CHAPTER 7

THIRTEEN MILLION WORDS

The task of receiving, relaying, processing, and interpreting the data

coming in simultaneously on a twenty-four-hour basis for several months

from the several scientific and many engineering sources of the Mariner

spacecraft was of truly monumental proportions.

This activity involved five DSIF tracking stations scattered around the

world, a communication network, two computing stations and auxiliary

facilities, and some 400 personnel over a four-month period.

Although the Mariner scientific information could be stored and

subsequently processed at a later (non-real) time, it was necessary to

make tracking and position data available almost as soon as it was

received (in real time) so that the midcourse maneuver might be computed

and transmitted to the spacecraft, and to further perfect the predicted

trajectory and arrival time at Venus.

The engineering performance of the many spacecraft subsystems was also

of vital concern. Inaccurate operation in any of several areas could

endanger the success of the entire mission. The performance of the

attitude control system, the Earth and Sun sensors, the power system,

and communications were all of critical importance. Corrective action

was possible in certain subsystems where trouble could be predicted from

the data or where limited breakdown had occurred.

To integrate all the varied activities necessary to accomplish the

mission objectives, an organization was formed within JPL to coordinate

the DSIF, the communication network, the work of engineering and

scientific advisory panels, and the computer facilities required to

evaluate the data.

This organization was known as the Space Flight Operations Complex. For

operational purposes only, it included the Space Flight Operations

Center, a Communication Center, and a Central Computing Facility (CCF).

The DSIF was responsive to the requirements of the organization, but was

not an integral part of it.

A space flight operations director was responsible for integrating these

many functions into a world-wide Mariner space-flight organization. It

was an exhausting 109-day task, one that would severely tax all the

resources of JPL in terms of know-how, qualified personnel, time, and

equipment before Mariner completed its encounter with Venus.

COMMUNICATION CONTROL

The Communication Center at JPL in Pasadena was one of the most active

areas during the many days and nights of the Mariner II mission. All of

the teletype and radio lines from the Cape, South Africa, Australia, and

Goldstone terminated in this Center. A high-speed data line bypassed the

Communication Center, linking Goldstone directly with the Central

Computing Facility for quick, real-time computer processing of vital

flight information.

From the Communication Center, the teletype data and voice circuits were

connected to the several areas within JPL where the mission-control

activities were centered, and where the data output was being studied.

The Communication Center was equipped with teletype paper-page printers

and paper-tape hole reperforators, which received and transmitted

data-word and number groups. The teletype lines terminating at the

Center included circuits from Goldstone, South Africa, Australia, and

Cape Canaveral.

There were three lines to Goldstone for full-time, one-way data

transmission. Duplex (simultaneous two-way) transmission was available

to Woomera and South Africa on a full-time basis. In each case, a

secondary circuit was provided to the overseas sites for use during

critical periods and in case the primary radio-teletype circuits had

transmission difficulties. These secondary circuits used different radio

transmission paths in order to reduce the chance of complete loss of

contact for any extended period of time.

[Illustration: _Radio signals from Mariner are received on 85-ft.

antenna._]

[Illustration: _The highly sensitive receiver (shown under test) is

located in the control room of the station._]

[Illustration: _In Goldstone control room, DSIF personnel await

confirmation that spacecraft has begun to scan the planet Venus._]

[Illustration: _From DSIF stations, the data are teletyped in coded

format to Pasadena._]

Z ZSQSGSGKGKXRGOQOS DNQ XZARZXAVAQQVA XXDRDZ

QSGIGKGKXRGOQOX DXQ XZAIZXAVQQKDZ XXDRDDDRZ

DXQ XZAIZAZVAQQZDZXXDLKKDRA Z DSQSGIGGGQXRDN

G XXDRZSDRA Z DSQSGIGGGQXRGLZOX DXQ XZAIZAZV

QSGIGGGQXRGLZOX DXQ XZAIZGAVAQQSXZXXDRDZDRA

DXQ XQAIZGAVQQKVA XXDRDZDRANGDSSQSGIGGGQXRDI

Z XXDRDDDRZLQ ZSQSGIGGGGXRGVZOA DNQ XZARZGAV

QSGIGGGGXRGVQOA DNQ XZARZGAVQKZZAZXXDRZDDRA

DNQ XZARZAZVAKDDGZXXDRDADIZLA DSQSGIGGGGXRGZ

SZXXDRDDDRXOS DSQSQIGGGGXRDDZOA DNQ XZARZXAV

QSGSGGGGXRDSQOG DXQ XZARZXAVAKDZDZXXDRDLDRA

DXQ XZARZXAZZKZZDZXXDLKADRA Z DSQSGIGGGGXRGX

GZXXDRZXDRZ Z DSQSAQGGGGXRDAZOG DXQ XZAIZAZV

DRDXDRA Z DSQSGIGGGGXRDGSOG DXQ XZAIZAZVQKZS

OGGGXRDGAOG DXQ XZAIZAZVQKZVA XXDRDZDRANGDSS

XZAIZXAZZKZZD XXDRDLZDZHA DSQSGIGGGGXRDQAOQ

DLKADRKHQ ZSQSGIGGGGXRDKZOQ DXQ XZAVZAAVQKZZ

GGGGXRS ZOQ DXQ XZAIZAZVQKZDG XXDRDSDIZ A ZS

XZAIZAZVQQKSX XXDRDDDRZNS ZSQSGIGGGGXRSOAOQ

DRDZDRANGDSSQSAQGGGGXRSOAOK DNQ XZAVZAAVQQKZ

GGGGXRSNZOK DNQ XZAIZAZZSQQZSZXXDLKADRA Z DS

XZAIZGAVQQKZG XXDRZXDRZ Z DSQSAQGGGGXRSLAOK

DRDSDRZ Z DSQSAQGGGGXRSLAOK DNQ XZAIZAZZZQKS

GGGGXRSLAOK DNQ XZAIZAZZZQKVA XXDRDZDRANGDSS

XRSIZHZ DXQ XZAIZAZZZQKQQZXXDRDNDRZNQ DSQSGS

ZXAZSQQZXZXXDLKQDRSQS ZSQSGIGGGQXRSVAHZ DXQ

[Illustration: _Messages are received and routed at the JPL

Communications Center._]

[Illustration: _Data are routed to the digital computer at JPL._]

[Illustration: _Printout data are made available to experimenters._]

[Illustration: _Spacecraft status is posted in Operations Center._]

The Mobile Tracking Station in South Africa used the Johannesburg

communication facilities.

Two one-way circuits for testing and control purposes were open to Cape

Canaveral from a month before until after the spacecraft was launched.

Lines from the Communication Center to the Space Flight Operations

Center at JPL terminated in page printers and reperforators in several

locations.

Voice circuits connected all of the stations with Operations Center

through the Communication Center. Long-distance radio telephone calls

were placed to South Africa to establish contact before the launch

sequence was started. Woomera used the Project Mercury voice circuits to

the United States during launch and for three days after.

THE OPERATIONS CENTER

The actual nerve center of the Mariner operation was the Space Flight

Operations Center (SFOC) at Pasadena. Here, technical and scientific

advisory panels reported to the Project Manager and the Mariner Test

Director on the performance of the spacecraft in flight, analyzed

trajectories, calculated the commands for the midcourse trajectory

correction, and studied the scientific aspects of the mission.

These panels were a Spacecraft Data Analysis Team, a Scientific Data

Group, an Orbit Determination Group, a Tracking Data Analysis Group, and

a Midcourse Command Group.

The Spacecraft Data Analysis Team analyzed the engineering data

transmitted from the spacecraft to evaluate the performance of the

subsystems in flight. The Team was composed of one or more of the

engineers responsible for each of the spacecraft subsystems, and a

chairman.

The Science Data Group was composed of the project scientist and certain

other scientists associated with the experiments on board the

spacecraft. This Group evaluated the data from the scientific

experiments while Mariner was in flight and advised the Test Director on

the scientific status of the mission.

The Science Data Group was on continuous duty until 48 hours after

launch, and at other times during the mission. During encounter with

Venus, the Group was also in contact with the scientific experimenters

from other participating organizations who were working with JPL.

[Illustration: _Closed circuit television monitors are used for

instant surveillance of the internal activities of the Operations

Center._]

A Tracking Data Analysis Group analyzed the tracking data to be used in

orbit determination. They also assessed the performance of the DSIF

facilities and equipment used to obtain the data.

The Orbit Determination Group used the tracking data to produce

estimates of the actual spacecraft trajectory, and to compute the

spacecraft path with respect to the Earth, Venus, and the Sun. These

calculations were made once each day before the midcourse maneuver, once

a week during the cruise phase, and daily during and immediately after

the planet encounter.

The Operations Center was equipped with lighted boards on which the

progress of the mission was displayed. This information included

trajectory data, spacecraft performance, temperature and pressure

readings, and other data telemetered from the spacecraft subsystems.

Closed-circuit television was used for coordinating the activities of

the SFOC. Operating personnel could use television monitors in four

consoles which were linked to six fixed cameras viewing teletype page

printers. The entire Operations Room could be kept under surveillance by

the Project Manager, the Test Director, or the DSIF Operations Manager,

using cameras controlled in “pan,” “tilt,” and “zoom.”

CENTRAL COMPUTING FACILITY

During the Mariner II mission, the JPL Central Computing Facility (CCF)

processed approximately 13.1 million data words, or over 90 million

binary bits of computer data. (Binary bit = a discrete unit of

information intelligible to a digital computer. One data word = 7 binary

bits.)

In the four-month operation, about 100,000 tracking and telemetering

data cards were received and processed, yielding over 1.2 million

computer pages of tabulated, processed, and analyzed data for evaluation

by the engineers and scientists. Approximately 1,000 miles of magnetic

tape were used in the 1,056 rolls recorded by the DSIF.

The Central Computing Facility processed and reduced tracking and

telemetry data from the spacecraft, as recorded and relayed by the

stations of the DSIF. The tracking information was the basis for orbital

calculations and command decisions. After delivery of telemetry data on

magnetic tapes by the DSIF, the CCF stored the data for later reduction

and analysis. Where telemetry data were being processed in real or

near-real time, certain critical engineering and scientific functions

were programmed to print-out an “alarm” reading when selected

measurements in the data were outside specified limits.

The CCF consists of three stations at JPL: Station C, the primary

computing facility; Station D, the secondary installation; and the

Telemetry Processing Station (TPS).

Station C was the principal installation for processing both tracking

and telemetry data received from the DSIF tracking stations, both in

real and non-real time. The Station was equipped with a high-speed,

general-purpose digital computer with a 32,168-word memory and two

input-output channels, each able to handle 6 tape units. The associated

card-handling equipment was also available.

Tape translators or converters were provided for converting teletype

data and other digital information into magnetic tape format for

computer input. The teletype-to-tape unit operated at a rate of 300

characters per second.

A smaller computer acted as a satellite of the larger unit, performing

bookkeeping and such related functions as card punching, card reading,

and listing.

A high-speed unit microfilmed magnetic-tape printout was received from

the large computer. It provided “quick-look” copy within 30 minutes of

processing the raw data. Various paper-tape-to-card and

card-to-paper-tape converters were used to eliminate human error in

converting teletype data tape to computer cards.

Station C also utilized another computer as a real-time monitor and to

prepare a magnetic tape file of all telemetered measurements for input

to the large computer.

Station D was the secondary or backup computational facility, primarily

intended for use in case of equipment failure in Station C. During

certain critical phases of the Mariner mission—launch, orbit

determination, midcourse maneuver—this facility paralleled the

operations in Station C.

Station D is equipped with three computers and various card-to-tape

converters and teletype equipment.

The Telemetry Processing Station received and processed all demodulated

data (that recovered from the radio carrier) on magnetic tapes recorded

at the DSIF stations. The TPS output was digital magnetic tapes suitable

for computer entry.

The TPS equipment included FM discriminators, a code translator, a

device for converting data from analog to digital form, and

magnetic-tape recorders. Basically, the equipment accepted the digital

outputs from the tape units, the analog-to-digital converter, and the

code translator and put them in digital tape format for the computer

input.

As the launch operation started on August 27, the powered-flight portion

of the space trajectories program was run at launch minus 5 minutes (L

minus 5) and was repeated several times because of holds at AMR. The

orbit determination program was run at lift-off to calculate the first

orbit predictions used for aiding the DSIF in finding the spacecraft in

flight.

During the 12 hours following launch, both C and D Stations performed

parallel computations on tracking data. Station D discontinued space

flight operations at L plus 12 hours and resumed at the beginning of the

midcourse maneuver phase.

Tracking data processing and midcourse maneuver studies were conducted

daily until the midcourse maneuver was performed at L plus eight days.

For the following 97 days, tracking data were processed once each week

for orbit determination. Starting three days before the encounter,

tracking data were processed daily until the beginning of the encounter

phase.

Tracking data processing was conducted in near-real time throughout

encounter day, and daily for two days thereafter. For these three days,

tracking data were handled in Station D in order to permit exclusive use

of Station C for telemetry data processing and analysis. After this

three-day period, including the encounter, Station C processed the

tracking data every sixth day until the mission terminated on L plus 129

days.

Telemetry data were processed in a different manner. Following the

launch, DSIF Station 5 at South Africa received the telemetry signal

first, demodulated it, and put it in the proper format for teletype

transmission to JPL. The other DSIF stations followed in sequence as the

spacecraft was heard in other parts of the world. For two days after

launch, the computers processed telemetry data as required by the

Spacecraft Data Analysis Team.

During those periods when the large computer was processing tracking

data, a secondary unit supplied quick-look data in near-real time. When

Goldstone was listening to the spacecraft, quick-look data were

processed in real time, using the high-speed data line direct to the

Central Computing Facility.

For the 106 days that Mariner was actually in Mode II (cruise), the

telemetry data were processed twenty-four hours a day, seven days a

week. Data were presented to the engineering and science analysis teams

in quick-look format every three hours, except for short maintenance

interruptions, one computer failure, and a major modification requiring

three days, when a back-up data process mode of operation was used. The

large computer performed full processing and analysis of engineering and

science data seven days a week from launch until the Venus encounter.

On encounter day, the secondary Station C computer processed telemetry

data from the high-speed Goldstone line. Data on magnetic tapes produced

by the computer were processed and analyzed by the large unit in

near-real time every 30 minutes. The computer processing and delivery

time during this operation varied from 4½ to 7 minutes.