TWO

Locating and excavating several of the main canals proved almost

as difficult and trying as the building of the big dams. This was

especially true in the Yakima and Okanogan valleys in Washington,

the St. Mary and Flathead in Montana, Uncompahgre and Grand River in

Colorado, and the Utah valley, Utah. These canals cling to the edges of

deep and precipitous canyons, or hug the steep mountain slopes. Here

and there huge aqueducts of reinforced concrete span the chasms. For

miles the water is siphoned across broad ravines in iron-banded stave

pipe, or flows in tunnels through the cliffs.

The Tieton main canal of the Yakima project, Washington, for a distance

of twelve miles is through a very rough country. It is cement lined

throughout, and for two miles is in tunnels. For the greater part of

its length it hugs the side of the canyon, in places 500 feet above the

river. The lining for the canal was molded on the river bank, where

water, sand, and gravel were available for concrete making, and the

forms were carried to the top of the canyon by tram and cableways.

The capacity of the canal is 300 cubic feet per second, and it is now

irrigating 40,000 acres. The High line Canal of the Strawberry Valley

project swings around the steep slopes of the Spanish Peaks of the

Wasatch Range in Utah for several miles. At one point a portion of the

water is dropped in pipes to the turbines, where power is developed and

distributed to several towns in the valley. At various points along its

course the canal is covered with a reinforced concrete roof to prevent

injury and filling up from avalanches in the spring.

WRITTEN ESPECIALLY FOR THE MENTOR BY C. J. BLANCHARD

ILLUSTRATION FOR THE MENTOR, VOL. 6, No. 17, SERIAL No. 165

COPYRIGHT, 1918, BY THE MENTOR ASSOCIATION, INC.

[Illustration: GUNNISON TUNNEL. COLORADO]

_RECLAIMING THE DESERT_

_The Gunnison Tunnel_

The Mentor: Reclaiming the Desert, Vol. 6, Num. 17, Serial No. 165, October 15, 1918 · 第 7 / 37 题