Survey--Seufert to the Deschutes River

A survey was made in April, 1918, for the Columbia River Highway between

Seufert and the Deschutes River, along the river for the purpose of

comparison with a previous survey over the hill, conforming closely to

the present road.

This route, which was subsequently adopted, has a summit of 210 feet

against 780 feet on the hill route, and a length of 12.8 miles, a saving

of 2.7 miles in distance. Between The Dalles and Seufert about two miles

was graded to standard width and grade in 1917. The proposed route

follows close to the railroad, which is crossed near Big Eddy on a

proposed overhead bridge and utilizes the old State Portage Railroad

roadbed, as well as the already graded bank of the Government canal.

Near Celilo, another overhead crossing of the O.-W. R. R. & N. Co.

tracks is proposed, and from this point to the Deschutes River the

highway is located between the Oregon Trunk Railroad and the O.-W. R. R.

& N. Co., using about two miles of abandoned railroad roadbed.

This improvement requires only very light construction, except for short

distances, and it is believed it can be kept free from drifting blow

sand by the use of sand fences, as the Portage Railroad is used where

the sand is the worst, and this was kept open with very little

maintenance. With a smooth roadbed, and with nothing to cause drifting,

it is thought that the maintenance on this account will be negligible.

The route is attractive, as it makes available at close range the Locks

at Big Eddy, the Celilo Canal, and the magnificent Celilo Falls. The

estimated cost of this project is $142,500.00. It is proposed to include

this project in the 1919 program.

Deschutes River Bridge.

Among the bridges expected to be built in the near future is the

proposed reinforced concrete arch bridge over the Deschutes river at

Miller, about a mile above the river's mouth. This will be a State and

Inter-county structure, and will connect Sherman and Gilliam Counties on

the Columbia River Highway, and will be located a few hundred feet below

the present old wooden toll bridge which it will replace.

The design, which is practically completed, contemplates seven arch

spans aggregating 580 feet in length with a filled approach at either

end. The estimated cost of the bridge is $75,000.00.

Third biennial report of the Oregon State Highway Commission · 第 263 / 292 题