CHAPTER XII.

THE CULEBRA CUT.

The most famous section of work on the canal has been that at the

vertebra or "continental divide," which runs along the isthmus on the

Pacific side and had to be pierced through by any canal running from

Colon to Panama. This tremendous work, known as the "Culebra Cut," from

the name of one of the hills, extends for nine miles from Bas Obispo to

Pedro Miguel. Mr. Bryce has truly said, referring to this section, that

"never before on our planet have so much labour, so much scientific

knowledge, and so much executive skill been concentrated on a work

designed to bring the nations nearer to one another and serve the

interests of all mankind."[16] The bottom of the canal in the cut, as in

the channel through Lake Gatun, is 40 feet above sea-level. The highest

elevation of the original surface of the ground above the centre line of

the canal was 312 feet above sea-level, so that the total excavation

along this saddle was 312 minus 40, or 272 feet. This was, however, not

actually the highest point of excavation. Gold Hill, close to the canal

line, is 534 feet above sea-level, and from the top of this hill a new

and steeper slope had to be made. The surface of the water is 85 feet

above sea-level, and so is 227 feet below the original saddle at its

highest elevation. We have already noticed that a tide-level canal would

have involved an excavation 85 feet deeper, and the width of the cutting

would have had to be immensely wider. The slides and breaks which have

rendered the American excavation so much more difficult lead one to

suppose that the tide-level cutting might have proved impracticable.

All the work at Culebra performed by the French was available for their

successors. The French companies accounted for 18,646,000 cubic yards of

material on this section. They had already cut down 152 feet below the

original surface at its highest elevation, and the cliff they had cut

in the face of Gold Hill was 374 feet in vertical height. It is well to

mention such figures, as some people imagine that the French wasted all

their time and resources at Panama. It may be added that the bottom

width of the channel adopted by the French engineers was 74 feet,

whereas that of the American canal will be 300 feet.

Many descriptions have been given by visitors of the spectacle presented

in this long and deep gash through the mountains during the progress of

the excavations. From these and the numerous photographs taken at that

stage the traveller will be able to reconstruct the scene--the two

hundred miles of railroad construction track, laid down tier above tier

at different levels; the thousands of men busily at work; the roar and

smoke of the dynamite tearing the rock into fragments; the mighty

steam-shovels like great dragons burying their iron teeth in the surface

of the bank, engulfing a huge mouthful, then swinging round and belching

it all into the dirt trucks, to be carried off to the dumping-ground at

Gatun near the Atlantic or Balboa at the Pacific end of the canal. At

Culebra, Colonel Goethals made the "dirt fly" to the full satisfaction

of public opinion in the United States. All sorts of devices and

machinery were employed to hasten and economize the process. For

example, there was the Ledgerwood Unloader. Railway trucks provided with

flaps were used, these flaps making a single platform of the whole

train. At the rear of the train was a plough which could be drawn by a

wire rope attached to a drum carried on a special car in the fore part

of the train. When the train arrived at the dumping-ground the drum was

started, and the plough, advancing from the rear, swept the 320 cubic

yards and rock from the sixteen cars in seven minutes. Then there was a

"track-shifter," invented by an employee on the isthmus, which lifted

and relaid the railway lines as the spoil-tracks had to be shifted. This

powerful engine raised the track and ties clear of the ground and

deposited them from three to nine feet sideways.

The "spoil trains" were treated with all the respect which is accorded

to the fastest mail trains of the day on an English main line. They

followed one another from the cutting at intervals of three minutes, and

any delay, of course, balked the mammoth steam-shovel of its gluttonous

meal on the stones and rubble of the mountain-side. Any cause of delay

was at once reported by telephone to the superintendent of

transportation at Empire, and the obstruction was immediately dealt

with. By this persistent concentration on the main object the dirt has

been made to fly not only more speedily but more cheaply.

One of the most serious causes of anxiety and difficulty along the canal

line were the "slides" and "breaks" which kept occurring in the Culebra

Cut. To use a condensed Americanism, the sides would not "stay put."

Large masses of material would slide or move from the banks into the

excavated area, closing off the drainage, upsetting the steam-shovels,

and tearing up the tracks. A very unpleasant phenomenon was the lifting

of the shovels in the bottom of the canal due to the bulgings of the

earth there. It is not necessary to enter into the distinction between

"slides" and "breaks," or into the learned disquisitions that have been

written about them. It is sufficient for us to note that they added

immensely to the amount of material which had to be got out of the

Culebra gorge. Colonel Goethals tells us that of the 14,325,876 cubic

yards removed during the year 1909, 884,530 cubic yards, or 6 per cent.,

were due to slides; that in 1910 of 14,921,750 cubic yards removed,

2,649,000, or 18 per cent., came from slides or breaks that had

previously existed or that had developed during the year.

It might have been imagined that these discouraging additions to the

work would have seriously delayed progress on the canal and put forward

the date of its completion. But able and economic organization triumphed

over all these lets and hindrances. At the beginning of the American

excavations the engineers estimated that 103 million cubic yards of

"dirt" had still to be removed, and that this work would take nine years

to accomplish. But that estimate of material proved to be greatly below

the mark. Enlargements of the canal and the unforeseen collapses in the

Culebra Cut brought up the total to 195 million cubic yards. It is a

remarkable evidence of the efficiency and economy of the American

organization that this immense task will have been completed in about

six years of actual full-swing work.

Some idea of the way in which Colonel Goethals made the dirt fly may be

gathered from the fact that in the first five years of his directorship,

down to April 1912, he removed 160 million cubic yards of material. "If

all this material," writes Mr. Showalter, "could be placed in a solid

shaft of the shape of the Washington Monument, with a base as large as

an average city block, it would tower more than six miles skyward,

overtopping the earth's loftiest mountain peak by more than a mile.

Again, if it were to be loaded on to the big Lidgerwood dirt cars used

on the canal, it would make a string of them reaching over two and a

half times around the earth, and requiring a string of engines reaching

from New York to Sac Francisco to move them." It is indeed a remarkable

achievement that, while the amount of material to be removed was

increased by about 90 per cent., the time of removal was cut down by 30

per cent. Nor has the increase of the work added to the estimate of

cost. The total cost of the completed canal was fixed in 1908 at 375

million dollars. Yet, in spite of the increased excavations, enough of

this sum, it is calculated, will be left over to build a new

breakwater, and perhaps a big storage reservoir at Alhajuela on the

upper reaches of the Chagres River. In the Culebra Cut, despite the

landslides, the cost of excavation has actually been reduced by more

than one-third.

[Illustration: Culebra Cut, from West Bank, showing Shovels at Work.]

The pessimists have of course been busy with these landslides in the

"Cut." They predicted that the canal along this section would always be

exposed to danger from that source. But here, too, every precaution has

been taken. The engineers have given a much lower slope to the sides of

the canal, which is therefore wider at the top than had been originally

planned. The slopes will also be sown with creeping grasses and other

plants, which will bind down the surface soil. When the forty-five feet

of water are in the canal, the bottom will be held down by the weight,

and the bulgings no longer take place. Moreover, any earth that, in

spite of all precautions, still manages to slide into the canal should

be easily dealt with by the big 20-inch suction dredges, which can be

brought up through the locks and set to work. So we need not trouble

much about the stability of things along this nine-mile section through

the Culebra Mountains.

Here as elsewhere it is possible to give only a very general idea of the

difficulties which were encountered and overcome in the course of

construction. The drainage of the "Cut" during the work was in itself a

heavy and important task. It was necessary to keep out the water of the

surrounding country and to rid the excavated area of water collecting in

it. A system of diversion channels, carrying off the Obispo River and

its tributaries, effected the first object, and the second problem was

solved by gravity drains and pumps. On the whole, this mighty trench

through the isthmian hills is not only the biggest thing to the credit

of a nation which delights in bigness, but the greatest achievement of

its kind the world has ever seen.