CHAPTER XIV

ELECTRIC TRACTION ON MAIN LINE RAILWAYS

On tramways, automobiles, and 'third-rail' lines, the electric current

used belongs to the type described as 'continuous' or 'direct,'

because the flow is always in the same direction. The other type

of current is known as 'alternating,' as it flows backwards and

forwards many times per second. There are several kinds of alternating

current--single-phase, two-phase, three-phase, and polyphase--each

produced from generators designed in a particular way.

It is not possible to give any adequate account of these different

kinds of alternating current without going rather deeply into the

theory of electricity. The ultimate practical point is that in

transmitting alternating currents the circuits increase in number with

the phases. Thus, three-phase current requires three wires, two-phase

current three or four wires, and single-phase current a single circuit

like that of continuous current[1].

[Illustration: Fig. 12. Photograph of a train on the electrified

section of the London, Brighton and South Coast Railway. The overhead

wire is suspended from cables stretched between insulators, and

current is conveyed from it to the trains through a 'bow' which slides

along its lower side. The photograph is taken from the rear part of

the train. The front and rear cars are both equipped with electric

motors.]

Where current has to be conveyed economically over long distances, it

is generally done in the form of alternating current at high pressure.

For instance, the transmission from a tramway power station to the

sub-stations is almost uniformly by three-phase current at, say, 5000

volts. When it reaches the sub-station, it is 'transformed' down to

the working pressure of 500 volts and 'converted' from alternating to

continuous current by means of rotary machinery. The transforming is

done by a stationary piece of apparatus similar in principle to the

familiar induction coil. An induction coil takes current at a few volts

from a battery into its primary circuit and transforms it, by induction

in the secondary circuit, into current of high enough voltage to give a

long spark. A transformer can be designed to 'step-up' or 'step-down'

the pressure according to the requirements of the case.

So much explanation is necessary to give some account of the

alternating current railways on the Continent and thence of the

single-phase system on the London, Brighton and South Coast Railway.

The Morecambe and Heysham section of the Midland Railway is also

equipped on the single-phase system.

Most of the earliest electric railways on the Continent derived

their power from waterfalls and had to transmit it for a considerable

distance. Three-phase current at high pressure being adopted for this

purpose, the Continental engineers set to work to find some means of

utilising the high-pressure three-phase current directly. They did this

by carrying the three wires on poles alongside the railway track, and

using three 'bow' collectors (in place of trolley wheels) to convey

the current to transformers on the motor cars or locomotives. In these

transformers the current was brought down to working pressure and then

led to motors designed for three-phase current.

An immense amount of technical ingenuity was exercised in developing

this system; and when the Metropolitan Railway decided to follow the

District in electrifying its lines, a three-phase system was proposed.

As the Metropolitan and Metropolitan District companies share the

working of the Inner Circle, it was necessary that both should adopt

the same system. The result was that the question between three-phase

and continuous current working had to go to arbitration. After a

long discussion of masses of technical evidence, Mr Lyttelton, the

arbitrator, decided that the direct current system was better suited to

the conditions of traffic on an underground railway in London.

The wisdom of that decision will not be questioned now. Three-phase

motors do not give the rapid acceleration which is so urgently required

on suburban lines; there are complications in speed control; and

the necessity of having three overhead conductors is also a serious

drawback. For comparatively long-distance traffic with few stops,

however, the three-phase system is quite suitable. That is to say, it

is a possible solution of the main line problem.

The great simplicity and flexibility of the power supply arrangements

in the case of alternating current traction encouraged engineers to

find something better adapted to ordinary railway conditions than the

three-phase motor. Their problem was to find an arrangement which

required one overhead conductor instead of three, and also provided

a motor with the high starting torque and easy speed control of the

continuous-current motor. After much theoretical and experimental

work, they found it in the single-phase system, using a motor which is

similar in many respects to the continuous-current motor but capable of

being operated by alternating current.

On the advice of Mr Philip Dawson, the London, Brighton and South

Coast Railway Company decided to experiment with this system on the

double line connecting London Bridge and Victoria stations, about

9 miles long. Power is supplied to each track by a single overhead

conductor carrying current at 6000 volts. Transformers are placed on

the trains to bring the pressure down to 300 volts; the current is

then led through controllers to single-phase motors in much the usual

way. The reason for using so high a pressure on the overhead line is

not only economy in transmission. If lower pressures were used, the

heavy currents required for train propulsion would require a thicker

conductor and correspondingly heavier supports. At 6000 volts it is

possible for two double sliding bows to collect sufficient current

for a heavy train from a wire which is comparable in thickness to the

ordinary trolley wire of a tramway.

The power distribution arrangements, it will be noticed, are very much

simpler than with continuous current on the third-rail system. There

are no sub-stations with rotary machinery. Power is supplied direct

from the generating station to the overhead line and is transformed

down by stationary plant on the train itself. Single-phase traction

represents, in fact, power transmission for railway purposes reduced to

its simplest elements.

The overhead construction differs, however, in some important points

from the tramway standard. The supports, which are in both bridge and

bracket form, are stronger; the insulators are, owing to the much

higher pressure employed, more massive; and a different means of

suspension has been adopted. Each conductor is hung by links from two

steel cables stretched chain-wise between the supports. This method of

'catenary suspension' enables the bow to slide along the wire without

the jolts which are noticeable with a tramway trolley. Such smooth

running keeps the bow continuously at an even pressure on the wire--an

advantage which is of great importance at high speeds. The trains are

arranged on the multiple-unit system.

The full financial results obtained on this railway have not so far

been made public; but it is sufficient for our purpose to note that

the Company, after more than a year's full trial, extended the system

to the Crystal Palace and to Croydon. Further extensions are, it

is understood, contemplated over the suburban lines to Sutton and

elsewhere; and in course of time the conversion of the main line to

Brighton will be undertaken.

Here we touch upon the most interesting aspect of this demonstration of

electric traction on the single-phase system. The system was adopted

in the first instance because the third-rail system would lead to

complications and dangers which could not be permitted at crowded

railway termini shared by all kinds of traffic, suburban and main line.

But the advisers of the Company had also in view the possibility of

development beyond the range of suburban traffic. They therefore sought

a system which, while comparable to the third-rail continuous current

in the handling of suburban business, would be adaptable to main line

conditions, where infrequent stops and long runs at high speeds are the

rule.

The adoption of electric traction on such a route as the Brighton

main line would be a benefit in several ways. It would lead to a

faster express service, as the high overload capacity of the electric

motor enables it to take small account of gradients. It would also

lead to a more frequent service, as the electric system is free from

the conditions which force a steam railway to try to concentrate

traffic on a limited number of long trains. Further, it would, by

reducing the time lost in stopping and starting, bring the average

speed of stopping trains much closer to that of express trains. All

these improvements--assisted, probably, by lower fares--should lead

to a great increase in the volume of traffic, thus reproducing the

characteristic results of electric traction on suburban lines.

[Footnote 1: An admirable explanation of alternating currents will be

found in Mr Frank Broadbent's _Chats on Electricity_. (Werner Laurie,

1910.)]

Electricity in Locomotion An Account of Its Mechanism, Its Achievements, and Its Prospects · 第 14 / 16 章