Survey--Beaverton to Hillsboro

A location survey was started January 1, 1918, from the West City limits

of Beaverton and completed to the city limits of Hillsboro, a distance

of 7.7 miles. The alignment parallels the Southern Pacific Railway on

the north side of the tracks and eliminates four grade crossings. The

entire section was graded by Washington County during the 1918 season.

Third biennial report of the Oregon State Highway Commission · 第 270 / 292 题