1 M Stations 2

7:30 A. M. 0 Lv. Silverton Ar. 11:50 A. M.

8:00 6 Burro Bridge 11:40

8:10 9 Chattanooga 11:30

8:30 13 Summit 11:10

8:40 14 Red Mountain 10:50

15 Vanderbilt

8:55 15 Yankee Girl 10:45

16 Paymaster coal track

9:10 17 Corkscrew Gulch 10:25

18 Paymaster ore track

9:20 A. M. 20 Ar. Ironton Lv. 10:00

All carrier lines issued paper passes but Mears wanted to do something

special for _his_ railroad. Outside of the paper ones his passes fell

into four categories—buckskin, plate, medallion and filigree. The first

three were for the Silverton Railroad alone while the fourth, though

made especially for the Rio Grande Southern Railroad, was usable on the

S. R.

There were two designs of the silver plate pass. It is supposed that the

first die broke and a substitute had to be made. The medallion passes,

ordinarily silver, have the date 1890, the number and the name of the

recipient on the back. Two extra-special ones have come to light. Each

is made of two _gold_ medallions set back to back and hinged to form a

locket and each has a little diamond in the face. An odd silver pass, a

spoon with a plate pass hanging from underneath, has been discovered.

The filigrees, silver and gold, have been extensively treated in the

book, _Rio Grande Southern Story_.

According to an item in a Rico _Sun_ of November 28, 1891, copied from a

Denver _Sun_, a company called “Ouray and Ironton Electric Railway,

Light and Power,” consisting of Mears, Walsen, Charles Munn, James H.

Cassanova and William H. Wallace, with capital of $800,000, filed

articles of incorporation with the Secretary of State on November 20.

Its purpose was to build a cog road from Ouray to Ironton, with a branch

up Poughkeepsie Gulch (Uncompahgre River) to the head of Cement Creek.

The following quotation is from Mr. Arthur Ridgway:

“The assumption that Mr. Mears contemplated extending the S. R. from

Ironton to Ouray is correct but he was deterred because of its being so

formidable an undertaking. He may have considered Albany as the possible

point for the origin of the extension at first but later Ironton proved

the more feasible. Anyway, he had a preliminary location for an

_electric_ railway, Ouray to Ironton, made in 1892 by the then noted

locating engineer, R. L. Kelly. No doubt the impracticability if not the

utter impossibility, of operating steam locomotives over the heavy

grades and severe curvature known to be necessary dissuaded him from the

purpose until the recognized practicability of electric railway

operation became apparent in 1892. Whatever the delay (a long one for

Mr. Mears) it was not until 1892 that a survey was made and even then,

as stated before, for electric operation. The map I have of the

completed location shows a line starting from a connection with the

Denver & Rio Grande at the Ouray depot, eight miles in length, to a

connection near the Ironton depot, incorporating 7% maximum gradients

and 35° maximum rate of curvature. With even these severe physical

characteristics considerable tunnelling was necessary. I do not have the

estimated cost of the project but it must have been staggering. It is

small wonder that with the difficulty of financing so costly a scheme

and the great financial panic a year later in 1893, together with the

contemporary decadence of silver mining, the project was permanently

shelved by even the visionary Mr. Mears.”

D. & R. G. track already lay between Ouray and Ridgway and between

Silverton and Durango. Mr. Mears, by the end of 1891, had completed the

Rio Grande Southern from Ridgway to Durango. Only eight miles from

Ironton to Ouray were needed to make a complete 243 mile circle. If only

that eight miles could have been constructed! Then a sightseer could

have started at Ridgway, taken a side trip to Telluride (14.6 miles),

proceeded to Durango, to Silverton and back to starting point. He should

not have attempted it in the winter or spring because of snow blockades

or snowslides but in the summer or fall he could have had the thrill of

a lifetime.

He would have looked upon or wended his way among snowcapped peaks,

hundreds over 12,000 or 13,000 feet high and some over 14,000 feet, many

so sharp as to be termed “needles”; would have crossed several passes,

one over 10,000 feet and another over 11,000 feet in altitude; would

have gone up one canyon and down another, often beside rushing, tumbling

rivers. He would have passed over breathtakingly high bridges, over

trestles set against bare cliffs, around U-curves innumerable, over

switchbacks, over a turntable, through rock tunnels and even through

snow tunnels.

But the thrills and scenery would have been tempered with trouble, that

trouble-trouble-boil-and-bubble kind, such as delays because of engines

having to blow up, hot boxes, trees across the track, boulders and lots

of them on the track, mudslides, washouts, a derailed engine or car or a

couple of each and a missing bridge or two.

If his luck were still holding he would have ridden the last lap on the

electric railway, down the awesome Red Mountain Creek and Uncompahgre

River canyons where sheer rock walls would have risen hundreds of feet

above him and dropped hundreds of feet below him and, as he turned a

last curve, he would have beheld the never-to-be-forgotten sight of the

little town of Ouray, the gem of all mountain towns, nestled in a deep

pocket surrounded by towering peaks.

Three little lines · 第 7 / 28 题