Elgin-Minam Section

The State Highway Commission opened bids on the grading of a 9.37 mile

section between Elgin and Minam Hill. In the letting of this work they

experienced the same difficulty as with the Union-Telocaset work. (See

report on the Union-Telocaset grading). The subsequent action of the

State Highway Commission in taking the contract over to be done by State

forces resulted in work starting in August, 1918. Owing to weather and

soil conditions work on this section has closed down for the winter. The

amount expended is $3,838.44 and the total estimated cost is $41,151.00.

Mr. R. A. Pratt, resident engineer for the State Highway Department was

in charge of this work and Mr. C. A. Dunn was superintendent.