CHAPTER VII

THE BACKWARDNESS OF ELECTRIC TRACTION IN GREAT BRITAIN

Popular objections to the overhead system are not, of course, quite

dead. Every tramway proposal in districts where the trolley has not

already penetrated is still opposed on the ground of disfigurement

and danger. This opposition serves as an index to the severity of the

struggle which the advocates of the trolley system had to encounter

before they made it almost universal in large cities. But the dislike

of the public for a questionable novelty was not the sole reason why

electric tramway enterprise was backward in Great Britain.

It is not strictly accurate to say that electric tramway _enterprise_

was backward. The enterprise was there, in spirit, but circumstances

were very much against it. Tramway schemes are controlled by special

legislation which was passed before electric traction was contemplated;

and this legislation has not been amended in any material degree to

suit the altered conditions brought about by the use of electricity.

The Tramways Act, 1870--which is the master Act of the situation--was

framed at a time of reaction against public monopolies. Before that

time, gas, water, railway, and other companies had been granted

statutory powers in perpetuity; and when a local authority wanted to

take the supply of gas or water into its own hands, it had to buy the

existing undertakings at the valuation put upon them by the owners

themselves. There were frequent complaints about excessive purchase

terms, and also about extortionate rates charged by the monopolist

companies. Consequently, when horse tramways came on the scene, the

legislature determined to put the new 'monopoly' on quite a different

basis. The Tramways Act provided, first, that no application for

tramway powers would be so much as considered if it did not gain the

consent of the local authorities interested; second, that the period

of tenure should be limited to twenty-one years; and third, that the

local authorities should have the option, at the end of the period or

at seven-year intervals afterwards, of buying the tramway undertaking

at the 'then value' of the plant (rails, horses, cars, depots, etc.)

without any allowance for compulsory purchase, goodwill, future profits

or any other consideration whatsoever.

This Act was passed with the very best of intentions. It had the

advantage of substituting, for the costly and clumsy procedure by

Private Bill, the simple and cheap process of applying to the Board

of Trade for a 'Provisional Order' which would acquire the full

force of an Act when ratified (in a more or less automatic way) by

Parliament. But in spite of its good intentions it proved a serious

stumbling-block, especially when electric traction was proposed.

The effect of the limited tenure system, with compulsory expropriation

on what were called 'scrap-iron' terms, was to make the companies very

reluctant to spend one penny more than was absolutely necessary during

the concluding years. Capital expenditure on improvements in equipment

was regarded as out of the question, since there was not sufficient

time to recoup the difference between first cost and the 'then value'

at the purchase period. Money was grudged for the upkeep of track, the

repair and painting of cars, and the hundred and one items of expense

which are essential to a well-conducted tramway. System after system

fell into a state of shabby gentility, hoarding money against its

inevitable end.

This was the condition when, in the middle eighties, electric traction

was suggested. The public, suffering from the decay of the tramway

service, but not realising that the cause lay with an Act devised for

the public benefit, expected the tramway companies to adopt the new

mode of propulsion. But as the conversion to electric working involved

track-work costing several thousands of pounds per mile, and new cars

costing several hundreds each, together with a large generating plant

and new car depots, the change was commercially impossible to companies

which were forced to retain their old horse equipment in order to

realise something for the shareholders in the day of expropriation.

From these causes there arose a demand that the municipalities should

take over the tramway systems and do what the companies appeared too

slow to undertake.

Thus a strong impetus was given to municipal tramway enterprise. But

this impetus did not remove the causes of delay. The local authorities

had good economic reasons for waiting until the existing tramway leases

ran out and so enabled purchase to be made upon the most advantageous

terms. They were also obliged to move very cautiously in adopting so

radical and so novel a change as electric traction. Municipalities are

not speculative traders, who are ready to take risks after a rapid

expert investigation of a new policy. Further, no municipality likes to

accept the decision of another as valid for its own district.

The consequence was that each municipality thought it necessary to

get its own expert report on the subject and, in many cases, to send

its own deputation to inspect Continental tramway systems. These

preliminary studies, with debates in Council chambers and newspaper

columns, with public meetings of encouragement or protest, and with the

erection of experimental lines, took up so much time that little of a

substantial nature was done until several years after engineers were

ready and willing to carry out the conversion of large systems of horse

tramways to electric working.

The municipalities, however, were not the only forces at work. Towards

the year 1896, when a large number of tramway leases were running out,

a considerable amount of business was done by private capital in buying

up horse tramways with a view to conversion and also to extension far

beyond the limits of the existing routes. The essential condition of

the success of such enterprise was, of course, the renewal of the

tenure of the tramways for at least another twenty-one years. Here--and

in the accompanying applications for extensions of route--the true

inwardness of the Tramways Act was shown. Everything was in the hands

of the local authorities. They had only to withhold their consent, and

nothing could be done. And this power of veto enabled them to drive any

bargain they pleased with the promoters of tramway schemes.

Most electric tramway proposals covered the areas of several local

authorities, so that negotiations had to be entered into with each in

turn. The municipalities, being the guardians of the public interests,

considered it their duty to impose the heaviest conditions which

the promoters could be induced to accept, rather than abandon the

enterprise. It was a case of Hobson's choice in every parish. In some

instances direct payments for wayleaves were demanded. In others the

promoters were forced to bear the cost of street widenings and other

'public improvements' which were not always necessary for tramway

purposes. In nearly every town the fares and stages were determined by

the local authority--on the strength of the veto, not on commercial

principles. The cost of construction was frequently increased by

onerous conditions regarding the standard of overhead wire and track

work. Under the Tramways Act, tramway companies were compelled to

maintain the roadway between the rails and also outside for a space of

eighteen inches--a provision which was sensible enough when horses were

used. But the condition was not only enforced within these statutory

limits when the promoters were about to use a form of traction which

spared the road surface; it was extended in numerous cases to an

obligation to pave the entire roadway and to maintain it--often with

expensive wood paving where macadam had previously been considered

quite good enough for the traffic.

One effect of this state of affairs was delay. The preliminary

negotiations with local authorities--the interviews with mayors,

aldermen, councillors, town clerks, and borough surveyors, to say

nothing of the 'frontagers' along the line of route--usually occupied

far more time than the actual construction of the tramways. They were

also much more troublesome, since it was within the power of a single

local authority in a central position to 'hold up' a complete scheme,

while most districts had strong local patriotism and wanted a municipal

system to themselves. Very little is known by the general public of

the anxiety, difficulty, and expense attending such negotiations

with local bodies divided into parties or cliques and furnished with

an absolute power of veto. Looking back on the history of electric

traction, it really seems extraordinary that engineers and financiers

had the patience to undertake this work and carry it through. Their

reward, as will be seen, was not great in a pecuniary sense; and, as

regards reputation, they are generally accused of being extravagant,

avaricious, and wanting in enterprise.

The ultimate effect was that the actual cost of electric tramways

exceeded the estimates prepared on the basis of Continental and

American experience. The more prolonged and difficult the negotiations

preliminary to a scheme became, the greater the expense. And the

conditions imposed by local authorities as the price of their consent

loaded the capital account of electric tramway undertakings with items

which had no direct concern with the tramway. The Board of Trade

assisted the increase in cost by prescribing a standard of construction

which was higher than that allowed in other countries. The net result

has been that while electric tramways were expected to cost about £9500

per mile, they have actually cost over £12,000 per mile.

The revenue side of the account has also been affected by the power

of veto. A local authority has no hesitation in imposing low fares

and long stages (with high wages and short hours for employees) upon

a tramway company seeking its consent. The standard usually adopted

is that of large urban systems with dense traffic, so that systems in

scattered districts are often unfairly treated. In municipal systems

themselves the fares are apt to be determined by the promises of

councillors at election times rather than by the simple consideration

of a fair price for improved traffic facilities. Workmen's fares, for

instance, are a dead loss on practically every tramway system. Every

now and again there is an agitation for halfpenny fares, for the

extension of stages, for cheap rates for school children, for free

transport for the blind, and so on. A leading municipal tramway manager

once remarked that it was almost impossible for men in his position to

resist the pressure for such concessions, especially at local election

periods. The chairman of the Highways Committee of the London County

Council recently stated that never a day passes without some appeal for

concessions in tramway fares.

Most of the large urban systems are under municipal control, and

therefore they have the rates in reserve, as well as the most

favourable traffic conditions, to encourage them in giving the public

more and more for less money. But the tramway companies, working for

the greater part in less thickly populated areas, with no extraneous

means of making up losses, are put in a difficult position when similar

concessions are forced upon them. The upshot is that the average return

on the capital of electric traction companies amounts to only 3·41 per

cent. Better profits were, in fact, made in the horse tramway days; and

the electric traction industry is a fine example of the way in which

the enterprise of engineers and capitalists may bring little comfort

to themselves but enormous benefit to the public, which shows its

gratitude by asking for greater blessings at their expense.

Electricity in Locomotion An Account of Its Mechanism, Its Achievements, and Its Prospects · 第 7 / 16 章