blast is not so strong as that necessary for ore. The idea is

partially to bake the fume before submitting it to the hottest part of

the furnace, or to the part where the blast is most strongly felt. It

is only when smelting fume that it is necessary to keep the pipestone

water-cooled.

To start a furnace takes from two to three hours. The hearth is left

full of lead, and this has to be melted before the hearth is in normal

working order. Drawing the fire takes about three-quarters of an hour;

the clinkers are taken off and kept for starting the next run, and the

sides and back of the hearth are cleaned down.

THE FEDERAL SMELTING WORKS, NEAR ALTON, ILL.[7]

BY O. PUFAHL

(June 2, 1906)

The works of the Federal Lead Company, near Alton, Ill., were erected

in 1902. They have a connection with the Chicago, Peoria & St. Louis

Railway, by which they receive all their raw materials, and by which

all the lead produced is shipped.

The ore smelted is galena, with dolomitic gangue, and a small quantity

of pyrites (containing a little copper, nickel, and cobalt) from

southeastern Missouri, and consists chiefly of fine concentrates,

containing 60 to 70 per cent. lead. In addition thereto a small

proportion of lump ore is also smelted.

A striking feature at these works is the excellent facility for

handling the materials. The bins for the ore, coke and coal are made

of concrete and steel and are filled from cars running on tracks

laid above them. For transporting the materials about the works a

narrow-gage railway with electric locomotives is used.

The ores are smelted by the Scotch-hearth process. There are 20 hearths

arranged in a row in a building constructed wholly of steel and stone.

The sump (4 × 2 × 1 ft.) of each furnace contains about one ton of

lead. The furnaces are operated with low-pressure blast from a main

which passes along the whole row. The blast enters the furnace from a

wind chest at the back through eight 1 in. iron pipes, 2 in. above the

bath of lead. The two sides and the rear wall are cooled by a cast-iron

water jacket of 1 in. internal width.

Two men work, in eight-hour shifts, at each of the furnaces, receiving

4.75 and 4.25c. respectively for every 100 lb. of lead produced. The

ore is weighed out and heaped up in front of the furnaces; on the

track near by the coke is wheeled up in a flat iron car with two

compartments. The furnacemen are chiefly negroes. At the side of each

furnace is a small stock of coal, which is used chiefly for maintaining

a small fire under the lead kettle. Only small quantities of coal are

added from time to time during the smelting operation.

Over each furnace is placed an iron hood, through which the fumes and

gases escape. They pass first through a collecting pipe, extending

through the whole works, to a 1500 ft. dust flue, measuring 10 × 10

ft., in internal cross-section. Near the middle of this is placed a

fan of 100,000 cu. ft. capacity per minute, which forces the fumes and

gases into the bag-house, where they are filtered through 1500 sacks of

loosely woven cotton cloth, each 25 ft. long and 18 in. in diameter,

and thence pass up a 150 ft. stack.

The dust recovered in the collecting flue is burnt, together with the

fume caught by the bags, the coal which it contains furnishing the

combustible. It burns smolderingly and frits together somewhat. The

product (chiefly lead sulphate) is then smelted in a shaft furnace,

together with the gray slag from the hearth furnaces. The total

extraction of lead is about 98 per cent., i.e., the combined process

of Scotch-hearth and blast-furnace smelting yields 98 per cent. of the

lead contained in the crude ore.

The direct yield of lead from the Scotch hearths is about 70 per cent.

They also produce gray slag, containing much lead, which amounts to

about 25 per cent. of the weight of the ore. About equal proportions

of lead pass into the slag and into the flue dust. When working to

the full capacity, with rich ore (80 per cent. lead and more) the 20

furnaces can produce about 200 tons of lead in 24 hours. The coke

consumption in the hearth furnaces amounts to only 8 per cent. of the

ore. The lead from these furnaces is refined for 30 minutes to one

hour by steam in a cast-iron kettle of 35 tons capacity, and is cast

into bars either alone or mixed with lead from the shaft furnace. The

“Federal Brand” carries nearly 99.9 per cent. lead, 0.05 to 0.1 per

cent. copper, and traces of nickel and cobalt.

The working up of the between products from the hearth-furnaces is

carried out as follows: Slag, burnt flue dust and roasted matte from

a previous run, together with a liberal proportion of iron slag (from

the iron works at Alton), are smelted in a 12-tuyere blast furnace

for work-lead and matte. The furnace is provided with a lead well at

the back. The matte and slag are tapped off together at the front and

flow through a number of slag pots for separation. The shells which

remain adhering to the walls of the pots on pouring out the slag are

returned to the furnace. All the waste slag (containing about 0.5 per

cent. lead) is dumped down a ravine belonging to the territory of the

smeltery.

The lead from the shaft furnace is liquated in a small reverberatory

furnace, of which the hearth consists of two inclined perforated

iron plates. The residue is returned to the shaft furnace, while the

liquated lead flows directly to the refining kettle, which is filled

in the course of four hours. Here it is steamed for about one hour and

is then cast into bars through a Steitz siphon, after skimming off the

oxide. The matte is crushed and roasted in a reverberatory furnace (60

ft. long).

The power plant comprises three Stirling boilers and two 250 h. p.

compound engines, of which one is for reserve; also one steam-driven

dynamo, coupled direct to the engine, furnishing the current for the

entire plant, for the electric locomotives, etc.

The coke is obtained from Pennsylvania and costs about $4 a ton, while

the coal comes from near-by collieries and costs $1 per ton.

In the well-equipped laboratory the lead in the ores and slags is

determined daily by Alexander’s (molybdate) method, while the silver

content of the lead (a little over 1 oz. per ton) is estimated only

once a month in an average sample. When the plant is in full operation

it gives employment to 150 men. Cases of lead-poisoning are said to

occur but rarely, and then only in a mild form.

LEAD SMELTING AT TARNOWITZ

(September 23, 1905)

The account of the introduction of the Huntington-Heberlein process at

Tarnowitz, Prussia, published elsewhere in this issue, is of peculiar

interest inasmuch as it tells of the complete displacement by the new

process of one of the old processes of lead smelting which had become

classic in the art. The roast-reaction process of lead smelting,

especially as carried out in reverberatory furnaces, has been for a

long time decadent, even in Europe. Tarnowitz was one of the places

where it survived most vigorously.

Outside of Europe, this process never found any generally extensive

application. It was tried in the Joplin district, and elsewhere in

Missouri, with Flintshire furnaces in the seventies. Later it was

employed with modified Flintshire and Tarnowitz furnaces at Desloge,

in the Flat River district of Missouri, where the plant is still in

operation, but on a reduced scale.

The roast-reaction process of smelting, as practised at Tarnowitz,

was characterized by a comparatively large charge, slow roasting and

low temperature, differing in these respects from the Carinthian and

Welsh processes. It was not aimed to extract the maximum proportion of

lead in the reverberatory furnace itself, the residue therefrom, which

inevitably is high in lead, being subsequently smelted in the blast

furnace. Ores too low in lead to be suitable for the reverberatory

smelting were sintered in ordinary furnaces and smelted in the blast

furnace together with the residue from the other process. In both of

these processes the loss of lead was comparatively high. One of the

most obvious advantages of the Huntington-Heberlein process is its

ability to reduce the loss of lead. The result in that respect at

Tarnowitz is clearly stated by Mr. Biernbaum, whose paper will surely

attract a good deal of attention.[8]

LEAD SMELTING IN REVERBERATORY FURNACES AT DESLOGE, MO.

BY WALTER RENTON INGALLS

(December 16, 1905)

The roast-reaction method of lead smelting in reverberatory furnaces

never found any general employment in the United States, although

in connection with the rude air-furnaces it was early introduced in

Missouri. The more elaborate Flintshire furnaces were tried at Granby,

in the Joplin district, but they were displaced there by Scotch

hearths. The most extensive installation of furnaces of the Flintshire

type was made at Desloge, in the Flat River district of southeastern

Missouri. This continued in full operation until 1903, when the major

portion of the plant was closed, it being found more economical to ship

the ore elsewhere for smelting. However, two furnaces have been kept

in use to work up surplus ore. As a matter of historic interest, it is

worth while to record the technical results at Desloge, which have not

previously been described in metallurgical literature.

The Desloge plant, which was situated close to the dressing works

connected with the mine, and was designed for the smelting of its

concentrate, comprised five furnaces. The furnaces were of various

constructions. The oldest of them was of the Flintshire type, and

had a hearth 10 ft. wide and 14 ft. long. The other furnaces were a

combination of the Flintshire and Tarnowitz types. They were built

originally like the newer furnaces at Tarnowitz, Upper Silesia, with a

rather large rectangular hearth and a lead sump placed at one side of

the hearth near the throat end; but good results were not obtained from

that construction, wherefore the furnaces were rearranged with the sump

at one side, but in the middle of the furnace, as in the Flintshire

form. The rectangular shape of the Tarnowitz hearth was, however,

retained. Furnaces thus modified had hearths 11 ft. wide and 16 ft.

long, except one which had a hearth 13 ft. wide.

The same quantity of ore was put through each of these furnaces, the

increase in hearth area being practically of no useful effect, because

of inability to attain the requisite temperature in all parts of the

larger hearths with the method of heating employed. The men objected

especially to a furnace with hearth 13 ft. wide, which it was found

difficult to keep in proper condition, and also difficult to handle

efficiently. Even the width of 11 ft. was considered too great, and

preference was expressed for a 10 ft. width. In this connection, it may

be noted that the old furnaces at Tarnowitz were 11 ft. 9 in. long and

10 ft. 10 in. wide, while the new furnaces were 16 ft. long and 8 ft.

10 in. wide (Hofman, “Metallurgy of Lead,” fifth edition, p. 112). All

of these dimensions were exceeded at Desloge.

The Flintshire furnaces at Desloge had three working doors per side;

the others had four, but only three per side were used, the doors

nearest the throat end being kept closed because of insufficient

temperature in that part of the furnace. The furnace with hearth 11

× 14 ft. had a grate area of 6.5 × 3 ft. = 19.5 sq. ft.; the 11 × 16

furnaces had grates 8 × 3 = 24 ft. sq. The ratios of grate to hearth

area were therefore approximately 1:8 and 1:7.3, respectively. (Compare

with ratio of 1:10 at Tarnowitz, and 1:6⅔ at Stiperstones.) The ash

pits were open from behind in the customary English fashion. The grate

bars were cast iron, 36 in. long. The bars were 1 in. thick at the top,

with ⅝ in. spaces between them. The open spaces were 32 in. long,

including the rib in the middle. The bars were 4 in. deep at the middle

and 2 in. at the ends. The distance from the surface of the grate bars

to the fire-door varied in the different furnaces. Some of those with

hearths 11 × 16 ft. and grates 8 × 3 ft. had the bars 6 in. below the

fire-door; in others the bars were almost on a level with the fire-door.

The furnaces were run with a comparatively thin bed of coal on the

grate, and combustion was very imperfect, the percentage of unburned

carbon in the ash being commonly high. This was unavoidable with the

method of firing employed and the inferior character of the coal

(southern Illinois). The excessive consumption of coal was due largely,

however, to the practice of raking out the entire bed of coal at the

beginning of the operation of “firing down” (beginning the reaction

period), when a fresh fire was built with cordwood and large lumps of

coal.

Each furnace had two flues at the throat, 16 × 18 in. in size, each

flue being provided with a separate damper. Each furnace had an

iron chimney approximately 55 ft. high, of which 13 ft. was a brick

pedestal (64 × 64 in.) and the remaining 42 ft. sheet steel, guyed. The

chimneys were 42 in. in diameter. The distance from the outside end

of the furnace to the chimney was approximately 6 ft., and there was

consequently but little opportunity for flue dust to collect in the

flue. About once a month, however, the chimney was opened at the base

and about two wheelbarrows (say 600 lb.) of flue dust, assaying about

50 per cent. lead, was recovered per furnace.

The furnace house was a frame building 45 ft. wide, with boarded sides

and a corrugated-iron pitch roof, supported by steel trusses. The

furnaces were set in this house, side by side, their longitudinal axes

being at right angles to the longitudinal axis of the building. The

distance from the outside of the fire-box end of the furnace to the

side of the building was 10 ft. The coal was unloaded from a railway

track alongside of the building and was wheeled to the furnace in

barrows. Some of the furnaces were placed 18 ft. apart; others 22 ft.

apart. The men much preferred the greater distance, which made their

work easier, an important consideration in this method of smelting.

The hight from the floor to the working door of the furnace was

approximately 36 in. The working doors were formed with cast-iron

frames, making openings 7 × 11 in. on the inside and 15 × 28 in. on

the outside. On the side of the furnace opposite the middle working

door was placed a cast-iron hemispherical pot, set partially below the

floor-line. This pot was 16 in. deep and 24 in. in diameter; the metal

was ¼ in. thick. The distance from the top of the pot to the line of

the working door was 31 in.; from the top of the pot to the bottom of

the tap-door was 7 in. The tap-door was 4 in. wide and 9 in. high,

opening through a cast-iron plate 1½ in. thick. Below the tap-door

and on a line with the upper rim of the pot was a tap-hole 3½ in. in

diameter. The frames of the working doors had lugs in front, against

which the buckstaves bore, to hold the frames in position. All other

parts of the sides of the furnace, including the fire-box, were cased

with ⅝ in. cast-iron plates, which were obviously too light, being

badly cracked.

The cost of a furnace when built in 1893 was approximately $1400,

not including the chimney; but with the increased cost of material

the present expense would probably be about $2000. Notwithstanding

the light construction of the furnaces, repairs were never a large

item. Once a month a furnace was idle about 24 hours while the throat

was being cleaned out, and every two months some repairing, such as

relining the fire-boxes, etc., was required. If repairs had to be made

on the inside of the furnace, two days would be lost while it was

cooling sufficiently for the men to enter. In refiring a furnace, from

8 to 12 hours was required to raise it to the proper temperature. Out

of the 365 days of the year, a furnace would lose from 20 to 25 days,

for cleaning the throat and making repairs to the fire-box, arch, etc.

When a furnace was run with two shifts the schedule of operation was as

follows:

Drop charge 4 a.m.

Begin work 7 a.m.

Begin firing down 11 a.m.

Begin first tapping 1 p.m.

Rake out slag 2.30 p.m.

Begin second tapping 3 p.m.

Drop charge 4 p.m.

Begin working 5.30 p.m.

Begin firing down 11 p.m.

Begin first tapping 1 a.m.

Rake out slag 2.30 a.m.

Begin second tapping 3 p.m.

With three shifts on a furnace, the schedule was as follows:

Drop charge 7 a.m.

Begin firing down 12 a.m.

Begin tapping 1 p.m.

Rake out slag 2 p.m.

Begin tapping 2.30 p.m.

Drop charge 3 p.m.

Begin firing down 8 p.m.

Begin tapping 9 p.m.

Rake out slag 10 p.m.

Begin tapping 10.30 p.m.

Drop charge 11.00 p.m.

Begin firing down 4 a.m.

Begin tapping 5 a.m.

Rake out slag 6 a.m.

Begin tapping 6.30 a.m.

The hearths were composed of about 8 in. of gray slag beaten down

solidly on a basin of brick, which rested on a filling of clay, rammed

solid. The hearth was patched if necessary after the drawing of each

charge.

The system of smelting was analogous to that which was practiced

in Wales rather than to the Silesian, the charges being worked off

quickly, and with the aim of making a high extraction of lead directly

and a gray slag of comparatively low content in lead. The average

furnace charge was 3500 lb. At the beginning of the reaction period

about 85 to 100 lb. of crushed fluorspar was thrown into the furnace

and mixed well with the charge. The furnace doors were then closed

tightly and the temperature raised, the grate having previously been

cleaned. At the first tapping about 1200 lb. of lead would be obtained.

A small quantity of chips and bark was thrown into the lead in the

kettle, which was then poled for a few minutes, skimmed, and ladled

into molds, the pigs weighing 80 lb. The skimmings and dross were

put back into the furnace. The pig lead was sold as “ordinary soft

Missouri.” The gray slag was raked out of the furnace, at the end of

the operation, into a barrow, by which it was wheeled to a pile outside

of the building. Shipments of the slag were made to other smelters from

time to time, 95 per cent. of its lead content being paid for when its

assay was over 40 per cent., and 90 per cent. when lower.

Each furnace was manned by one smelter ($1.75) and one helper ($1.55)

per shift, when two shifts per 24 hours were run. They had to get their

own coal, ore and flux, and wheel away their gray slag and ashes. In

winter, when three shifts were run, the men were paid only $1.65 and

$1.50 respectively. There was a foreman on the day shift, but none at

night. The total coal consumption was ordinarily about 0.8 to 0.9 per

ton of ore. Run-of-mine coal was used, which cost about $2 per ton

delivered. The coal was of inferior quality, and it was wastefully

burned, as previously referred to, wherefore the consumption was high

in comparison with the average at Tarnowitz, where it used to be about

0.5 per ton of ore.

The chief features of the practice at Desloge are compared with those

at Tarnowitz, Silesia and Holywell (Flintshire), and Stiperstones

(Shropshire), Wales, in the following table, the data for Silesia and

Wales being taken from Hofman’s “Metallurgy of Lead,” fifth edition,

pp. 112, 113.

──────────────────────┬─────────┬────────┬─────────┬─────────┬────────

DETAIL │HOLYWELL │ STIPER-│TARNOWITZ│TARNOWITZ│ DESLOGE

│ │ STONES │ │ │

──────────────────────┼─────────┼────────┼─────────┼─────────┼────────

Hearth length, ft. │ 12.00 │ 9.75 │ 11.75 │ 16.00 │ 16.00

Hearth width, ft. │ 9.50 │ 9.50 │ 10.83 │ 8.83 │ 11.00

Grate length, ft. │ 4.50 │ 4.50 │ 8.00 │ 8.00 │ 8.00

Grate width, ft. │ 2.50 │ 2.50 │ 1.67 │ 1.67 │ 3.00

Grate area: hearth │ │ │ │ │

area │ 1:8 │ 1:6⅔ │ 1:10 │ 1:10 │ 1:7⅓

Charges per 24 hr., │ 3 │ 3 │ 2 │ 2 │ 3

Ore smelted per │ │ │ │ │

24 hr., lb. │ 7,050 │ 7,050 │ 8,800 │ 16,500 │ 10,500

Assay of ore, % Pb │ 75-80 │ 77.5 │ 70-74 │ 70-74 │ 70

Gray slag, % of charge│ 12 │ │ 15 │ 30 │ 27

Gray slag, % Pb │ 55 │ │ 38.8 │ 56 │ 38

Men per 24 hr. │ 6 │ 4 │ 4 │ 6 │ 6

Coal used per ton ore │0.57-0.76│ 0.56 │ 0.46 │ 0.50 │ 0.90

──────────────────────┴─────────┴────────┴─────────┴─────────┴────────

The regular furnace charge at Desloge was 3500 lb. The working of three

charges per 24 hours gave a daily capacity of 10,500 lb. per furnace.

These figures refer to the wet weight of the concentrate, which was

smelted just as delivered from the mill. Its size was 9 mm. and finer.

Assuming its average moisture content to be 5 per cent., the daily

capacity per furnace was about 10,000 lb. (5 tons) of dry ore.

The metallurgical result is indicated by the figures for two months

of operation in 1900. The quantity of ore smelted was 1012 tons,

equivalent to approximately 962 tons dry weight. The pig lead produced

was 523.3 tons, or 54.4 per cent. of the weight of the ore. The gray

slag produced was 262.25 tons, or about 27 per cent. of the weight of

the ore. The assay of the ore was approximately 70 per cent. lead,

giving a content of 673.4 tons in the ore smelted. The gray slag

assayed approximately 38 per cent. lead, giving a content of 99.66

tons. Assuming that 90 per cent. of the lead in the gray slag be

recoverable in the subsequent smelting in the blast furnace, or 89.7

tons, the total extraction of lead in the process was 523.3 + 89.7 ÷

673.4 = 91 per cent. The metallurgical efficiency of the process was,

therefore, reasonably high, especially in view of the absence of dust

chambers.

* * * * *

The cost of smelting with five furnaces in operation, each treating

three charges per day, was approximately as follows:

1 foreman at $3 $3.00

5 furnace crews at $9.90 49.50

Unloading 21 tons of coal at 6c. 1.26

Loading 14 tons lead at 15c. 2.10

“ 7 tons gray slag at 15c. 1.05

——————

Total labor $56.91

21 tons coal at $2 $42.00

Flux and supplies 13.00

Blacksmithing and repairs 10.00

——————

Total $121.91

On the basis of 6.25 tons of wet ore, this would be $4.65 per ton. The

actual cost in seven consecutive months of 1900 was as follows: Labor,

$1.98 per ton; coal, $1.86; flux and supplies, $0.51; blacksmithing and

repairs, $0.39; miscellaneous, $0,017; total, $4.757. If the cost of

smelting the gray slag be reckoned at $8 per ton, and the proportion

of gray slag be reckoned at 0.25 ton per ton of galena concentrate,

the total cost of treatment of the latter comes to about $6.75 per ton

of wet charge, or about $7 per ton of dry charge. This cost could be

materially reduced in a larger and more perfectly designed plant.

The practice at Desloge did not compare unfavorably, either in respect

to metal extracted or in smelting cost, with the roast-reduction method

of smelting or the Scotch hearth method, as carried out in the plants

of similar capacity and approximately the same date of construction,

smelting the same class of ore, but the larger and more recent plants

in the vicinity of St. Louis could offer sufficiently better terms to

make it advisable to close down the Desloge plant and ship the ore to

them. One of the drawbacks of the reverberatory method of smelting

was the necessity of shipping away the gray slag, the quantity of

that product made in a small plant being insufficient to warrant the

operation of an independent shaft furnace.