Amelia shaft, Shemnitz, Hungary. 1,782

The No. 1 Camphausen shaft, near Fishbach,

in the department of the Saarbruck

Collieries, Prussia. 1,650

Now, taking the mines of the Comstock for a distance of over a

mile--from the Utah on the north to the Alto on the south--there is

hardly a mine that is not down over 2,500 feet, and most of the shafts

are deeper than those mentioned above; while the Union Consolidated

shaft has a vertical depth of 2,900 feet, and the Yellow Jacket a

depth of 3,030 feet. In his closing argument before the Congressional

Committee on Mines and Mining in 1872, Adolph Sutro of the Sutro

tunnel said: "The deepest hole dug by man since the world has existed

is only 2,700 feet deep, and it remains for the youngest nation on

earth to contribute more to science and geology by giving

opportunities of studying the formation of mineral veins at a greater

depth than has ever been accomplished by any other nation in the

world." Mr. Sutro was of the opinion that the completion of his tunnel

would enable our leading mining companies to reach a vertical depth of

5,000 feet.

This great depth has never yet been attained except in a bore hole or

artesian well. The deepest points to which the crust of the earth has

ever been penetrated have been by means of such borings in quest of

salt, coal, or water. A bore hole for salt at Probst Jesar, near

Lubtheen, for the Government of Mecklenberg-Schwerin, is down 3,315

feet, the size of which bore is twelve inches at the top and three

inches at the bottom. A bore hole was put down for the Prussian

Government to the depth of 4,183 feet. But in these bore holes the

United States leads the world, as there is one near St. Louis, Mo.,

that is 5,500 feet in depth. Here on the Comstock, in the Union

Consolidated mine, a depth of 3,300 feet has been attained, but not by

means of a single vertical shaft. The vertical depth of the shaft is

2,900 feet; the remainder of the depth has been attained by means of

winzes sunk from drifts. Several long drifts were run at this great

depth without difficulty as regards ventilation or heat.

The combination shaft is situated much further east (in which

direction the lode dips) than any other on the Comstock. It is 3,000

feet east of the point where the great vein crops out on the side of

Mount Davidson; 2,200 feet east of the old Chollar-Potosi shaft, 1,800

ft. east of the old Hale & Norcross (or Fair) shaft, and 2,000 ft.

east of the Savage shaft. Thus, it will be seen it is far out to the

front in the country toward which the vein is going. The shaft is sunk

in a very hard rock (andesite), every foot of which requires to be

blasted. The opening is about thirty feet in length by ten feet in

width. In timbering up this is divided into four different

compartments, some for the hoisting and some for the pumping

machinery, thus presenting the appearance at the top of four small

shafts set in a row. Over the shaft stand several large buildings, all

filled with ponderous machinery.

The Sutro drain tunnel (nearly four miles in length) connects with the

shaft at a depth of 1,600 ft., up to which point all the water

encountered below is pumped. The shaft was sunk to the depth of 2,200

ft. before more water was encountered than could be hoisted out in the

"skips" with the dirt. At the 2,200 level two Cornish pumps, each with

columns fifteen inches in diameter, were put in. At the 2,400 level

the same pumps were used. On this level a drift was run that connected

with the old Hale & Norcross and Savage shafts, producing a good

circulation of air both in the shaft and in the mines mentioned. At

this point, on account of the inflow from the mines consequent upon

connecting with them by means of the drift, they had more water than

the Cornish pumps could handle, and introduced the hydraulic pumps,

which pumps are run by the pressure of water from the surface through

a pipe running down from the top of the shaft, whereas the Cornish

pumps are run by huge steam engines.

By means of the hydraulic pumps they were enabled to sink the shaft to

the 2,600 level, and extended the Cornish pumps to that point, where

another set of hydraulic pumps was put in. They then sunk the shaft to

the 2,800 level, when they ran another drift westward, and tapped the

vein. The prospects at this depth in the Hale & Norcross and Chollar

mines were so encouraging that the management decided to sink the

shaft to the depth of 3,000 ft. On reaching the 3,000 level, they ran

a third drift through to the vein. The distance from the shaft to the

east wall of the vein was found to be only 250 ft. At the depth of

3,000 ft. they put in one of the pair of hydraulic pumps that is to be

set up there. The second pump is now arriving from San Francisco, and

as soon as the several parts are on the ground, it will be at once put

in place alongside its fellow on the 3,000 level. This additional pump

will increase the capacity from 600,000 to 700,000 gallons in

twenty-four hours, or about forty-five miners' inches.

Owing to the excellent showing of ore obtained on the 3,000 level by

the Hale & Norcross Company, and to the continuation of the ore below

that level (as shown by a winze sunk in the vein), the management

determined to sink the shaft to the vertical depth of 3,200 ft. It is

now 3,120 ft. deep, and it is safe to say that it will reach the depth

of 3,200 ft. early in September, when it will lack but eighty feet of

being as deep as the shaft at Przibram was at the time of the great

festival. Although the shaft is of great size--about thirty feet by

ten feet before the timbers are put in--the workmen lower it at the

rate of about three feet a day, in rock as hard as flint.

The hydraulic pump now working at the 3,000 foot level of the shaft is

the deepest in the world. In Europe the deepest is in a mine in the

Hartz Mountains, Germany, which is working at the depth of 2,700 feet.

It is, however, a small pump not half the size of the one in the

Combination shaft. Although these pumps were first used in Europe,

those in operation here are far superior in size, and in every other

respect, to those of the Old World, several valuable improvements

having been made in them by the machinists of the Pacific coast.

The capacity of the two Cornish pumps, which lift the water from the

2,900 foot level to the Sutro drain tunnel (at the 1,600 level), is

about 1,000,000 gallons in twenty-four hours, and the capacity of the

present hydraulic pumps is 3,500,000 gallons in the same time. They

are now daily pumping, with both hydraulic and Cornish pumps, about

4,000,000 gallons, but could pump at least 500,000 gallons more in

twenty-four hours than they are now doing. The daily capacity with the

hydraulic pump now coming, and which will be set up as mate to that

now in operation at the 3,000 foot level, will be 5,200,000 gallons.

The water which feeds the pressure pipe of the three sets of hydraulic

pumps is brought from near Lake Tahoe, in the Sierra Nevada Mountains.

The distance is about thirty miles, and the greater part of the way

the water flows through iron pipes, which at one point cross a

depression 1,720 feet in depth. The pressure pipe takes this water

from a tank situated on the eastern slope of Mount Davidson, 3,500

feet west of the shaft. At the tank this pipe is twelve inches in

diameter, but is only eight inches where it enters the top of the

shaft. The tank whence the water is taken is 426 feet higher than the

top of the shaft, therefore the vertical pressure upon the hydraulic

pump at the 3,000 foot level is 3,426 feet. The pressure pipe is of

ordinary galvanized iron where it receives the water at the tank, but

gradually grows thicker and stronger, and at the 3,000 level it is

constructed of cast iron, and is 2½ inches in thickness. The pressure

at this point is 1,500 pounds to the square inch.

In the early days of hydraulic mining in California the miners thought

that with a vertical pressure of 300 feet they could almost tear the

world to pieces, and not a man among them could have been made to

believe that any pipe could be constructed that would withstand a

vertical pressure of 1,000 feet; but we now see that a thickness of

two and a half inches of cast iron will sustain a vertical pressure of

over 3,400 feet.

There is only one pressure pipe for all the hydraulic pumps. This

extends from the tank on the side of the mountain to the 3,000 foot

level. It is tapped at the points where are situated the several sets

of hydraulic pumps. The water from the pressure pipe enters one part

of the pump, where it moves a piston-back and forth, just as the

piston of a steam engine is moved by steam. This water engine moves a

pump which not only raises to the surface the water which has been

used as driving power, but also a vast quantity of water from the

shaft, all of which is forced up to the Sutro drain tunnel through

what is called a return pipe. Each set of hydraulic pumps has its

return pipe; therefore there are three return pipes--one from the

2,400, one from the 2,600, and another from the 3,000 level.

Some idea may be formed of the great size of these hydraulic engines

when it is known that the stations excavated for them at the several

levels where they are placed are 85 feet long, 28 feet wide, and 12

feet high. All this space is so filled with machinery that only

sufficient room is left to allow of the workmen moving about it. One

of these stations would, on the surface, form a hall large enough for

a ball room, and to those who are unacquainted with the skill of our

miners it must seem wonderful that such great openings can be made and

securely supported far down in the bowels of the earth; yet it is very

effectually done. These great subterranean halls are supported by

timbers 14×16 inches square set along the walls three feet apart, from

center to center, and the caps or joists passing overhead are timbers

of the same size. The timber used is mountain spruce. Not one of these

huge stations has thus far cost one dollar for repairs. The station at

the 2,400 level has been in use five years, that at the 2,600 three

years, and the one at the 3,000 level eight months. Room for

ventilation is left behind the timbers, and all are still sound.

Timbers of the same kind are used in the shaft, and all are sound. The

shaft has cost nothing for repairs. Being in hard andesite rock from

top to bottom, the ground does not swell and crowd upon the timbers.

If it shall be thought advisable to go to a greater depth than 3,200

feet, a station of large size will be made on the east side of the

present shaft, and in this station will be sunk a shaft of smaller

size. The reason why the work will be continued in this way is that in

a single hoist of 3,200 feet the weight of a steel wire cable of that

length is very great--so great that the loaded cage it brings up is a

mere trifle in comparison. In this secondary shaft the hoisting

apparatus and pumps will be run by means of compressed air. As it is

very expensive to make compressed air by steam power, the pressure

pipe will be tapped at the level of the Sutro tunnel, and a stream of

water taken out that will be used in running a turbine wheel of

sufficient capacity to drive three air compressors. As there will be a

vertical pressure upon the turbine at this depth of over 2,000 feet, a

large stream of water will not be required. The water used in driving

the wheel will flow out through the Sutro tunnel, and give no trouble

in the shaft.

By means of this great shaft and its powerful hydraulic and Cornish

pumps the crust of the earth will probably yet be penetrated to far

greater depth than in any other place in the world. It has been only a

little over ten years since the work of sinking it was begun, whereas

in the mines of the Old World they have been delving since "time

whereof the memory of man runneth not to the contrary." The work on

the Combination shaft has been by no means continuous. There have been

long stoppages aside from those required at such times as they were

engaged in running long drifts to the westward to tap the vein, and at

times for many months, when the several companies interested in the

shaft were engaged in prospecting the various levels it had opened up.

* * * * *

Scientific American Supplement, No. 508, September 26, 1885 · 第 24 / 73 题