SINKING OF THE QUIEVRECHAIN WORKING SHAFT.

The sinking of mine shafts in certain Belgian and French basins, where

the coal deposit is covered with thick strata of watery earth, has

from all times been considered as the most troublesome and delicate,

and often the most difficult operation, of the miner's art. Of the few

modern processes that have been employed for this purpose, that of

Messrs. Kind and Chaudron has been found most satisfactory, although

it leaves much to be desired where it is a question of traversing

moving sand. An interesting modification of this well-known process

has recently been described by Mr. E. Chavatte, in the Bulletin de la

Societe Industrielle du Nord de la France. Two years ago the author

had to sink a working shaft at Quievrechain, 111 feet of which was to

traverse a mass of moving and flowing sand, inconsistent earth,

gravel, and marls, and proceeded as follows:

He first put down two beams, A B (Pl. 1, Figs. 2, 3, and 9), each 82

feet in length and of 20×20 inch section in the center, and upon these

placed two others, E F, of 16×16 inch section. Beneath the two first

were inserted six joists, _c c c c c c_, about 82 feet in length and

of 14 or 16 inch section in the center. Finally these were

strengthened at their extremities with two others, _d d_, about 82

feet in length. All these timbers, having been connected by tie bands

and bolts, constituted a rigid structure that covered a surface of

nearly seven hundred square yards.

From the beams, A B and E F, there was suspended a red fir frame by

means of thirty-four iron rods.

Upon this frame, which was entirely immersed in the moving sand, there

was established brick masonry (Figs. 1, 2, and 3). As the ends of the

timbers entered the latter, and were connected by 1½ inch bolts, they

concurred in making the entire affair perfectly solid. The frame, K K,

was provided with an oaken ring, which was affixed to it with bolts.

After this, a cast iron tubbing, having a cutting edge, and being

composed of rings 3.28 feet wide and made of six segments, was

lowered. This tubbing was perfectly tight, all the surfaces of the

joints having been made even and provided with strips of lead

one-tenth of an inch thick. It weighed 4,000 pounds to the running

foot.

[Illustration: FIG. 1.--Section through A B. FIG. 2.--Plan. FIG.

3.--Section through C D. FIG. 5.--Section through E F of Fig. 4. FIGS.

6 AND 7.--Work Prepared and finished. FIG. 10.--Section through A B

and C D of Fig. 12. FIGS. 11 6 AND 12.--Arrangement of jack-screw.

FIG. 13.--Section through A B and C D of Fig. 11.